Vous êtes sur la page 1sur 2

16148 Federal Register / Vol. 71, No.

61 / Thursday, March 30, 2006 / Notices

If you have any questions about the Chelan and Douglas Counties, www.ferc.gov using the ‘‘eLibrary’’ link.
Coast Guard’s safety and security Washington. Enter the docket number excluding the
assessment or its Letter of g. Filed Pursuant to: Rule 602 of the last three digits in the docket number
Recommendation process, contact Commission’s Rules of Practice and field to access the document. For
Lieutenant Andy Meyers or Charlie Procedure, 18 CFR 385.602. assistance, contact FERC Online
Johnson at Marine Safety Unit h. Applicant Contact: Gregg Support at
Savannah, (912) 652–4353 or (912) 652– Carrington, Director of Hydro Services, FERCOnlineSupport@ferc.gov or toll-
4180 (fax). 327 N. Wenatchee Avenue, Wenatchee, free at 1–866–208–3676, or for TTY
In addition, the FERC now offers a WA 98801, (509) 661–4178, (202) 502–8659. A copy is also available
free service called eSubscription that gregg@chelanpud.org. for inspection and reproduction at the
allows you to keep track of all formal i. FERC Contact: Kim A. Nguyen, address in item h above.
issuances and submittals in specific (202) 502–6105, kim.nguyen@ferc.gov. You may also register online at http://
dockets. This can reduce the amount of j. The deadline for filing comments on www.ferc.gov/docs-filing/
time you spend researching proceedings the Settlement Agreement is 20 days esubscription.asp to be notified via e-
by automatically providing you with from the date of this notice, or April 12, mail of new filings and issuances
notification of these filings, document 2006. The deadline for filing reply related to this or other pending projects.
summaries, and direct links to the comments is 30 days from the date of For assistance, contact FERC Online
documents. To register for this service, this notice, or April 24, 2006. Support.
All documents (original and eight m. We are modifying our processing
go to http://www.ferc.gov/
copies) should be filed with: Magalie R. schedule for the relicensing of the
esubscribenow.htm.
Public meetings or site visits will be Salas, Secretary, Federal Energy Project. The schedule given in our
posted on the Commission’s calendar Regulatory Commission, 888 First Notice on January 30, 2006 is replaced
located at http://www.ferc.gov/ Street, NE., Washington, DC 20426. with the following schedule:
The Commission’s Rules of Practice Target Date: Issue Final
EventCalendar/EventsList.aspx along
require all intervenors filing documents Environmental Impact Statement July,
with other related information.
with the Commission to serve a copy of 2006; Ready for Commission Action
Finally, SNG has established an
that document on each person on the October, 2006.
Internet Web site for this project at
official service list for the project.
http://www.elba3.com. The Web site Magalie R. Salas,
Further, if an intervenor files comments
includes a description of the project,
or documents with the Commission Secretary.
additional maps of the project area, and
relating to the merits of an issue that [FR Doc. E6–4593 Filed 3–29–06; 8:45 am]
answers to frequently asked questions.
may affect the responsibilities of a BILLING CODE 6717–01–P
You can also request additional
particular resource agency, they must
information or provide comments
also serve a copy of the document on
directly to SNG at (800) 793–4514.
that resource agency. DEPARTMENT OF ENERGY
Magalie R. Salas, Comments may be filed electronically
Secretary. via the Internet in lieu of paper. The Federal Energy Regulatory
[FR Doc. E6–4654 Filed 3–29–06; 8:45 am] Commission strongly encourages Commission
BILLING CODE 6717–01–P
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions Notice of Applications Accepted for
on the Commission’s Web site (http:// Filing and Soliciting Comments,
www.ferc.gov) under the ‘‘e-Filing’’ link. Motions To Intervene, and Protests
DEPARTMENT OF ENERGY
k. Chelan PUD filed the settlement March 24, 2006.
Federal Energy Regulatory agreement on behalf of themselves and Take notice that the following
Commission the U.S. Fish and Wildlife Service, the hydroelectric applications have been
Washington Department of Ecology, the filed with the Commission and are
[Project No. 2145–060]
U.S. National Park Service, the U.S. available for public inspection:
Public Utility District No. 1 of Chelan Bureau of Land Management, the a. Type of Applications: Preliminary
County, WA (Chelan PUD); Notice of Washington Department of Fish and Permit (Competing).
Settlement Agreement, Soliciting Wildlife, the Washington State Parks b. Applicants, Project Numbers, and
Comments, and New Procedural and Recreation Commission, the City of Dates Filed:
Schedule Entiat, the Entiat Coalition, and Alcoa Wilkesboro Hydroelectric Company
Power Generating, Inc. The purpose of LLC filed the application for Project No.
March 23, 2006. the settlement agreement is to resolve 12642–000 on January 25, 2006.
Take notice that the following among the signatories issues regarding Yadkin Hydropower LLC filed the
settlement agreement has been filed the relicensing of the Rocky Reach application for Project No. 12651–000
with the Commission and is available Hydroelectric Project. The signatories on February 9, 2006.
for public inspection. have agreed that the settlement c. Name of the Project: W. Kerr Scott
a. Type of Application: Final agreement is fair and reasonable and in Hydroelectric Project. The project
Comprehensive Settlement Agreement. the public interest. On behalf of the would be located on the Yadkin River
b. Project No.: P–2145–060. signatories, Chelan PUD requests that in Wilkes County, North Carolina. It
c. Date Filed: March 20, 2006. the Commission approve the settlement would use the U.S. Army Corps of
d. Applicant: Public Utility District agreement and adopt it as part of a new
cprice-sewell on PROD1PC66 with NOTICES

Engineers’ (Corps) existing W. Kerr


No. 1 of Chelan County, Washington license without material modification. Scott Dam.
(Chelan PUD). l. A copy of the settlement agreement d. Filed Pursuant to: Federal Power
e. Name of Project: Rocky Reach is available for review at the Act, 16 U.S.C. 791a–825r.
Hydroelectric Project (Project). Commission in the Public Reference e. Applicants Contacts: For
f. Location: On the mid-Columbia Room or may be viewed on the Wilkesboro Hydroelectric Company: M.
River, near the city of Wenatchee, in Commission’s Web site at http:// Clifford Phillips, Wilkesboro

VerDate Aug<31>2005 18:18 Mar 29, 2006 Jkt 208001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\30MRN1.SGM 30MRN1
Federal Register / Vol. 71, No. 61 / Thursday, March 30, 2006 / Notices 16149

Hydroelectric Company, 150 North call (202) 502–8659. A copy is also o. Comments, Protests, or Motions to
Miller Road Suite 450C, Failawn, Ohio available for inspection and Intervene: Anyone may submit
44333, phone (330)–869–8151. For reproduction at the address in item h comments, a protest, or a motion to
Yadkin Hydropower LCC: Mr. Kevin above. intervene in accordance with the
Edwards, 1000 C&N Smith Mill Road, j. Individuals desiring to be included requirements of Rules of Practice and
Stoneville, North Carolina 27048, phone on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
(336)–427–2136. so indicate by writing to the Secretary In determining the appropriate action to
f. FERC Contact: Chris Yeakel, (202) of the Commission. take, the Commission will consider all
502–8132. k. Competing Preliminary Permit:
protests or other comments filed, but
g. Deadline for Filing Comments, Anyone desiring to file a competing
Protests, and Motions to Intervene: 60 application for preliminary permit for a only those who file a motion to
days from the issuance date of this proposed project must submit the intervene in accordance with the
notice. competing application itself, or a notice Commission’s Rules may become a
The Commission’s Rules of Practice of intent to file such an application, to party to the proceeding. Any comments,
and Procedure require all intervenors the Commission on or before the protests, or motions to intervene must
filing documents with the Commission specified comment date for the be received on or before the specified
to serve a copy of that document on particular application (see 18 CFR 4.36). comment date for the particular
each person in the official service list Submission of a timely notice of intent application.
for the project. Further, if an intervenor allows an interested person to file the Comments, protests and interventions
files comments or documents with the competing preliminary permit may be filed electronically via the
Commission relating to the merits of an application no later than 30 days after Internet in lieu of paper; See 18 CFR
issue that may affect the responsibilities the specified comment date for the 385.2001(a)(1)(iii) and the instructions
of a particular resource agency, they particular application. A competing
must also serve a copy of the document on the Commission’s web site under ‘‘e-
preliminary permit application must
on that resource agency. filing’’ link. The Commission strongly
conform with 18 CFR 4.30(b) and 4.36.
h. Description of Projects: The project l. Competing Development encourages electronic filing.
proposed by Wilkesboro Hydroelectric Application: Any qualified development p. Filing and Service of Responsive
Company would use the Corps’ W. Kerr applicant desiring to file a competing Documents—Any filings must bear in
Scott Dam and would consist of: (1) A development application must submit to all capital letters the title
proposed powerhouse containing 2 the Commission, on or before a ‘‘COMMENTS’’,
generating units with a total installed specified comment date for the ‘‘RECOMMENDATIONS FOR TERMS
capacity of 4 megawatts , (2) one particular application, either a AND CONDITIONS’’, ‘‘PROTEST’’, OR
proposed 10-foot-diameter steel competing development application or a ‘‘MOTION TO INTERVENE’’, as
penstock, (3) a proposed transmission notice of intent to file such an applicable, and the Project Number of
line, and (4) appurtenant facilities. The application. Submission of a timely the particular application to which the
Wilkesboro Hydroelectric Company’s notice of intent to file a development filing refers. Any of the above-named
W. Kerr Scott Project would have an application allows an interested person
average annual generation of 19 documents must be filed by providing
to file the competing application no
gigawatt-hours and would be sold to a later than 120 days after the specified the original and the number of copies
local utility. comment date for the particular provided by the Commission’s
The project proposed by Yadkin application. A competing license regulations to: The Secretary, Federal
Hydropwer, LLC would use the Corps’ application must conform with 18 CFR Energy Regulatory Commission, 888
W. Kerr Scott Dam and would consist 4.30(b) and 4.36. First Street, NE., Washington, DC 20426.
of: (1) A proposed powerhouse m. Notice of Intent: A notice of intent A copy of any motion to intervene must
containing 2 generating units with a must specify the exact name, business also be served upon each representative
total installed capacity of 5 megawatts, address, and telephone number of the of the Applicant specified in the
(2) one proposed 11.5-foot-diameter prospective applicant, and must include particular application.
steel penstock, (3) a proposed an unequivocal statement of intent to q. Agency Comments: Federal, state,
transmission line, and (4) appurtenant submit, if such an application may be and local agencies are invited to file
facilities. The Yadkin Hydropower LCC filed, either a preliminary permit comments on the described application.
W. Kerr Scott Project would have an application or a development A copy of the application may be
average annual generation of 21.2 application (specify which type of
obtained by agencies directly from the
gigawatt-hours and would be sold to a application). A notice of intent must be
Applicant. If an agency does not file
local utility. served on the applicant(s) named in this
i. Locations of Applications: A copy of public notice. comments within the time specified for
the application is available for n. Proposed Scope of Studies under filing comments, it will be presumed to
inspection and reproduction at the Permit: A preliminary permit, if issued, have no comments. One copy of an
Commission in the Public Reference does not authorize construction. The agency’s comments must also be sent to
Room, located at 888 First Street NE, term of the proposed preliminary permit the Applicant’s representatives.
Room 2A, Washington DC 20426, or by would be 36 months. The work Magalie R. Salas,
calling (202) 502–8371. This filing may proposed under the preliminary permit
Secretary.
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering [FR Doc. E6–4646 Filed 3–29–06; 8:45 am]
cprice-sewell on PROD1PC66 with NOTICES

the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental BILLING CODE 6717–01–P
number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.

VerDate Aug<31>2005 15:32 Mar 29, 2006 Jkt 208001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\30MRN1.SGM 30MRN1

Vous aimerez peut-être aussi