Vous êtes sur la page 1sur 1

54638 Federal Register / Vol. 71, No.

180 / Monday, September 18, 2006 / Notices

Commission, at the expiration of a DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call
license term, to issue from year-to-year (202) 502–8659.
an annual license to the then licensee Federal Energy Regulatory
Magalie R. Salas,
under the terms and conditions of the Commission
Secretary.
prior license until a new license is
[FR Doc. E6–15393 Filed 9–15–06; 8:45 am]
issued, or the project is otherwise [Docket No. RP01–205–013]
BILLING CODE 6717–01–P
disposed of as provided in section 15 or
any other applicable section of the FPA. Southern Natural Gas Company;
If the project’s prior license waived the Notice of Negotiated Rate DEPARTMENT OF ENERGY
applicability of section 15 of the FPA, September 11, 2006.
then, based on section 9(b) of the Federal Energy Regulatory
Administrative Procedure Act, 5 U.S.C. Take notice that on September 1, Commission
558(c), and as set forth at 18 CFR 2006, Southern Natural Gas Company
[Docket No. CP06–439–000]
16.21(a), if the licensee of such project (Southern) tendered for filing as part of
has filed an application for a subsequent its FERC Gas Tariff, Seventh Revised Southern Natural Gas Company;
license, the licensee may continue to Volume No. 1, the following tariff Transcontinental Gas Pipe Line
operate the project in accordance with sheets, to become effective November 1, Corporation; Notice of Joint
the terms and conditions of the license 2006: Application for Abandonment
after the minor or minor part license Tenth Revised Sheet No. 23
September 11, 2006.
expires, until the Commission acts on Sixth Revised Sheet No. 23A
Take notice that on August 30, 2006,
its application. If the licensee of such a Southern Natural Gas Company
Any person desiring to intervene or to
project has not filed an application for (Southern) and Transcontinental Gas
protest this filing must file in
a subsequent license, then it may be Pipe Line Corporation (Applicants)
accordance with Rules 211 and 214 of
required, pursuant to 18 CFR 16.21(b), tendered for filing a joint application in
the Commission’s Rules of Practice and
to continue project operations until the Procedure (18 CFR 385.211 and abbreviated format for an order
Commission issues someone else a 385.214). Protests will be considered by permitting and approving abandonment
license for the project or otherwise the Commission in determining the of the transportation services provided
orders disposition of the project. appropriate action to be taken, but will pursuant to the following rate
If the project is subject to section 15 not serve to make protestants parties to schedules:
of the FPA, notice is hereby given that the proceeding. Any person wishing to
Southern rate
an annual license for Project No. 2195 become a party must file a notice of Transco rate schedule schedule
is issued to Portland General Electric intervention or motion to intervene, as
Company for a period effective appropriate. Such notices, motions, or X–213 ................................ X–47
September 1, 2006 through August 31, protests must be filed in accordance X–225 ................................
2007, or until the issuance of a new with the provisions of Section 154.210
license for the project or other of the Commission’s regulations (18 CFR Any person desiring to intervene or to
154.210). Anyone filing an intervention protest this filing must file in
disposition under the FPA, whichever
or protest must serve a copy of that accordance with Rules 211 and 214 of
comes first. If issuance of a new license
document on the Applicant. Anyone the Commission’s Rules of Practice and
(or other disposition) does not take Procedure (18 CFR 385.211 and
place on or before August 31, 2007, filing an intervention or protest on or
before the intervention or protest date 385.214). Protests will be considered by
notice is hereby given that, pursuant to the Commission in determining the
18 CFR 16.18(c), an annual license need not serve motions to intervene or
protests on persons other than the appropriate action to be taken, but will
under section 15(a)(1) of the FPA is not serve to make protestants parties to
renewed automatically without further Applicant.
the proceeding. Any person wishing to
order or notice by the Commission, The Commission encourages become a party must file a notice of
unless the Commission orders electronic submission of protests and intervention or motion to intervene, as
otherwise. If the project is not subject to interventions in lieu of paper using the appropriate. Such notices, motions, or
section 15 of the FPA, notice is hereby ‘‘eFiling’’ link at http://www.ferc.gov. protests must be filed on or before the
given that Portland General Electric Persons unable to file electronically date as indicated below. Anyone filing
Company, is authorized to continue should submit an original and 14 copies an intervention or protest must serve a
operation of the Clackamas River Project of the protest or intervention to the copy of that document on the Applicant.
until such time as the Commission acts Federal Energy Regulatory Commission, Anyone filing an intervention or protest
888 First Street, NE., Washington, DC on or before the intervention or protest
on its application for a subsequent
20426. date need not serve motions to intervene
license.
This filing is accessible on-line at or protests on persons other than the
Magalie R. Salas, http://www.ferc.gov, using the Applicant.
Secretary. ‘‘eLibrary’’ link and is available for The Commission encourages
[FR Doc. E6–15385 Filed 9–15–06; 8:45 am] review in the Commission’s Public electronic submission of protests and
BILLING CODE 6717–01–P Reference Room in Washington, DC. interventions in lieu of paper using the
There is an ‘‘eSubscription’’ link on the ‘‘eFiling’’ link at http://www.ferc.gov.
cprice-sewell on PROD1PC66 with NOTICES

Web site that enables subscribers to Persons unable to file electronically


receive e-mail notification when a should submit an original and 14 copies
document is added to a subscribed of the protest or intervention to the
docket(s). For assistance with any FERC Federal Energy Regulatory Commission,
Online service, please e-mail 888 First Street, NE., Washington, DC
FERCOnlineSupport@ferc.gov, or call 20426.

VerDate Aug<31>2005 14:48 Sep 15, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1