Vous êtes sur la page 1sur 20

AIM

BR.100ABOM BILL OF MATERIALS


APPLICATION SETUP

Author:

Eugenio Gonzlez De La Garza

Creation Date:

March 12, 2012

Last Updated:

March 28, 2012

Document Ref:

<Document Reference Number>

Version:

DRAFT 1A

Approvals:

<Approver 1>
<Approver 2>

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>


March 28, 2012

Documento de Control
Change Record
4

Date

Author

Versio
n

Change Reference

12-Mar1212

Eugenio Gonzlez

Draft
1a

No Previous Document

Reviewers

Name

Position

Distribution

Copy
No.

Name

Location

1
2
3
4

Library Master

Project Library
Project Manager

Note To Holders:
If you receive an electronic copy of this document and print it out, please
write your name on the equivalent of the cover page, for document control
purposes.
If you receive a hard copy of this document, please write your name on the
front cover, for document control purposes.

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

1221142

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>


March 28, 2012

Contents

Documento de Control.................................................................................ii
Application Set Up Control Sheet - Oracle Bills Of Material..........................1
BOM: Definir Parmetros............................................................................2
BOM: Definir Alternos.................................................................................3
BOM: Definir Departamentos......................................................................4
BOM: Definir Rutas.....................................................................................5
BOM: Definir Operaciones Estndares........................................................7
BOM: Definir Artculos Manufacturados......................................................9
BOM: Definir Documentos........................................................................11
BOM: Definir Documentos de Rutas..........................................................13
Temas Abiertos y Cerrados........................................................................15
Temas Abiertos....................................................................................15
Temas Cerrados...................................................................................15

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

1321143

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

Application Set Up Control Sheet - Oracle Bills Of Material


Environment Name:

Workflow
Setup Task
Sub Workflow name

Machine:

Type (definition, execution, or both):

bility

Respo
nsibilit
y

Date

i
g
n
a
t
u
r
e
A
p
p
r
o
v
a
l

Bills of Material
Setup
BOM: Define BOM
Parameters
BOM: Define BOM
Alternates
BOM: Define BOM Routings
BOM: Define BOM Standard
Operations

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

1121141

BR.100Abom Bill of Materials Application Setup

Workflow
Setup Task
Sub Workflow name

Doc Ref: <Document Reference Number>

bility

Respo
nsibilit
y

Date

i
g
n
a
t
u
r
e
A
p
p
r
o
v
a
l

BOM: Define Artculos


Manufacturados
BOM: Define BOM
Documents
BOM: Define BOM Routing
Documents

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

1221142

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Parmetros


Listas de Materiales >Configuracin >Parmetros
CHRISTUS MUGUERZA
<Process Name>

Process:

Control Number:

Business Area:

Date:

Priority(H, M, L):

Process Owner:

<Business Area>

<Date>

<Control Number>
<Priority (H, M, L)>
<Process Owner>
Description: Use this form to define and update BOM default parameters. You use these parameters to define modes of operation and default values
that affect other functions in Oracle BOM.

Cambiar a Organizacin G
<Parameters>
Niveles Lista
Mxima

10

<Configuration Options>
Estado Inactivo

Inactive

Segmento
Numeracin
Mtodo
Numeracin
Crear Suministro
Nivel Mas Bajo
Creacin Config
Num Autorizada
Incluir Artculos
Clase
Modelo/opcin en
Acumulacin

Agregar con Secuencia

No

Si

No

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

1321143

BR.100Abom Bill of Materials Application Setup

Usar Ruteos
Fantasmas
Heredar Sec Op
Fantasma

Doc Ref: <Document Reference Number>

No

Si

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

1421144

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Alternos


Listas de materials >Configuracin>Alternos
CHRISTUS MUGUERZA Process:
<Process Name>

Business Area:

Date:

Control Number:

Priority(H, M, L):

Process Owner:

<Business Area>

<Date>

<Control Number>
<Priority (H, M, L)>
<Process Owner>
Description: Use this form to define and delete alternates for BOMs and routings. When you define a BOM or a routing you can assign an alternate.

<Alternates>
Use this region to define and update alternates for BOMs and routings.
Alternate

Description

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Inactive On

Documento de Control
Company Confidential - For internal use only

1521145

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Departamentos


Listas de Materiales>Ruteos>Departamentos
CHRISTUS MUGUERZA Process:
<Process Name>

Business Area:

Date:

Control Number:

Priority(H, M, L):

Process Owner:

<Business Area>

<Date>

<Control Number>
<Priority (H, M, L)>
<Process Owner>
Description: Use this form to define and update BOM default parameters. You use these parameters to define modes of operation and default values that
affect other functions in Oracle BOM.
Departamento
Descripcin

MAQUILA
Maquila de Productos CEYEQ

Clase
Direccin
Organizacin de Gastos de
Projectos

0(14) MSE
FUTURO y ACTUAL

Inactivo En

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

1621146

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Rutas


Listas de Matriales>Ruteos>Ruteos
CHRISTUS MUGUERZA Process:
<Process Name>

Business Area:

Date:

Control Number:

Priority(H, M, L):

Process Owner:

<Business Area>

<Date>

<Control Number>
<Priority (H, M, L)>
<Process Owner>
Description: Use this form to define and update BOM default parameters. You use these parameters to define modes of operation and default values that
affect other functions in Oracle BOM.

<Routings>
Artculo
Alterno
Capable To Promise
00

Revisin

FUTURO y ACTUAL

Desplegar

Principal
Sequen
ce
10

Cod
e

Referenc
ed

WIP
Department

Effective
Dates:
From

MAQUILA

21-ENE-2012

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

T
o

Option
Depende
nt

Description
Lead
Time%

Count
Point

AutoChar
ge

BackFlu
sh

Ok

Ok

Ok

Minimum
Transfer
Qty

Description

Documento de Control
Company Confidential - For internal use only

1721147

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

Operation Resources
<Resources>
Item
Sequence
Sequence

Resource

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

UOM

Basis

Rate or Amount:
Usage

Inverse

Documento de Control
Company Confidential - For internal use only

1821148

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Operaciones Estndares


Listas de Materiales>Ruteos>Opetraciones Estndares
CHRISTUS MUGUERZA Process:
<Process Name>

Business Area:

Date:

Control Number:

Priority(H, M, L):

Process Owner:

<Business Area>

<Date>

<Control Number>
<Priority (H, M, L)>
<Process Owner>
Description: Use this form to define and update BOM default parameters. You use these parameters to define modes of operation and default values that
affect other functions in Oracle BOM.

<Standard Operations>
Code
Description
Department
Min Transfer Qty
Option Dependent

AutoCharge

Count Point

Backflush

Operation Sources
<Resources>

Main

Sequenc Resource
e

Basis

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Scheduling
Rate or
Amount:
Usage

Inverse

Available
24 Hours

Assigned
Units

Costing
Schedule

Activity

Standard Rate Charge Type

Documento de Control
Company Confidential - For internal use only

1921149

BR.100Abom Bill of Materials Application Setup

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Doc Ref: <Document Reference Number>

Documento de Control
Company Confidential - For internal use only

110211410

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Artculos Manufacturados


Listas de materials > Listas > Listas
Lista de Materiales> Listas> Listas
MUGUERZA

Proceso:

Nmero de Control:
BR100V1

rea de Negocios:
Inventarios

Fecha:

Prioridad (A,B,C):

Proceso Propietario:

01-Marzo-2012
<Process Owner>

Prioridad (A)

Lista de Materiales
Articulo

Articulo Kit

Descripcin
UDM

PZA

Alterno
Revision

Fecha
Desplegar
Solo
implementado

Futuro y Actual
Si

<Principal>
Sec Artculo

Sec
Operacin

Componente

10

Articulo Componente 1

PZA

20

Articulo Componente 2

PZA

30

Articulo Componente 3

PZA

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Descripcin
Artculo

Revisin

UDM

Cantidad

Documento de Control
Company Confidential - For internal use only

Art Ing

111211411

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

<Control de Materiales>
Sec Artculo

Sec
Operacin

Componente

10

Articulo Componente 1

20

Articulo Componente 2

30

Articulo Componente 3

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Tipo Suministro
Proceso Pull
Producto Final
Proceso Pull Producto
Final
Proceso Pull Producto
Final

Suninvnetario

Localizador

CEYEQ
CEYEQ
CEYEQ

Documento de Control
Company Confidential - For internal use only

112211412

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Documentos


Listas de Materiales>Listas>Documentos
CHRISTUS MUGUERZA Process:
<Process Name>

Business Area:

Date:

Control Number:

Priority(H, M, L):

Process Owner:

<Business Area>

<Date>

<Control Number>
<Priority (H, M, L)>
<Process Owner>
Description: Use this form to define and update any number of standard comments that you can assign to a specific BOM. You define these comments
by attaching the actual text of the comments to a comment name. You can then assign the comment name to any number of bills. You may print
standard comments on BOM reports.

<Bill Documents>
Category
Description (Comment
Name)
Usage
Source:
Data Type

Storage

File

Security:
Type

Owner

Share

Effective Dates:
From
Effective Dates:
To
Magnification
Error: Reference source not found
File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

113211413

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

(Comment Text)

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

114211414

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

BOM: Definir Documentos de Rutas


Listas de Materiales>Ruteos>Documentos
CHRISTUS MUGUERZA Process:
<Process Name>

Business Area:

Date:

Control Number:

Priority(H, M, L):

Process Owner:

<Business Area>

<Date>

<Control Number>
<Priority (H, M, L)>
<Process Owner>
Description: Use this form to define and update any number of standard instructions that you can assign when you define an operation or standard
operation. You define standard instructions by attaching the actual text to an instruction name. You can then assign the instruction name to any number
of operations or standard operations. You may print operation instructions on BOM reports.

<Documents>
Category
Description (Comment
Name)
Usage
Source:
Data Type

Storage

File

Owner

Share

Short Text

Security:
Type
Organization

Effective Dates:
From
Effective Dates:
To
Magnification
Error: Reference source not found
File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

115211415

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

(Comment Text)

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

116211416

BR.100Abom Bill of Materials Application Setup

Doc Ref: <Document Reference Number>

Temas Abiertos y Cerrados


Temas Abiertos
ID

Issue

Resolution

Responsibility

Target Date

Impact Date

Resolution

Responsibility

Target Date

Impact Date

Temas Cerrados
ID

Issue

Error: Reference source not found


File Ref: 287279863
(v. DRAFT 1A )

Documento de Control
Company Confidential - For internal use only

117211417

Vous aimerez peut-être aussi