Vous êtes sur la page 1sur 2

43726 Federal Register / Vol. 71, No.

148 / Wednesday, August 2, 2006 / Notices

Commission’s Web site (http:// docket(s). For assistance with any FERC interventions in lieu of paper using the
www.ferc.gov) under the ‘‘e-Filing’’ link. Online service, please e-mail ‘‘eFiling’’ link at http://www.ferc.gov.
FERCOnlineSupport@ferc.gov, or call Persons unable to file electronically
Magalie R. Salas,
(866) 208–3676 (toll free). For TTY, call should submit an original and 14 copies
Secretary. (202) 502–8659. of the protest or intervention to the
[FR Doc. E6–12392 Filed 8–1–06; 8:45 am] Federal Energy Regulatory Commission,
Magalie R. Salas,
BILLING CODE 6717–01–P 888 First Street, NE., Washington, DC
Secretary.
20426.
[FR Doc. E6–12381 Filed 8–1–06; 8:45 am] This filing is accessible on-line at
DEPARTMENT OF ENERGY BILLING CODE 6717–01–P http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
Federal Energy Regulatory
review in the Commission’s Public
Commission DEPARTMENT OF ENERGY Reference Room in Washington, DC.
[Docket No. RP05–317–004]
Federal Energy Regulatory There is an ‘‘eSubscription’’ link on the
Commission Web site that enables subscribers to
Texas Gas Transmission, LLC; Notice receive e-mail notification when a
of Compliance Filing [Docket No. RP06–440–000] document is added to a subscribed
July 26, 2006. docket(s). For assistance with any FERC
Wyoming Interstate Company, Ltd.; Online service, please e-mail
Take notice that on July 21, 2006, Notice of Proposed Changes in FERC
Texas Gas Transmission, LLC (Texas FERCOnlineSupport@ferc.gov, or call
Gas Tariff
Gas) submitted a compliance filing (866) 208–3676 (toll free). For TTY, call
pursuant to the provisions of Article IX, July 25, 2006. (202) 502–8659.
Report of Refunds, of the Stipulation Take notice that on July 20, 2006, Magalie R. Salas,
and Agreement in the above-referenced Wyoming Interstate Company, Ltd.
Secretary.
docket, as approved by ‘‘Order (WIC) tendered for filing as part of its
[FR Doc. E6–12384 Filed 8–1–06; 8:45 am]
Approving Uncontested Settlement’’ FERC Gas Tariff, Second Revised
Volume No 2, the following tariff sheets BILLING CODE 6717–01–P
issued April 21, 2006 [Texas Gas
Transmission, LLC, 115 FERC ¶ 61,092 to become effective September 1, 2006:
(2006)], and to Subpart F of Section 154 Fifteenth Revised Sheet No. 4C DEPARTMENT OF ENERGY
of the Commission’s regulations. Eighth Revised Sheet No. 5A
Texas Gas states that an abbreviated Tenth Revised Sheet No. 11 Federal Energy Regulatory
version of the filing was served on all Seventh Revised Sheet No. 26
Commission
Eleventh Revised Sheet No. 37A
affected parties and interested state Tenth Revised Sheet No. 37B [Docket No. EL06–89–000]
commissions. Second Revised Sheet No. 39C
Any person desiring to protest this Eighth Revised Sheet No. 83 Californians for Renewable Energy,
filing must file in accordance with Rule Original Sheet No. 83A Inc. Complainants v. California
211 of the Commission’s Rules of Original Sheet No. 83B Independent System Operator
Practice and Procedure (18 CFR Original Sheet No. 83C
Respondent; Notice of Complaint
385.211). Protests to this filing will be WIC states that copies of its filing
considered by the Commission in have been sent to all firm customers, July 26, 2006.
determining the appropriate action to be interruptible customers, and affected Take notice that on July 24, 2006,
taken, but will not serve to make state commissions. Californians for Renewable Energy, Inc.
protestants parties to the proceeding. Any person desiring to intervene or to (CARE) filed a complaint against the
Such protests must be filed in protest this filing must file in California Independent System Operator
accordance with the provisions of accordance with Rules 211 and 214 of Corporation (CAISO). CARE alleges that
Section 154.210 of the Commission’s the Commission’s Rules of Practice and the CAISO provided testimony before
regulations (18 CFR 154.210). Anyone Procedure (18 CFR 385.211 and the California Energy Commission in
filing a protest must serve a copy of that 385.214). Protests will be considered by reference to a power plant siting
document on all the parties to the the Commission in determining the application by the City and County of
proceeding. appropriate action to be taken, but will San Francisco, without complying with
The Commission encourages not serve to make protestants parties to CAISO’s articles of incorporation.
electronic submission of protests in lieu the proceeding. Any person wishing to CARE asks the Commission to order
of paper using the ‘‘eFiling’’ link at become a party must file a notice of the CAISO to rescind its findings and
http://www.ferc.gov. Persons unable to intervention or motion to intervene, as conclusions concerning the power plant
file electronically should submit an appropriate. Such notices, motions, or application until it can issue
original and 14 copies of the protest to protests must be filed in accordance conclusions without exceeding its
the Federal Energy Regulatory with the provisions of Section 154.210 statutory mandate as described in the
Commission, 888 First Street, NE., of the Commission’s regulations (18 CFR CAISO’s articles of incorporation.
Washington, DC 20426. 154.210). Anyone filing an intervention Any person desiring to intervene or to
This filing is accessible on-line at or protest must serve a copy of that protest this filing must file in
http://www.ferc.gov, using the document on the Applicant. Anyone accordance with Rules 211 and 214 of
‘‘eLibrary’’ link and is available for filing an intervention or protest on or the Commission’s Rules of Practice and
review in the Commission’s Public before the intervention or protest date Procedure (18 CFR 385.211 and
wwhite on PROD1PC61 with NOTICES

Reference Room in Washington, DC. need not serve motions to intervene or 385.214). Protests will be considered by
There is an ‘‘eSubscription’’ link on the protests on persons other than the the Commission in determining the
Web site that enables subscribers to Applicant. appropriate action to be taken, but will
receive e-mail notification when a The Commission encourages not serve to make protestants parties to
document is added to a subscribed electronic submission of protests and the proceeding. Any person wishing to

VerDate Aug<31>2005 16:40 Aug 01, 2006 Jkt 208001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\02AUN1.SGM 02AUN1
Federal Register / Vol. 71, No. 148 / Wednesday, August 2, 2006 / Notices 43727

become a party must file a notice of Millstone after the December 1, 2005 DEPARTMENT OF ENERGY
intervention or motion to intervene, as effective date of DNC’s notice
appropriate. The Respondent’s answer terminating service. Federal Energy Regulatory
and all interventions or protests must be Commission
DNC certifies that copies of the
filed on or before the comment date. complaint were served on the contacts [Docket No. EL06–90–000]
The Respondent’s answer, motions to
for CL&P as listed on the Commission’s
intervene, and protests must be served PPL EnergyPlus, LLC, PPL Martins
list of Corporate Officials.
on the Complainants. Creek, LLC, PPL Susquehanna, LLC,
The Commission encourages Any person desiring to intervene or to PPL Montour, LLC, PPL Brunner
electronic submission of protests and protest this filing must file in Island, LLC, PPL Holtwood, LLC, PPL
interventions in lieu of paper using the accordance with Rules 211 and 214 of University Park, LLC, Lower Mount
‘‘eFiling’’ link at http://www.ferc.gov. the Commission’s Rules of Practice and Bethel Energy, LLC, Complainants; v
Persons unable to file electronically Procedure (18 CFR 385.211 and PJM Interconnection, LLC,
should submit an original and 14 copies 385.214). Protests will be considered by Respondent; Notice of Complaint
of the protest or intervention to the the Commission in determining the
Federal Energy Regulatory Commission, July 26, 2006.
appropriate action to be taken, but will
888 First Street, NE., Washington, DC Take notice that on July 25, 2006, PPL
not serve to make protestants parties to
20426. EnergyPlus LLC, and PPL Martins
the proceeding. Any person wishing to Creek, LLC, PPL Susquehanna, LLC,
This filing is accessible on-line at become a party must file a notice of
http://www.ferc.gov, using the PPL Montour LLC, PPL Brunner Island,
intervention or motion to intervene, as LLC, PPL Holtwood, LLC, PPL
‘‘eLibrary’’ link and is available for appropriate. The Respondent’s answer
review in the Commission’s Public University Park, LLC and Lower Mount
and all interventions, or protests must bethel Energy, LLC (collectively, PPL)
Reference Room in Washington, DC.
be filed on or before the comment date. filed a formal complaint against PJM
There is an ‘‘eSubscription’’ link on the
The Respondent’s answer, motions to Interconnection, L.L.C. (PJM) pursuant
Web site that enables subscribers to
receive e-mail notification when a intervene, and protests must be served to 18 CFR 385.206 and sections 206,
document is added to a subscribed on the Complainants. 303, and 306 of the Federal Power Act,
docket(s). For assistance with any FERC The Commission encourages alleging, in part, that: (1) PJM
Online service, please e-mail electronic submission of protests and impermissibly applied offer-caps to real-
FERCOnlineSupport@ferc.gov, or call interventions in lieu of paper using the time market bids associated with
(866) 208–3676 (toll free). For TTY, call combustion turbines (CTs) at seven
‘‘eFiling’’ link at http://www.ferc.gov.
(202) 502–8659. locations owned by PPL that were
Persons unable to file electronically
Comment Date: 5 p.m. Eastern Time operated for PJM on July 27, 2005; (2)
should submit an original and 14 copies PJM violated the Commission’s
on August 14, 2006. of the protest or intervention to the requirements when it failed to request
Magalie R. Salas, Federal Energy Regulatory Commission, PPL to turn on CTs at PPL’s Fishbach
Secretary. 888 First Street, NE., Washington, DC generating facility before PJM declared a
[FR Doc. E6–12375 Filed 8–1–06; 8:45 am] 20426. maximum generation emergency on July
BILLING CODE 6717–01–P This filing is accessible on-line at 27, 2005; and (3) PJM improperly
http://www.ferc.gov, using the dispatched PPL’s generation resources,
‘‘eLibrary’’ link and is available for miscalculated real-time energy market
DEPARTMENT OF ENERGY review in the Commission’s Public prices for energy to reflect market-based
Reference Room in Washington, DC. bids for energy supplied on July 27,
Federal Energy Regulatory There is an ‘‘eSubscription’’ link on the 2005, and failed to comply with its
Commission payment obligations for energy supplied
Web site that enables subscribers to
[Docket No. EL06–88–000] receive e-mail notification when a from PPL’s resources on July 27, 2005.
PPL certified that copies of the
document is added to a subscribed complaint were served on the contacts
Dominion Nuclear Connecticut, Inc., docket(s). For assistance with any FERC
Complainant v. the Connecticut Light for PJM, as listed on the Commission’s
Online service, please e-mail list of Corporate Officials, as well as
and Power Company, Respondent; FERCOnlineSupport@ferc.gov, or call
Notice of Complaint affected state regulatory agencies.
(866) 208–3676 (toll free). For TTY, call Any person desiring to intervene or to
July 26, 2006. (202) 502–8659. protest this filing must file in
Take notice that on July 24, 2006, Comment Date: 5 p.m. Eastern Time accordance with Rules 211 and 214 of
Dominion Nuclear Connecticut, Inc. on August 14, 2006. the Commission’s Rules of Practice and
(DNC), owner and operator of the Procedure (18 CFR 385.211 and
Millstone Nuclear Power Station located Magalie R. Salas, 385.214). Protests will be considered by
in Waterford, Connecticut (Millstone) Secretary. the Commission in determining the
filed a formal complaint against The [FR Doc. E6–12383 Filed 8–1–06; 8:45 am] appropriate action to be taken, but will
Connecticut Light and Power Company BILLING CODE 6717–01–P not serve to make protestants parties to
(CL&P) pursuant to section 206 of the the proceeding. Any person wishing to
Federal Power Act, and the become a party must file a notice of
Commission’s rules and regulations, 18 intervention or motion to intervene, as
CFR 385.206, alleging that CL&P appropriate. The Respondent’s answer
wwhite on PROD1PC61 with NOTICES

unlawfully imposed charges for station and all interventions, or protests must
power service it did not provide from be filed on or before the comment date.
December 1, 2005 through June 16, The Respondent’s answer, motions to
2006, and has imposed and continues to intervene, and protests must be served
impose retail service charges for on the Complainants.

VerDate Aug<31>2005 16:40 Aug 01, 2006 Jkt 208001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\02AUN1.SGM 02AUN1