Vous êtes sur la page 1sur 1

58286 Federal Register / Vol. 71, No.

191 / Tuesday, October 3, 2006 / Rules and Regulations

speed in order to return the bridge to FOR FURTHER INFORMATION CONTACT: John DEPARTMENT OF HEALTH AND
normal operation as soon as possible. McDonald, Project Officer, First Coast HUMAN SERVICES
Should the bridge maintenance Guard District, at (617) 223–8364.
authorized by this temporary deviation Centers for Medicare & Medicaid
be completed before the end of the SUPPLEMENTARY INFORMATION: The Services
effective period published in this notice, Carlton Bridge, across the Kennebec
the Coast Guard will rescind the River at mile 14.0, between Bath and 42 CFR Parts 409, 410, 412, 413, 414,
remainder of this temporary deviation, Woolwich, Maine, has a vertical 424, 485, 489, and 505
and the bridge shall be returned to its clearance in the closed position of 10
[CMS–1488–CN]
normal operating schedule. Notice of feet at mean high water and 16 feet at
the above action shall be provided to the mean low water. The existing RIN 0938–AO12
public in the Local Notice to Mariners drawbridge operation regulations are
and the Federal Register, where listed at 33 CFR 117.525. Medicare Program; Changes to the
practicable. Hospital Inpatient Prospective
The owner of the bridge, Maine Payment Systems and Fiscal Year 2007
This deviation from the operating Department of Transportation, requested
regulations is authorized under 33 CFR Rates; Correction
a temporary deviation to facilitate
117.35. AGENCY: Centers for Medicare &
scheduled bridge maintenance,
Dated: September 25, 2006. replacement of the bridge lift cables. Medicaid Services (CMS), HHS.
Gary Kassof, The bridge will not be able to open ACTION: Correction of final rule.
Bridge Program Manager, First Coast Guard while the bridge maintenance is
District. SUMMARY: This document corrects
underway.
[FR Doc. E6–16316 Filed 10–2–06; 8:45 am] technical errors that appeared in the
Under this temporary deviation, the final rule published in the Federal
BILLING CODE 4910–15–P
Carlton Bridge need not open for the Register on August 18, 2006 entitled
passage of vessel traffic from 7 a.m. on ‘‘Medicare Program; Hospital Inpatient
DEPARTMENT OF HOMELAND October 16, 2006 through 8 p.m. on Prospective Payment Systems and Fiscal
SECURITY October 17, 2006. Year 2007 Rates.’’
In accordance with 33 CFR 117.35(c), DATES: Effective Date: These corrections
Coast Guard this work will be performed with all due are effective on October 1, 2006.
speed in order to return the bridge to FOR FURTHER INFORMATION CONTACT:
33 CFR Part 117 normal operation as soon as possible. Marc Hartstein, (410) 786–4548.
[CGD01–06–120] Should the bridge maintenance SUPPLEMENTARY INFORMATION:
authorized by this temporary deviation I. Background
Drawbridge Operation Regulations;
be completed before the end of the
Kennebec River, Bath and Woolwich, In FR Doc. 06–6692 of August 18,
effective period published in this notice,
ME 2006 (71 FR 47870), the final rule
the Coast Guard will rescind the entitled ‘‘Changes to the Hospital
AGENCY: Coast Guard, DHS. remainder of this temporary deviation, Inpatient Prospective Payment Systems
ACTION: Notice of temporary deviation and the bridge shall be returned to its and Fiscal Year 2007 Rates’’ (hereinafter
from regulations. normal operating schedule. Notice of referred to as the FY 2007 IPPS final
the above action shall be provided to the rule) there were several minor
SUMMARY: The Commander, First Coast
public in the Local Notice to Mariners typographical and technical errors that
Guard District, has issued a temporary
and the Federal Register, where we are identifying and correcting in
deviation from the regulation governing
practicable. section III. of this notice. The provisions
the operation of the Carlton Bridge
across the Kennebec River at mile 14.0, This deviation from the operating in this correction notice are effective as
between Bath and Woolwich, Maine. regulations is authorized under 33 CFR if they had been included in the
Under this temporary deviation, the 117.35. published FY 2007 IPPS final rule.
bridge may remain in the closed Accordingly, the corrections are
Dated: September 25, 2006. effective October 1, 2006.
position from 7 a.m. on October 16,
Gary Kassof,
2006 through 8 p.m., on October 17, II. Summary of the Corrections to the
2006. This deviation is necessary to Bridge Program Manager, First Coast Guard
District.
FY 2007 IPPS Final Rule
facilitate scheduled bridge maintenance.
[FR Doc. E6–16318 Filed 10–2–06; 8:45 am] On page 47944, in our preamble
DATES: This deviation is effective from
BILLING CODE 4910–15–P
discussion regarding Carotid Artery
October 16, 2006 through October 17, Stents, we erroneously stated that we
2006. were creating a new DRG 583, when, in
ADDRESSES: Materials referred to in this fact, we were creating a new DRG 577.
document are available for inspection or Therefore, in section III. A. of this
copying at the First Coast Guard notice, we are correcting that error. This
District, Bridge Branch Office, 408 technical correction merely corrects the
Atlantic Avenue, Boston, Massachusetts description of the new DRG in the
02110, between 7 a.m. and 3 p.m., preamble text and does not affect the
Monday through Friday, except Federal GROUPER or the relative weight for the
mstockstill on PROD1PC61 with RULES

holidays. The telephone number is (617) new DRG.


223–8364. The First Coast Guard On page 48137, we made several
District Bridge Branch Office maintains errors in the first amendatory statement
the public docket for this temporary for § 412.25. First, we misstated that we
deviation. were amending the introductory text of

VerDate Aug<31>2005 14:44 Oct 02, 2006 Jkt 211001 PO 00000 Frm 00044 Fmt 4700 Sfmt 4700 E:\FR\FM\03OCR1.SGM 03OCR1

Vous aimerez peut-être aussi