26490 Federal Register / Vol. 71, No.

87 / Friday, May 5, 2006 / Notices

The Commission encourages import terminal (referred to as the of the proposed LNG terminal would
electronic submission of protests and Crown Landing LNG Project) proposed involve the dredging of shallow water
interventions in lieu of paper, using the by Crown Landing, LLC (Crown riverbottom and the filling of a small
FERC Online links at http:// Landing), a BP Energy Company (BP) area of intertidal river shoreline for the
www.ferc.gov. To facilitate electronic affiliate, and natural gas pipeline installation of berthing structures in the
service, persons with Internet access facilities (referred to as the Logan Delaware River. No permanent filling of
who will eFile a document and/or be Lateral Project) proposed by Texas federally regulated wetlands is proposed
listed as a contact for an intervenor Eastern Transmission, L.P. (Texas for construction of the terminal
must create and validate an Eastern) in the above-referenced facilities. The proposed pipeline
eRegistration account using the dockets. connection would involve the
eRegistration link. Select the eFiling The final EIS was prepared to satisfy installation of about 11.00 miles of new
link to log on and submit the the requirements of the National underground pipeline from the storage
intervention or protests. Environmental Policy Act (NEPA). The and transfer facility in Gloucester
Persons unable to file electronically staff concludes that approval of the County, New Jersey, crossing Birch
should submit an original and 14 copies proposed projects with appropriate Creek, Raccoon Creek, Delaware River,
of the intervention or protest to the mitigating measures as recommended, Chester Creek, and several smaller
Federal Energy Regulatory Commission, would have limited adverse waterways on both sides of the
888 First St. NE., Washington, DC environmental impact. The final EIS Delaware River, to an existing pipeline
20426. also evaluates alternatives to the junction facility in Pennsylvania.
The filings in the above proceedings proposal, including system alternatives, The Birch Creek, Raccoon Creek,
are accessible in the Commission’s alternative sites for the LNG import Delaware River, and Chester Creek
eLibrary system by clicking on the terminal, and pipeline alternatives. crossings would all be accomplished by
appropriate link in the above list. They The proposed LNG terminal would be Horizontal Directional Drilling (HDD)
are also available for review in the located on the shoreline of the Delaware method. All smaller waterway crossings
Commission’s Public Reference Room in River in Logan Township, Gloucester would be accomplished by open-cut
Washington, DC. There is an County, New Jersey, and would consist trenching. The rigging for the HDD
eSubscription link on the Web site that of facilities capable of unloading LNG crossing of the Delaware River would be
enables subscribers to receive e-mail ships, storing up to 450,000 cubic set-up on the Pennsylvania bank of the
notification when a document is added meters (m33) of LNG (9.2 billion cubic
river in Chester. The pipeline would be
to a subscribed docket(s). For assistance feet of natural gas equivalent),
‘‘pulled under’’ the river from the old
with any FERC Online service, please e- vaporizing the LNG, and sending out
Ferry Road roadbed on the New Jersey
mail FERCOnlineSupport@ferc.gov or natural gas at a baseload rate of 1.2
side.
billion cubic feet per day (Bcfd) and a
call (866) 208–3676 (toll free). For TTY, The following modifications to the
maximum rate of 1.4 Bcfd (using spare
call (202) 502–8659. project have been proposed since the
equipment). Crown Landing proposes to
Magalie R. Salas, interconnect the LNG facilities onsite draft EIS was issued:
with three pipelines. One interconnect (1) Texas Eastern now proposes a
Secretary.
would be with the new pipeline that contingency plan for constructing the
[FR Doc. E6–6822 Filed 5–4–06; 8:45 am]
Texas Eastern proposes to construct and Chester Creek crossing by open-cut
BILLING CODE 6717–01–P
operate (i.e., Logan Lateral) between its method if the HDD method fails.
existing Chester Junction facility in (2) Crown Landing has submitted a
Brookhaven Borough, Pennsylvania and minor modification to the proposed
DEPARTMENT OF ENERGY
the proposed LNG terminal. The other design of the LNG terminal berthing
Federal Energy Regulatory two interconnects would be with configuration in order to provide for an
Commission existing pipelines that currently cross enhanced margin of safety in LNG
the LNG terminal site. One of these carrier maneuvering. The modified
[Docket No. CP04–411–000, COE proposed design is evaluated in the final
pipelines is owned and operated by
Application #CENAP–OP–R–200500146; EIS. In addition, Crown Landing has re-
Docket No. CP04–416–000, COE Application
Columbia Gas Transmission Company
(Columbia Gas). The other pipeline is calculated the volume of material that
#CENAP–OP–R–200500145 and 200500146]
owned and operated by would result from the dredging for the
U.S. Army Corps of Engineers, Transcontinental Gas Pipe Line proposed LNG terminal berthing
Philadelphia District; Crown Landing, Corporation (Transco). To date, neither provisions in order to correct an error
LLC; Texas Eastern Transmission, Columbia Gas nor Transco have filed identified in the original calculations
L.P.; Notice of Availability of the Final applications with the FERC to construct and to provide for a customary 2 foot
Environmental Impact Statement for and operate the interconnects. The ‘‘over-dredge’’ volume. There is no
the Proposed Crown Landing LNG and Crown Landing LNG Project would have change in the proposed dredging depth
Logan Lateral Projects a maximum delivery capacity of 0.5 or dredged material disposal.
Bcfd to the Columbia Gas pipeline The draft EIS document indicated that
April 28, 2006. system, 0.6 Bcfd to the Transco pipeline 800,000 cubic yards of material would
The staff of the Federal Energy system, and 0.9 Bcfd to the Texas be dredged in the construction of the
Regulatory Commission (FERC or Eastern pipeline system. proposed LNG berthing terminal. Crown
Commission) in cooperation with the The proposed preferred project Landing now calculates that 1.24
U.S. Army Corps of Engineers (COE), construction site, referenced above, is million cubic yards of material would
U.S. Coast Guard, U.S. Environmental approximately 175 acres in size be dredged: 60,000 cubic yards are
cchase on PROD1PC60 with NOTICES

Protection Agency (EPA), and National (waterward of the low water line on the added to the original total from the
Oceanic and Atmospheric Delaware River). Within the site there safety modifications; 110,000 cubic
Administration Fisheries has prepared a are uplands, wetlands (federally yards are added by the over-dredge
final Environmental Impact Statement regulated), and intertidal river shoreline allowance; and 270,000 cubic yards are
(EIS) for a liquefied natural gas (LNG) (also federally regulated). Construction added from the error correction.

VerDate Aug<31>2005 18:48 May 04, 2006 Jkt 208001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1
Federal Register / Vol. 71, No. 87 / Friday, May 5, 2006 / Notices 26491

The final EIS addresses the potential included with the draft EIS. Comments publishes a notice of availability of a
environmental effects of the are used in determining the need for final EIS. However, the CEQ regulations
construction and operation of the and the preparation of any necessary provide an exception to this rule when
following LNG and natural gas pipeline supplemental NEPA documentation. an agency decision is subject to a formal
facilities: Comments are also used to determine internal process that allows other
• A ship unloading facility capable of the need for a public hearing on the agencies or the public to make their
receiving LNG ships with capacities up proposed design modifications and to views known. In such cases, the agency
to 200,000 m3; determine the overall public interest of decision may be made at the same time
• Three 150,000 m3 (net capacity) the proposed activities. Please carefully the notice of the final EIS is published,
full-containment LNG storage tanks, follow these instructions to ensure that allowing both periods to run
comprised of 9 percent nickel steel your comments are received in time and concurrently. Should the FERC issue
inner tank, pre-stressed concrete outer properly recorded: Crown Landing and Texas Eastern
tank, and a concrete roof; • Send an original and two copies of authorizations for the proposed projects,
• A closed-loop shell and tube heat your letter on the design modifications it would be subject to a 30-day rehearing
exchanger vaporization system; to: Magalie R. Salas, Secretary, Federal period.
• Various ancillary facilities, Energy Regulatory Commission, 888 Additional information about the
including administrative offices, First St. NE.; Room 1A, Washington, DC project is available from the
warehouse/maintenance building, main 20426; Commission’s Office of External Affairs,
control center, guardhouse, and a pier • Label one copy of the comments for at 1–866–208–FERC or on the FERC
control room; the attention of Gas 1, PJ–11.1; Internet Web site (http://www.ferc.gov)
• Three meter and regulation stations
• Reference Docket Nos. (Crown using the eLibrary link. Click on the
located on the proposed LNG terminal
Landing) CP04–411–000 and (Texas eLibrary link, click on ‘‘General Search’’
site; and
• Approximately 11.00 miles of 30- Eastern) CP04–416–000; and enter the docket number excluding
inch-diameter natural gas pipeline (4.92 • Mail your comments so that they the last three digits in the Docket
miles in Pennsylvania and 6.08 miles in will be received in Washington, DC on Number field. Be sure you have selected
New Jersey), a pig launcher and receiver or before June 27, 2006 (Copies will be an appropriate date range. For
facility at the beginning and end of the provided to the COE). assistance, please contact FERC Online
The final EIS has been placed in the Support at
pipeline, a mainline valve, and a meter
public files of the FERC and is available FERCOnlineSupport@ferc.gov or toll
and regulation station at the end of the
for distribution and public inspection free at 1–866–208–3676, or for TTY,
pipeline.
Crown Landing and Texas Eastern at: Federal Energy Regulatory contact (202) 502–8659. The eLibrary
have applied concurrently to the COE Commission, Public Reference Room, link on the FERC Internet Web site also
for two Department of the Army 888 First Street, NE., Room 2A, provides access to the texts of formal
Individual Permits pursuant to Section Washington, DC 20426, (202) 502–8371. documents issued by the Commission,
404 of the Clean Water Act (33 U.S.C. Copies are also available at the such as orders, notices, and
1344) and section 10 of the Rivers and following locations: rulemakings.
Harbors Act of 1899 (33 U.S.C. 403). The Gloucester County Library, 415 Magalie R. Salas,
COE solicited public comment on the Swedesboro Road, Gibbstown, NJ
Secretary.
applications in their public notice 08027.
Gloucester County Library, 101 Beckett [FR Doc. E6–6854 Filed 5–4–06; 8:45 am]
which was included as part of the draft
Road, Logan Township, NJ 08085. BILLING CODE 6717–01–P
EIS notice for the projects published in
February 2005. The COE is now J. Lewis Crozier Library, 620 Engle
soliciting public comment on the two Street, Chester, PA 19013.
Aston Public Library, 3720 Concord DEPARTMENT OF ENERGY
modifications to the original proposal
which are described above: (1) Texas Road, Aston, PA 19014. Federal Energy Regulatory
Eastern proposed open-cut contingency Brandywine Hundred Branch of the Commission
for the construction of the proposed New Castle County Library, 1300
Chester Creek pipeline crossing and; (2) Foulk Road, Wilmington, DE 19803. [Docket Nos. CP05–130–000, CP05–132–
the Crown Landing berthing terminal U.S. Army Corps of Engineers, 000, Corps Application # CENAB–OP–
Regulatory Branch, John Wanamaker RMS200565510–4; Docket No. CP05–131–
safety modification and related dredge 000]
volume calculation. Building, 100 Penn Square East,
The COE is soliciting comments from Philadelphia, PA 19107, 215–656–
U.S. Army Corps of Engineers,
the public; Federal, State and local 5940.
Baltimore District; Dominion Cove
agencies and officials; Indian Tribes; A limited number of copies are Point LNG, LP; Dominion
and other interested parties in order to available from the Public Reference Transmission, Inc.; Notice of
consider and evaluate any additional Room identified above. In addition, Availability of the Final Environmental
impacts resulting from the proposed copies of the final EIS have been mailed Impact Statement for the Cove Point
minor design modifications. Any to Federal, State, and local agencies; Expansion Project
comments received will be considered public interest groups; individuals and
by the COE to determine whether to affected landowners who requested a April 28, 2006.
issue, modify, condition, or deny copy of the final EIS; libraries; The staff of the Federal Energy
permits for these proposals as modified. newspapers; and parties to this Regulatory Commission (FERC or
To make this decision, comments are proceeding. Commission) in cooperation with the
cchase on PROD1PC60 with NOTICES

used to assess impacts on endangered In accordance with the Council on U.S. Army Corps of Engineers (Corps)
species, historic properties, water Environmental Quality’s (CEQ) and U.S. Coast Guard, (Coast Guard) has
quality, general environmental effects, regulations implementing NEPA, no prepared a final Environmental Impact
and the other public interest factors agency decision on a proposed action Statement (EIS) for a liquefied natural
listed in the COE’s original notice may be made until 30 days after the EPA gas (LNG) import terminal expansion