53446 Federal Register / Vol. 71, No.

175 / Monday, September 11, 2006 / Notices

filing comments, it will be presumed to k. Description of Project: The application. A competing license
have no comments. One copy of an proposed project would consist of: (1) application must conform with 18 CFR
agency’s comments must also be sent to 100 to 150 ocean current generation 4.30(b) and 4.36.
the Applicant’s representatives. (OCGenTM) modules each approximately p. Notice of Intent: A notice of intent
13 feet-wide, 49 feet-long, and 11 feet- must specify the exact name, business
Magalie R. Salas, address, and telephone number of the
high, consisting of, (2) an anchoring
Secretary. support structure, (3) two horizontally prospective applicant, and must include
[FR Doc. E6–14953 Filed 9–8–06; 8:45 am] mounted turbines, (4) an integrated an unequivocal statement of intent to
BILLING CODE 6717–01–P generator with a maximum capacity of submit, if such an application may be
158 kilowatts, and (5) 69 kilovolt filed, either a preliminary permit
interconnection transmission lines. The application or a development
DEPARTMENT OF ENERGY project is estimated to have an annual application (specify which type of
generation of 466 megawatt-hours per- application). A notice of intent must be
Federal Energy Regulatory unit per-year. served on the applicant(s) named in this
Commission l. Locations of Applications: A copy of public notice.
the application is available for q. Proposed Scope of Studies under
Notice of Application Accepted for
inspection and reproduction at the Permit: A preliminary permit, if issued,
Filing and Soliciting Motions To
Commission in the Public Reference does not authorize construction. The
Intervene, Protests, and Comments term of the proposed preliminary permit
Room, located at 888 First Street, NE.,
August 30, 2006. Room 2A, Washington, DC 20426, or by would be 36 months. The work
Take notice that the following calling (202) 502–8371. This filing may proposed under the preliminary permit
hydroelectric application has been filed also be viewed on the Commission’s would include economic analysis,
with the Commission and is available Web site at http://www.ferc.gov using preparation of preliminary engineering
for public inspection: the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
a. Type of Application: Preliminary number excluding the last three digits in impacts. Based on the results of these
Permit. the docket number field to access the studies, the Applicant would decide
b. Project No.: 12678–000. document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to
c. Date filed: May 30, 2006.
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
d. Applicant: Ocean Renewable Power r. Comments, Protests, or Motions to
Company Alaska, LLC. call (202) 502–8659. A copy is also
available for inspection and Intervene: Anyone may submit
e. Name of Project: Resurrection Bay comments, a protest, or a motion to
reproduction at the address in item h
OCGenTM Power Project. intervene in accordance with the
above.
f. Location: The project would be m. Individuals desiring to be included requirements of Rules of Practice and
located in Resurrection Bay in the Gulf on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
of Alaska between Aialik Peninsula and so indicate by writing to the Secretary In determining the appropriate action to
Resurrection Peninsula, in Kenai of the Commission. take, the Commission will consider all
Peninsula Borough, Alaska. n. Competing Preliminary Permit: protests or other comments filed, but
g. Filed Pursuant to: Federal Power Anyone desiring to file a competing only those who file a motion to
Act, 16 U.S.C. 791(a)–825(r). application for preliminary permit for a intervene in accordance with the
h. Applicant Contacts: Mr. Paul proposed project must submit the Commission’s Rules may become a
Wells, Ocean Renewable Power competing application itself, or a notice party to the proceeding. Any comments,
Company, LLC, 2430 NE 199th Street, of intent to file such an application, to protests, or motions to intervene must
N. Miami Beach, FL 33180, phone (305) the Commission on or before the be received on or before the specified
936–1515, Mr. Christopher Sauer, Ocean specified comment date for the comment date for the particular
Renewable Power Company, LLC, 2723 particular application (see 18 CFR 4.36). application.
W. Jetton Ave, Tampa, FL 33629, phone Submission of a timely notice of intent Comments, protests and interventions
(305) 794–7590, Ms. Mary McCann, allows an interested person to file the may be filed electronically via the
Devine Tarbell and Associates, 970 competing preliminary permit Internet in lieu of paper; See 18 CFR
Baxter Blvd., Portland, ME 04103, application no later than 30 days after 385.2001(a)(1)(iii) and the instructions
phone (207) 775–4495. the specified comment date for the on the Commission’s web site under ‘‘e-
i. FERC Contact: Chris Yeakel, (202) particular application. A competing filing’’ link. The Commission strongly
502–8132. preliminary permit application must encourages electronic filing.
j. Deadline for filing comments, conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive
protests, and motions to intervene: 60 o. Competing Development Documents: Any filings must bear in all
days from the issuance date of this Application: Any qualified development capital letters the title ‘‘COMMENTS’’,
notice. applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS
The Commission’s Rules of Practice development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’,
and Procedure require all intervenors the Commission, on or before a ‘‘COMPETING APPLICATION’’ or
filing documents with the Commission specified comment date for the ‘‘MOTION TO INTERVENE’’, as
to serve a copy of that document on particular application, either a applicable, and the Project Number of
each person in the official service list competing development application or a the particular application to which the
for the project. Further, if an intervenor notice of intent to file such an filing refers.
files comments or documents with the application. Submission of a timely Any of the above-named documents
rwilkins on PROD1PC61 with NOTICES

Commission relating to the merits of an notice of intent to file a development must be filed by providing the original
issue that may affect the responsibilities application allows an interested person and the number of copies provided by
of a particular resource agency, they to file the competing application no the Commission’s regulations to: The
must also serve a copy of the document later than 120 days after the specified Secretary, Federal Energy Regulatory
on that resource agency. comment date for the particular Commission, 888 First Street, NE.,

VerDate Aug<31>2005 18:03 Sep 08, 2006 Jkt 208001 PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 E:\FR\FM\11SEN1.SGM 11SEN1
Federal Register / Vol. 71, No. 175 / Monday, September 11, 2006 / Notices 53447

Washington, DC 20426. A copy of any Magalie R. Salas, Secretary, Federal be received on or before the specified
motion to intervene must also be served Energy Regulatory Commission, 888 comment date for the particular
upon each representative of the First Street, NE., Washington, DC 20426. application.
Applicant specified in the particular Please include the project number (P– o. Filing and Service of Responsive
application. 405–071) on any comments or motions Documents: Any filings must bear in all
t. Agency Comments: Federal, state, filed. Comments, protests, and capital letters the title ‘‘COMMENTS’’,
and local agencies are invited to file interventions may be filed electronically ‘‘RECOMMENDATIONS FOR TERMS
comments on the described application. via the Internet in lieu of paper. See, 18 AND CONDITIONS’’, ‘‘PROTEST’’, or
A copy of the application may be CFR 385.2001(a)(1)(iii) and the ‘‘MOTION TO INTERVENE’’, as
obtained by agencies directly from the instructions on the Commission’s Web applicable, and the Project Number of
Applicant. If an agency does not file site under the ‘‘e-Filing’’ link. The the particular application to which the
comments within the time specified for Commission strongly encourages e- filing refers. A copy of any motion to
filing comments, it will be presumed to filings. intervene must also be served upon each
have no comments. One copy of an k. Description of Request: The representative of the Applicant
agency’s comments must also be sent to licensee is requesting that the specified in the particular application.
the Applicant’s representatives. Commission amend the approved p. Agency Comments: Federal, state,
project recreation plan (plan) by: (1) and local agencies are invited to file
Magalie R. Salas, Deleting the provision in the plan comments on the described
Secretary. requiring the licensees to allow public applications. A copy of the applications
[FR Doc. E6–14954 Filed 9–8–06; 8:45 am] fishing on the galley (catwalk), which is may be obtained by agencies directly
BILLING CODE 6717–01–P located on the downstream face of the from the Applicant. If an agency does
powerhouse; (2) adding to the plan a not file comments within the time
provision that allows the licensee to specified for filing comments, it will be
DEPARTMENT OF ENERGY construct a new boardwalk along the presumed to have no comments. One
west side of the river in Harford County, copy of an agency’s comments must also
Federal Energy Regulatory immediately below the powerhouse and
Commission be sent to the Applicant’s
make certain other modifications to the representatives.
public access area at Fisherman’s Park;
Notice of Application for Non-Project Magalie R. Salas,
(3) adding to the plan a provision that
Use of Project Lands and Waters and
allows the licensee to make public Secretary.
Soliciting Comments, Motions To
access enhancements below the dam on [FR Doc. E6–14955 Filed 9–8–06; 8:45 am]
Intervene, and Protests the east side of the river in Cecil County BILLING CODE 6717–01–P
August 31, 2006. including shoreline fishing
Take notice that the following opportunities on Octarora Creek, from
application has been filed with the Md. 222 to the confluence of Octarora DEPARTMENT OF ENERGY
Commission and is available for public Creek and the Susquehanna River; and
inspection: (4) opening more project land for public Federal Energy Regulatory
a. Application Type: Request to recreational use downstream of the dam. Commission
Amendment Project License (Recreation l. Location of the Application: This
filing is available for review at the Notice of Application Accepted for
Plan).
b. Project No.: 405–071. Commission or may be viewed on the Filing and Soliciting Comments,
c. Date Filed: July 28, 2006. Commission’s Web site at http:// Motions To Intervene, and Protests
d. Applicant: Susquehanna Power www.ferc.gov, using the ‘‘eLibrary’’ link.
August 31, 2006.
Company and PECO Energy Power Enter the docket number excluding the
last three digits in the docket number Take notice that the following
Company.
field to access the document. For hydroelectric application has been filed
e. Name of Project: Conowingo
assistance, contact FERC Online with the Commission and is available
Hydroelectric Project.
f. Location: The proposed action will Support at for public inspection:
take place at the Conowingo FERCOnlineSupport@ferc.gov or toll- a. Type of Application: Competing
Hydroelectric Project on the free at (866) 208–3676, or for TTY, Preliminary Permit.
Susquehanna River, which is located in contact (202) 502–8659. b. Project No.: 12719–000.
Harford and Cecil Counties, Maryland m. Individuals desiring to be included c. Date filed: July 25, 2006.
and Lancaster and York Counties, on the Commission’s mailing list should d. Applicant: Green Power
Pennsylvania. so indicate by writing to the Secretary Development, LLC.
g. Filed Pursuant to: Federal Power of the Commission. e. Name of Project: Lace River
Act, 16 U.S.C. 791(a)–825(r) and §§ 799 n. Comments, Protests, or Motions to Hydroelectric Project.
and 801. Intervene: Anyone may submit f. Location: The project would be
h. Applicant Contact: Mr. Brian J. comments, a protest, or a motion to located on the Lace River, within the
McManus, Jones Day, 51 Louisiana intervene in accordance with the Juneau Borough, Alaska. The proposed
Avenue, NW., Washington DC 20001– requirements of Rules of Practice and project would occupy lands within the
1700, (202) 879–5452. Procedure, 18 CFR 385.210, .211, .214. Tongass National Forest.
i. FERC Contact: Any questions on In determining the appropriate action to g. Filed Pursuant to: Federal Power
this notice should be addressed to Brian take, the Commission will consider all Act, 16 U.S.C. 791(a)–825(r).
Romanek at (202) 502–6175, or by e- protests or other comments filed, but h. Applicant Contact: Mr. Earle
rwilkins on PROD1PC61 with NOTICES

mail: Brian.Romanek@ferc.gov. only those who file a motion to Ausman, Green Power Development,
j. Deadline for filing comments and or intervene in accordance with the LLC, 1503 West 33rd Avenue,
motions: October 2, 2006.. Commission’s Rules may become a Anchorage, AK 99503, (907) 258–2420.
All documents (original and eight party to the proceeding. Any comments, i. FERC Contact: Patricia W. Gillis at
copies) should be filed with: Ms. protests, or motions to intervene must (202) 502–8735.

VerDate Aug<31>2005 18:03 Sep 08, 2006 Jkt 208001 PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 E:\FR\FM\11SEN1.SGM 11SEN1