INTRODUCTION
The cooling system receives hot bleed air from the engines or APU
(Ref. 36-00) and supplies cooled air to the distribution system (Ref.
21-20).
DESCRIPTION
The cooling system has two bootstrap three-wheel Air Cycle Machines
(ACM) of high capacity. The pneumatic system (Ref. 36-00) supplies
the energy which the air cycle machine requires.
There are two valves in the cooling inlet to control the air pressure
and flow to the cooling packs. Two switches installed on the overhead
panel control these valves.
The figure COOLING - MAIN COMPONENT LOCATIONS shows
the location of the main components of the system.
The COOLING includes this (these) sub-subsystem(s):
COOLING PACK SYSTEM ............................................... (21-51)

EFFECTIVITY: ALL

21-50-00

Page 2

sds1230

May 04/99

AIRCRAFT
MAINTENANCE MANUAL

PACK
OVERPRESSURE
SWITCH

PACK VALVE
CONDENSER
MIXER

ACM

PACK DUCT
OVERTEMPERATURE
SWITCH

FAN

DET. A
(LEFT SIDE)

WATER
COLLECTOR
PACK
SETDOWN
SWITCH

PACK
OVERTEMPERATURE
SWITCH

DUAL HEAT
EXCHANGER
145AMM210105.MCE C

COOLING - MAIN COMPONENT LOCATIONS

wipsds1230

EFFECTIVITY: ALL

21-50-00

Page 3
Mar 29/01

AIRCRAFT
MAINTENANCEMANUAL
COMPONENTS
COOLING PACK SYSTEM (21-51)

The cooling pack system automatically controls the temperature and


decreases the humidity of the cockpit and cabin air. It has two cooling
packs installed in the forward part of the wing-to-fuselage fairing.
OPERATION
As soon as bleed air from the engines or from the APU (Ref. 36-00) is
available, the cooling pack can start operating. When the PACK 1
switch is pushed, DC Bus 1 energizes the pack valve 1 solenoid to
supply bleed air to the left air cycle machine.
When the PACK 2 switch is pushed, DC Bus 2 energizes the pack
valve 2 solenoid to supply bleed air to the right air cycle machine.
Both pack systems (1 and 2) depend on the system condition to
operate or not.
In normal operation, they supply conditioned air to the crew and
passengers, according to the temperature (Ref. 21-60) adjusted on
the air conditioning/pneumatic panel.
The figure COOLING - PACK VALVE OPERATING LOGIC shows
the control logic.

EFFECTIVITY: ALL

21-50-00

Page 4

wipsds1230

May 04/99

AIRCRAFT
MAINTENANCE MANUAL

VALVE
ENERGIZED
TO OPEN

VALVE SHUTOFF
AND AUGMENTED
SOLENOID ENERG.
TO OPEN IN HIGH

WING A/I
VALVE IS
CLOSED

CROSS SIDE
PACK VALVE
IS CLOSED

PRESSURE
REGULATOR
SET DOWN SW
NOT ACTUATED

VALVE SHUTOFF
SOL. ENERGIZED
TO OPEN IN LOW.
NORMAL ELECTR.
CONDITIONS TO
ENERGIZE VALVE
SHUTOFF SOL.

VALVE SHUTOFF
SOL. ENERGIZED
TO OPEN IN LOW
NORMAL ELECTR.
CONDITIONS TO
ENERGIZE VALVE
SHUTOFF SOL.

1
FAILURE EITHER
IN THE PACK OR
RELATED TO
ENGINE/ANTI-ICE

COMMANDED TO
CLOSE THE
PACK VALVE
APU IS NOT
THE PNEUMATIC
SOURCE

ECS OFF
SIGNAL FROM ANY
OF CORRESP.
FADECS

FOR RH PACK VALVE

DUCT LEAKAGE
DOWNSTREAM
OF THE PACK
VALVE

ALT<24500ft
ADC1

NO ENG. IS
STARTING WHEN
APU IS THE
PRESS SOURCE

PACK
OVERTEMP.
SWITCH
ACTUATED

CORRESP.
ENGINE IS NOT
STARTING

CORRESP.
PUSH BUTTON
PRESSED

PACK DUCT
OVERTEMP.
SWITCH
ACTUATED

PACK
OVERPRESSURE

ALT<24500ft
ADC2

RH PACK
VLV IS
OPEN

CORRESP.
28 V DC BUS
ENERGIZED

LEFT PACK VALVE IS


COMMANDED TO
CLOSE WHEN WING 1
A/I VLV IS OPEN FOR
ALT<24500 FT AND RH
PACK VLV IS OPEN

WING 1 A/I
VLV POS. IS
OPEN

145AMM210374.MCE

COOLING - PACK VALVE OPERATING LOGIC

wipsds1230

EFFECTIVITY: ALL

21-50-00

Page 5
Mar 29/01

AIRCRAFT
MAINTENANCEMANUAL
The pack valve automatically adjusts the pressure to the air conditioning pack. There are two adjustment modes for the valve: Normal
(29.5 psig at sea level) and High (42.5 psig at sea level). These
values vary with altitude.
The adjusted bleed air flows into the cooling pack (Ref. 21-51) . There
the temperature is controlled (Ref. 21-60) and then the air flows to the
distribution ducts to supply the cockpit and the passenger cabin (Ref.
21-20). If there is a leakage in the pack ducts and the temperature
near the temperature switch increases to 91 3oC (195 5oF):
The temperature switch sends a signal to the CMC for air conditioning duct leakage indication.
The related pack valve closes.
The operation for pack valve 2 is the same but with electrical supply
from DC Bus 2.