Federal Register / Vol. 71, No.

106 / Friday, June 2, 2006 / Notices 32085

notice appears in the Federal Register, ensure safe ambient air quality levels in ENVIRONMENTAL PROTECTION
pursuant to section 307 of the Act. The the Camden area; and (6) NJDEP did not AGENCY
Administrator’s action amending the adequately address environmental
[ER–FRL–6675–8]
February 18, 2005 Order on Kodak is justice issues.
not subject to judicial review, as no On April 4, 2006, the Administrator Environmental Impact Statements and
portions of the original citizen petition Regulations; Availability of EPA
issued an order partially granting and
were denied. Comments
partially denying the petition on G–P
ADDRESSES: You may review copies of
Gypsum. The order explains the reasons Availability of EPA comments
the final order, the petition, and all
behind EPA’s conclusion that the NJDEP prepared pursuant to the Environmental
relevant information at the EPA Region
must re-issue the statement of basis to Review Process (ERP), under section
2 Office, 290 Broadway, New York, New
York 10007–1866. If you wish to provide an explanation for the eight 309 of the Clean Air Act and section
examine these documents, you should monitoring provisions added after the 102(2)(c) of the National Environmental
make an appointment at least 24 hours close of the public comment period. The Policy Act as amended. Requests for
before visiting day. Additionally, the order also explains the reasons for copies of EPA comments can be directed
final order for G–P Gypsum is available denying SJEJA’s remaining claims. to the Office of Federal Activities at
electronically at: http://www.epa.gov/ 202–564–7167.
II. Kodak Park
region07/programs/artd/air/title5/ An explanation of the ratings assigned
petitiondb/petitiondb2002.htm, and the On August 16, 2005, the EPA received to draft environmental impact
amended Kodak order is available a letter from NYSDEC, requesting that statements (EISs) was published in the
electronically at: http://www.epa.gov/ EPA reconsider certain revisions to the Federal Register dated April 7, 2006 (71
region07/programs/artd/air/title5/ Kodak Park Facility’s operating permit, FR 17845).
petitiondb/petitiondb2003.htm. mandated by the Administrator’s Draft EISs
FOR FURTHER INFORMATION CONTACT: February 18, 2005 Order. This Order
Steven Riva, Chief, Permitting Section, EIS No. 20060034, ERP No. D–NRC–
granted in part and denied in part a F06028–MN, GENERIC—License
Air Programs Branch, Division of petition filed by the New York Public
Environmental Planning and Protection, Renewal of Nuclear Plants,
Interest Research Group, asking EPA to Supplement 26 to NUREG 1437,
EPA, Region 2, 290 Broadway, 25th object to the Kodak Park Facility(s
Floor, New York, New York 10007– Regarding Monticello Nuclear
operating permit. In its letter, NYSDEC Generating Plant (TAC NO. MC6441)
1866, telephone (212) 637–4074. sought reconsideration of EPA’s Renewal of Operating License DRP–22
SUPPLEMENTARY INFORMATION: The Act objections for the following reasons: (1) for Additional 20-Years of Operation,
affords EPA a 45-day period to review, The actual annual quantity of benzene Mississippi River, City of Monticello,
and object to as appropriate, operating in facility waste is very low compared Wright County, MN.
permits proposed by State permitting to the permitted cap; (2) the standard
authorities. Section 505(b)(2) of the Act Summary: EPA expressed
test method for volatile organic environmental concerns about
authorizes any person to petition the
compounds (VOC) in coatings and radiological impacts and risk estimates,
EPA Administrator within 60 days after
fountain solutions is burdensome and future up rates, spent fuel storage
the expiration of this review period to
yields unreliable results, and actual facilities, and abnormal effluent
object to State operating permits if EPA
has not done so. Petitions must be based VOC levels are low compared to releases.
only on objections to the permit that permitted levels; and (3) frequent Rating EC2.
were raised with reasonable specificity monitoring on several small cold EIS No. 20060077, ERP No. D–COE–
during the public comment period cleaning units is overly burdensome. E36184–FL, Central and Southern
provided by the State, unless the On April 4, 2006, the Administrator Florida Project, New Authorization
petitioner demonstrates that it was issued an amended order, granting the for Broward County Water Preserve
impracticable to raise these issues request for reconsideration on Kodak Areas, South Florida Water
during the comment period or the Park. The amended Order explains the Management District (SFWMD),
grounds for the issues arose after this reasons behind EPA’s decision to Comprehensive Everglades
period. provide the NYSDEC with some Restoration Plan, (CERP), Broward
flexibility in resolving EPA’s February County, FL.
I. G–P Gypsum Corporation
18, 2005 objections regarding these Summary: EPA fully supports the
On September 15, 2005, the EPA restoration components of the project
three issues. The amended Order also
received a petition from SJEJA, and its expedited implementation. EPA
explains why EPA believes there
requesting that EPA object to the requested quantification of water quality
issuance of the title V operating permit continue to be sufficient bases on which
to grant the citizen petition on these benefits and an exotics management
for G–P Gypsum based on the following plan.
allegations: (1) The draft permit was not issues.
accompanied by a statement of basis Dated: May 22, 2006.
Rating EC1.
explaining various permitting decisions, Alan J. Steinberg,
EIS No. 20060089, ERP No. DS–AFS–
particularly eight monitoring provisions L65400–ID, West Gold Creek Project,
Regional Administrator, Region 2. Updated Information, Forest
that NJDEP added after the close of
[FR Doc. E6–8617 Filed 6–1–06; 8:45 am] Management Activities Plan,
public comment; (2) the facility should
have filed a compliance plan and the BILLING CODE 6560–50–P Implementation, Idaho Panhandle
jlentini on PROD1PC65 with NOTICES

permit should have contained a National Forests, Sandpoints Ranger


compliance schedule; (3) the permit District, Bonner County, ID.
fails to address past violations; (4) the Summary: EPA expressed
permit has inadequate monitoring and environmental concerns about the
reporting provisions; (5) NJDEP failed to potential adverse impacts to water

VerDate Aug<31>2005 18:05 Jun 01, 2006 Jkt 208001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\02JNN1.SGM 02JNN1
32086 Federal Register / Vol. 71, No. 106 / Friday, June 2, 2006 / Notices

quality and on the bull trout spawning EIS No. 20060217, Final Supplement, Functionality, Canadian Border in
area under the preferred alternative. The COE, IL, Upper Des Plaines River, Blaine, Whatcom County, WA, Wait
Final EIS should evaluate additional Proposed Flood Damage Reduction Period Ends: July 3, 2006, Contact:
reductions in sediment loading to West (Site 37 on Upper Des Plaines River), Michael Levine 253–931–7263.
Gold Creek. Prospect Heights, Cook County, IL, EIS No. 20060225, Final EIS, BLM, NV,
Rating EC2. Wait Period Ends: June 26, 2006, Sheep Complex, Big Springs and
Contact: Keith Ryder 312–846–5587 Owyhee Grazing Allotments Sensitive
Final EISs Bird Species Project, Determine
The above EIS should have appeared
EIS No. 20060112, ERP No. F–OSM– in FR on May 26, 2006 the Wait Period Impacts of Livestock Grazing, Elko
D36120–PA, ADOPTION—Dents Run is Calculated from May 26, 2006. County, NV, Wait Period Ends: July 3,
Watershed Ecosystem Restoration, EIS No. 20060218, Draft EIS, FHW, NY, 2006, Contact: Bryan Fuell 775–753–
Construction and Operation of Six Williamsville Toll Barrier 0200.
Acid Mine Drainage Abatement EIS No. 20060226, Final EIS, FHW, CA,
Improvement Project, Improvements
Projects, Implementation, Benezette Lincoln Bypass Construction, South
from New York Thruway, Interstate
Township, Susquehanna River Basin, of Industrial Boulevard to North of
90 between Interchange 48A and 50,
Elk County, PA. Riosa Road, Funding and U.S. Army
Funding, Erie and Genesee Counties,
Summary: No formal comment letter COE Section 404 Permit, Issuance,
NY, Comment Period Ends: July 17,
was sent to the preparing agency. Placer County, CA, Wait Period Ends:
2006, Contact: Amy Jackson-Grove
July 5, 2006, Contact: Maiser Khaled
EIS No. 20060116, ERP No. F–NPS– 518–431–4125.
EIS No. 20060219, Final EIS, COE, VA, 916–498–5020.
F65076–OH, First Ladies National EIS No. 20060227, Draft EIS, COE, 00,
Historic Site General Management Craney Island Eastward Expansion,
White River Minimum Flood Study,
Plan, Implementation, Canton, OH. Construction of a 580-acre Eastward
Manages the Water and Land Areas at
Summary: EPA does not object to the Expansion of the Existing Dredged
Five Reservoirs: Beaver, Table Rock,
proposed action. Material Management Area, Port of
Bull Shoals, Norfork and Greers Ferry,
Hampton Roads, Norfolk Harbor and
EIS No. 20060129, ERP No. F–FRC– Little Rock District, AR and MO,
Channels, VA, Wait Period Ends: July
E03014–FL, Cypress Pipeline Project Comment Period Ends: July 17, 2006,
3, 2006, Contact: Craig Seltzer 757–
and Phase VII Expansion Project, Contact: Mike Biggs 501–324–5842.
201–7390. EIS No. 20060228, Final Supplement,
Construction and Operation, U.S. EIS No. 20060220, Draft EIS, BLM, ID,
Army COE Section 10 and 404 COE, MA, Boston Harbor Inner Harbor
Snake River Birds of Prey National
Permits, Northern and Central Maintenance Dredging Project,
Conservation Area, Resource
Florida. Updated Information, Boston Harbor,
Management Plan, Implementation,
Summary: EPA continues to have Mystic River and Chelsea River, MA,
Ada, Canyon, Elmore, Owyhee
environmental concerns about impacts Wait Period Ends: July 3, 2006,
Counties, ID, Comment Period Ends:
to wetland. Contact: Michael F. Keegan 978–318–
August 17, 2006, Contact: Mike
8087.
EIS No. 20060134, ERP No. F–SFW– O’Donnell 208–384–3315.
K99034–CA, Coachella Valley EIS No. 20060221, Draft EIS, CGD, MA, Amended Notices
Multiple Species Habitat Neptune Liquefied Natural Gas EIS No. 20060132, Draft EIS, AFS, ID,
Conservation Plan (MSHCP), Santa Deepwater Port License Application, White/White Analysis Project,
Rosa and San Jacinto Mountains Proposes to Construct, Own and Proposes Vegetative Management and
Trails Plan, Issuance of Incidental Operate a Deepwater Port, northeast Watershed Improvement, Lolo Creek,
Take Permit, Riverside County, CA. of Boston and south-southeast of Chamook Creek, White Creek, Mike
Summary: EPA does not object to the Gloucester, MA, Comment Period White Creek, Nevada Creek, and Utah
proposed action. Ends: July 17, 2006, Contact: M.A. Creek, Lochsa Ranger District,
Prescott 202–372–1451. Clearwater National Forest, Idaho and
Dated: May 30, 2006. EIS No. 20060222, Draft EIS, COE, 00, Clearwater County, ID, Comment
Robert W. Hargrove, Kansas Citys, Missouri and Kansas Period Ends: June 15, 2006, Contact:
Director, NEPA Compliance Division, Office Flood Damage Reduction Study, Steve Bess 208–926–4274.
of Federal Activities. Improvements to the Existing Line of
Revision to FR Notice Published April
[FR Doc. E6–8593 Filed 6–1–06; 8:45 am] Protection, Birmingham, Jackson, Clay
14, 2006: Comment Period Extended
BILLING CODE 6560–50–P Counties, MO and Wyandotte County,
from May 30, 2006 to June 15, 2006.
KS, Comment Period Ends: July 17,
2006, Contact: Christopher M. White EIS No. 20060183, Final EIS, FAA, UT,
ENVIRONMENTAL PROTECTION 816–389–3158. St. George Municipal Airport
AGENCY EIS No. 20060223, Draft EIS, FRC, 00, Replacement, Funding, City of St.
Carthage to Perryville Project, George, Washington County, UT, Wait
[ER–FRL–6675–7] Period Ends: July 3, 2006, Contact:
Construction and Operation of a
Natural Gas Pipeline Facilities, T.J. Stetz 425–227–2611.
Environmental Impacts Statements;
Notice of Availability CenterPoint Energy Gas Transmission, Revision to Federal Register Notice
Located in various counties and Published May 19, 2006: Wait Period
Responsible Agency: Office of Federal parishes in eastern Texas and Extend from June 19, 2006 to July 3,
Activities, General Information (202) northern Louisiana, Comment Period 2006.
564–7167 or http://www.epa.gov/ Ends: July 17, 2006, Contact: Todd EIS No. 20060190, Final EIS, AFS, MI,
jlentini on PROD1PC65 with NOTICES

compliance/nepa/. Sedmak 1–866–208–3372. Ottawa National Forest, Proposed


Weekly receipt of Environmental Impact EIS No. 20060224, Final EIS, GSA, WA, Land and Resource Management Plan,
Statements Peace Arch Port of Entry Forest Plan Revision, Implementation,
Filed May 22, 2006 through May 26, Redevelopment Project, Baraga, Gogebic, Houghton, Iron,
2006 pursuant to 40 CFR 1506.9. Improvements to Security, Safety and Marquette and Ontonagan Counties,

VerDate Aug<31>2005 18:05 Jun 01, 2006 Jkt 208001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\02JNN1.SGM 02JNN1

Vous aimerez peut-être aussi