written comments to the Tonopah Field also available although no responses • Substantially improve the long-term
Station, P.O. Box 911, Tonopah, Nevada have yet been completed. The final EIS/ reliable level of anadromous fish
89049. Facsimiles, telephone calls, and EIR will be prepared after the end of the passage, both upstream and
electronic mails are unacceptable means new comment period. downstream, past the Red Bluff
of notification. Comments including DATES: Comments on the DEIS/EIR will Diversion Dam.
names and street addresses of be accepted on or before March 16, • Substantially improve the long-term
respondents will be available for public 2007. ability to reliably and cost-effectively
review at the BLM, Tonopah Field move sufficient water into the Tehama-
Station (address above) during regular ADDRESSES: Written comments on the Colusa Canal and the Corning Canal
business hours, except holidays. DEIS/EIR should be sent to Mr. David systems to meet the needs of the water
Individual respondents may request Bird, General Manager, Tehama-Colusa districts served by the TCCA.
confidentiality. If you wish to withhold Canal Authority, P.O. Box 1025, The TCCA and Reclamation are
your name or address from public Willows, CA 95988. Comments may be working together as ‘‘co-lead’’ agencies
disclosure under the Freedom of submitted electronically by e-mailing on this project to achieve the project
Information Act, you must state this the project team: dbird@tccanal.com. purpose and need. However, they are
prominently at the beginning of your A copy of the Executive Summary, independent agencies with various
comments. Any determination by the DEIS/EIR, and/or technical appendices interests and methods for approaching a
BLM to release or withhold the names may be obtained by calling Mr. Bird at project such as this one. Work
and/or addresses of those who comment the telephone number below. conducted to date has built upon a wide
will be made on a case-by-case basis. FOR FURTHER INFORMATION CONTACT: Mr. array of previous studies conducted at
Such requests will be honored to the Paul Freeman, Bureau of Reclamation, the dam.
extent allowed by law. telephone: 530–529–3890, fax: 530– Through detailed feasibility studies,
Any adverse comments will be 529–3895, e-mail: six alternatives, including the No Action
reviewed by the Nevada State Director, pfreeman@mp.usbr.gov; or Mr. David alternative, were created based on
who may sustain, vacate, or modify this Bird, Tehama-Colusa Canal Authority, various combinations of new facilities
realty action and issue a final telephone: 530–934–2125, e-mail: and operational changes. These have
determination. In the absence of timely dbird@tccanal.com. been created to encompass the range of
filed objections, this realty action will options available to address the
SUPPLEMENTARY INFORMATION: Since identified water delivery and fish
become the final determination of the
construction of the Red Bluff Diversion passage issues.
Department of the Interior.
Dam, concern has been expressed The alternatives identified in the
(Authority: 43 CFR 2711.1–2(a)). regarding the dam’s effect on both DEIS/EIR are:
Dated: November 6, 2006. upstream and downstream fish No action—The current operating
William S. Fisher, migration. The dam was built with 11 conditions remain the same with a 4-
Assistant Field Manager, Tonopah. movable gates. Raising the gates month dam ‘‘gates-in,’’ that creates Lake
[FR Doc. E7–1428 Filed 1–29–07; 8:45 am] eliminates the dam’s effect and allows Red Bluff from May 15 to September 14.
BILLING CODE 4310–HC–P
the river to flow unimpeded. Lowering The impacts of this option must be
the dam gates allows for gravity studied to a similar level of detail as the
diversion into canals and results in the others. It is used as a benchmark for
DEPARTMENT OF THE INTERIOR creation of Lake Red Bluff. comparison of the other alternatives.
Over the years, the dam gates have 1B—4-Month Bypass—This option
Bureau of Reclamation been raised more frequently in an creates a fish-friendly channel around
attempt to enhance fish passage. the dam with sufficient water flow to
Fish Passage Improvement Project at Therefore, the ability to divert irrigation attract and transport fish moving
the Red Bluff Diversion Dam, Tehama water has been gradually decreased upstream and deliver juvenile fish
County, CA from year-round to the current 4-month moving downstream when the dam
AGENCY: Bureau of Reclamation, (gates-in) operations from May 15 to gates are lowered in late spring and
Interior. September 14. During the remainder of early fall. Gates would continue to be
ACTION: Notice of Availability (NOA) of the year, the dam gates are open, lowered in the May 15 to September 14
the Draft Environmental Impact allowing a free flowing, unimpeded period. A new pumping station would
Statement/Environmental Impact Report river. Detailed studies show the current be required to provide reliable
(DEIS/EIR), recirculation of the design of the fish ladders and the agricultural water supply from the river
document. operations of the dam gates do not into the water delivery canals.
adequately allow passage of all 1A and 2A—Improved fish ladders—
SUMMARY: The Bureau of Reclamation threatened and endangered fish species. These two alternatives are being
(Reclamation) and the Tehama-Colusa The DEIS/EIR outlines the proposed considered and are aimed at improving
Canal Authority (TCCA) are re- project alternatives that seek to address the efficiency of the ‘‘fish ladders’’
circulating the DEIS/EIR for the Fish issues related to the Red Bluff Diversion designed to create a passage for fish to
Passage Improvement Project at the Red Dam, including fish passage and water swim around the dam. The design
Bluff Diversion Dam for public review supply. Current dam operations do not improvements will increase the flow of
and comment. The document is being adequately allow passage of threatened water through the fish ladders. By
re-circulated for any additional and endangered fish species. increasing the flow, more fish will be
comments since it was originally Additionally, current dam operations attracted to the ladders and successfully
available to the public from August 14 limit the dam’s capacity to meet the pass the dam. The two alternatives
ycherry on PROD1PC64 with NOTICES

through October 29, 2002, given the agricultural demand. To address these differ in the operations of the dam gates.
length of lapsed time and the recent critical issues, TCCA and Reclamation Alternative 1A proposes lowering the
selection of Alternative 2B as are working together to determine an dam gates for the current 4-month
Reclamation’s Preferred Alternative. appropriate solution. operation and Alternative 2A for a 2-
The public comments sent in 2002 are The project goals are to: month operation (July 1 through August

VerDate Aug<31>2005 15:36 Jan 29, 2007 Jkt 211001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1
Federal Register / Vol. 72, No. 19 / Tuesday, January 30, 2007 / Notices 4293

31). A new pumping station would be INTERNATIONAL TRADE assistance in gaining access to the
required to provide reliable agricultural COMMISSION Commission should contact the Office
water supply from the river into the of the Secretary at 202–205–2000.
[Investigation Nos. 701–TA–413 and 731– General information concerning the
water delivery canals under Alternative
TA–913–916 and 918 (Review)]
2A. Commission may also be obtained by
2B—Existing fish ladders with gates Stainless Steel Bar From France, accessing its Internet server (http://
up 10 months—Alternative 2B retains Germany, Italy, Korea, and the United www.usitc.gov). The public record for
Kingdom these reviews may be viewed on the
the current fish ladders and decreases
Commission’s electronic docket (EDIS)
lowering of the dam gates to 2 months
AGENCY: United States International at http://edis.usitc.gov.
(July 1 through August 31). The source
Trade Commission. SUPPLEMENTARY INFORMATION:
of improved fish passage would be the
reduction in gate operations. A new ACTION: Institution of five-year reviews Background.—On March 7, 2002, the
pumping station would be required to concerning the countervailing duty Department of Commerce (‘‘Commerce’’)
provide reliable agricultural water order on stainless steel bar from Italy issued antidumping duty orders on
and the antidumping duty orders on imports of stainless steel bar from
supply from the river into the water
stainless steel bar from France, France, Germany, Italy, Korea, and the
delivery canals. Reclamation has
Germany, Italy, Korea, and the United United Kingdom (67 FR 10381–10385).
identified Alternative 2B as the
Kingdom. On March 8, 2002, Commerce issued a
preferred alternative.
countervailing duty order on imports of
3—Gates out—Alternative 3 keeps the SUMMARY: The Commission hereby gives stainless steel bar from Italy (67 FR
dam gates open year round, creating a notice that it has instituted reviews 10670). The Commission is conducting
free flowing river, unimpeded by the pursuant to section 751(c) of the Tariff reviews to determine whether
dam. Fish ladders or other bypass Act of 1930 (19 U.S.C. 1675(c)) (the Act) revocation of the orders would be likely
options would no longer be necessary to determine whether revocation of the to lead to continuation or recurrence of
and Lake Red Bluff would no longer be countervailing duty order on stainless material injury to the domestic industry
created. A new pumping station would steel bar from Italy and the antidumping within a reasonably foreseeable time. It
be required to provide reliable duty orders on stainless steel bar from will assess the adequacy of interested
agricultural water supply from the river France, Germany, Italy, Korea, and the party responses to this notice of
into the water delivery canals. United Kingdom would be likely to lead institution to determine whether to
to continuation or recurrence of material conduct full reviews or expedited
Additional Information injury. Pursuant to section 751(c)(2) of reviews. The Commission’s
Comments received in response to the Act, interested parties are requested determinations in any expedited
this notice will become part of the to respond to this notice by submitting reviews will be based on the facts
administrative record and are subject to the information specified below to the available, which may include
public inspection. Our practice is to Commission;1 to be assured of information provided in response to this
make comments, including names, consideration, the deadline for notice.
responses is March 23, 2007. Comments Definitions.—The following
home addresses, home phone numbers,
on the adequacy of responses may be definitions apply to these reviews:
and e-mail addresses of respondents, (1) Subject Merchandise is the class or
available for public review. Individual filed with the Commission by April 16,
2007. For further information kind of merchandise that is within the
respondents may request that we scope of the five-year reviews, as
withhold their names and/or home concerning the conduct of these reviews
and rules of general application, consult defined by Commerce.
addresses, etc., but if you wish us to (2) The Subject Countries in these
consider withholding this information, the Commission’s Rules of Practice and
Procedure, part 201, subparts A through reviews are France, Germany, Italy,
you must state this prominently at the Korea, and the United Kingdom.
beginning of your comments. In E (19 CFR part 201), and part 207,
subparts A, D, E, and F (19 CFR part (3) The Domestic Like Product is the
addition, you must present a rationale domestically produced product or
for withholding this information. This 207).
products which are like, or in the
rationale must demonstrate that EFFECTIVE DATE: February 1, 2007. absence of like, most similar in
disclosure would constitute a clearly FOR FURTHER INFORMATION CONTACT: characteristics and uses with, the
unwarranted invasion of privacy. Mary Messer (202–205–3193), Office of Subject Merchandise. In its original
Unsupported assertions will not meet Investigations, U.S. International Trade determinations, the Commission
this burden. In the absence of Commission, 500 E Street SW., defined a single Domestic Like Product
exceptional, documentable Washington, DC 20436. Hearing- consisting of all stainless steel bar
circumstances, this information will be impaired persons can obtain meeting the specifications described in
released. We will always make information on this matter by contacting Commerce’s scope determination.
submissions from organizations or the Commission’s TDD terminal on 202– (4) The Domestic Industry is the U.S.
businesses, and from individuals 205–1810. Persons with mobility producers as a whole of the Domestic
identifying themselves as impairments who will need special Like Product, or those producers whose
representatives or officials of collective output of the Domestic Like
organizations or businesses, available 1 No response to this request for information is Product constitutes a major proportion
for public inspection in their entirety. required if a currently valid Office of Management of the total domestic production of the
and Budget (‘‘OMB’’) number is not displayed; the
product. In its original determinations,
Dated: December 28, 2006. OMB number is 3117–0016/USITC No. 07–5–166,
the Commission defined a single
ycherry on PROD1PC64 with NOTICES

expiration date June 30, 2008. Public reporting


Frank Michny, burden for the request is estimated to average 10 Domestic Industry encompassing all
Assistant Regional Director, Mid-Pacific hours per response. Please send comments U.S. producers of stainless steel bar. The
Region. regarding the accuracy of this burden estimate to
the Office of Investigations, U.S. International Trade
Commission also concluded that service
[FR Doc. E7–1405 Filed 1–29–07; 8:45 am] Commission, 500 E Street, SW., Washington, DC centers were not part of the Domestic
BILLING CODE 4310–MN–P 20436. Industry.

VerDate Aug<31>2005 15:36 Jan 29, 2007 Jkt 211001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1

Vous aimerez peut-être aussi