Vous êtes sur la page 1sur 307

Price Schedule Format

Project :
Tender No.
Tender No.

Mahavitaran InfraPlan - Part II


CE(Infra)/Infra Plan-II /T 23

Zone
Circle
Division

Nagpur Urban
Nagpur Rural
Nagpur Division II

Schedule 1: Grand Summary


(Bidder to Carry Quoted Prices forward from Schedules 2 and 3)
Schedule
Number

Employer's
Estimated
Cost(UNTOUCH WORKS)
(Rs. Lakhs)

Description of Activity

471.91

Civil Works

Supply and Installation of Plant and Equipment:


a.

Part 1: Cost of Material

4343.13

b.

Part 2: Cost of Tansportation, Installation, Erection, Commissioning & Guarantee

1324.66

Grand Total (Excluding Taxes)

6139.70

The Taxes chargable to Employer will be paid as per the rates given below
1

MVAT @ _____ on Supply of equipment produced in Maharashtra


For supply of equipment produced outside Maharashtra
* The Contractor has to raise an invoice on MSEDCL charging no tax stating clearly in the invoice
"Sales under section 6(2)(b) of the Central Sales Tax Act, 1956-against "C" form.

As per Volume -I, Section I Clause 16.2(b)


Grand Total & Taxes

0.00

I/ we hereby offer to complete the above described Works contained in the Schedules 2 and 3 together, for the Price of:
________ % ( _____________________ percent) above / below the total tendercost of the Employer's Estimate for a total amount of: Rs. __________________ Lakhs
(Rupees ______________________________________________________________________________ only), excluding the cost of MVAT & Service Tax.

Signature of Bidder:
Name & Designation:
Company:
Notes :-

1) The bidder should quote his % rate on the total tender estimated cost. Separate rates should not be quoted against Civil, Material & Services Components.
2) The quoted rate and price must be exclusive of MVAT and Service Tax.
3) Any deviation from the instructions contained in these notes shall make the offer of the bidder as non-responsive.
Schedule 1

Page 1 of 307

Price Schedule Format


Project:
Tender No.
Tender No.

Mahavitaran InfraPlan II

Zone:
Nagpur Urban
Circle :
Nagpur Rural
Division Nagpur Division II

Schedule 2: Civil Works and Other Services


Employer's Estimate
Unit
Total
Rate
Cost
(Rs. Lakhs)
(Rs. Lakhs)
(5)
(6) = (4) x (5)

Activity
Number

Description of Activity

Unit

Quantity

(1)

(2)

(3)

(4)

Supply, Erection, Testing and Commissioning of 33/11 KV, 2X5 MVA SubStation (Outdoor Type).

Nos

58.133

465.068

Supply, Erection, Testing and Commissioning 33/11 KV, 1x5 MVA Additional
Power T/F ( Outdoor) without Gantry structure with required Civil work

Nos

6.843

6.843

0103C

0301D/New

Total (Excluding Taxes)

471.91

CAPITAL WORKS
0103C

Supply, Erection, Testing and Commissioning of 33/11 KV, 2X5 MVA


Sub-Station (Outdoor Type).

Nos

143.11

43.65

186.76

1144.90

349.19

1494.09

0201

Supply, Erection, Testing and Commissioning of Augmentation of 33/11


KV, 1x3.15 MVA to 1x5 MVA Power T/F ( Outdoor)[if associated switch Nos
gears available]

37.08

11.31

48.39

148.32

45.24

193.55

0202

Supply, Erection, Testing and Commissioning of Augmentation of 33/11


Nos
KV, 1x5 MVA to 1x10 MVA Power T/F ( Outdoor)

82.64

25.21

107.85

330.57

100.82

431.39

0301D/New

Supply, Erection, Testing and Commissioning 33/11 KV, 1x5 MVA


Additional Power T/F ( Outdoor) without Gantry structure with required
Civil work

Nos

65.89

20.10

85.98

65.89

20.10

85.98

0601A

Supply, Erection, Testing and Commissioning of 33 KV FEEDER BAY


(Outdoor) without Gantry structure

Nos

16

7.47

2.28

9.75

119.59

36.48

156.07

0603

Supply, Erection, Testing and Commissioning of 11 KV FEEDER BAY

Nos

7.00

2.14

9.14

7.00

2.14

9.14

0701

Supply, Erection, Testing and Commissioning of 1 Km. 33 KV S/C Line


with 100 mm2 ACSR (Suspension type) & RSJ 152 X 152 mm 12 mtr. km
Long.

69.00

6.82

2.08

8.90

470.44

143.49

613.93

0708

Supply, Erection, Testing and Commissioning of laying of 1 Km. 33 KV


3 C 300 mm 2 XLPE under ground Cable

km

17.20

20.28

6.18

26.46

348.73

106.36

455.09

0709

Supply, Erection, Testing and Commissioning of 33 kV 3 X 300 sqmm


XLPE Underground Cable for Railway line crossing as per Sketch

km

3.00

6.86

2.09

8.95

20.58

6.28

26.85

0713

Supply, Erection, Testing and Commissioning of DOUPLE POLE


STRUCTURE(cut point) OF- 33 KV LINE USING 11 M LONG RSJ
POLE

Nos

138.00

0.51

0.16

0.67

70.76

21.58

92.34

0905

Supply, Erection, Testing and Commissioning of 1.0 Km. Pin type with
km
100 Sq. mm ACSR lines on 152 X 152 mm 11 mtr RSJ poles

44.00

6.30

1.92

8.23

277.34

84.59

361.93

0908

Supply, Erection, Testing and Commissioning of 11 KV Single circuit


Pin type with 55sq.mm AAAC lines on 100x116 mm 9 mtr PSC poles

km

101.00

2.77

0.84

3.61

279.60

85.28

364.88

0915

Supply, Erection, Testing and Commissioning of laying 11 KV 3x185


sq.mm XLPE under ground Cable

km

15.00

10.18

3.10

13.28

152.67

46.56

199.23

0921

Supply, Erection, Testing and Commissioning of DOUPLE POLE


STRUCTURE(cut point) OF- 11 KV LINE USING11 M LONG RSJ
POLE

Nos

237.00

0.60

0.18

0.78

141.63

43.20

184.83

1216

Supply, Erection, Testing and Commissioning of POLE MOUNTED


DISTRIBUTION TRANSFOEMER SUB-STATION 100KVA, 11/0.433
KV ON 11 mtr RSJ POLE

Nos

175.00

1.91

0.58

2.50

334.83

102.12

436.96

1302

Supply, Erection, Testing and Commissioning of Augumentation of


Pole mounted Distribution Transformer Sub-station 11/0.433 KV 100
KVA to 11/0.433 kv 200 KVA

Nos

50.00

2.10

0.64

2.75

105.19

32.08

137.27

1401

Supply, Erection, Testing and Commissioning of L.T. LINE 3 ph 4 W.


-WIND PRESSURE ZONE - With ANT for phase & GNAT for neutral
with PSC Pole 8 Mtr (140 KG)

km

36.00

1.68

0.51

2.20

60.58

18.48

79.05

1404

Supply, Erection, Testing and Commissioning of laying of 1 Km.


L.T.XLPE Cable for Size 95 Sqmm

km

2.00

2.81

0.86

3.67

5.63

1.72

7.35

1501

Supply, Erection, Testing and Commissioning of L.T. LINE 1 ph 3 W.


-with GNAT for phase & neutral with PSC Pole 8 Mtr (200 KG)

km

10.00

1.16

0.36

1.52

11.65

3.55

15.20

New
A.

national Highway crossing


CAPITAL WORKS

Nos

1.00

1.18

0.36

1.54

1.18

0.36

1.54

0.00

0.00

0.00

0.00

0.00

Price Schedule Format


Project :
Tender No.
Tender No.

Mahavitaran InfraPlan II

Zone
Circle
Division

Schedule 4: Payment Schedule

(The Bidder shall complete his estimated payment schedule based on payments being made as per terms of the bidding docum
according to the pre-estimated construction progress. The total amount of payments to be made shall not exceed the quoted P
The Bidder should note that this is an estimate only, and that payments will be made based on actual progress of the Works.
The Employer and Contractor shall make necessary adjustments to the payment schedule as the work progresses based on th
approved Construction Programme and actual progress of the Works.

Payment Period

Estimated Percent

Estimated Amount
(Rs. Lakhs)

Cumulative %

1st Quarter
2nd Quarter
3rd Quarter
4th Quarter
Totals

Note: While giving the requirement the bidder should consider the quoted price + (plus) Estimated amount of MVAT / Service Ta
Signature of Bidder:
Name & Designation:
Company:

Nagpur Urban
Nagpur Rural
Nagpur Division II

erms of the bidding documents &


not exceed the quoted Price.
progress of the Works.
k progresses based on the

Milestone %

ount of MVAT / Service Tax

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.
0103C

Discreption
Supply, Erection, Testing and Commissioning of 33/11
KV, 2X5 MVA Sub-Station (Outdoor Type).

Unit

Rate

No

186.761

Item Code No.0103C


Cost data for 33/11 kV 2 X 5 MVA New S/S33 kV Outdoor & 11 kV Indoor
Sr. No

Description

Unit

Qty.

Set
Set
Set
Nos
Nos
MTR
Nos
Set
No
Nos
Nos
Set
No
Nos
No
KG

4
2
5
6
36
200
12
2
2
3
6
2
2
12
2
150

Nos

No.

Set
MTR

1
600

A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

33 KV SIDE
33 KV Lightning Arrestors (Station type)
33 KV Isolators with EB (800 A)
33 KV Isolators without EB (800 Amp.)
33 KV Post Insulator
Disc Insulator 11 KV 7000 KG.
ACSR Panther
Strain Hardware for0.2 ACSR
Earthing complete as per Sheet no.2
Power Transformer 33/11 KV, 5 MVA
33 KV P.T.
33 kV C. T. (400-200/1-1-1)
33 KV VCB complete 1600 Amp (O.D.)
C&R panel for 33 KV Transformer with 1 Amp. Relay
33 kV Pin Insulators with G.I. Pins
Structure for 33 KV CT & PT as per Sheet no.3
G.I.Nut Bolts

17

Gantry Structure/Steel section for 33 KV Bus as per


Table No.1

19
B
20
21

Marshalling Box
11 KV SIDE
11kV I D switchgear (2 I/c+1 B/c+8O/G)
XLPE Cable 11 KV, 3 C / 300 mm sq.

22

11 kV heat shrinkable Indoor termination joint kit for 3


C X 300 sqmm

No.

23
24
25

Clamps and Connectors as per Sheet no.4


S/S Yard lighting as per Sheet no.5
Battery set 30 Volt, 100 AH with Battery charger

No.
No.
No.

1
1
1

26

11/0.43 KV x 100 KVA station Transformer as per Sheet


no.6

No.

27
28
D

Control cables for S/S as per Sheet no.7


AC Distribution Board 'B' type
Cost of material

No.
No.

1
1

Services @ 30.5 %
Total cost of Material

Sheet No.1
Cost data for 33 KV Gantry M.S. Structure/Steel Section for 2x5 MVA 33/11 kv S/S (Outdoor)
Sr.No.
1
2

Description of Material
Column type HG( 6Nos.)-496.0 kg.
Beam type HA(4 Nos.)-261.0 Kg.

Unit
MT
MT

Qty.
2.976
1.044

Sheet No.2
Sr.No.
1
2
3
4
5
6

Cost data for Earthing Work at 2x 5 MVA at 33/11


Description of Material
Unit
M.S.Flat 50 x 6 mm
Kg.
Earthing Sets H.T of C.I.pipe 150 mm 3 mtr.
No.
Coal
Kg.
Salt
Kg.
RCC Ring work for earthing pits
No.
Sundries
L.S.

KV S/S
Qty.
1500
22
1310
1310
22
1

Sheet No.3
Cost data of Structure for 33 KV CT & PT at 2x5 MVA, 33/11 KV S/Stn.
Sr.No.
1
2
3
4
5

Description of Material
Structure for 33 KV PT
Structure for 33 KV CT
Structure for 33 KV L.A.
Structure for Power T/F Neutral Earthing
G.I.Nut Bolts

Unit
Kg.
Kg.
Kg.
Kg.
Kg.

Qty.
315
360
155
50
30

Sheet No.4
Sr.No.
1
2
3
4
5
6
7
a)
b)

Cost data for Clamps & Connectors at 2x5 MVA, 33/11 KV S/S
Description of material
Unit
Qty.
T-Connector for 200 sq mm conductor(Compression type)
Nos.
60
Clamps for 33 KV Isolator
Nos.
42
Connectors for T/F Bushing
Nos.
12
Clamps for 33 KV C.T.
Nos.
12
Clamps for 33 KV P.T.
Nos.
3
Clamps for 33 KV V.C.B.
Nos.
12
Wedge Connectors
DOG TO DOG
Nos.
30
T-Connector for 200 sq mm conductor(Compression type)
Nos.
30

Sheet No.5
Cost data for Yard Lighting of 2X 5 MVA, 33/11 KV sub station. (Outdoor)
Sr.No.
1
2
3
4
5
6
7
8

Description of Material
Flood lights with control gear box & 250w SV Lamp
Tubular pole 9 Mtr. Long 88.9C, 137.7 mm
Armoured Copper control cable 4C X 2.5 Sq mm
2 C X 2.5 sq mm Copper Cable
Concreting ration 1:4:8
Red Bricks
Sand
Sundries

Unit
No.
No.
Mtr.
Mtr.
Cmt
No.
Cum
L.S.

Qty.
14
14
250
100
8
1200
6.5
1

Sheet No.6
Cost data for 100 KVA, 11/0.43 KV Station Transformer for 2x 5 MVA, 33/11 S/S (Outdoor).
Sr.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Description of material
G.I.Channel 100x50x6mm
G.I.Channel 75x40x6mm
G.I Flat 75x10 mm
Dist. Transformer 100 KVA, 11/0.43 kv
L.T.Dist.Boxes 100 KVA with MCCB
11KV H.G.Fuses
L.As. 11 KV (Gapless type) with disconector
11 kV Pin Insulators with G.I. Pins
L.T.XLPE Armoured cable120 sq.mm.
L.T.XLPE Armoured cable70 sq.mm.
Earthing Sets H.T
G.I.Strip (25 X 3 mm)
Coal
Salt
Plinth for station Transformer
Half round cement pipe ( 150mm X 1mtr)
G.I.Nut Boltss Washer & Misc Material

Unit
Kg.
Kg.
Kg.
No.
No
Nos.
Set
Nos.
Rmt.
Rmt.
Nos.
Kg.
Kg.
Kg.
Cmt.
Nos.
L.S

Qty.
290
15
20
1
1
1
1
6
10
50
3
40
200
200
5.6
30
1

Sheet No.7
Cost data for Control cable 2 X 5 MVA, 33/11KV S/Stn
Sr.No.
1
2
3
4

Description of material
19 C X 2.5 sq mm Copper Cable
12 C X 2.5 sq mm Copper Cable
4 C X 2.5 sq mm Copper Cable
2 C X 2.5 sq mm Copper Cable

Unit
Rmt
Rmt
Rmt
Rmt

Qty.
250
260
125
100

5
6

L.T.PVC Armoured cable 4core 16sq.mm.


Misc

RMT
L.S

200
1

Cost data for civil works for 33/11 KV Sub Station.

Sr.No.
1
2
3
4
5
6

Particular
Land Development ( As per table A)
Control room of size 9.45 m X 9.65 m (As per table B)
Store room of size 8.0m X 6.0 m (As per table C)
Sanitory Water supply
Electrification (Lumsum)
WBM Road (As per table D)

Amount
342420
1339443
435920.87
0
100000
307362.5

*
*
*
*
*
*

Chain link fencing and Bar bed wire fencing (As per table E)850171.32

8
Metal Spreading (As per table F)
202750
9
Foundations for structures and equipments (for 2 t/f bays) 1061488
Water
10
Supply arrangement for C/Room and Switch Yard.(As per table
61205
H)
11Borewell including pumpset and allied accessories. (As per table I)
80623
12
Const.of cable trench with covers in S/Yard. (As per table J)325543.27
13
Construction of retaining wall. (As per table K)
706418.18
Total=
5813345

*
*
*
*
*
*

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be given.

ION CO. LTD.

Qty.

Amount

1494.09

Rate/Unit
Rs.

Total Cost Rs.

11496.7201
50840.3033
46480.4668
907.5
200.753612
133.685928
671.429652
232594
3707880
18245.6685
25825.9123
188046.82
63721.7717
687.957808
43594
73

45986.880576
101680.6065
232402.3341
5445
7227.130032
26737.1856
8057.155824
465188
7415760
54737.005464
154955.47375
376093.6392
127443.54348
8255.493696
87188
10950

169824.9

169824.9

& 11 kV Indoor

5445

10890
0
3188816 3188815.9912
1125.67866 675407.196
1798.06

14384.48

479860.26
479860.26
203310.507 203310.50716
56421.5291 56421.529056
185612.216 185612.21582
171667.631 171667.63069
26914.2425 26914.242488
14311216.401

4364921.00
18676137.40

A 33/11 kv S/S (Outdoor)


RT/U Rs.
42245
42245
Total:

Amt.Rs.
125721.12
44103.78
169824.9

RT/U Rs.
44.66
6655
6
4
242
770
Total:

Amt.Rs.
66990
146410
7860
5240
5324
770
232594

KV S/S

/11 KV S/Stn.
RT/U Rs.
47.05
47.05
47.05
47.05
73
Total:

Amt.Rs.
14820.75
16938
7292.75
2352.5
2190
43594

Rate
3520
1071.4
3899.17
1497.1
1497.1
2142.91

Amount
211200
44998.8
46790.04
17965.2
4491.3
25714.92
0
23100
105600
479860.26

11 KV S/S

770
3520
Total:

ation. (Outdoor)
RT/U Rs.
Amt. Rs.
3388
47432
5056.2
70786.8
190.234
47558.5
43.4669716 4346.697162
3518
28144
2.42
2904
210.54
1368.51
770
770
Total:
203310.50716

A, 33/11 S/S (Outdoor).


Rate
57.05
57.05
54.06
94217.3656
20436.093
1879.46819
1056.40872
124.135328
292.282068
179.744281
319.594537
57.05
6
4
4818
95
1815
Total:

Amount
16544.5
855.75
1081.2
94217.365632
20436.09298
1879.468192
1056.40872
744.811968
2922.82068
8987.2140386
958.7836104
2282
1200
800
26980.8
2850
1815
185612.21582

S/Stn
Rate
Amount
337.158652
84289.663
223.731232 58170.12032
75.5108526 9438.8565755
43.4669716 4346.697162

74.9114682 14982.293637
440
440
TOTAL
171667.63069

charcole, salt etc. for


I.E. rule. The cost of
yment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0201

Supply, Erection, Testing and Commissioning of


Augmentation of 33/11 KV, 1x3.15 MVA to 1x5 MVA
Power T/F ( Outdoor)[if associated switch gears available]

No

48.388

Item Code No. 0201

Cost data for Augmentation of 33/11 KV, 1x3.15 MVA to 1x5 MVA Power T/F ( Outdoor)[if associated switch
available]
Sr.No.
1

Description
Power Transformer 33/11 KV, 5 MVA
Services @ 30.5 %

Unit

Qty.

No

Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be given.

TION CO. LTD.

Qty.

Amount

193.55

( Outdoor)[if associated switch gears


Rate/Unit
Rs.
3707880

f charcole, salt etc. for


r I.E. rule. The cost of
payment will be given.

Total Cost Rs.


3707880
1130903.40
4838783.40

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0202

Supply, Erection, Testing and Commissioning of


Augmentation of 33/11 KV, 1x5 MVA to 1x10 MVA Power
T/F ( Outdoor)

No

107.847

Item Code No. 0202


Cost data for Augmentation of 33/11 KV, 1x5 MVA to 1x10 MVA Power T/F ( Outdoor)
Sr.No.

Description

Unit

Qty.

Power Transformer 33/11 KV, 10 MVA

No

C&R panel for 33 KV Transformer with Diff. Protection

No

3
4
B

ACSR Panther
33 kV C. T. (400-200/1-1-1)
11 KV Side

Mtr
Nos

75
3

11 kv 250 MVA OD Switchgears comprising of 1 Incomer


and 3 single feeder with associated OD panels, Islators,
C.T. & P.T. etc.

Set

Clamps and Connectors as per Sheet no.1

No.

Take off structure for 3 outgoing feeder as per Sheet no.2

No.

4
5
D

Structure for 11 KV Main Bus as per Sheet no.3


Armoured Copper control cable 7Cx2.5 sq.mm.
Cost of material
Services @ 30.5 %

No.
mtr

1
125

Total cost of Material


Sheet No. 1

Cost data for Clamps & Connectors at 1x 10 MVA,3311 kv sub stn. (Outdoor)
Sr.No.
1

Description of material

Unit

Qty.

a) DOG TO DOG

Nos.

30

b) T-Connector for 200 sq mm conductor(Compression type)

Nos.

30

Wedge Connectors

Clamps for 33 KV Isolator

Nos.

24

Connectors for T/F Bushing

Nos.

Clamps for 33 KV C.T.

Nos.

Clamps for 33 KV P.T.

Nos.

Clamps for 33 KV V.C.B.

Nos.

Sheet No : 2
Cost data for Take off structure for 11 KV Feeders 3 outlets at 1x5 MVA,33/11 KV Sub Stn. (Outdoor)

Sr.No.

Description of material

Unit

Qty.

RSJ 116x100, 9 m long

Nos.

MS Channel 100x50x6 mm

Kg.

1610

MS angle 50x50x6 mm

Kg.

100

MS Flat 75x10 mm

Kg.

80

11KV A.B. Switch

Nos.

Disc Insulator 11 KV 7000 KG.

Nos.

36

Strain Hardware for Dog0.1 or Equ.AAAC.

Nos.

36

11 kV Pin Insulators with G.I. Pins

Nos.

Earthing Sets H.T

Sets

10

L.As. 11 KV (Gapless type) with disconector

Sets

11

ACSR Dog

Rmt.

150

12

G.I.Strip (25 X 3 mm)

Kg.

40

13

G.I.Nut Bolts

Kg.

50

14

Concreting ration 1:4:8

Cmt.

15

Wedge Connectors

a)

DOG TO DOG

Nos.

18

b)

T-Connector for 100 sq mm conductor

Nos.

18

16

Miscelleneous material

LS

Sheet No.3
Cost data for Structure of 11 KV Main Bus at 1x5MVA, 33/11 KV Sub-Station (Outdoor)

Sr.No.

Description of Material

Unit

Qty.

RSJ 116x100, 9 m long

Nos.

MS Channel 100x50x6 mm

Kg.

1610

MS angle 50x50x6 mm

Kg.

100

MS Flat 75x10 mm

Kg.

80

Disc Insulator 11 KV 7000 KG.

Nos.

36

Strain Hardware for Dog0.1 or Equ.AAAC.

Nos.

36

11 kV Pin Insulators with G.I. Pins

Nos.

Earthing Sets H.T

Sets

L.As. 11 KV (Gapless type) with disconector

Sets

10

ACSR Dog

Rmt.

150

11

G.I.Strip (25 X 3 mm)

Kg.

40

12

G.I.Nut Bolts

Kg.

50

13

Concreting ration 1:4:8

Cmt.

14

T-Connector for 100 sq mm conductor

Nos.

12

15

Miscelleneous material

LS

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathi
sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder
considered in the cost of sundries only no seperate payment will be given.

UTION CO. LTD.

Qty.

Amount

431.39

A Power T/F ( Outdoor)


Rate/Unit
Rs.

Total Cost Rs.

6179800

6179800

144916.119 144916.118988
133.685928
25825.9123

10026.4446
77477.736876
0

1181212.59

1181212.59

204139.98

204139.98

250893.05 250893.047263
197958.65 197958.651019
142.002422 17750.3027425
8264174.87149
2520573.34
10784748.21

b stn. (Outdoor)
Rate

Amount

770.00

23100.00

3520.00

105600.00

1071.40

25713.60

3899.17

23395.02

1497.10

8982.60

1497.10

4491.30

2142.91

12857.46

Total:

204139.98

3/11 KV Sub Stn. (Outdoor)

Rate

Amount

8461.22

50767.30

47.05

75750.50

47.05

4705.00

44.06

3524.80

11484.80

34454.40

200.75

7227.13

354.72

12769.94

124.14

1117.22

319.59

958.78

1056.41

3169.23

55.83

8374.75

57.05

2282.00

73.00

3650.00

3518.00

14072.00

770.00

13860.00

770.00

13860.00

350.00

350.00

Total:

250893.05

ub-Station (Outdoor)

RT/U Rs.

Amt. Rs.

8461.22

50767.30

47.05

75750.50

47.05

4705.00

44.06

3524.80

200.75

7227.13

354.72

12769.94

124.14

1117.22

319.59

958.78

1056.41

3169.23

55.83

8374.75

57.05

2282.00

73.00

3650.00

3518.00

14072.00

770.00

9240.00

350.00

350.00

Total:

197958.65

d of charcole, salt etc. for eathing with


The cost of Bentonite powder is to be
ment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

Qty.

Amount

0301D

Supply, Erection, Testing and Commissioning 33/11 KV,


1x5 MVA Additional Power T/F ( Outdoor) without
Gantry structure with required Civil work

No

85.983

85.98

Item Code No. 0301D/new


Cost data for 33/11 KV, 1x5 MVA Additional Power T/F ( Outdoor) without Gantry structure with required Civil work
Sr.No.

Description

Unit

Qty.

Rate/Unit
Rs.

Total Cost Rs.

Set
Set
Set
Nos
Nos
MTR
Nos
Set
No
Nos
Set
No
No

2
1
3
3
18
200
6
1
1
3
1
1
1

11496.7201
50840.3033
46480.4668
907.5
200.753612
133.685928
671.429652
232594.00
3707880
25825.9123
188046.82
63721.7717
28773.25

22993.440288
50840.30325
139441.40046
2722.5
3613.565016
26737.1856
4028.577912
232594
3707880
77477.736876
188046.8196
63721.77174
28773.25

105865.97

105865.97

A
1
2
3
4
5
6
7
8
9
10
11
12
13

33 KV SIDE
33 KV Lightning Arrestors (Station type)
33 KV Isolators with EB (800 A)
33 KV Isolators without EB (800 Amp.)
33 KV Post Insulator
Disc Insulator 11 KV 7000 KG.
ACSR Panther
Strain Hardware for0.2 ACSR
Earthing complete as per sheet No. 1
Power Transformer 33/11 KV, 5 MVA
33 kV C. T. (400-200/1-1-1)
33 KV VCB complete 1600 Amp (O.D.)
C&R panel for 33 KV Transformer with 1 Amp. Relay
Structure for 33 KV CT as per Sheet no. 2

14

Gantry Structure/Steel section for 33 KV Bus as per


Sheet No.7

Nos

15
16
17

33 kV Pin Insulators with G.I. Pins


G.I.Nut Bolts
Fire Extinguisher with stand

Nos
KG
Set

6
100
L.S

11 KV SIDE

18

11 kv 250 MVA OD Switchgears comprising of 1 Incomer


and 3 single feeder with associated OD panels, Islators,
C.T. & P.T. etc.

Set

19
20

11 kV Pin Insulators with G.I. Pins


L.As. 11 KV (Gapless type) with disconector

No
Set

12
1

21

Take off structure for 3 outgoing feeder as per Sheet no.3

No.

250893.05 250893.04726

22
23
24

Clamps and Connectors as per Sheet no. 4


Structure for 11 KV Main Bus as per Sheet no.5
Control cables for S/S as per Sheet no.6
Cost of Material
Services @ 30.5 %

No.
No.
No.

1
1
1

199648.68
199648.68
197958.65 197958.65102
85487.48 85487.483953
6588750.7525
2009568.98

687.957808 4127.746848
73
7300
4840
4840
0
1181212.59

1181212.59

124.135328 1489.623936
1056.40872 1056.40872

Total cost of Material


Sheet No.1

8598319.73

# Cost data for Earthing Work at 1x 5 MVA at 33/11 KV S/S


Sr.No.
1
2
3
4
5
6

Description of Material
M.S.Flat 50 x 6 mm
Earthing Sets H.T of C.I.pipe 150 mm 3 mtr.
Coal
Salt
RCC Ring work for earthing pits
Sundries

Unit
Kg.
No.
Kg.
Kg.
No.
L.S.

Qty.
1500
22
1310
1310
22
1

RT/U Rs.
44.66
6655.00
6.00
4.00
242.00
770.00

Amt.Rs.
66990.00
146410.00
7860.00
5240.00
5324.00
770.00

Total:

232594.00

Sheet
No.2
Cost data of Structure for 33 KV CT & LA at 1x5 MVA 33/11 KV S/Stn.
Sr.No.
1
2
3
4

Description of Material
Structure for 33 KV CT
Structure for 33 KV L.A.
Structure for Power T/F Neutral Earthing
G.I.Nut Bolts

Unit
Kg.
Kg.
Kg.
Kg.

Qty.
360
155
50
30

RT/U Rs.
47.05
47.05
47.05
73.00

Amt.Rs.
16938.00
7292.75
2352.50
2190.00

Total:

28773.25

Sheet No
:3
Cost data for Take off structure for 11 KV Feeders 3 outlets at 1x 5 MVA,33/11 KV Sub Stn. (Outdoor)
Sr.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
a)
b)
16

Description of material
RSJ 116x100, 9 m long
MS Channel 100x50x6 mm
MS angle 50x50x6 mm
MS Flat 75x10 mm
11KV A.B. Switch
Disc Insulator 11 KV 7000 KG.
Strain Hardware for Dog0.1 or Equ.AAAC.
11 kV Pin Insulators with G.I. Pins
Earthing Sets H.T
L.As. 11 KV (Gapless type) with disconector
ACSR Dog
G.I.Strip (25 X 3 mm)
G.I.Nut Bolts
Concreting ration 1:4:8
Wedge Connectors
DOG TO DOG
T-Connector for 100 sq mm conductor
Miscelleneous material

Unit
Nos.
Kg.
Kg.
Kg.
Nos.
Nos.
Nos.
Nos.
Sets
Sets
Rmt.
Kg.
Kg.
Cmt.

Qty.
6
1610
100
80
3
36
36
9
3
3
150
40
50
4

Rate
8461.22
47.05
47.05
44.06
11484.80
200.75
354.72
124.14
319.59
1056.41
55.83
57.05
73.00
3518.00

Amount
50767.30
75750.50
4705.00
3524.80
34454.40
7227.13
12769.94
1117.22
958.78
3169.23
8374.75
2282.00
3650.00
14072.00

Nos.
Nos.
LS

18
18
-

770.00
770.00
350.00

13860.00
13860.00
350.00

Total:

250893.05

Sheet
No. 4
Cost data for Clamps & Connectors at 1x 5 MVA, 3311 kv sub stn. (Outdoor)
Sr.No. Description of material
1
Wedge Connectors
a) DOG TO DOG
b) T-Connector for 200 sq mm conductor(Compression type)
2
3
4
5

Clamps for 33 KV Isolator


Connectors for T/F Bushing
Clamps for 33 KV C.T.
Clamps for 33 KV V.C.B.

Unit

Qty.

Rate

Amount

Nos.

30

770.00

23100.00

Nos.

30

3520.00

105600.00

Nos.
Nos.
Nos.
Nos.

24
6
6
6

1071.40
3899.17
1497.10
2142.91

25713.60
23395.02
8982.60
12857.46

Total:
Sheet
No.5
Cost data for Structure of 11 KV Main Bus at 1x 5 MVA, 33/11 KV Sub-Station (Outdoor)

199648.68

Sr.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Description of Material
RSJ 116x100, 9 m long
MS Channel 100x50x6 mm
MS angle 50x50x6 mm
MS Flat 75x10 mm
Disc Insulator 11 KV 7000 KG.
Strain Hardware for Dog0.1 or Equ.AAAC.
11 kV Pin Insulators with G.I. Pins
Earthing Sets H.T
L.As. 11 KV (Gapless type) with disconector
ACSR Dog
G.I.Strip (25 X 3 mm)
G.I.Nut Bolts
Concreting ration 1:4:8
T-Connector for 100 sq mm conductor
Miscelleneous material

Unit
Nos.
Kg.
Kg.
Kg.
Nos.
Nos.
Nos.
Sets
Sets
Rmt.
Kg.
Kg.
Cmt.
Nos.
LS

Qty.
6
1610
100
80
36
36
9
3
3
150
40
50
4
12
-

Sheet
No.6

RT/U Rs.
8461.22
47.05
47.05
44.06
200.75
354.72
124.14
319.59
1056.41
55.83
57.05
73.00
3518.00
770.00
350.00

Amt. Rs.
50767.30
75750.50
4705.00
3524.80
7227.13
12769.94
1117.22
958.78
3169.23
8374.75
2282.00
3650.00
14072.00
9240.00
350.00

Total:

197958.65

Rate
337.16
223.73
75.51
43.47
74.91
440.00

Amount
42144.83
29085.06
4153.10
2173.35
7491.15
440.00

TOTAL

85487.48

Cost data for Control cable 1 X 5 MVA S/Stn


Sr.No.
1
2
3
4
5
6

Description of material
19 C X 2.5 sq mm Copper Cable
12 C X 2.5 sq mm Copper Cable
4 C X 2.5 sq mm Copper Cable
2 C X 2.5 sq mm Copper Cable
L.T.PVC Armoured cable 4core 16sq.mm.
Misc

Unit
Rmt
Rmt
Rmt
Rmt
RMT
L.S

Qty.
125
130
55
50
100
-

Sheet
No.7
Cost data for 33 KV Gantry M.S. Structure/Steel Section for 1x 5 MVA &1x10 MVA 33/11 kv S/S (Outdoor)
Sr.No.
1
2

Description of Material
Column type HG(4 Nos.)-496.0 kg.
Beam type HA(2 Nos.)-261.0 Kg.

Unit
MT
MT

Qty.
1.984
0.522

RT/U Rs.
42245.00
42245.00
Total:

C
Sr.No.
1
2
3
4
5
6
7
8
9
10
11

Cost data for civil works for 22/11 KV Sub Station.


Particular
Land development
Control room of size 9.45mX9.65m(as per table B)
Store room 8X6 m (as per table C)
Sanitory Water supply
Electrification (LS)
Approach Rood (WBM road) (as per table D)
Chain-link fencing (as per table E)if required
Metal spreading (as per table F)
Foundations for structures and equipments (for 1 t/f
bay)
water supply arrangement for switch yard
Borewell including pumpsets and allied accesaries

Amount
28605

92862.00
530744
32040

Amt.Rs.
83814.08
22051.89
105865.97

12

construction of Cable trenches including providing C.C.


covers in switch yard

13

Construction of retaining wall (If required)


Total=
684251
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 480 sqm.
Table A
Item No

Particulars

Cuting down the raod side thornyt bushes having girth


5\ cm to 20 cm including removingtheir roots stacking
and conveying the material upto 1 Km removing
vegitation including levelling ground as directed for both
sides of road etc. compl;ete.

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber and side
slopes and conveying the excavated materials with all
lifts and upto a lead of 50 metres and spreading for
embankment or stacking etc. as directed by Engineer in
charge.
Spec. No. : Rd.2 Page No. 180
Supplying,stacking and spreading of Hard murum
brought from outside including all leads,lifts,labours
,spreading in line and level,sectioning,watering and
compacting etc complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Qty

Unit

Rate

Amount

480

Sqm

2.5

1200

50

Cum

120

6000

35

Cum

567

19845

35

Cum

24

840

15

Cum

48

720

Spreading hard murum/ kankar at the road side,


including conveying and stacking and spreading in line
and level etc complete as directed by Engr In Charge
5

Filling the open uneven space by approved excavated


material in 15 to 20 cm layer including the watering and
compaction etc.as directed by engineer in charge.

TOTAL

28605

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Table F
Model Estiamte for the work of Metal Spreading in Switch Yard at 33 Kv Sub Station Under Infra II Project.
Switch yard area considered 480 Sqm..
Item No Particulars
Qty
Unit
Rate
Amount
1

480.00

Sqm

5.00

2400.00

23.00

Cum

1018.00

23414.00

30.00

Cum

1193.00

35790.00

16.00

Cum

1543.00

24688.00

125.00

Rmt

42.00

5250.00

30.00

Cum

32.00

960.00

15.00

Cum

24.00

360.00

Removing Grass and Vegetation ,small trees,bushes etc


including removing the same from root,disposing off the
same removed material outside the premises of sub
station etc complete as directed by Engr In Charge.
2
Supplying and stacking, stone dust brought from outside
source of approved quality including all labour charges
required for spreading in line and level in switch yard
area of sub station with watering and compaction as
directed by Engr In Charge.
3

Supplying and stacking,40 mm machine crushed metal


brought from outside source of approved quality
including all labour charges required for spreading in
line and level in switch yard area of sub station as
directed by Engr In Charge.

4
Supplying andstacking 12/20 mm machine crushed
metal brought from outside source of approved quality
including all labour charges required for spreading in
line and level in switch yard area of sub station as
directed by Engr In Charge.
5

Providing anf fixing Brick on Edge lining of approved


quality bricks including excavation,all labour charges
,fixing in neat line and level as directed by Engr In
Charge including two coats of white or colour washing to
the bricks.

Spreading of machine crushed 40 mm metal in line and


level in switch yard area including labour lead and lifts
as directed by engineer in charge.

7
Spreading of machine crushed 12/20 mm metal and
stone dust in line and level in switch yard area including
labour lead and lifts as directed by engineer in charge

TOTAL

92862.00

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Table H
Model estimate for Providing Water Supply arrangement for Switch Yard at 33 Kv Sub Station under Infra-II
project.
Item No Particulars
1

2
3
4

6
7

Providing and fixing on walls / ceiling / floors, 15 mm.


diameter light grade (type) having embossed as ISI Mark
galvanised iron pipes with screwed, sockets, joints and
necessary galvanised iron fittings such as sockets, back
nuts, elbows, bends, tees, reducers, enlargers, plugs,
clamps etc. including necessary drilling holes in walls,
slabs etc. and remaking good the demolished portion to
restore the same in original condition neatly and
applying anti corrosive primer oil paint and two coats of
oil painting complete.
Spec. No. : Bd.V.5 Page No. 551
As Above but for 20 mm dia.
As Above but for 25 mm dia.
Providing and fixing 15 mm. diameter screw down bib/
stop tap of brass including necessary socket union nut
complete.conforming to I.S. : 781)
Spec. No. : Bd.V.8 Page No. 554
Providing and fixing Gate Valve of 20mm dia gun
metal/brass including
necessary sockets/ union nut complete.
(conforming to I.S. : 781)
Spec. No. : Bd.V.9 Page No. 555
As Above but for 25 mm dia.

Qty

Unit

Rate

Amount

20

Rmt

165

3300

35
40
18

Rmt
Rmt
Nos

188
235
175

6580
9400
3150

Nos

675

675

1
9

Nos
Nos

835
900

835
8100

Providing and fixing R.C.C. Collers of 450 mm Diameter


and height of about 200 to 250 mm of approved quality
and manufacture including all loading and unloading
and carting at site with all labours and fixing the same
collers at required position around earth pits in switch
yard as directed by Engr In Charge complete.
TOTAL

32040

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder
is to be considered in the cost of sundries only no seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No. Discreption
0601A

Supply, Erection, Testing and Commissioning of 33 KV


FEEDER BAY (Outdoor) without Gantry structure

Unit

Rate

No

9.754

Item Code No. 0601A


Cost data for 33 KV FEEDER BAY (Outdoor) without Gantry structure
Sr.No.
1
2
3
4
5
6
7
8
9

Description of Material
33 KV Lightning Arrestors (Station type)
33 KV Isolators with EB (800 A)
33 KV Isolators without EB (800 Amp.)
33 KV VCB complete 1600 Amp (O.D.)
CT 200-100/1-1 A , 33 KV
C&R panel for 33 KV for feeder breaker

Unit
Set
Set
Set
Set
Nos.
Nos.

Qty.
1
1
1
1
3
1

Structure and foundation cables, clamps, painting etc.as


per sheet (A+B+C+D+F)

L.S.

No
L.S.

1
1

Marshalling Box
Earthing as per Sheet (E)
Cost of material
Services @ 30.5 %
Total cost of Material

33 KV Feeder bay (Structure, Foundation, Bus bar material, Cable , Earthing Materials & Painting)
Sr.No.
A)
1
2
3
4
B)
1
2
3
4
5

Description of Material
STRUCTURE
Structure for 33 KV L.A.
Structure for 33 KV CT
G.I.Nut Bolts
Welding Rods

Unit

Qty.

Kg.
Kg.
Kg.
Nos.

250
315
100
5000

FOUNDATION(Civil works)
Foundation for 33 kV Isolators with EB
Foundation for 33 kV Isolators without EB
Foundation for 33 kV C.Ts
Foundation for 33 kV Lightning Arrestor
Foundation for 33 kV Breaker

Cmt.
Cmt.
Cmt.
Cmt.
Cmt.

1.3
1.3
1.3
1.3
1.3

Foundation for Gantry Structures

Cmt.

2.6

C)
1
2

BUS-BAR MATERIAL
ACSR Panther
Wedge Connectors

Mtrs.

25

a)

T-Connector for 200 sq mm conductor(Compression type)

Nos.

30

3
4
5
6
7

Breaker Clamps
clamps for Isolator
Clamps for CTs
Disc Insulator 11 KV 7000 KG.
Strain Hardware for0.2 ACSR

Nos.
Nos.
Nos.
Nos.
Nos.

6
12
6
18
6

CONTROL CABLE
19 C X 2.5 sq mm Copper Cable
Armoured Copper control cable 2Cx2.5 sq.mm.
Control Cable 2/4 sq.mm.
Cable Trays 2.5 Mtr. X 6" W
Cable Glands,rerules and tape etc.
Angle for fixing trays 50x50x6mm
Half round cement pipe ( 150mm X 1mtr)
Sand

Rmt.
Rmt.
Rmt.
Nos.
L.S.
Kg.
Nos.
Cmt.

50

E)
1
2
3
4
5
6
7
8

EARTHING WORK
M.S. Flats(50 X 10mm)
M.S.Flat 25x6 mm
Earthing Sets H.T of C.I.pipe 150 mm 3 mtr.
Coal
Salt
Welding Rods
Hiring of Welding machine
Brick & Masonary works for earthing pit

Kg.
Kg.
Nos.
Kg.
Kg.
Nos.
Nos.
Nos.

50
20
1
100
100
50
1
1

F)
1
2

PAINTING OF STRUCTURE
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat

Ltrs.
Ltrs.

10
5

D)
1 a)
b)
c)
2
3
4
5
6

40
50
10
L.S.
20
80
4

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

16

156.07

Rate
11496.7201
50840.3033
46480.4668
188046.82
24200
96224.4748

Amt.
11496.720144
50840.30325
46480.46682
188046.8196
72600
96224.474784

antry structure

263800.214 263800.21393
5445
12512.2

5445
12512.2
747446.19853
227971.09
975417.29

arthing Materials & Painting)


Rate

Amount

47.05
47.05
73
2.42
Sub Total

11762.5
14820.75
7300
12100
45983.25

4046
4046
4046
4046
4046

5259.8
5259.8
5259.8
5259.8
5259.8

263800.2139

3518
Sub Total:

9146.8
35445.8

133.685928

3342.1482

3520

105600

1772.35
10634.1
887.6
10651.2
1239.65
7437.9
200.753612 3613.565016
671.429652 4028.577912
Sub Total: 145307.49113

Sub Total:

16857.9326
2353.5802008
3850
3025
550
941
7600
842.16
36019.672801

44.06
44.06
6655
6
4
2.42
220
1432
Sub Total:

2203
881.2
6655
600
400
121
220
1432
12512.2

56
96.8
Sub Total:

560
484
1044

337.16
58.84
77.00
302.50
550.00
47.05
95.00
210.54

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

No

9.138

Description of Material
L.As. 11 KV (Gapless type) with disconector
11 KV Isolators with EB (800 A)
11 KV Isolators without EB (800 Amp.)
11 KV VCB 400 A Outdoor
11 KV CT 400 - 200 / 5 - 5 Outdoor
C&R Panel for 11 kV Outgoing Feeder OD

Unit
Set
Set
Set
Set
Nos.
Nos.

Qty.
1
1
1
1
3
1

Structure and foundation cables, clamps, painting etc.as


per sheet (A+B+C+D+F)

L.S.

No
L.S.

1
1

Supply, Erection, Testing and Commissioning of 11 KV


FEEDER BAY

0603

Item Code 0603


11 KV FEEDER BAY
Sr.No.
1
2
3
4
5
6
7
8
9

Marshalling Box
Earthing as per Sheet (E)
Cost of material
Services @ 30.5 %
Total cost of Material

11 KV Feeder bay (Structure, Foundation, Bus bar material, Cable , Earthing Materials & Painting
Sr.No.
A)
1
2
3
4
5
B)
1
2
3
4
5
6

Description of Material
STRUCTURE
Structure for 11 KV L.A.
Structure for 11 KV CT
Gantry Structures
G.I.Nut Bolts
Welding Rods
FOUNDATION(Civil works)
Foundation for 11 kV Isolators
Foundation for 11 kV Isolators without EB
Foundation for 11 kV Lightning Arrestor
Foundation for 11 kV C.Ts
Foundation for 11 kV Breaker
Foundation for Gantry Structures

Unit

Qty.

Kg.
Kg.
Kg.
Kg.
Nos.

250
315
1000
100
5000

Cmt.
Cmt.
Cmt.
Cmt.
Cmt.
Cmt.

1.3
1.3
1.3
1.3
1.3
2.6

C)
1
2

BUS-BAR MATERIAL
ACSR Panther
Wedge Connectors

Mtrs.

25

Nos.

30

Breaker Clamps
clamps for Isolator
Clamps for CTs
Disc Insulator 11 KV 7000 KG.
Strain Hardware for0.2 ACSR

Nos.
Nos.
Nos.
Nos.
Nos.

6
12
6
12
6

D)
1 a)
b)
c)
2
3
4
5
6

CONTROL CABLE
19 C X 2.5 sq mm Copper Cable
Armoured Copper control cable 2Cx2.5 sq.mm.
Control Cable 2/4 sq.mm.
Cable Trays 2.5 Mtr. X 6" W
Cable Glands,rerules and tape etc.
Angle for fixing trays 50x50x6mm
Half round cement pipe ( 150mm X 1mtr)
Sand

Rmt.
Rmt.
Rmt.
Nos.
L.S.
Kg.
Nos.
Cmt.

50
40
50
10
20
80
4

E)
1
2
3
4
5
6
7
8

EARTHING WORK
M.S. Flats(50 X 10mm)
M.S.Flat 25x6 mm
Earthing Sets H.T of C.I.pipe 150 mm 3 mtr.
Coal
Salt
Welding Rods
Hiring of Welding machine
Brick & Masonary works for earthing pit

Kg.
Kg.
Nos.
Kg.
Kg.
Nos.
Nos.
Nos.

50
20
1
100
100
50
1
1

F)
1
2

PAINTING OF STRUCTURE
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat

Ltrs.
Ltrs.

10
5

a) T-Connector for 200 sq mm conductor(Compression type)


3
4
5
6
7

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

9.14

Rate
1056.40872
43924.6139
38615.2668
150000
16500
84988.4748

Amt.
1056.41
43924.61
38615.27
150000.00
49500.00
84988.47

314163.69

314163.69

5445
12512.20

5445.00
12512.20
700205.66
213562.73
913768.38

Earthing Materials & Painting)


Rate

Amount

47.05
47.05
55.00
73.00
2.42

11762.50
14820.75
55000.00
7300.00
12100.00

Sub Total
3518.00
3518.00
3518.00
3518.00
3518.00
3518.00
Sub Total:

100983.25
4573.40
4573.40
4573.40
4573.40
4573.40
9146.80
32013.80

133.69

3342.15

3520.00

105600.00

1772.35
887.60
1239.65
200.75
671.43

10634.10
10651.20
7437.90
2409.04
4028.58

Sub Total:

144102.97

337.16
58.84
77.00
302.50
550.00
47.05
95.00
210.54

16857.93
2353.58
3850.00
3025.00
550.00
941.00
7600.00
842.16

Sub Total:

36019.67

44.06
44.06
6655.00
6.00
4.00
2.42
220.00
1432.00
Sub Total:
56.00
96.80
Sub Total:

2203.00
881.20
6655.00
600.00
400.00
121.00
220.00
1432.00
12512.20
560.00
484.00
1044.00

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

0701

Discreption
Supply, Erection, Testing and Commissioning of 1 Km.
33 KV S/C Line with 100 mm2 ACSR (Suspension type)
& RSJ 152 X 152 mm 12 mtr. Long.

Unit

Rate

Km

8.898

Item Code No. 0701

Cost data for 1 Km. 33 KV S/C Line with 100 mm2 ACSR (Suspension type) & RSJ 152 X 152 mm 12 m
Sr.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
a)

Particulars
RSJ 152x152, 12 m long
RSJ 152x152, 11 m long
MS Channel 100x50x6 mm
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
MS Flat 75x10 mm
G.I.Nut Bolts
Disc Insulator 11 KV 7000 KG.
SSN Hardware for 0.1 Dog or AAAC 100 Sq.mm
ACSR Dog
H.T.Stay Set
G.I.Stay Wire 7/4mm(8 SWG)
G.I.Wire 8 SWG/ 6 SWG
Sleve Joints
Danger Board in yard.
Earthing Sets H.T
Concreting ration 1:3:6
G.I.Barbed Wire `A' type.
Black bituminus paint
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat
Sundries
Wedge connectors
DOG TO DOG
Cost of material
Services @ 30.5 %
Total cost of Material
Assumption1) 3- cut points (including 1- rightangle cut point in 1 km.)
2) 2- line deviations upto 60*
3) 2 Strut support

Unit
No.
No.
Kg.
Kg.
Kg.
Kg.
Kg.
No.
No.
Mtrs.
No.
Kg.
Kg.
No.
No.
No.
cmt.
Kg.
Ltr.
Ltr.
Ltr.
LS

Qty.
14
2
495
91
203
89
80
153
33
3150
6
60
130
3
14
14
25
60
6
20
9
LS

No

18

4) 4 span guarding.
5) Average span length - 75 mtrs.

Note:A). The cost for the year 2012-13 is updated by considering the latest CPA rates i.e upto March 2013. The Price variation are updated upto March 2
items which are not purchased by CPA.
B). The rates considered are Ex-works rates inclusive of excise duty but exclusive of MVAT /LBT/LPT/Octroi/service tax which will be paid at actual
C). The rates for PSC poles are considered as per office note no.CEC/CO/BND/Tech/335 dated 21.06.2013
D). Updated the cost of RSJ poles, MS channel, MS Angle, MS Flat, Clamps, Structures as per latest IEEMA rates (April 2013), SAIL rate (June 2013)

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

69

613.93

e) & RSJ 152 X 152 mm 12 mtr. Long.


Rate
17631.9914
16162.6588
47.05
47.05
47.05
44.06
73
200.753612
247.720092
55.831684
543.661725
53.640664
53.640664
121
49
319.594537
4046
66.090152
45.1
56
96.8
770
770

Amount
246847.87997
32325.317615
23289.75
4281.55
9551.15
3921.34
5840
30715.302636
8174.763036
175869.8046
3261.9703512
3218.43984
6973.28632
363
686
4474.3235152
101150
3965.40912
270.6
1120
871.2
770
0
13860
681801.08701
207949.33
889750.42

Price variation are updated upto March 2013 for the

rvice tax which will be paid at actual

tes (April 2013), SAIL rate (June 2013)

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0708

Supply, Erection, Testing and Commissioning of laying of


1 Km. 33 KV 3 C 300 mm 2 XLPE under ground Cable

Km

26.459

Item Code 0708


Cost Data for laying of 1 Km. 33 KV 3 C 300 mm 2 XLPE under ground Cable
Sr.No.
1
2
3

Particulars
XLPE Cable 33 KV, 3 C / 300 mm sq.
R.C.C. Pipe 150 mm 2 M
RCC Tiles (0.6 x 0.5) Mtrs.

Unit
Rmt
No
No.

Qty.
1000
30
940

33 kV Heat shrik Straight through joint (Al) kit for XLPE


3 C X 300 sqmm

No.

33 kV Heat shrik Outdoor termination joint (Al) kit for


XLPE 3 C X 300 sqmm

No.

Cmt.
LS

250
1

6
7

Sand
# Misc. for XLPE U/G Cable
Cost of material
Services @ 30.5 %
Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

17.2

455.09

under ground Cable


Rate (Rs.)
Amount
1747.7297 1747729.6988
527
15810
95
89300
39930

79860

20590.57

41181.14

210.54
990

52635
990
2027505.8388
618389.28
2645895.12

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0709

Supply, Erection, Testing and Commissioning of 33 kV 3


X 300 sqmm XLPE Underground Cable for Railway line
crossing as per Sketch

Km

8.952

Item Code No. 0709


33 kV 3 X 300 sqmm XLPE Underground Cable for Railway line crossing as per Sketch
S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Description of Material
RSJ 152x152, 13 m long
M.S.Channel 75x40x6 mm
MS Channel 100x50x6 mm
MS angle 50x50x6 mm
M.S.Flat 50 x 6 mm
33 KV Isolators with EB (800 A)
33 kV Pin Insulators with G.I. Pins
ACSR Dog
XLPE Cable 33 KV, 3 C / 300 mm sq.
R.C.C. Pipe 150 mm 2 M
Black Bituminus Paint
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat

Unit
No.
Kg.
Kg.
kg.
kg.
Set
NO.
Rmt
Rmt
No
Ltr.
Ltr.
Ltr.

QTY
4
60
100
22
24
2
6
100
160
35
2
6
4

33 kV Heat shrik Outdoor termination joint (Al) kit for


XLPE 3 C X 300 sqmm

No.

Cmt
LS

500
2

Sand
Misc. for XLPE U/G Cable
Cost of material
Services @ 30.5 %
Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

26.85

crossing as per Sketch


RT/U.Rs.
19101.324
47.05
47.05
47.05
44.66
50840.3033
687.957808
55.831684
1747.7297
527
45.1
56
96.8

Amt Rs.
76405.296182
2823
4705
1035.1
1071.84
101680.6065
4127.746848
5583.1684
279636.7518
18445
90.2
336
387.2

20590.57

82362.28

210.54
990

105270
1980
685939.18973
209211.45
895150.64

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0713

Supply, Erection, Testing and Commissioning of


DOUPLE POLE STRUCTURE(cut point) OF- 33 KV LINE
USING 11 M LONG RSJ POLE

No

0.669

Item Code No. 0713


DOUPLE POLE STRUCTURE(cut point) OF- 33 KV LINE USING 11 M LONG RSJ POLE
S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Description of Material
RSJ 116x100, 11 m long
M.S. Flats(50 X 10mm)
MS Channel 100x50x6 mm
MS angle 50x50x6 mm
33 kv guarding channel MS100x50
33 kV Pin Insulators with G.I. Pins
Strain Hardware for Dog0.1 or Equ.AAAC.
Disc Insulator 11 KV 7000 KG.
H.T.Stay Set
Stay Wire 7/8
Earthing Sets H.T
G.I.Wire 8 SWG/ 6 SWG
G.I.Barbed Wire `A' type.
Danger Board in yard.
Black Bituminus Paint
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat
Concreting ration 1:3:6
# Sundries
Cost of material
Services @ 30.5 %

Unit
No.
Kg.
Kg.
Kg.
Kg.
No.
No.
No.
No.
Kg.
No
kg.
kg.
No.
Ltr.
Ltr.
Ltr.
Cmt.
LS

QTY
2
10
46
50
80
3
6
18
4
20
2
6
7
2
1
3
2
2
1

Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

138

92.34

11 M LONG RSJ POLE


RT/U.Rs.
10341.4874
44.06
47.05
47.05
47.05
687.957808
354.72052
200.753612
543.661725
55
319.594537
53.640664
66.090152
49
45.1
56
96.8
4046
770

Amt Rs.
20682.974866
440.6
2164.3
2352.5
3764
2063.873424
2128.32312
3613.565016
2174.6469008
1100
639.1890736
321.843984
462.631064
98
45.1
168
193.6
8092
770
51275.147449
15638.92
66914.07

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0905

Supply, Erection, Testing and Commissioning of 1.0 Km.


pin type 11 KV Single circuit Pin type with 100sq.mm
ACSR lines on 152x152 mm 11 mtr RSJ poles

Km

8.226

Item Code No.0904

Cost data for11 KV Single circuit Pin type with 100sq.mm ACSR lines on 152x152 mm 11 mtr RSJ pole
Sr.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
a)

Description of Material
RSJ 152x152, 11 m long
RSJ 116x100, 10 m long
11 kv guarding channel MS 75x40
M.S.Channel 75x40x6 mm
11 KV V cross arm with clamp
11 KV Top fitting with clamp
MS angle 50x50x6 mm
M.S. Flats(50 X 10mm)
G.I.Nut Bolts
11 kV Pin Insulators with G.I. Pins
Disc Insulator 11 KV 7000 KG.
Strain Hardware for Dog0.1 or Equ.AAAC.
ACSR Dog
Sleve Joints
H.T.Stay Set
Stay Wire 7/8
Earthing Sets H.T
G.I.Barbed Wire `A' type.
Danger Board in yard.
Concreting ration 1:4:8
G.I.Wire 8 SWG/ 6 SWG
Black Bituminus Paint
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat
# Sundries
Wedge connectors
DOG TO DOG
Cost of material
Services @ 30.5 %
Total cost of Material

Unit
No.
No.
Kg.
Kg.
Kg.
Kg.
No.
No.
Kg.
No.
No.
Set
Rmt
No.
Set
Kg.
Set
Kg.
No.
Cmt.
Kg.
Ltr.
Ltr.
Ltr.
LS

Qty.
17
2
104
122
13
13
72
37
90
39
24
24
3150
3
8
80
17
71
17
18
130
6
20
9
1

No

24

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

44

361.93

152x152 mm 11 mtr RSJ poles


RT/U Rs.
16162.6588
9401.35221
47.05
47.05
580.136956
82.5
47.05
44.06
73
124.135328
200.753612
354.72052
55.831684
121
543.661725
55
319.594537
66.090152
49
3518
53.640664
45.1
56
96.8
770
770

Amount
274765.19973
18802.704424
4893.2
5740.1
7541.7804222
1072.5
3387.6
1630.22
6570
4841.277792
4818.086688
8513.29248
175869.8046
363
4349.2938016
4400
5433.1071256
4692.400792
833
63324
6973.28632
270.6
1120
871.2
770
0
18480
630325.65418
192249.32
822574.98

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.
0908

Discreption
SSupply, Erection, Testing and Commissioning of 11 KV
Single circuit Pin type with 55sq.mm AAAC lines on
100x116 mm 9 mtr PSC poles

Unit

Rate

Km

3.613

Item Code No. 0908

Cost data for11 KV Single circuit Pin type with 55sq.mm AAAC lines on 100x116 mm 9 mtr PSC poles
Sr.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
a)

(A) HT Line :
Description of Material
PSC Pole 9 Mtr (200 KG)
11 kv guarding channel MS 75x40
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
11 KV V cross arm with clamp
11 KV Top fitting with clamp
M.S. Flats(50 X 10mm)
11 kV Pin Insulators with G.I. Pins
Disc Insulator 11 KV 7000 KG.
Strain Hardware for 55 Sq.mm AAAC
AAAC 55 mm2
Sleve Joints
H.T.Stay Set
Stay Wire 7/8
Earthing Sets H.T
G.I.Barbed Wire `A' type.
Danger Board in yard.
Concreting ration 1:4:8
G.I.Wire 8 SWG/ 6 SWG
Black Bituminus Paint
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat
G.I.Nut Bolts
# Sundries
Wedge connectors
RABIT To RABIT
Cost of material
Services @ 30.5 %
Total cost of Material

Unit
No.
Kg.
Kg.
Kg.
No.
No.
Kg.
No.
No.
Set
Rmt
No.
Set
Kg.
Set
Kg.
No.
Cmt.
Kg.
Ltr.
Ltr.
Ltr.
Kg.
LS

Qty.
18
104
122
72
12
12
39
42
24
24
3150
3
8
80
18
71
18
18
130
6
20
9
90
1

No

24

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

101

364.88

100x116 mm 9 mtr PSC poles


RT/U Rs.
2234.8404
47.05
47.05
47.05
580.136956
82.5
44.06
124.135328
200.753612
161.73
30.123716
121
543.661725
55
319.594537
66.090152
49
3518
53.640664
45.1
56
96.8
73
770
157.3

Amount
40227.1272
4893.2
5740.1
3387.6
6961.6434667
990
1718.34
5213.683776
4818.086688
3881.52
94889.7054
363
4349.2938016
4400
5752.7016624
4692.400792
882
63324
6973.28632
270.6
1120
871.2
6570
770
0
3775.2
276834.68911
84434.58
361269.27

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0915

Supply, Erection, Testing and Commissioning of laying of


1 Km. 11 KV 3 C 185 mm 2 XLPE under ground Cable

Km

13.282

Item Code No. 0915


Cost Data for laying 11 KV 3x240 sq.mm XLPE under ground Cable
Sr.No.
1
2
3

Particulars
XLPE Cable 11 KV, 3 C / 185 mm sq.
R.C.C. Pipe 150 mm 2 M
RCC half round pipe (1mtr)

Unit
Rmt
No
No.

Qty.
1000
30
940

11 kV heat shrinkable Straight through joint kit for 3 C


X 185 sqmm

No.

11 kV heat shrinkable Outdoor termination joint kit for 3


No.
C X 185 sqmm

6
7

Sand
Misc. for XLPE U/G Cable
Cost of material
Services @ 30.5 %

Cmt
LS

250
1

Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

15

199.23

ground Cable
Rate (Rs.)
844.9472
527
94
5457.1
2063.05
210.54
990

Amount
844947.2
15810
88360
10914.2
4126.1
52635
990
1017782.5
310423.66
1328206.16

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

0921

Supply, Erection, Testing and Commissioning of


DOUPLE POLE STRUCTURE(cut point) OF- 11 KV LINE
USING11 M LONG RSJ POLE

No

0.780

Item Code No. 0921


DOUPLE POLE STRUCTURE(cut point) OF- 11 KV LINE USING11 M LONG RSJ POLE
S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Description of Material
RSJ 152x152, 11 m long
M.S. Flats(50 X 10mm)
MS Channel 100x50x6 mm
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
Strain Hardware for Dog0.1 or Equ.AAAC.
Disc Insulator 11 KV 7000 KG.
H.T.Stay Set
Stay Wire 7/8
Earthing Sets H.T
G.I.Wire 8 SWG/ 6 SWG
G.I.Barbed Wire `A' type.
Danger Board in yard.
Black Bituminus Paint
Red Oxide Paint for 2 coats
Aluminium Paint for 1 coat
Concreting ration 1:4:8
# Sundries
Cost of material
Services @ 30.5 %

Unit
No.
Kg.
Kg.
Kg.
Kg.
No.
No.
No.
Kg.
No
kg.
kg.
No.
Ltr.
Ltr.
Ltr.
Cmt.
L.S.

QTY
2
10
110
75
50
6
6
2
25
2
6
7
2
2
6
4
2
1

Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be gi

TION CO. LTD.

Qty.

Amount

237

184.83

1 M LONG RSJ POLE


RT/U.Rs.
16162.6588
44.06
47.05
47.05
47.05
354.72052
200.753612
543.661725
55
319.594537
53.640664
66.090152
49
45.1
56
96.8
3518
770

Amt Rs.
32325.317615
440.6
5175.5
3528.75
2352.5
2128.32312
1204.521672
1087.3234504
1375
639.1890736
321.843984
462.631064
98
90.2
336
387.2
7036
770
59758.899979
18226.46
77985.36

d instead of charcole, salt etc. for


ance as per I.E. rule. The cost of
seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.
1216

Discreption
Supply, Erection, Testing and Commissioning of POLE
MOUNTED DISTRIBUTION TRANSFOEMER SUBSTATION 100KVA, 11/0.433 KV ON 11 mtr RSJ POLE

Unit

Rate

No

2.497

Item Code No. 1216

POLE MOUNTED DISTRIBUTION TRANSFOEMER SUB-STATION 100KVA, 11/0.433 KV ON 11 mtr RSJ P


S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Description of Material
Dist. Transformer 100 KVA, 11/0.43 kv
RSJ 116x100, 11 m long
MS Channel 100x50x6 mm
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
M.S.Flat 50 x 6 mm
11 kV Pin Insulators with G.I. Pins
Strain Hardware for Dog0.1 or Equ.AAAC.
L.T.Dist.Boxes 100 KVA with MCCB
L.As. 11 KV (Gapless type) with disconector
H.T.Stay Set
G.I.Stay Wire 7/4mm(8 SWG)
Earthing Sets H.T
11KV H.G.Fuses
11KV A.B. Switch
Danger Board in yard.
G.I.Wire 8 SWG/ 6 SWG
G.I.Barbed Wire `A' type.
Concreting ration 1:4:8

Unit
No.
No
Kg.
kg.
kg.
kg.
NO.
No.
No.
Set.
No
kg.
No.
Set.
No.
No.
Kg.
kg.
CMT.

QTY
1
2
100
44
22
24
3
3
1
1
4
25
5
1
1
2
40
15
2

19

Painting/Hardware & support with numbering of pole

L.S.

20

Sundries

L.S.

21

DTC Metring with Box, single core L.T. XLPE cable (70
sq.mm., 120 mtr length) and other allied material.

No.

Cost of material
Services @ 30.5 %
Total cost of Material

*- The DTC Meter should have LT AC 3Ph 4wire CT/PT operated fully static AMR Compatible Tri-Vect
RS-232 port.
Note

Note

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt et
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The co
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be g

TION CO. LTD.

Qty.

Amount

180

449.44

11/0.433 KV ON 11 mtr RSJ POLE


RT/U.Rs.
94217.3656
10341.4874
47.05
47.05
47.05
44.66
124.135328
354.72052
20436.093
1056.40872
543.661725
53.640664
319.594537
1879.46819
11484.7987
49
53.640664
66.090152
3518

Amt Rs.
94217.365632
20682.974866
4705
2070.2
1035.1
1071.84
372.405984
1064.16156
20436.09298
1056.40872
2174.6469008
1341.0166
1597.972684
1879.468192
11484.798748
98
2145.62656
991.35228
7036

220

220

770

770

14883.72

14883.72
191334.15171
58356.92
249691.07

static AMR Compatible Tri-Vector meter

used instead of charcole, salt etc. for


sistance as per I.E. rule. The cost of
no seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

1302

Discreption
Supply, Erection, Testing and Commissioning of
Augumentation of Pole mounted Distribution
Transformer Sub-station 11/0.433 KV 100 KVA
to 11/0.433 kv 200 KVA

Unit

Rate

Qty.

Amount

No

2.745

50

137.27

Item Code No. 1302


Cost Data for Augumentation of Pole mounted Distribution Transformer Sub-station 11/0.433 KV
100 KVA to 11/0.433 kv 200 KVA
Sr.No

Description of Material

Unit

Qty.

RT/UNIT(
RS)

Amount
(Rs.)

Dist. Transformer 200 KVA, 11/0.43 kv

No.

1.00

162066.01

162066.01

L.T.Dist.Boxes 200 KVA with MCCB

No.

1.000

34727.35

34727.35

L.T.XLPE Armoured cable120 sq.mm.

Rmt

25.00

292.28

7307.05

L.T. XLPE cable 3.5 Core 240 mm2

Rmt

10.00

551.13

5511.26

Sundries

no

1.00

770.00

770.00

Cost of material

210381.67

Services @ 30.5 %

64166.41

Total cost of Material

274548.08

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

1401

Discreption
Supply, Erection, Testing and Commissioning of L.T.
LINE 3 ph 4 W. -WIND PRESSURE ZONE - With ANT for
phase & GNAT for neutral with PSC Pole 8 Mtr
(140
KG)

Unit

Rate

Qty.

Km

2.196

36

Item Code No. 1401


L.T. LINE 3 ph 4 W. -WIND PRESSURE ZONE - With ANT for phase & GNAT for neutral with PSC Pole 8 Mtr (200 KG)
SR.NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
a)
b)

DESCRIPTION OF MATERIALS.

UNIT

QTY

RT/UNIT(R
S)

PSC Pole 8 Mtr (200 KG)

No.

20

1729.2204

AAC Ant
AAC Gnat
M.S.Flat 50 x 6 mm
L.T.Shackle Insulator
L.T.Shackle hardware
Jointing Sleeves for AAC
Aluminium Bobbins for neutral
PG Clamp
Earthing Sets L.T.
L.T. Stay sets
G.I.Stay Wire 7/3.15mm(10SWG)
Stay Insulators
Binding Wire
Binding Tape
G.I.Wire 8 SWG/ 6 SWG
Concreting ration 1:4:8
L.T.Spacers
Sundries such as N/B, Washers, Welding etc.
Wedge connectors
Ant To Ant
GNAT To GNAT
Cost of material
Services @ 30.5 %

Rmt
Rmt
Kg
No
Pair
No
No.
No
No
No
Kg
No
Kg.
Kg
Kg.
Cmt
No
LS

3200
1100
24
72
96
4
20
6
5
8
72
8
1.5
1.5
100
2.4
57
1

23.584364
12.280948
44.66
9.8753204
28.730452
33
33
27.83
154.853428
428.915199
53.640664
9.629252
72.6
44
53.640664
3518
96.8
2750

No
No

32
24

157.3
157.3

Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing with
sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to be
considered in the cost of sundries only no seperate payment will be given.

TD.

Amount

79.05

th PSC Pole 8 Mtr (200 KG)


AMT.(RS)
34584.408
75469.9648
13509.0428
1071.84
711.0230688
2758.123392
132
660
166.98
774.267142
3431.3215904
3862.127808
77.034016
108.9
66
5364.0664
8443.2
5517.6
2750
0
5033.6
3775.2
168266.69902
51321.34
219588.04

, salt etc. for eathing with


Bentonite powder is to be
given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.
1404

Discreption
Supply, Erection, Testing and Commissioning of laying
of 1 Km. L.T.XLPE Cable for Size 95 Sqmm

Unit

Rate

Km

3.673

Item Code No. 1404


Cost data for laying of 1 Km. L.T.XLPE Cable for Size 95 Sqmm
Sr.No.
1
2
3
4

Particulars
LT XLPE Armoured Cable 3 1/2C X 95 Sq mm
R.C.C. Pipe 150 mm 2 M
L.T. jointing kits for 95 Sqmm
Misc. ( Bricks,sand,tremination kit and etc.)
Cost of material
Services @ 30.5 %

Unit

Qty.

Rmt
No.
No
LS

1000
30
10
1

Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathin
sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is
considered in the cost of sundries only no seperate payment will be given.

TION CO. LTD.

Qty.

Amount

7.35

RT/UNIT(R
S)

Amount

e 95 Sqmm

236.013174 236013.17439
527
15810
544.5
5445
24200
24200
281468.17439
85847.79
367315.97

of charcole, salt etc. for eathing with


The cost of Bentonite powder is to be
ent will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.
1501

Discreption
Supply, Erection, Testing and Commissioning of L.T.
LINE 1 ph 3 W. -with GNAT for phase & neutral with
PSC Pole 8 Mtr (200 KG)

Unit

Rate

Qty.

Km

1.520

10

Item Code No. 1501


L.T. LINE 1 ph 3 W. -with GNAT for phase & neutral with PSC Pole 8 Mtr (200 KG)
SR.NO.

DESCRIPTION OF MATERIALS.

UNIT

QTY

RT/UNIT(R
S)

PSC Pole 8 Mtr (200 KG)

No.

22

1729.2204

AAC Gnat

Rmt

3150

12.280948

M.S.Flat 50 x 6 mm
L.T.Shackle Insulator
Aluminium Bobbins for neutral
L.T.Shackle hardware
Jointing Sleeves for AAC
PG Clamp
Earthing Sets L.T.
L.T. Stay sets
G.I.Stay Wire 7/3.15mm(10SWG)
Stay Insulators
Binding Wire
Binding Tape
G.I.Wire 8 SWG/ 6 SWG
Concreting ration 1:4:8
L.T.Spacers
Sundries such as N/B, Washers, Welding etc.
Wedge connectors
GNAT To GNAT
Cost of material
Services @ 30.5 %

Kg
No
No.
Pair
No
No
No
No
Kg
No
Kg.
Kg
Kg.
LS
No
LS

60
52
26
104
3
6
5
8
96
8
2
2
100
1
63
1

9.8753204
33
28.730452
33
27.83
154.853428
428.915199
53.640664
9.629252
72.6
44
53.640664
3518
96.8
2750

No

32

157.3

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
a)

44.66

Total cost of Material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing with
sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to be
considered in the cost of sundries only no seperate payment will be given.

TD.

Amount
15.20

(200 KG)
AMT.(RS)
38042.8488
38684.9862
2679.6
513.5166608
858
2987.967008
99
166.98
774.267142
3431.3215904
5149.503744
77.034016
145.2
88
5364.0664
3518
6098.4
2750
0
5033.6
116462.29156
35521.00
151983.29

, salt etc. for eathing with


Bentonite powder is to be
given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

Discreption

Unit

Rate

Qty.

Amount

New

Supply, Erection, Testing and Commissioning of


National highway crossing 33 KV U/G cable

No

1.544

1.54

Item Code No. New

activity of National highway crossing 33 KV U/G cable


Sr.No.
1
2

Discription of Materials
R.S.J. 4 X 4 1/2 11 Mtr.
Top Channel 8' D.P.(cut Point)

Unit
Nos.
Set

Qty.
4
2

Rate/Unit
Amount
10341.48743 41365.9497
2206.56
4413.12

3
4

Bracing Set 8' D.P.


H.T. Stay Set

Set
Set

2
4

2431.15
543.66

4862.3
2174.64

5
6
7

Stay Wire 7/8


H.T. Earthing Set
Danger Board

Kg.
Set
Nos.

40
4
4

55
319.59
49

2200
1278.36
196

8
9

Painting & Numbering of Supports


Concerting of Poles 0.8 Cmt. In LS

Nos.
Cmt.

4
3.2

200
3518

800
11257.6

11
12
13

Sundries
Black Bitumius Paint
Red Oxide Paint 2Coats

L.S.
Ltr.
Ltr.

1
2
2

500
45
56

500
90
112

14
15

Alluminium Paint 1Coat


H.T. Guarding Channel

Ltr.
Nos.

2
0

96
542.48

192
0

16
17

G.I. Wire 8 S.W.G.


Barbed Wire

Kg.
Kg.

25
10

53.64
54.6

1341
546

18
19
20
21
22
23

M.S.Nut Bolt
RCC Full Round Pipe 2 Mtr
RCC Half Round Pipe 1 Mtr
Sand
Bricks
G.I. Pipe 3 Mte 6 " Dia

Kg.
Mtr
Mtr
Cmt.
Nos.
Nos.

10
0
60
15
600
24

73
479
94
210.54
2.42
1500

730
0
5640
3158.1
1452
36000

24

AB Switch

Set

10436.23

Cost of Material

25

118309.07

Services @ 30.5 %

36084.27

Total cost of Material

154393.34

Horizontle drilling Charges by machine


operated ring below the road @ 4500.00 P/M
( 1 crossing 75 mtr)

RMT

150

4500

675000.00

Note - Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

OTA-1

Discreption
Supply, Erection, Testing & Commissioning of pole mounted
DTC Single phase,15 KVA on 10' Centers PSC double pole
structure

Unit

Rate

Nos

2.99

Item Code No. OTA-1


Cost Data for Pole mounted DTC Single phase,15 KVA on 10' Centers PSC double pole structure
SR.NO.

DESCRIPTION OF MATERIALS.

UNIT

QTY

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
18
19
20
21
22
23
24
25
26

PSC Pole 9 Mtr (200Kg)


Dist.transformer 15 KVA -Single phase
Distribution box
11 KV Pin Insulator with pin
11 Kv Disc insulator 45 KN with strain hardware
M.S. Channel 100mmX50mmX6mm(9.8Kg/m)
M.S. Channel 75mmX40mmX6mm(7.2Kg/m)
M.S. Angles 50mmX50mmX6mm(4.5 Kg/m)
M.S. Flats 50mmX6mm(2.4 Kg/m)
G.I.Wire 8 SWG
HT.Stay Set Complete
HT.Stay wire 7/8 SWG
ACSR Conductor Wheasel(0.03)
Barbed wire with anticlimbing devices
Danger Board
A] Concreting of Pole & Stay
Cable 2 core 50sqmm
Horn gap Fuse
HT Earthing Set
Special Design earthing for Single phasing
Red oxide for pole painting
Balck Bituminous Paint for pole earthing
Aluminium Paint
Nut & Bolt
Backfilling of Supporting with Boulders

No.
No.
No.
No.
No.
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Km
Kg
No.
CMT
Km
No.
No.
Set
Ltr
Ltr
Ltr
Kg
No.

2
3
3
3
3
142
112
18
44
30
4
38
0.02
15
2
3.5
0.075
3
7
1
2
0
4
35
6

27

Sundries such as washers & Minor fabri.bind.tape/wire ,PG


clamps etc wedge connectors

L.S

Cost of material
Services @ 30.5 %

Total cost of Material

Soecial Design Earthing for single pahse DTC


SR.NO.

DESCRIPTION OF MATERIALS.

UNIT

QTY

1
2
3
4
5

Raw salt
Bentonite Clay
Cahrcoal powder
G.I.tunnel
Cast iron cover 500mm dia 6mm thickness

Kg
Kg
Kg
No
No

280
140
280
7
7

MS flat 50X8mm for 6pits/DP lightening arrester earthing


should done by 8 SWG GI wire

Kg

1680

L.S

#Sundries
Cost of material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. f
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Be
powder is to be considered in the cost of sundries only no seperate payment will be given

ON CO. LTD.

Qty.

Amount

45

134.55

PSC double pole structure


RT/UNIT(R
S)

AMT.(RS)

2234.8404
4469.6808
25826.845 77480.53464
3276.7772 9830.331456
124.13533 372.405984
190.71986 572.159592
47.05
6681.1
47.05
5269.6
47.05
846.9
44.66
1965.04
53.640664 1609.21992
543.66173 2174.6469008
55
2090
16.34838
0.3269676
66.090152
991.35228
49
98
3518
12313
97550.423 7316.281725
1879.4682 5638.404576
319.59454 2237.1617576
82888.8
82888.8
56
112
45.1
0
96.8
387.2
73
2555
36
216
1000

1000
229115.1466
69880.12

298995.27

RT/UNIT(R
S)

AMT.(RS)

4
11
6
60
300

1120
1540
1680
420
2100

44.66

75028.8

1000

1000
82888.8

ad of charcole, salt etc. for eathing


I.E. rule. The cost of Bentonite
te payment will be given.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.


Cost Data 2012-13
A.S.No.

OTA-2

Discreption
Supply, Erection, Testing & Commissioning of pole mounted
DTC Single phase,25 KVA on 10' Centers PSC double pole
structure

Unit

Rate

Nos

4.15

Item Code No. OTA-1


Cost Data for Pole mounted DTC Single phase,15 KVA on 10' Centers PSC double pole structure
SR.NO.

DESCRIPTION OF MATERIALS.

UNIT

QTY

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
18
19
20
21
22
23
24
25
26

PSC Pole 9 Mtr (200Kg)


Dist.transformer 25 KVA -Single phase
Distribution box
11 KV Pin Insulator with pin
11 Kv Disc insulator 45 KN with strain hardware
M.S. Channel 100mmX50mmX6mm(9.8Kg/m)
M.S. Channel 75mmX40mmX6mm(7.2Kg/m)
M.S. Angles 50mmX50mmX6mm(4.5 Kg/m)
M.S. Flats 50mmX6mm(2.4 Kg/m)
G.I.Wire 8 SWG
HT.Stay Set Complete
HT.Stay wire 7/8 SWG
ACSR Conductor Wheasel(0.03)
Barbed wire with anticlimbing devices
Danger Board
A] Concreting of Pole & Stay
Cable 2 core 50sqmm
Horn gap Fuse
HT Earthing Set
Special Design earthing for Single phasing
Red oxide for pole painting
Balck Bituminous Paint for pole earthing
Aluminium Paint
Nut & Bolt
Backfilling of Supporting with Boulders

No.
No.
No.
No.
No.
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Km
Kg
No.
CMT
Km
No.
No.
Set
Ltr
Ltr
Ltr
Kg
No.

2
3
3
3
3
142
112
18
44
30
4
38
0.02
15
2
3.5
0.075
3
7
1
2
0
4
35
6

27

Sundries such as washers & Minor fabri.bind.tape/wire ,PG


clamps etc wedge connectors

L.S

Cost of material
Services @ 30.5 %

Total cost of Material

Soecial Design Earthing for single pahse DTC


SR.NO.

DESCRIPTION OF MATERIALS.

UNIT

QTY

1
2
3
4
5

Raw salt
Bentonite Clay
Cahrcoal powder
G.I.tunnel
Cast iron cover 500mm dia 6mm thickness

Kg
Kg
Kg
No
No

280
140
280
7
7

MS flat 50X8mm for 6pits/DP lightening arrester earthing


should done by 8 SWG GI wire

Kg

1680

L.S

# Sundries
Cost of material

#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. f
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Be
powder is to be considered in the cost of sundries only no seperate payment will be given

ON CO. LTD.

Qty.

Amount

45

186.56

PSC double pole structure


RT/UNIT(R
S)

AMT.(RS)

2234.8404
4469.6808
55349.809 166049.42644
3276.7772 9830.331456
124.13533 372.405984
190.71986 572.159592
47.05
6681.1
47.05
5269.6
47.05
846.9
44.66
1965.04
53.640664 1609.21992
543.66173 2174.6469008
55
2090
16.34838
0.3269676
66.090152
991.35228
49
98
3518
12313
97550.423 7316.281725
1879.4682 5638.404576
319.59454 2237.1617576
82888.8
82888.8
56
112
45.1
0
96.8
387.2
73
2555
36
216
1000

1000
317684.0384
96893.63

414577.67

RT/UNIT(R
S)

AMT.(RS)

4
11
6
60
300

1120
1540
1680
420
2100

44.66

75028.8

1000

1000
82888.8

ad of charcole, salt etc. for eathing


I.E. rule. The cost of Bentonite
te payment will be given.

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

TOTAL

342420

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250

Civil Estimates (Tables A to K)


MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 6000 sqm.
Table A

Item No
1

Particulars

Qty

Unit

Rate

Amount

6000
Cuting down the raod side thornyt bushes
having girth 5\ cm to 20 cm including
removingtheir roots stacking and conveying the
material upto 1 Km removing vegitation
including levelling ground as directed for both
sides of road etc. compl;ete.

Sqm

2.5

15000

600

Cum

120

72000

420

Cum

567

238140

Excavation for road way in earth soil of all


sorts sand, gravel, soft murum including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts and upto a lead of 50
metres and spreading for embankment or
stacking etc. as directed by Engineer in charge.
Spec. No. : Rd.2 Page No. 180
3

Supplying,stacking and spreading of Hard


murum brought from outside including all
leads,lifts,labours ,spreading in line and
level,sectioning,watering and compacting etc
complete upto the satisfaction of Engr In
Charge.( Compacted area of Switch Yard will be
considered for Measurement.)

Spreading hard murum/ kankar at the road


side, including conveying and stacking and
spreading in line and level etc complete as
directed by Engr In Charge

420

Cum

24

10080

Filling the open uneven space by approved


excavated material in 15 to 20 cm layer
including the watering and compaction etc.as
directed by engineer in charge.

150

Cum

48

7200

342420

TOTAL

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.


Model Estimate for control room for 33 Kv S/stn.(inclusive of internal water supply and sanitary system)for
Infra -II project
Table B
Size of Control room considered (Approx. For Estimation) 9.45 x 9.65 = 91.20 sqm
Particulars
Item No
1
Excavation for foundation in earth, soils of all
types, sand, Gravel and soft murum, including
removing the excavated material upto a

Qty

Unit

Rate

Amount

25

Cum

130

3250