Vous êtes sur la page 1sur 2

29148 Federal Register / Vol. 71, No.

97 / Friday, May 19, 2006 / Notices

Management Plans, Implementation, 404 Permits, Big Stone City, Grant 1801) at the Presidio of San Francisco
San Bernardino, Riverside, and San County, SD and MN, Comment Period (Area B) of Presidio Trust
Diego Counties, CA. Ends: July 3, 2006, Contact: Nancy Management Plan, Rehabilitation and
Summary: No comment letter was Werdel 720–962–7251. Reuse of Buildings, Gold Gate
sent to the preparing agency. EIS No. 20060179, Final EIS, AFS, WY, National Recreation Area, San
EIS No. 20060076, ERP No. F–CGD– Moose-Gypsum Project, Proposes to Francisco Bay, Marin County, CA,
G39043–00, Main Pass Energy Hub Authorize Vegetation Treatments, Wait Period Ends: June 19, 2006,
Deepwater Port License Application, Watershed Improvements, and Travel Contact: John G. Pelka 415–561–5300.
Proposes to Construct a Deepwater Plan and Recreation Updates, EIS No. 20060187, Draft EIS, AFS, WI,
Port and Associated Anchorages, U.S. Pinedale Ranger District, Bridger- Long Rail Vegetation and
Army COE Section 10 and 404 Teton National Forest, Sublette Transportation Management Project,
Permits, Gulf of Mexico (GOM), County, WY, Wait Period Ends: June Implementation, Eagle River-Florence
southeast of the coast of Louisiana in 19, 2006, Contact: Craig Trulock 307– Ranger District, Chequamegon-Nicolet
Main Pass Lease Block (MP) 2999 and 367–4326. National Forest, Florence and Forest
from the Mississippi coast in MP 164. EIS No. 20060180, Final EIS, AFS, IN, Counties, WI, Comment Period Ends:
Summary: EPA appreciates the Tell City Windthrow 2004 Project, July 3, 2006, Contact: Christine
improvements that have been Salvage Harvest and Prescribed Brunner 715–479–2827.
incorporated into the proposed LNG Burning of Windthrow Timber, EIS No. 20060188, Draft EIS, NOA, CA,
project; therefore, concludes that the Implementation, Hoosier National Channel Islands National Marine
ORV technology would result in minor Forest, Perry, Crawford and Dubois Sanctuary Management Plan Review,
adverse impacts to water quality and Counties, IN, Wait Period Ends: June Implementation, Santa Barbara and
biological resources. EPA recommends 19, 2006, Contact: Ron Ellis 812–275– Ventura Counties, CA, Comment
that USCG and the Maritime 5987. Period Ends: July 21, 2006, Contact:
Administration consider operational EIS No. 20060181, Draft EIS, BLM, 00, Chris Mobley 805–966–7107 x465.
modifications to further reduce impacts. Devers-Palo Verde No. 2 Transmission EIS No. 20060189, Final EIS, NRC, OH,
EIS No. 20060111, ERP No. FC–COE– Line Project, Construction and American Centrifuge Plant, Gas
H36012–MO, St. Johns Bayou and Operation a New 230-mile 500 kV Centrifuge Uranium Enrichment
New Madrid Floodway Project, Electric Transmission Line between Facility, Construction, Operation, and
Channel Enlargement and Devers Substation in California and Decommission, License Issuance,
Improvement, Revised Information to Harquahala Generating Substation in Piketon, OH, Wait Period Ends: June
Clarify and Address Issues of Arizona, Comment Period Ends: July 19, 2006, Contact: Matthew Blevins
Concern, Flood Control National 5, 2006, Contact: Greg Hill 760–251– 301–415–7684.
Economic Development (NED), New 4840. EIS No. 20060190, Final EIS, AFS, MI,
Madrid, Mississippi and Scott EIS No. 20060182, Draft EIS, COE, CA, Ottawa National Forest, Proposed
Counties, MO. San Clemente Dam Seismic Safety Land and Resource Management Plan,
Summary: EPA does not object to Project, Increase Dam Safety to Meet Forest Plan Revision, Implementation,
proposed project. Current Design Standards, Monterey Baraga, Gogebic, Houghton, Iron,
County, CA, Comment Period Ends: Marquette and Ontonagan Counties,
Dated: May 16, 2006.
July 3, 2006, Contact: Robert Smith MI, Wait Period Ends: June 19, 2006,
Robert W. Hargrove,
415–977–8450. Contact: Robert Brenner 906–931–
Director, NEPA Compliance Division, Office
EIS No. 20060183, Final EIS, FAA, UT, 1330 x317.
of Federal Activities.
St. George Municipal Airport EIS No. 20060191, Final EIS, FAA, FL,
[FR Doc. E6–7661 Filed 5–18–06; 8:45 am]
Replacement, Funding, City of St. Panama City-Bay County International
BILLING CODE 6560–50–P
George, Washington County, UT, Wait Airport (PFN), Proposed Relocation to
Period Ends: June 19, 2006, Contact: a New Site, NPDES Permit and U.S.
ENVIRONMENTAL PROTECTION T.J. Stetz 425–227–2611. Army COE Section 404 Permit, Bay
AGENCY EIS No. 20060184, Draft EIS, COE, MD, County, FL, Wait Period Ends: June
Masonville Dredge Material 19, 2006, Contact: Virginia Lane 407–
[ER–FRL–6675–3] Containment Facility (DMCF), 872–6331 Ext. 129.
Construction from Baltimore Harbor EIS No. 20060192, Draft EIS, AFS, ID,
Environmental Impacts Statements;
Channel north of Point-Rock Point Myrtle Creek Healthy Forest
Notice of Availability
Line, U.S. Army COE Section 10 and Restoration Act Project, Proposes
Responsible Agency: Office of Federal 404 Permits, Baltimore, MD, Aquatic and Vegetation Improvement
Activities, General Information (202) Comment Period Ends: July 7, 2006, Treatments, Panhandle National
564–7167 or http://www.epa.gov/ Contact: Jon Romeo 410–962–6079. Forests, Bonners Ferry Ranger
compliance/nepa/. EIS No. 20060185, Final EIS, AFS, MI, District, City of Bonners Ferry,
Weekly receipt of Environmental Impact Hiawatha National Forest, Proposed Boundary County, ID, Comment
Statements Land and Resource Management Plan, Period Ends: July 3, 2006, Contact:
Filed May 8, 2006 Through May 12, Forest Plan Revision, Implementation, Doug Nishek 208–267–5561.
2006. Alger, Cheboygan, Chippewa, Delta, EIS No. 20060193, Final EIS, AFS, UT,
Pursuant to 40 CFR 1506.9. Luce, Mackinac, Marquette and Ogden Ranger District Travel Plan, To
EIS No. 20060178, Draft EIS, WPA, 00, Schoolcraft Counties, MI, Wait Period Update the Travel Management Plan,
wwhite on PROD1PC61 with NOTICES

Big Stone II Power Plant and Ends: June 19, 2006, Contact: Dave Wasatch-Cache National Plan, Ogden
Transmission Project, Propose Power Maercklein 906–789–3301. Ranger District, Box Elder, Cache,
Plant, Transmission Alternatives, and EIS No. 20060186, Final Supplement, Morgan, Weber and Rich Counties,
Substation Modification, (DOE/EIS– TPT, CA, Presidio Trust Public Health UT, Wait Period Ends: June 19, 2006,
0377), U.S. Army COE Section 10 and Service Hospital (PUSH or Building Contact: Rick Vallejos 801–625–5112.

VerDate Aug<31>2005 17:37 May 18, 2006 Jkt 208001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1
Federal Register / Vol. 71, No. 97 / Friday, May 19, 2006 / Notices 29149

EIS No. 20060194, Draft EIS, AFS, 00, ENVIRONMENTAL PROTECTION FOR FURTHER INFORMATION CONTACT: For
Kootenai National Forest Invasive AGENCY information on the IRIS program,
Plant Management, Proposes to contact Dr. Abdel-Razak Kadry, IRIS
[FRL–8172–5; Docket ID No. EPA–HQ–ORD–
Manage Noxious Weed and Invasive 2003–0016]
Program Director, National Center for
Plant Species, Lincoln Sanders, Environmental Assessment, (mail code:
Flathead Counties, MT and Bonner Integrated Risk Information System 8601D), Office of Research and
and Boundary Counties, ID, Comment (IRIS); Announcement of 2006 Program Development, U.S. Environmental
Period Ends: July 3, 2006, Contact: Protection Agency, Washington, DC
AGENCY: Environmental Protection 20460; telephone: (202) 564–1645,
Ellen Sullivan 406–296–7114.
Agency. facsimile: (202) 565–0075; or e-mail:
EIS No. 20060195, Draft EIS, CGD, MA, ACTION: Notice; correction. kadry.abdel@epa.gov.
Northeast Gateway Deepwater Port For general questions about access to
License Application, Construct, Own SUMMARY: The U.S. Environmental IRIS, or the content of IRIS, please call
and Operate a Deepwater Port to Protection Agency (EPA) published a the IRIS Hotline at (202) 566–1676 or
Import Liquefied Natural Gas (LNG) document in the Federal Register of send electronic mail inquiries to
in Massachusetts Bay, City of February 23, 2006 (71 FR 9333), hotline.iris@epa.gov.
Gloucester, MA, Comment Period announcing the IRIS 2006 program
agenda. EPA is correcting errors in the SUPPLEMENTARY INFORMATION:
Ends: July 3, 2006, Contact: Mark
list of substances. Background
Prescott 202–267–0225.
The Integrated Risk Information
EIS No. 20060196, Final EIS, COE, FL, System (IRIS) is an EPA database that IRIS is an EPA database containing
South Florida Water Management contains the Agency’s scientific Agency scientific positions on potential
positions on human health effects that adverse human health effects that may
District, (SFWMD), Proposes
may result from exposure to chemical result from exposure to chemical
Construction and Operation
substances in the environment. On substances found in the environment.
Everglades Agricultural Area
March 4, 2005, EPA announced the (EPA notes that information in the IRIS
Reservoir A–1 Project, Lake database has no preclusive effect and
Okeechobee, Palm Beach County, FL, 2005 IRIS agenda (70 FR 10616), with
solicitation of scientific information does not predetermine the outcome of
Wait Period Ends: June 19, 2006, any rulemaking. When EPA uses such
Contact: Tori White 561–742–8888. from the public for consideration in
assessing health effects from specific information to support a rulemaking,
Amended Notices chemical substances. All assessments the scientific basis for, and the
currently in progress are listed in this application of, that information are
EIS No. 20060136, Draft EIS, AFS, AK, notice. EPA is not initiating new subject to comment.) IRIS currently
Kenai Winter Access Project, Develop assessments in 2006 in order to focus on provides information on health effects
a Winter Access Management Plan for completion of existing assessments. associated with more than 500 chemical
2006/2007 Winter Season, This notice also provides an update on substances.
Implementation, Seward Ranger EPA’ efforts to improve the IRIS health The database includes chemical-
District, Chugach National Forest, assessment development and review specific summaries of qualitative and
Located on the Kenai Peninsula in processes. quantitative health information in
Southcentral, AK, Comment Period support of the first two steps of the risk
DATES: While EPA is not expressly assessment process, i.e., hazard
Ends: June 12, 2006, Contact: Sharon soliciting comments on this notice, the
Randall 907–743–9497. identification and dose-response
Agency will accept information related evaluation. Combined with specific
Revision to FR Notice Published April to the substances included herein. situational exposure assessment
21, 2006: Comment Period Extended Please submit any information in information, the information in IRIS is
from June 5, 2006 to June 12, 2006. accordance with the instructions an important source in evaluating
provided at the end of this notice. potential public health risks from
EIS No. 20060162, Draft EIS, FHW, 00, ADDRESSES: Please submit relevant environmental contaminants.
TIER 1—DEIS Trans-Texas Corridor— scientific information identified by EPA’s overall process for developing
35 (TTC–35) System, Improvement to docket ID number EPA–HQ–ORD–2003– IRIS assessments consists of: (1) An
International, Interstate and Intrastate 0016, online at http:// annual Federal Register announcement
Movement of Goods and People, www.regulations.gov (EPA’ preferred of EPA’s IRIS agenda and call for
Oklahoma-Mexico/Gulf Coast method); by e-mail to scientific information from the public
Element, Comment Period Ends: ord.docket@epa.gov; mailed to EPA on selected chemical substances; (2) a
August 21, 2006, Contact: Salvador Docket Center, Environmental search of the scientific literature; (3)
Decampo 512–536–5950. Protection Agency, Mail Code: 2822T, development of IRIS Summaries and
Revision to FR Notice Published May 1200 Pennsylvania Ave., NW., support documents; (4) EPA-wide
Washington, DC 20460–0001; or by review; (5) external peer review; (6)
5, 2006: Comment Period Extended from
hand delivery or courier to EPA Docket management review and approval; and
June 19, 2006 to August 21, 2006.
Center, EPA West, Room B102, 1301 (7) entry of IRIS Summaries and support
Dated: May 16, 2006. Constitution Ave., NW., Washington, documents into the IRIS database
Robert W. Hargrove, DC, between 8:30 a.m. and 4:30 p.m. (http://www.epa.gov/iris).
Director, NEPA Compliance Division, Office Monday through Friday, excluding legal
holidays. Comments on a disk or CD– The IRIS Annual Agenda
of Federal Activities.
wwhite on PROD1PC61 with NOTICES

[FR Doc. E6–7663 Filed 5–18–06; 8:45 am] ROM should be formatted in Word or as Each year, EPA develops an annual
an ASCII file, avoiding the use of special agenda for the IRIS program and
BILLING CODE 6560–50–P
characters and any form of encryption, announces new assessments under
and may be mailed to the mailing review. A focus of the IRIS Program for
address above. 2006 is to move forward the 75

VerDate Aug<31>2005 17:37 May 18, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1

Vous aimerez peut-être aussi