Federal Register / Vol. 71, No.

180 / Monday, September 18, 2006 / Notices 54637

Commission, 888 First Street, NE., need not serve motions to intervene or 211 of the Commission’s Rules of
Washington, DC 20426. protests on persons other than the Practice and Procedure (18 CFR
This filing is accessible on-line at Applicant. 385.211). Protests to this filing will be
http://www.ferc.gov, using the The Commission encourages considered by the Commission in
‘‘eLibrary’’ link and is available for electronic submission of protests and determining the appropriate action to be
review in the Commission’s Public interventions in lieu of paper using the taken, but will not serve to make
Reference Room in Washington, DC. ‘‘eFiling’’ link at http://www.ferc.gov. protestants parties to the proceeding.
There is an ‘‘eSubscription’’ link on the Persons unable to file electronically Such protests must be filed in
Web site that enables subscribers to should submit an original and 14 copies accordance with the provisions of
receive e-mail notification when a of the protest or intervention to the Section 154.210 of the Commission’s
document is added to a subscribed Federal Energy Regulatory Commission, regulations (18 CFR 154.210). Anyone
docket(s). For assistance with any FERC 888 First Street, NE., Washington, DC filing a protest must serve a copy of that
Online service, please e-mail 20426. document on all the parties to the
FERCOnlineSupport@ferc.gov, or call This filing is accessible on-line at proceeding.
(866) 208–3676 (toll free). For TTY, call http://www.ferc.gov, using the The Commission encourages
(202) 502–8659. ‘‘eLibrary’’ link and is available for electronic submission of protests in lieu
Comment Date: 5 p.m. Eastern Time review in the Commission’s Public of paper using the ‘‘eFiling’’ link at
on September 18, 2006. Reference Room in Washington, DC. http://www.ferc.gov. Persons unable to
Magalie R. Salas, There is an ‘‘eSubscription’’ link on the file electronically should submit an
Secretary. Web site that enables subscribers to original and 14 copies of the protest to
[FR Doc. E6–15395 Filed 9–15–06; 8:45 am]
receive e-mail notification when a the Federal Energy Regulatory
document is added to a subscribed Commission, 888 First Street, NE.,
BILLING CODE 6717–01–P
docket(s). For assistance with any FERC Washington, DC 20426.
Online service, please e-mail This filing is accessible on-line at
DEPARTMENT OF ENERGY FERCOnlineSupport@ferc.gov, or call http://www.ferc.gov, using the
(866) 208–3676 (toll free). For TTY, call ‘‘eLibrary’’ link and is available for
Federal Energy Regulatory (202) 502–8659. review in the Commission’s Public
Commission Reference Room in Washington, DC.
Magalie R. Salas,
There is an ‘‘eSubscription’’ link on the
[Docket No. RP06–517–000] Secretary. Web site that enables subscribers to
[FR Doc. E6–15397 Filed 9–15–06; 8:45 am] receive e-mail notification when a
Kern River Gas Transmission
Company; Notice of Proposed
BILLING CODE 6717–01–P document is added to a subscribed
Changes in FERC Gas Tariff docket(s). For assistance with any FERC
Online service, please e-mail
September 11, 2006. DEPARTMENT OF ENERGY FERCOnlineSupport@ferc.gov, or call
Take notice that on August 25, 2006, (866) 208–3676 (toll free). For TTY, call
Federal Energy Regulatory
Kern River Gas Transmission Company (202) 502–8659.
Commission
(Kern River) tendered for filing as part
of its FERC Gas Tariff, Second Revised [Docket No. RP97–81–028] Magalie R. Salas,
Volume No. 1, the following tariff Secretary.
sheets, to be effective October 1, 2006: Kinder Morgan Interstate Gas [FR Doc. E6–15388 Filed 9–15–06; 8:45 am]
Transmission LLC; Notice of Filing BILLING CODE 6717–01–P
Second Revised Sheet No. 200
Original Sheet No. 200–A September 11, 2006.
Kern River states that it has served a Take notice that on September 5, 2006 DEPARTMENT OF ENERGY
copy of this filing upon its customers Kinder Morgan Interstate Gas
and interested state regulatory Transmission LLC (KMIGT) tendered for Federal Energy Regulatory
commissions. filing Fourth Revised Volume No. 1–A, Commission
Any person desiring to intervene or to Sixth Revised Sheet No. 4L, to be
[Project No. 2195]
protest this filing must file in effective September 6, 2006.
accordance with Rules 211 and 214 of KMIGT states that the above- Portland General Electric Company;
the Commission’s Rules of Practice and referenced tariff sheet reflects an Notice of Authorization for Continued
Procedure (18 CFR 385.211 and amendment to a previously approved Project Operation
385.214). Protests will be considered by negotiated rate contract effective
the Commission in determining the September 6, 2006. The tariff sheet is September 8, 2006.
appropriate action to be taken, but will being filed pursuant to Section 36 of On August 26, 2004, Portland General
not serve to make protestants parties to KMIGT’s FERC Gas Tariff Fourth Electric Company, licensee for the
the proceeding. Any person wishing to Revised Volume No. 1–B, and the Clackamas River Hydroelectric Project,
become a party must file a notice of procedures prescribed by the filed an application for a new or
intervention or motion to intervene, as Commission in its December 31, 1996 subsequent license pursuant to the
appropriate. Such notices, motions, or ‘‘Order Accepting Tariff Filing Subject Federal Power Act (FPA) and the
protests must be filed in accordance to Conditions’’ in Docket No. RP97–81 Commission’s regulations thereunder.
with the provisions of Section 154.210 (77 FERC ¶ 61,350) and the The Clackamas River Project is located
cprice-sewell on PROD1PC66 with NOTICES

of the Commission’s regulations (18 CFR Commission’s Letter Orders dated on the Clackamas River in Clackamas
154.210). Anyone filing an intervention March 28, 1997 and November 30, 2000 County, Oregon near Estacada, Oregon.
or protest must serve a copy of that in Docket Nos. RP97–81–001 and RP01– The license for Project No. 2195 was
document on the Applicant. Anyone 70–000, respectively. issued for a period ending August 31,
filing an intervention or protest on or Any person desiring to protest this 2006. Section 15(a)(1) of the FPA, 16
before the intervention or protest date filing must file in accordance with Rule U.S.C. 808(a)(1), requires the

VerDate Aug<31>2005 14:48 Sep 15, 2006 Jkt 208001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1
54638 Federal Register / Vol. 71, No. 180 / Monday, September 18, 2006 / Notices

Commission, at the expiration of a DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call
license term, to issue from year-to-year (202) 502–8659.
an annual license to the then licensee Federal Energy Regulatory
Magalie R. Salas,
under the terms and conditions of the Commission
Secretary.
prior license until a new license is
[FR Doc. E6–15393 Filed 9–15–06; 8:45 am]
issued, or the project is otherwise [Docket No. RP01–205–013]
BILLING CODE 6717–01–P
disposed of as provided in section 15 or
any other applicable section of the FPA. Southern Natural Gas Company;
If the project’s prior license waived the Notice of Negotiated Rate DEPARTMENT OF ENERGY
applicability of section 15 of the FPA, September 11, 2006.
then, based on section 9(b) of the Federal Energy Regulatory
Administrative Procedure Act, 5 U.S.C. Take notice that on September 1, Commission
558(c), and as set forth at 18 CFR 2006, Southern Natural Gas Company
[Docket No. CP06–439–000]
16.21(a), if the licensee of such project (Southern) tendered for filing as part of
has filed an application for a subsequent its FERC Gas Tariff, Seventh Revised Southern Natural Gas Company;
license, the licensee may continue to Volume No. 1, the following tariff Transcontinental Gas Pipe Line
operate the project in accordance with sheets, to become effective November 1, Corporation; Notice of Joint
the terms and conditions of the license 2006: Application for Abandonment
after the minor or minor part license Tenth Revised Sheet No. 23
September 11, 2006.
expires, until the Commission acts on Sixth Revised Sheet No. 23A
Take notice that on August 30, 2006,
its application. If the licensee of such a Southern Natural Gas Company
Any person desiring to intervene or to
project has not filed an application for (Southern) and Transcontinental Gas
protest this filing must file in
a subsequent license, then it may be Pipe Line Corporation (Applicants)
accordance with Rules 211 and 214 of
required, pursuant to 18 CFR 16.21(b), tendered for filing a joint application in
the Commission’s Rules of Practice and
to continue project operations until the Procedure (18 CFR 385.211 and abbreviated format for an order
Commission issues someone else a 385.214). Protests will be considered by permitting and approving abandonment
license for the project or otherwise the Commission in determining the of the transportation services provided
orders disposition of the project. appropriate action to be taken, but will pursuant to the following rate
If the project is subject to section 15 not serve to make protestants parties to schedules:
of the FPA, notice is hereby given that the proceeding. Any person wishing to
Southern rate
an annual license for Project No. 2195 become a party must file a notice of Transco rate schedule schedule
is issued to Portland General Electric intervention or motion to intervene, as
Company for a period effective appropriate. Such notices, motions, or X–213 ................................ X–47
September 1, 2006 through August 31, protests must be filed in accordance X–225 ................................
2007, or until the issuance of a new with the provisions of Section 154.210
license for the project or other of the Commission’s regulations (18 CFR Any person desiring to intervene or to
154.210). Anyone filing an intervention protest this filing must file in
disposition under the FPA, whichever
or protest must serve a copy of that accordance with Rules 211 and 214 of
comes first. If issuance of a new license
document on the Applicant. Anyone the Commission’s Rules of Practice and
(or other disposition) does not take Procedure (18 CFR 385.211 and
place on or before August 31, 2007, filing an intervention or protest on or
before the intervention or protest date 385.214). Protests will be considered by
notice is hereby given that, pursuant to the Commission in determining the
18 CFR 16.18(c), an annual license need not serve motions to intervene or
protests on persons other than the appropriate action to be taken, but will
under section 15(a)(1) of the FPA is not serve to make protestants parties to
renewed automatically without further Applicant.
the proceeding. Any person wishing to
order or notice by the Commission, The Commission encourages become a party must file a notice of
unless the Commission orders electronic submission of protests and intervention or motion to intervene, as
otherwise. If the project is not subject to interventions in lieu of paper using the appropriate. Such notices, motions, or
section 15 of the FPA, notice is hereby ‘‘eFiling’’ link at http://www.ferc.gov. protests must be filed on or before the
given that Portland General Electric Persons unable to file electronically date as indicated below. Anyone filing
Company, is authorized to continue should submit an original and 14 copies an intervention or protest must serve a
operation of the Clackamas River Project of the protest or intervention to the copy of that document on the Applicant.
until such time as the Commission acts Federal Energy Regulatory Commission, Anyone filing an intervention or protest
888 First Street, NE., Washington, DC on or before the intervention or protest
on its application for a subsequent
20426. date need not serve motions to intervene
license.
This filing is accessible on-line at or protests on persons other than the
Magalie R. Salas, http://www.ferc.gov, using the Applicant.
Secretary. ‘‘eLibrary’’ link and is available for The Commission encourages
[FR Doc. E6–15385 Filed 9–15–06; 8:45 am] review in the Commission’s Public electronic submission of protests and
BILLING CODE 6717–01–P Reference Room in Washington, DC. interventions in lieu of paper using the
There is an ‘‘eSubscription’’ link on the ‘‘eFiling’’ link at http://www.ferc.gov.
cprice-sewell on PROD1PC66 with NOTICES

Web site that enables subscribers to Persons unable to file electronically


receive e-mail notification when a should submit an original and 14 copies
document is added to a subscribed of the protest or intervention to the
docket(s). For assistance with any FERC Federal Energy Regulatory Commission,
Online service, please e-mail 888 First Street, NE., Washington, DC
FERCOnlineSupport@ferc.gov, or call 20426.

VerDate Aug<31>2005 14:48 Sep 15, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1

Vous aimerez peut-être aussi