DIVISION - D
Controls And Instrumentation
VOLUME- D1
Schemes , Shedules, FSSS, SADC and Soot Blower Controls
List Of Contents
Location

Document Description

Drawing No. / Ref. No.

Tab -1 Schemes
Scheme of Air And Gas Path With Instrumentation

0-97-288-90090

Scheme of Tube Mill with Instrumentation

1-97-291-90125

Location of MTM Thermocouples on SH/RH Tubes


Legend-1
Legend-2
Drum level control
Feed Control Valve DP Control
Furnace Draft Control
Primary Air PressureControl
Pulverised Coal Temperature Control
Co Ordinated Control
Air Flow Control

Drum level control

0-97-293-90110
2-97-096-90244
2-97-096-90245
2-97-096-90246
2-97-096-90247
2-97-096-90248
2-97-096-90249
2-97-096-90250
2-97-096-90251
2-97-096-90252
2-97-096-90253
2-97-096-90254
2-97-096-90255
2-97-096-90256
2-97-096-90257
2-97-096-90258

Secondery Air Bypass Control

2-97-096-90259

Recommended Write-up On Auto Controls

4-97-096-90633

Recommended Write-up On Boiler House Auxiliaries


Interlock And Protection System

4-97-096-90874

Measurement And Control Recommendation for Air And


Flue Gas System

3-97-288-92118

Measurement And Control Recommendation for Air And


Tube Mill System

3-97-288-92119

Measurement And Control Recommendation for Steam


And Water & SB System

3-97-288-92120

Measurement And Control Recommendation for Fuel Oil


System

3-97-288-92121

Mill Load Preparation

&

Tube Mill Level Control


SH-RH Steam Temperature Control

0361 PARLI VOL D1

&

BHARAT HEAVY ELECTRICALS LIMITED

Sheet 2 of 3

DIVISION - D
Controls And Instrumentation
VOLUME- D1
Schemes , Shedules, FSSS, SADC and Soot Blower Controls
List Of Contents
Location

Document Description

Drawing No. / Ref. No.

Tab - 2 Schedules
Schedule of Dampers

3-97-599-92163

Schedule of LT motors
Data for LT motors

3-97-599-92097
3-97-599-92413

Schedule of Servo motors

3-97-599-92244

Tab -3 Tapping point details

Tab-4

Drum Dished End Instant Tapping Details

3-97-287-92174

Tapping drawings

4-97-288-90775

Pressure measurement in A&FG furnace(Local & remote)

4-97-288-90776

Temperature measurement in furnace(Local & Remote)

4-97-288-90777

Analy. Meaurement in furnace(Local & remote)

4-97-288-90778

Pressure Measurement In Air & Flue Gas Duct

4-97-288-90779

Temperature Measurement In Air & Flue Gas Duct

4-97-288-90780

Analyser Measurement in Air & FG duct(remote & test)

4-97-288-90782

Temperature stub for Pressure parts

4-97-288-90783

Test thermowell for PP

4-97-288-90784

Stub For Sonic Tube Leak Detection System

4-97-288-90787

Physical location of tapping points in furnace Region

1-97-599-90140

Furnace Safeguard Supervisor System


Write-up on FSSS
FSSS Legend For Logic Drawing
Basic scope Diagram For FSSS
List of Logic Diagrams
FSSS Local Oil Gun Maintenance Switch Box
List of Interconnection Diagrams

0361 PARLI VOL D1

3-95-094-13324
3-95-094-12973
3-95-094-13272
to
3-95-094-13324
1-95-089-05320
3-95-094-13381
to
3-95-094-13416

BHARAT HEAVY ELECTRICALS LIMITED

GO TO INDEX

Sheet 3 of 3

DIVISION - D
Controls And Instrumentation
VOLUME- D1
Schemes , Shedules, FSSS, SADC and Soot Blower Controls
List Of Contents
Location

Document Description

Drawing No. / Ref. No.

Tab -5 Secondary air damper controls


SADC write-up
Basic scope Diagram
Shemes

3-95-194-12972
3-95-194-13130
3-95-194-13137

to

Tab -6 Soot Blower controls


General write up on microprocessor based Soot blower
Wiring diagrams
Soot Blower System Basic Scope Drawing

2-96-185-01783

Interconnection Diagram For Soot Blower System

to

Temperature Probe Control Scheme And Starter Box


Arrangement
SBMCC Schemes

3-96-186-08398
3-96-186-08415
1-96-188-02700

to

3-96-186-08018
3-96-186-08027

Tab -7 Operation and Maintenance Manual For Soot Blower Motor Controls & Schematics
Control Centres(SBMCC)
Limited

0361 PARLI VOL D1

BHARAT HEAVY ELECTRICALS LIMITED

GO TO INDEX

TAB - 1

GO TO INDEX

0361 PARLI VOL D1T01-1

GO TO INDEX

0361 PARLI VOL D1T01-2

GO TO INDEX

0361 PARLI VOL D1T01-3

GO TO INDEX

0361 PARLI VOL D1T01-4

GO TO INDEX

0361 PARLI VOL D1T01-5

GO TO INDEX

0361 PARLI VOL D1T01-6

GO TO INDEX

0361 PARLI VOL D1T01-7

GO TO INDEX

0361 PARLI VOL D1T01-8

GO TO INDEX

0361 PARLI VOL D1T01-9

GO TO INDEX

0361 PARLI VOL D1T01-10

GO TO INDEX

0361 PARLI VOL D1T01-11

GO TO INDEX

0361 PARLI VOL D1T01-12

GO TO INDEX

0361 PARLI VOL D1T01-13

GO TO INDEX

0361 PARLI VOL D1T01-14

GO TO INDEX

0361 PARLI VOL D1T01-15

GO TO INDEX

0361 PARLI VOL D1T01-16

GO TO INDEX

0361 PARLI VOL D1T01-17

GO TO INDEX

0361 PARLI VOL D1T01-18

GO TO INDEX

0361 PARLI VOL D1T01-19

GO TO INDEX

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

RECOMMENDED WRITE UP ON
AUTO CONTROLS
Reference drawings: Sl.no
01
02
03
04
05

Legend-1
Legend-2
Drum Level Control
Feed Control valve DP Control
Furnace Draft control

Sheet no.
2-97-096-90244
2-97-096-90245
2-97-096-90246
2-97-096-90247
2-97-096-90248

Rev
00
00
00
00
00

06

Primary Air Pressure Control

2-97-096-90249

00

07
08
09

Pulverised Coal Temperature Control


Coordinated Control
Air Flow Control

10

Mill Load Preparation (Fuel Flow Control 1)


Mill Load Preparation (Fuel Flow Control 2)

2-97-096-90250
2-97-096-90251
2-97-096-90252
2-97-096-90253
2-97-096-90254

00
00
00
00
00

Tube Mill Level Control


SH / RH Steam Temp. Control 1
SH /RH Steam Temp. Control 2
LOFCV, HOTCV, ASPRV & SEAL AIR TO MILL
DP Controls

2-97-096-90255
2-97-096-90256
2-97-096-90257

00
00

Secondary Air Bypass Control

2-97-096-90259

11
12
13
14

Description

Name
Prepared

S.Sankaranarayanan

Checked

A.Chandramohan

Date

2-97-096-90258

00
00

Drawing No

Rev

4-97-096-90633

00

Approved E.S.Salaikuberan

Drg. No.: 4-97-096-90633


Sheet 1 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-20

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

DRUM LEVEL CONTROL: -

Reference drg. No.: 2-97-096- 90246

The objective of this control system is to maintain the drum level to the normal water
level at all loads. At lower loads (less than 30% MCR), start up feed control valve is used as
final control element and at higher loads full load feed control valve is used as final control
element. If the full load feed control valve is taken for maintenance, stand by feed control valve
will be used. Drum level is measured at left and right side of the drum with level transmitters
through temperature compensated constant head unit. Drum pressure is measured with pressure
transmitters for compensation. The pressure compensated drum level signal is used for control.
Excessive deviation between left and right side is alarmed and the control shall be tripped to
manual.
LOW LOAD:

At lower loads the full load control valve and stand by control valve shall be
closed. The drum level measured signal is compared with the drum level set point. The error
signal will have a proportional, integral and differential action in the single element controller.
This controller output will be the position demand signal for the start up feed control valve.
Auto/manual station is provided for auto/manual selection and operation. Position indicator is
provided for the start up feed control valve.
HIGH LOAD:

At higher loads the start up and stand by full load control valve shall be closed.
The pressure and temperature compensated steam flow shall be measured in the left and right
main steam lines. These two flows are added for total steam flow. In order to prevent sudden
response due to drum swell and shrink on load change, a time lag unit shall be included in the
steam flow signal. The temperature compensated feed water flow signal is measured before feed
control station. The error signal produced between drum level measured signal and drum level
set point shall have proportional, integral and differential action in the three-element drum
level controller. This will be added with steam flow signal, which is the feed water flow demand
signal (set point for feed water flow). This will be compared with the feed water controller.
Deviation if any will have a proportional and integral action in the feed water controller. This
controller output will be the position demand signal for the full load feed control valve.
Auto/manual station is provided for auto/manual selection and operation. Position indicator is
provided for the full load feed control valves.

FEED CONTROL VALVE DP CONTROL


Reference drg.no. 2-97-096-90247.

The objective of this control system is to maintain the DP across the feed control valves
to a constant set value. This is required to be maintained to supply feed water according to the
requirement of the boiler at various loads. Differential pressure across the feed control station is
measured with primary and redundant transmitters. These two signals are monitored and excessive
deviation is alarmed and the control is tripped to manual. A transfer switch is provided to select the
functioning transmitter and to defeat the comparison net work. The measured signal is compared with
the DP set point and error is applied to a controller provided with proportional and integral action. The
controller output is the positioning signal for the feed pump speed regulator. For boiler loads less than
Drg. No.: 4-97-096-90633
Sheet 2 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-21

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

30 % MCR, a minimum flow in the feed pump is ensured by the high signal selector. Separate
auto/manual station is provided for each feed pump speed-regulating device. Speed indication of each
feed pump shall be provided in the operator interface. However this control loop shall be decided based
on the BFP requirement provided by BFP supplier.
Refer the notes in the control scheme for interlocks.
FURNACE DRAFT CONTROL
(ID FANS with Inlet DAMPER CONTROL and HYDRAULIC COUPLING)
Reference drg.no. 2-97-096-90248: The main objective of the control is to maintain the furnace pressure constant at the desired
set value at all loads. This is achieved by changing the flow of flue gas by modulating the inlet
damper and varying the speed of the ID fan. Furnace pressure is measured by three transmitters and
middle value auto selection is used to select the mid value. Recommended control range for the
pressure transmitter is -250 mmwc to +250 mmwc excessive furnace pressure is monitored for
directional block on ID fans.
Furnace pressure is compared with set point and error will have proportional and integral
action. FD fan demand signal is added as a feed forward feature. MFT feed forward feature is
provided to minimize negative furnace pressure excursion. Separate AUTO / MANUAL station and
position indicator for each ID fan-regulating device is provided. To have equal loading of the ID
fans, each ID fan motor current is measured, averaged and compared. The difference is used for
taking corrective action. The corrected signal is used to position the ID fans regulating units. The
inlet damper position is monitored and compared separately with maximum and minimum position
limit. The maximum and minimum position limit enables the inlet damper to be kept in its control
range. The output will have proportional and integral action. The output from the controller is used
to vary the speed of ID fan through VFD. Refer the notes in the control scheme for interlocks.
PRIMARY AIR HEADER PRESSURE CONTROL:
Reference drg.no. 2-97-096-90249: The objective of this control is to maintain the Hot Primary air header pressure at the desired
value by adjusting the PA fan regulating unit.
The Hot Primary air header pressure is measured using primary and redundant transmitters. Deviation
between the above is alarmed and control is tripped to manual. The Hot Primary air pressure header
pressure signal is compared with a set point in a PI controller. The controller output controls the PA
fan-regulating unit.
The set point of the PI controller is generated taking into consideration the following values:
a) The boiler load which increases the PA pressure on increasing boiler load.
b) Minimum set value.
c) Air to mill damper position (of mill AB, CD & EF-side DE and side NDE) which optimizes
the PA pressure to allow the Air to mill damper position with in a optimum range control (i.e
between min. and max values as elaborated through function generator characteristic curve. To
have equal loading of PA fan motor current is measured, averaged and compared. The
difference is used to take corrective action. The corrected value is used to position the PA fan
regulating units. Separate auto manual stations are provided with position indicator for PA fan
regulating unit.
d) A transfer switch is provided to close/open and stay put the vane of each PA fan regulating unit
whenever there is a command from the interlock system.
Drg. No.: 4-97-096-90633
Sheet 3 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-22

TRICHIRAPALLI

e)

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

Refer the notes in the control scheme for the interlocks.

PULVERISED COAL TEMPERATURE CONTROL


Reference drg.no. 2-97-096-90250: The objective of this control is to maintain pulverized coal air temperature, at mill outlet at a
constant value by action on the position of cold air regulating & hot air regulating dampers. The mill
outlet temperature at both sides are measured and compared. The signal corresponding to the lower of
the above two temperature is selected and compared with the set point in a proportional and integral
controller. The output of the controller positions the cold air damper.
A second loop controls the hot air regulating damper position in relation with the position of
cold air regulating damper. This is in order to maintain the cold air damper in the optimum range of
control typically between 40% to 80% damper opening. During half mill operation the side not in
operation is rejected from the circuit by using a transfer switch. The transfer selects 100% signal from a
signal generator. Since the lower of mill outlet temperature at two sides is selected, the signal from
the not operation side signal generator is not selected. On mill starting the outlet temperature may not
be adequate. Then the mill is set on a pre heat mode (contact from FSSS).
A switching module switches the control from the above controller to a warm up controller.
The mill inlet air temperature at common line is measured and compared with set point in a
proportional and integral controller (warm up controller). The warm up controller output controls the
cold air regulating damper position. Once the mill outlet temperature adequate condition is available
set mill on preheat mode condition is removed through FSSS.
A transfer switch is provided to close MILL-AB cold air regulating damper on MILL AB
OFF condition from FSSS. Also a transfer switch is provided to close MILL-AB hot air regulating
damper on MILL-AB OFF from FSSS. Separate auto manual station with position indication
for cold air regulating dampers and hot air regulating dampers are provided.
Refer the notes in the control scheme for interlocks.
CO - ORIDINATED MASTER CONTROL
Reference drg.no. 2-97-096-90251: The main object of the co-ordinated control is to operate the turbine - generator and the
steam generator as an integral unit. The desired generation of the boiler turbine combination will
be established either by the operator unit load demand (ULD) setter or by a remote auto load
despatch system (ADS). The desired generation signal (Target load) will be subjected to
following limits.
a)
Operator set maximum generation limit (MW)
b)
Operator set minimum generation limit (MW)
c)
Maximum rate of change (mw per min.)
When in load despatch mode, the maximum rate of change setter will permit the load despatch
system to obtain slow rates. When in operator set mode, the new desired load will be achieved
from the existing load at the rate set by the operator. The desired generation signal is further
modified with generation error and frequency error, which will be adjusted to match the speed
regulation inherent in the turbine governor. The frequency correction will be limited by the
maximum/minimum generation settings, but will not be limited by the maximum rate of change
of setter.
As the response of turbine is faster than the boiler, a second order delay is included in the
turbine demand to match with boiler. The firing rate demand is modified by a throttle pressure
Drg. No.: 4-97-096-90633
Sheet 4 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-23

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

TRICHIRAPALLI

correction by means of PID control from throttle pressure set point and the actual value.
MODES OF CONTROL:
A) Co-ordinated control mode: The generation demand is applied to both boiler and turbine simultaneously in coordinated mode. When the system is in co-ordinated control mode, all run UPS and run downs,
limit rate of change, frequency error, generation error and throttle pressure error will function
automatically. If a run back action occurs while in the co-ordinated mode it will trip to base
mode until operator desires
Base mode: In the base mode the demand for fuel and air will subject to maximum/minimum limit
rate to change runback acting only will be applied. The generation and frequency error will not
affect the demand signal.
Boiler flow mode: Whenever the capabilities of the turbine generator are exceeded or limited, the boiler load
shall follow the turbine load.
Turbine follow mode: Whenever the capabilities of boiler and its auxiliaries are exceeded or limited, the turbine
- generator shall follow the boiler. The run back will occur if any one of the two running
FD/ID/PA fans, or boiler Feed pumps and number of elevations/feeders in service.
AIR FLOW CONTROL
Reference drg.no. 2-97-096-90252: The secondary air flow is measured at left and right side of the ducts to wind box
by means of aerofoils. Each flow will have temperature and pressure compensation. The flow is
linearised by means of square root extractors. The total PA flow, obtained by summing the air
flow through each mill in service, is added to obtain total air flow to the boiler. This signal is
compared with the developed set point.
The air flow demand from combustion control and actual fuel flow whichever is high (lead-lag
system) is selected to ensure enrich combustion air. The oxygen in the flue gas at the inlet of
AH is measured with primary & redundant transmitters. Transfer switch can be selected for
either average value or individual value. This signal is compared with excess air set point and
any error will have proportional and integral action to have better combustion efficiency.
High/low limiters are used to limit the value in case the oxygen analyser is out of service. Under
any circumstance the air flow should not be less than 30% MCR flow. This signal is the
developed set point for the air flow control. Any difference between the developed set point and
the air flow signal will have proportional and integral action in the air flow controller. This
position demand signal will be selected to the corresponding FD fans in service through auto /
manual stations.
Equal loading of FD fans are achieved by measuring the motor current. Necessary interlock
from FSSS, boiler auxiliaries interlock system, maximum deviation limit (MDL) etc. are
provided. Position indicator for each FD fan regulating device is provided.
Drg. No.: 4-97-096-90633
Sheet 5 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-24

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

Refer the 'notes' with control scheme for interlocks.


TUBE MILL LOAD REPARTITION (FUEL FLOW CONTROL - 1 & 2 )
Reference drg.no. 2-97-096-90253 & 2-97-096-90254.
The objective of the control is to vary the fuel flow so as to maintain the main steam pressure
constant. The fuel demand signal (from combustion control) and total air flow (from air
flow control) corrected for fuel air ratio are compared in a low signal selector. This is to ensure that
fuel flow never exceeds the actual airflow. The lesser of fuel demand or total air flow is selected and
compared with the fuel flow signal. The difference will have proportional and integral action in the
fuel flow controller. Necessary auto manual station is provided for common and individual mill
control. In tube mill, the fuel flow to the burners is directly proportional to the actual air flow to the
mill. Hence the actual fuel flow is measured by adding air flow (temperature compensated) to each
mill side (from tube mill controls) and heavy oil flow .
Mill load demand (side NDE) is compared with actual coal flow (side NDE mill air flow). Any
deviation shall have proportional and integral action to position the air to mill control damper and
inturn varies the mill air flow. Total primary air flow is the sum of bypass air and air flow to the
mill. Bypass air flow is required in order to have sufficient velocity in pulverised coal pipe at all
loads.
The sum of air through the mill and bypass air demand is a function of air flow through the mill.
The set point for the bypass air flow demand is a function of the actual Mill air flow demand signal.
This set point is compared with the actual bypass airflow. Any deviation shall have proportional and
integral action to position bypass air dampers.
Actual air flow to mill (side NDE) is also taken for secondary air damper control system. High
& low signal monitors are used to generate mill air flow <30% and mill air flow >60% contacts
for use in FSSS. Actual air flow to mill (side NDE) is added with bypass air flow to mill (side
NDE) to get PA flow for each mill (side NDE). Similarly, PA flow for each mill (side DE) is
measured. Both the above are added to get PA flow for each mill. Three such signals (for MILL
AB, CD & EF) are added to get total PA flow only when the condition Mill on load from
FSSS is present the air to mill signal (side NDE) is allowed for further processing in mill load
preparation. Whenever the condition filling value from FSSS is present, a transfer switch
switches to a control signal equal to a 30% of mill air control damper (side NDE) position. Also,
whenever the condition preheat mode from FSSS is present, a transfer switch switches to a
control signal which varies in accordance to a ramp function, 0-30% air flow demand in 5
minutes. Auto manual stations are provided with position indication for mill air control damper and
mill bypass air control damper.
Refer the notes in the control scheme for interlocks.
TUBE MILL LEVEL CONTROL
Reference drg.no. 2-97-096-90255: The objective of this control is to maintain a constant coal level in the mill. Coal level is
measured as a function of differential pressure across the mill. The feed rate signal of each
gravimetric feeder in side DE & NDE of each mill is compared with the set point in proportional
and integral controller. The output of this controller regulates the feeder speed. The differential
pressure across the mill is measured on side DE & NDE of the mill. The greater of the two signals
is selected and compared with the set point in a proportional and integral controller. The output of
this controller forms the set point for the feeder speed controller.
Drg. No.: 4-97-096-90633
Sheet 6 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-25

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

When the differential pressure tapping are under purge sequence the mill DP signal is frozen to the
earlier value in a memory. The contact for freezing is taken from FSSS. Separate auto manual
station and feeder speed indication are provided for each feeder. A transfer switch is provided to
select a control signal from a function generator wherever the conditions filling up value" is present
from FSSS. The function generator gives a ramp output for feeder speed with respect to time. A
transfer switch is provided to run feeder speed set point to minimum whenever there is a command
from FSSS. High & low signal monitors are used to generate DP <25% & DP >27% contact for
use in FSSS.
Refer the notes in the control scheme for interlocks.
SH / RH - STEAM TEMPERATURE CONTROL
Reference drg.no. 2-97-096-90256 & 2-97-096-90257: General
Steam temperature control is provided by a combination of burner nozzle tilt positioning
and SH, RH de-superheating spray. Allowing nozzle tilt to respond to the lower of either SH or
RH outlet temperature maintains steam temperature, with spray responding to the higher.
Auto/manual stations are to be provided for modulating the following:
1 SH spray water valve - left
2 SH spray water valve - right
3 RH spray water valve - left
4 RH spray water valve - right
5 Burner tilts power cylinder.
Each measurement is manually selectable between a primary and redundant element. Each pair
of elements is compared and excessive deviation between the primary and redundant is alarmed,
with control rejected to manual.
SH SPRAY WATER VALVE CONTROL
In the automatic mode, each SH spray water valve is controlled by a cascade control.
Under normal conditions average SH outlet temperature (Tsho), the primary controlled
variable, is in the outer loop of the cascade control for each valve. SH DESH outlet
temperature (Tshdso), an index of the immediate effect of spray valve operation, is in the inner
loop. The outer loop PID controller receives an error signal equal to the average deviation of
Tsho set point and each measured final SH (left and right) outlet temp. (Tshol and Tshor). The
Tsho set point is programmed as a function of unit steam flow for constant pressure operation.
The outer loop controller establishes a set point for the SH DESH outlet temp. This set point is
compared to measured Tshdso and the resulting error is used to position the SH spray valves.
If the deviation between Tsho set point and measured Tshol or Tshor exceeds a preset
high limit, control of the outer cascade loops is transferred from average Tsho to the individual
final SH outlet temperature, Tshoa and Tshob. Strong feed forward to the SH temperature
control which interact with each other are provided. These feed forwards are needed to
compensate for over firing and under firing which may be required initially. When changing unit
load, feed forward signals are utilised as follows (using unit load increase as an example):
1. The rate of change of fuel demand increase (an indication of over firing) is used to open the
SH spray valves to counter the initial temperature rise.
2. Drum pressure and steam flow (applied inversely to spray valve demand) and tilt position
Drg. No.: 4-97-096-90633
Sheet 7 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-26

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

(applied directly) are used as an index to recognize the tendency for temperature to drop after
item-1 above occurs, and is used to close the SH spray valves to counter the subsequent
temperature drop.
Interlocks are provided to close the SH spray valves at loads less than 20% MCR.
RH SPRAY WATER VALVE CONTROL
In the automatic mode, each RH spray water valve is controlled by a cascade control.
Under normal operating conditions RH outlet temperature (Trho), the primary controlled
variable, is in the outer loop of each cascade control; RH DESH outlet temperature (Trhdso),
an index of the immediate effect of spray valve operation, is in the inner loop.
The outer loop PID controller receives an error signal final RH (left and right) outlet
temperature (Trhol and Trhor). The Trho set point is programmed against the main steam flow
curve, for constant pressure operation. The outer loop controller output is modified with tilt
position to establish a set point for the RH DESH outlet temperature. This set point is
compared to measured Trhdso, and the resulting error is used to position the associated RH
DESH spray water valve. If the deviation between the Trho set point and the individual
measured final RH outlet temperature exceeds a preset high limit, control of the outer cascade
loops is transferred from average Trho to the individual measured final RH outlet temperature
(Trhol and Trhor) to allow spraying of the hot lead. Interlocks are provided to keep the spray
valves closed at loads less than 20% MCR.
Nozzle tilt control
The average Tsho and Trho error signals are compared and the greater of the two errors
(i.e., The lower of the two temperatures), is selected for nozzle tilt control. An interlock is
provided to keep the tilts at their base (horizontal) position at loads less than 25% MCR.
If any spray water valve opens fully, the tilt control is interlocked to disallow further
raising of the tilts, and thus prevent possible over heating of the SH and RH outlet lead.
OVERALL STEAM TEMPERATURE CONTROL:
Typical operation :
1.At loads less than 20% MCR, SH and RH spray water valves are maintained closed. At
loads
less than 25% MCR, the nozzle tilts are maintained at their horizontal position.When loading
reaches 25% MCR, and with no SH or RH spray demand, the lower of either Trho
(average) or Tsho (average) is selected for tilt control.
2. If, for example, trho (average) is less than Tsho (average), Then trho will assume control of
the nozzle tilts. At that time, transfers will occur to add a bias to the outer loop of each RH
cascade control, and remove the bias from each SH cascade control. This insures that the RH
spray water valves remain closed while tilts are on RH control, except in emergency high
temperature conditions. In these situations, if the average Trho error exceeds the bias, the RH
spray water valves are allowed to open to lower the temperature in the associated lead.
3. While tilts are on RH control, if Tsho goes higher than set point, the SH spray water valves are
allowed to modulate as necessary to maintain Tsho set point. When a SH spray water valve
begins to open, a transfer occurs to add a negative bias to the Tsho error. This prevents the
Drg. No.: 4-97-096-90633
Sheet 8 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-27

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

immediate temperature lowering action of SH sprays from falsely shifting tilt control to average
SH temperature which may be momentarily lower. When the associated SH spray water valve
closes, the bias is automatically removed from the Tsho error signal. If Tsho (average) should
become less than Trho (average), tilt control will be transferred to SH control and the overall
operation will be the converse of the above example.
LIGHT FUEL OIL FLOW CONTROL
Reference drg. No.: 2-97-096-90260
The purpose of the control system is to maintain the flow required LFO flow by
maintaining constant pressure. The pressure after fuel oil flow control valve is measured with
primary and redundant transmitters. Deviation is alarmed and the controller is tripped to manual.
The selected signal is compared with the set point. The error will have proportional and integral
action. The controller output will be the position demand signal for the flow control valve
located in the fuel pump house. Auto/manual station is provided for auto/manual selection.
Position indication is provided for the fuel oil pressure control valve.
HEAVY FUEL OIL FLOW CONTROL
Reference drg. No.: 2-97-096-90258
The purpose of the control system is to maintain the required HFO flow by maintaining
constant pressure in the header. The pressure after flow control valve is measured with primary
and redundant transmitters. Deviation is alarmed and the controller is tripped to manual. The
selected signal is compared with the set point. The error will have proportional and integral
action. The controller output will be the position demand signal for the flow control valve
located in the fuel oil line. Auto/manual station is provided for auto/manual selection for
operation. Position indication is provided for the heavy fuel oil flow control valve.
ATOMISING STEAM PRESSURE CONTROL
Reference drg. No.: 2-97-096-90258
The purpose of the control system is to maintain the pressure of atomising steam line at
the required value. The atomising steam pressure is measured with primary and redundant
transmitters. Deviation is alarmed and the controller is tripped to manual. The selected signal is
compared with the set point. The error will have proportional and integral action. The controller
output will be the position demand signal for the atomising pressure control valve. Auto/manual
station is provided for auto/manual selection. Position indication is provided for the atomising
pressure control valve.
SEAL AIR TO PRY. AIR INLET DP CONTROL
Reference drg.no. 2-97-096-90258
The objective of this control system is to maintain the DP across seal air common header to
primary air at mill inlet to a constant set value. This is required to avoid coal and coal dust entry to
the rotating parts of tube mills and feeders at various loads. Differential pressure across seal air
common header to primary air inlet to mill measured with diff. Pressure transmitter. The measured
signal is compared with the DP set point and error is applied to a controller provided with
proportional and integral action. The controller output is the positioning signal for the
pneumatically operated damper's regulator. Separate auto/manual station is provided for this
Drg. No.: 4-97-096-90633
Sheet 9 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-28

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY CORPORATION


NEW PARLI THERMAL POWER STATION EXTN. #1
1 X 250 MW BOILER,
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

damper. Position indication of each damper shall be provided in the operator interface.

SECONDARY AIR BYPASS CONTROL (manual)


The main objective of this control is to maintain the flue gas temperature above the dew
point by manually operating the Secondary air duct damper during start up condition low load
condition (HLA 10 AA201) from remote (DCS). This operation has to send the cold secondary
air partially through the BYPASS DUCT. So that required average cold end temperature, above
the dew point can be achieved depending upon the ambient temperature.

]]]]]

Drg. No.: 4-97-096-90633


Sheet 10 OF 10

GO TO INDEX

0361 PARLI VOL D1T01-29

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C Customer No: 0361

TRICHIRAPALLI

RECOMMENDED WRITE UP ON
BOILER HOUSE AUXILIARIES
INTERLOCK & PROTECTION SYSTEM

BCR NO: 501


PREPARED

S.Sankaranarayanan
--sd--

Date
30/9/04

CHECKED

A.Chandramohan
--sd--

30/9/04

APPROVED

E.S.Salaikuberan
--sd--

Revision

Date

Checked

01

21.12.04

Approved

Sheet

of

30/9/04

Drawing No

Rev

4-97-096-90874

010

Corrected as per MSEB


marked up comments vide
their letter No: 3503 dtd
1.12.04 and our reply.

15

GO TO INDEX

0361 PARLI VOL D1T01-30

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

GENERAL:
To-days steam generators are larger in size and sophisticated in nature.
Failure of any equipment calls for expensive replacement and results in costlier down
time.
This emphasizes careful planning on the correct procedure for
1. Safe sequence of start-up of equipments in the power plant.
2. Continuous trouble free & efficient operation.
3. Safe sequence of shut down of the equipment when needed.
This also leads to provision of adequate and reliable protection to safeguard the various
plant equipments under abnormal and dangerous conditions. The operation of the
protections shall be accompanied by visual and audible annunciation, which provide
definite indication of the primary cause or causes of operation of the protection.
Restarting of the equipment, which has once been tripped by protection either by remote,
automatic or manual control shall be possible only after the elimination of the cause of
tripping.
PROTECTIONS ARE CLASSIFIED UNDER THREE GROUPS NAMELY:
i. Protection causing complete shut down of the unit.
ii. Protection causing load reduction of the unit.
iii. Protection causing annunciation only.
1.PROTECTIONS CAUSING COMPLETE SHUT DOWN OF THE UNIT.
i. Failure of all feed pumps i.e., reserve feed pumps if any fails to start on tripping of
running pumps even after a preset time delay.
ii. Boiler shut down due to failure of both FD Fans, all ID Fans and other conditions.
iii Reheater protection which is to ensure
continuous steam flow through
REHEATER tubes at specified conditions.
2. PROTECTION CAUSING LOAD REDUCTION.
a. ID Fans:
Normally 2 ID Fans are sufficient for boiler MCR. If any one of the two running ID
Fans trips, the boiler load shall be run down to60% MCR and action shall be initiated to
start the standby ID fan for boiler load greater than 60% MCR.
b. FD Fans.
Any one of the two running FD Fans trip, the boiler load shall be run down to 60% MCR.
c. Mills, PA Fans & Coal feeders:
This reduces the boiler load correspondingly due to limitations in fuel firing capabilities.
3. PROTECTIONS CAUSING ANNUNCIATION:

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 2 of 16

0361 PARLI VOL D1T01-31

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

The causes that lead to visual/audible annunciation are covered under various sub
systems like FSSS, SADC, SB control system, FUEL oil, system, Air & Flue gas system,
Steam & Water system etc. These interlocks & protection systems are divided into two
portions based on the area they cover as briefly described below.
a. BOILER AUXILIARIES INTERLOCK & PROTECTION.
i) This system takes care of sequence of starting protection and interlock of boiler
auxiliaries like FD Fans, ID Fans, AHs, Dampers, Valves etc. covered in this write
up.
a. FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS).
This system takes care of interlocks required for starting, supervising the operating
and safe shut down of the equipments connected with fuel firing system.
BOILER HOUSE AUXILARY INTERLOCKS
1.0 ID FAN INTERLOCKS (FOR TWO FANS)
This Boiler equipped with
*
*
*
*
*
1.1.

2 ID Fans
2 FD Fans
2 Cold PA Fans
2 Trisector regenerative AH
3 Tube mills
Conditions existing when the unit is shutdown and prior to starting of ID
fans.

ID fan `A' and ID fan `B' OFF.


Inlet regulating damper of fans A & B fully open.
Inlet gates of ID fan A & B open.
Outlet gates of ID fans A & B open.
The inlet regulating dampers and VFD speed control will be on manual controls
during shut down and signal from furnace draft control to regulating equipments of
ID fans disconnected.
Lube oil pumps of ID fans OFF

1.2. Starting ID fan `A' (ID fan `B' OFF)


a. ID fan `A' shall be prohibited from starting till the following conditions are satisfied.
- Inlet dampers of ID fan `A' in minimum position.
- Outlet gate of ID fan `A' closed.

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 3 of 16

0361 PARLI VOL D1T01-32

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

Inlet gate of ID fan `A' closed.


LUB oil pressure to the ID fan-A bearing adequate. (LUBE oil pressure adequate
lamp indication shall be provided on the control in DCMIS).
ID Fan and Fan motor bearing temperature not very high.
One of the airpreheaters running.
Motor winding temperature not very high.
VFD"Aux. supplies healthy"in ID Fan A channel-1(CH-1) & channel-2 (CH-2).
VFD"Ready" signal from channel-1 (CH-1) OR channel-2 (CH-2) is present.
VFD "Start permissive" from channel-1 (CH-1) OR channel-2 (CH-2) is present.
When ID Fan-A is started (ID Fan B is off), impulse shall be given for:
Opening the inlet gate and outlet gate of ID Fan A simultaneously.
Connecting the Inlet regulating dampers/VFD control of ID Fan A to the auto
control.
Closing the inlet gate and the outlet gate of ID fan B and bringing the regulating
inlet dampers/VFD control minimum position.
Permission to start either FD Fan A or FD Fan B.
VFD Channel-1 (CH-1) "Start". The fan now starts and run at minimum speed.
VFD Channel-2 (CH-2) "Start". This impulse is to be given after fan reaches
minimum speed.

1.3 Starting ID Fan B (ID Fan A is OFF)


Interlocks similar to those at clause 1.2 shall hold good for this condition.
1.4 Tripping of ID Fan A (ID Fan B is OFF)
a. ID Fan-A shall trip automatically under the following conditions. (ID Fan-A trip shall
mean that "Stop" impulses shall be issued to channel-1 & channel-2 simultaneously).
-

ID Fan A bearing temperature too high (prior to this, ID fan A bearing temperature
high shall be annunciated in UCB).

ID Fan A motor bearing/winding temperature too high (prior to this ID Fan 'A' motor
bearing/winding temperature high shall be annunciated in UCB).

Post purge fan trip from FSSS.

Vibration level of fan or motor very high (high to be alarmed) after 10 minutes delay.

ID Fan A motor protection acted.

ID Fan-A channel-1 (CH-1) & channel-2 (CH-2) input breaker 11kv trip. Here only the
respective channel shall be issued a "STOP" impulse.

"Fault" from channel-1 & channel-2. Here only the respective channels shall be issued
stop impulse.

Drg. NO.: 4-97-096-90874 /01


Sheet 4 of 16

PARLIint.doc

GO TO INDEX

0361 PARLI VOL D1T01-33

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

b. When ID Fan A trips (ID Fan B is OFF) impulses shall be given for:
- Opening the outlet gate of ID Fan B.
- Opening the inlet gate and inlet damper of ID Fan B to wide open position.
- Disconnecting the impulse from auto control system (output from A/M station).
- Opening the inlet dampers/VFD control of ID Fan A to wide-open position. 01
- Tripping the working FD Fans.
-

Boiler tripping. (thro FSSS)

- To keep the inlet gate and outlet gate of ID fan A open.4


1.5

Tripping of ID fan B (ID fan A is OFF)


Interlocks similar to those at clause 1.4 shall be good for this condition.

1.6

Starting of ID fan B (ID fan A is ON)

a. ID fan B shall be prohibited from starting unless the following conditions are satisfied:
-

Outlet gate of fan B is closed.


Inlet gate of fan B is closed.
Inlet dampers/VFD Control of fan B are in minimum position.
Lube oil pressure to the fan bearing is adequate
Fan and fan motor bearing temperature not very high.
Motor winding temperature not very high.
Both AHs are running.
VFD "AUX. supplies healthy" in ID fan B channel-1 (CH-1) & channel-2 (CH-2).
VFD "Ready"signal from channel-1 (CH-1) OR channel-2 (CH-2) is present.
VFD "Start permissive" from channel-1 (CH-1) OR channel-2 (CH-2) is present.

Note: Lube oil pressure adequate lamp indication shall be provided on the control desk.
b. When ID fan B is started, impulses shall be given for
-

Opening the inlet gate and outlet gate of fan B after the motor reaches the rated speed.
Connecting the inlet dampers/VFD of fan B to auto control.
Permissive to start other FD fan.
VFD Channel-1 (CH-1) "Start". The fan now starts and run at minimum speed.
VFD Channel-2 (CH-2) "Start". This impulse is to be given after fan reaches minimum
speed.

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 5 of 16

0361 PARLI VOL D1T01-34

TRICHIRAPALLI

1.7

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

Starting of ID fan A (ID fan B is ON):


Interlocks similar to those at clause 1.6 shall be hold good for this condition.

1.8

Tripping of ID fan B (ID fan A is ON)

a. ID fan B shall trip automatically under the following conditions. (ID fan B trip shall
mean that :Stop" impulses shall be issued to channel-1 & channel-2 simultaneously).
- Fan bearing temperature too high (prior to this fan bearing temperature high shall be
annunciated in UCB).
- Fan motor bearing/winding temperature too high (prior to this fan motor
bearing/winding
temperature high shall be annunciated in UCB).
- Vibration level of Fan/motor very high (high to be alarmed) after 10 minutes delay.
- ID fan A channel-1 (CH-1) & channel-2 (CH-2) input breaker 11 KV trip. Here only
the respective channel shall be issued a "Stop" impulse.
- "Fault" from channel-1 & channel-2. Here only the respective channels shall be
issued stop impulse.
- ID Fan-B Motor protection acted. 01
Note: Lube oil pressure low condition will be annunciated.
b. When ID fan B trips (ID fan A is ON) impulses shall be given for:
-

Disconnecting the regulator from acting on the inlet dampers.


Bringing the inlet dampers of Fan B to the minimum position.
Closing the inlet gate of fan B.
Closing the outlet gate of fan B.
Tripping the FD fan B, provided FD fan A is ON.
Boiler load shall be reduce to 60% MCR at the rate of 60% MCR/mis.

1.9 Tripping of ID fan A (ID fan B is ON):


Interlocks similar to those at clause 1.8 shall hold good for this condition:
Note:
1. Individual start/stop push button will be given in UCB/CRT for each VFD control.
2. For more details refer BHEL-EDN VFD documents.
2.0 FD FAN INTERLOCKS.
2.1 Conditions prior to starting FD Fans:
i. FD FAN-A and FD FAN-B OFF
ii. FAN inlet damper to maximum opening.

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 6 of 16

0361 PARLI VOL D1T01-35

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

iii. Outlet dampers are fully open.


iv. FAN inlet damper regulator disconnected.
v. Lube oil pumps of FD Fans OFF.
2.2 Starting FD FAN-A (FD FAN- B is OFF):
(a) FD FAN-A shall be prohibited from starting until the following conditions
are satisfied.
i. ID FAN-A or ID FAN-B is ON.
ii. Control oil pressure adequate (Control oil pressure adequate lamp indication
shall be provided on the control desk)
iii. FAN-A inlet damper in the minimum position.
iv. Outlet damper of FAN-A in closed position.
v. FAN / Motor bearing temperature not very high.
vi. Motor winding temperature not very high.
(b) When FD FAN-A is started (FD FAN-B is OFF) impulses shall be given for:
i. Outlet damper of FAN-A to open after the motor reaches rated speed.
ii. The outlet damper of FD FAN-B to close & inlet damper of FAN-B to be driven to
minimum position.
iii. Connecting the inlet damper of FAN - A control drive to auto control.
2.3 Starting of FD FAN-B (FD FAN-A is OFF):
Interlocks similar to those at clause 2.2 shall hold good for this condition.
2.4 Tripping of FD FAN A (FD FAN-B is OFF).
(a) FD FAN-A shall trip automatically under the following conditions:
i. FD FAN-A bearing temperature too high (prior to this, FD FAN-A bearing
temperature high will be annunciated in UCB.)
ii. FD FAN-A motor bearing / winding temperature too high (prior to this, FD FAN-A
motor bearing / winding temperature high will be annunciated in UCB).
iii. Both ID Fans trip.
iv. Post purge Fan trip.
v. Vibration level of FAN-A or Motor bearing very high. (High to be alarmed) after 10
minutes delay.
vi. FD FAN-A lube oil pressure very low (prior to this lube oil pressure low shall be
annunciated in UCB.

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 7 of 16

0361 PARLI VOL D1T01-36

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

vii. FD FAN-A motor protection acted 01

(b) When FD FAN-A trips (FD FAN-B is OFF) impulses shall be given for:
i. Disconnecting the inlet damper control drive from auto control system (output
signal from A/M station.)
ii. Bringing the inlet regulating damper of FAN-A to the maximum position.
iii. Bringing the inlet regulating damper of FD FAN-B to the maximum position.
iv. Opening the outlet damper of FD FAN-B.
v. To open the emergency scanner air damper.
vi. Boiler tripping
vii. The outlet damper of FD FAN-A shall remain open.
2.5 Tripping FD FAN-B (FD FAN-A is OFF):
Interlocks similar to those of clause 2.4 shall hold good for this condition.
2.6 Starting FD FAN-B (FD FAN-A is ON):
(a) FD FAN-B (FD FAN-A is ON) shall be prohibited from starting until the following
conditions are satisfied:
i. Both ID Fans are ON.
ii. Fan control oil pressure adequate. (Control oil pressure adequate lamp indication
shall be provided on the control desk. 01
iii. FAN-B inlet regulating damper in the minimum position.
iv. Outlet damper of FAN-B in closed position.
v. FAN-B and its motor bearing temperature not very high.
vi. Motor winding temperature not very high.
(b) When FD FAN-B is started (FD FAN-A is ON) impulses shall be given for:
i. Opening the outlet damper of FD FAN-B after the motor reaches rated speed.
ii. Connecting the impeller control drive of FD FAN-B to auto control.
2.7 Starting FD FAN-A (FD FAN-B is ON):
Interlocks similar to those at clause 2.6 shall hold good for this condition.
2.8 Tripping of FD FAN-B (FD FAN-A is ON):
a) FD FAN-B shall trip when FD FAN-A is ON under the following conditions:

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 8 of 16

0361 PARLI VOL D1T01-37

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

i. ID fan B trips.
ii. FD FAN-B motor bearing /winding temperature too high (prior to this, FD FAN-B
motor bearing/winding temperature high shall be annunciated in UCB).
iii. FD FAN-B bearing temperature too high
temperature high shall be annunciated in UCB).

(prior to this, FD FAN-B bearing

iv. Vibration level of FAN -B bearing very high. (High to be alarmed) after 10 minutes
delay.
v. FD FAN-B lube oil pressure very low(prior to this lube oil pressure low shall be
annunciated in UCB).
vi. FD FAN-B motor protection acted. 01
(b)

When FD FAN-B trips (FD FAN A is ON), impulses shall be given for:

i. Disconnecting regulator impulse from acting on inlet damper control drive of FANB.
ii. Bringing impeller of FAN-B to the minimum position.
iii. Closing the outlet damper of FAN-B.
iv. Energisation of partial load relay to reduce boiler load to 60% MCR.
v. Tripping mills working more than four elevations through FSSS
2.9. Tripping of FD FAN -A (FD FAN-B is ON):
Interlocks similar to those at clause 2.8 shall hold good for this condition.
3.0 PA fan Interlocks:
3.1 Conditions prior to start up
- PA fan A and PA fan B off
- Outlet dampers of fan A and B closed
- Regulating damper of fan A and fan B in closed position
- Regulating damper is disconnected.
3.2 Starting PA fan A (PA fan B OFF)
a) PA fan A shall be prohibited from starting until the following conditions are satisfied:
- Regulating vanes of PA Fan A in the minimum position.
- Outlet gate of PA fan A in closed position
- Anyone FD fan is ON
- Purge complete
- PA fan A and fan motor bearing temperature not very high
- PA fan A motor winding temperature not very high 01
- PA fan A lub. Oil pressure adequqate 01
Note : Signal from PA fan A start PB shall simultaneously go to start PA fan A and seal air
fan A .

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 9 of 16

0361 PARLI VOL D1T01-38

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

b) When PA fan A is started (PA fan B is OFF), impulses shall be given for:
The starting of PA fan A shall be done in the following sequence
- Release regulating damper control to auto.
- Opening the outlet gate of PA fan A after the motor reaches rated speed.
- Bringing the regulating damper of PA fan B to the minimum position
- Closing the outlet gate of PA fan B
- Permission to start any Mill / Three coal elevations through FSSS
3.3 Starting PA fan B (PA fan A is OFF)
Interlocks similar to those at clause 3.2 shall hold good for this condition.
3.4 PA fan A shall trip (PA fan B is OFF)
a) PA fan A shall trip (PA fan B is OFF) under the following conditions:
- PA fan A bearing temperature too high (prior to this bearing temperature high shall
be annunciated in UCB)
- PA fan A motor bearing /winding temperature too high (prior to this, motor
bearing/winding temperature high shall be annunciated in UCB)
- Vibration level of Fan or motor very high (High to be alarmed) after 10 minutes
delay.
- Boiler trips
- PA fan A motor protection
b) When PA fan A trips (PA fan B is OFF), impulses shall be given for:
- Disconnecting the regulating damper of PA fan A from auto control
- Bringing the regulating damper of PA fan A to the minimum position
- Closing the outlet gate of PA fan A
- Tripping all the working Mills / coal elevations (done through FSSS)
- Bringing the regulating damper of PA fan B to the minimum position 01
3.5 Tripping PA fan B (PA fan A is OFF)
Interlocks similar to those at clause 3.4 shall hold good for this condition.
3.6 Starting PA fan B (PA fan A is ON)
a) PA fan B shall be prohibited from starting unless the following conditions are satisfied:
- Any one FD fan is ON

b)

Regulating damper of PA Fan B in the minimum position

Outlet gate of PA fan B in closed position.

PA fan B and fan motor bearing temperature not very high.

PA fan B motor winding temperature not very high. 01


PA fan B lub. Oil pressure adequqate . 01

When PA fan B is started (PA fan A is ON), impulses shall be given for:

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 10 of 16

0361 PARLI VOL D1T01-39

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

Opening the outlet gate of PA fan B after the motor reaches rated speed
Connecting the regulating vanes of PA fan B to auto control
Permission to start Mill / Three coal elevation through FSSS.

3.7 Starting PA fan A (PA fan B is ON)


Interlocks similar to those at clause 3.6 shall hold good for this condition.
3.8 Tripping of PA fan B (PA fan A is ON)
a) PA fan B shall trip (PA fan A is ON) under the following conditions:
PA fan B bearing temperature too high (prior to this, fan bearing temperature high
shall be annunciated in UCB)
- PA fan B motor bearing / winding temperature too high ((prior to this, fan motor
bearing winding temperature high shall be annunciated in UCB)
- Boiler Trips
- Vibration level of fan or motors very high (high to be alarmed) after 10 minutes
delay.
- PA fan B motor protection acted
b) When PA fan B trips (PA fan A is ON), impulses shall be given for:
- Disconnecting the regulating damper control of PA fan B from auto control
- Bringing the regulating damper of PA fan B to minimum position
- Closing the outlet gate of PA fan B
-

Energisation of partial load relay (load to be limited to 60 MCR)

3.9 Tripping of PA fan A (PA fan B is ON)


Interlocks similar to those at clause 3.8 shall hold good for this condition.
3.10 Both the PA fans shall trip simultaneously when any boiler trip condition is present
(Impulses from FSSS)
4.0 AH interlocks:
4.1

Conditions before start up of AHs:


i.
ii.

Both AHs are OFF (Electric motor and air motors are OFF)
The inlet dampers and the outlet dampers in the Gas path, Secondary Air
bypass dampers, AH secondary air outlet damper are in full open condition.
4.2 Starting AH - A (AH-B is OFF):
i. AH-A main electric motor is started if the sump oil temperature of the bearing
measured through RTD is less 70 Deg.c.

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 11 of 16

0361 PARLI VOL D1T01-40

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

ii. Whenever AH-A electric motor trips, impulse shall be given for starting AH-A air
motor by De-energising the solenoid, provided & the sump oil temperature of
support/guide bearing of is less than 70 Deg.c.
iii. Impulse shall be given for closing of the inlet and outlet dampers of AH-B which is
OFF.
4.3

Tripping of AH-A (AH-B is OFF).


i. Whenever the sump oil temperature of support/guide bearing is greater than
70 Deg.c an alarm shall be initiated through RTD to alert the operator. The
operator shall check the circulation pump operation and the coolant flow at
local to bring down the sump oil temperature. In case if the temperature of
sump oil is unable to be brought down AH electric motor/air motor shall be
tripped manually.
ii. Air motor shall trip automatically when the electric motor of AH-A starts.

Note: Trip signal of AH is to be taken from proximity switch if provided.


(Sensing
stoppage of AH motor) or electric motor trip and air pressure
for air motor low.
Starting of AH-B (AH-A is OFF):
4.4
The interlocks said above for AH-A starting (AH-B OFF ) clause 4.2 is applicable
here.
Tripping of AH-B (AH-A is OFF).
4.5
The interlocks said above for AH-A tripping (AH B OFF ) clause 4.3 is applicable
here.
4.6
Both AHs are working when AH-A trips & AH-B continues to run:
The gas inlet damper, the secondary air outlet damper and primary air outlet
damper of the tripped AH shall automatically closed. The gas outlet damper and the
secondary air inlet damper of the tripped AH need not be closed. However, if the
operator wants to manually close these dampers they can be closed.
The operator shall try for restarting the tripped AH-A by either air motor or electric
motor. If the restarting is not possible the boiler load shall be brought down to 60%.
4.7

Both AHs are working when AH-B trips & AH -A continues to run:
The interlocking conditions said above under 4.6 is applicable here.

4.8

Both AHs are tripped:


If both AH- A & AH-B trip the operator may try for restarting the AHs. If anyone of
the AH is not started within 5 minutes the operator shall manually trip the boiler.

4.9

Interlocks for oil circulation pumps of support bearing:


(Applicable for AH-A and AH-B) 2 x 100% oil circulation pump have been provided
for the support bearing. Anyone of the two oil circulation pumps can be pre-selected
as main pump and the other as standby.

Drg. NO.: 4-97-096-90874 /01


Sheet 12 of 16

PARLIint.doc

GO TO INDEX

0361 PARLI VOL D1T01-41

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

4.10 Following interlocks shall be provided for oil circulation pumps.


(Applicable for Air heater A and Air heater B) 2 x 100% oil circulation pump have been
provided for the support bearing. Anyone of the two oil circulation pumps can be preselected as main pump and the other as standby. Following interlocks shall be
provided for oil circulation pumps.
i. Whenever the sump oil temperature of support bearing of AH-A is high (40 Deg. C)
impulse shall be given to start the main oil circulation.
ii. The standby oil circulation pump shall start when the main oil circulation pump
fails
to start or trips.
iii. The main oil circulation pump/standby oil circulation pump shall trip when the
temperature of the support bearing falls below a preset value (40 Deg.c).
iv.Manual operation of the lube oil pumps shall be prohibited when the ambient
temperature is too low. Since viscosity of the oil will be high the pump could not be
started.
4.11 Interlocks for oil circulation pumps of guide bearing:
2x 100% oil circulation pumps have been provided for guide bearing. Anyone of the
two oil circulation pumps can be pre-selected as main pump and the other as standby.
The interlocks for these pumps shall be similar to those for support bearing as
envisaged in clause 4.10. The set point for starting the lube oil pump of the guide
bearing is 40 Deg.c.
5.0

BLOW DOWN VALVE: (VALVE TAG NO: B095 & B096)


i. When DRUM water level rises to 125 mm above normal water level an
annunciation DRUM LEVEL high shall be given in UCB.
ii. When drum level rises to 125 mm above normal water level, blow down valves shall
open and this condition shall be annunciated.
iii. Blow down valves shall close automatically when the water level falls down to
NWL. One de interlock switch shall be provided for both the valves for manual
operation.

6.0 INTERLOCKS FOR FD FAN LUBRICATING OIL SYSTEM:


6.1

FD FAN-A lube oil system: (Ref. Drg. No. :-2-00-107-21361/00)


i. Pump A will start automatically if pump B trips provided A/M switch is in auto
position.
ii. Pump A will start automatically with a time delay of 0-60 seconds if lube oil
pressure falls below a set value and the pump B is working provided A/M switch
is in auto position.
iii. Pump B will start automatically if pump A trips/has not started provided A/M

Drg. NO.: 4-97-096-90874 /01


Sheet 13 of 16

PARLIint.doc

GO TO INDEX

0361 PARLI VOL D1T01-42

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

switch is in auto position. Pump B will start automatically with a time delay of 060 seconds if lube oil pressure falls below a set value and the pump A is working
provided A/M switch is in auto position.
iv. Pump A or pump B can be started/tripped by pressing the respective local push
button only when A/M switch is in manual position.
v.

FD FAN A shall be prohibited from starting until the control oil Pressure is adequate

Note : FD fan A lube. oil pressure LOW shall be alarmed in UCB.


6.2

FD FAN B lubricating oil systems: (Ref. Drg. No. 2-00-107-21361/00)


Interlocks similar to those at 6.1 above shall hold good for
FD FAN-B lubricating oil system.

6.3 Interlock for PA FAN A & B


21363/00)

lubricating oil system:- (Ref. Drg. No. 2-00-107-

Interlocks similar to 6.1 shall hold good for PA FAN A&B lube oil system.
6.4 Interlock for ID FAN A&B lube oil system:- (Ref. Drg. No. 2-00-107-21362/00)
Interlock similar to 6.1 shall hold good for ID FAN lube oil system.
7.0 FURNACE TEMPERATURE PROBE
i. Furnace temperature probe can be advanced / retracted using the push buttons
Provided in UCB (part of DCS) as well as from local.
ii. Furnace temperature probe shall be prohibited from being advanced further into
the furnace if furnace temperature sensed by it is more than 540 Deg.c.(Contact
divided in DDCMIS)
iii. If furnace temperature probe is inside the furnace and the temperature exceeds
540 Deg.c it will be retracted back automatically.
8.0 MISCELLANEOUS INTERLOCKS:
8.1

Interlocks and protection write-up for DDI gate/dampers with motor operated
blowers / isolation valves.

8.1.0 Guillotine gate with motor operated blower & manual isolation valve for blower:
i.
ii.

Gate will close and open according to BHA interlock and protection.
Blower shall be continuously working irrespective of whether the gate is in close
or open position, when boiler is working.

Drg. NO.: 4-97-096-90874 /01


Sheet 14 of 16

PARLIint.doc

GO TO INDEX

0361 PARLI VOL D1T01-43

TRICHIRAPALLI

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

Note: The blower motor for ID FAN outlet gate shall be started simultaneously with ID
FAN.
iii.
iv.
v.

Blower shall be continuously working irrespective of whether one of the ID FAN is


in operation or not.
The manual isolation valve in the blower line shall always be open.
If the blower motor trips due to overload, it shall be annunciated.

8.1.1. Interlocks for guillotine gate without blowers but with manual isolation valve:
i.

Manual valve has to be kept open irrespective of the position of the gate.

8.2.0 Interlocks for motor operated valves with BY PASS valves:


i. First open the BY PASS valve fully.
ii. After main valve is fully opened, BY PASS valve may or may not be closed.
iii. Main valve can be closed wherever required. The BY PASS valve, if not already
closed, can be closed when main valve is commanded to close
8.3.0 Interlocks for valves with integral BY PASS: ( as applicable )
i.
ii.
iii.
iv.

Isolating valves before and after the feed regulating valves.


Isolating valves before & after hp heater in the boiler feed water line.
Isolating valves on BY PASS of feed water of HP heaters.
Isolating valves on main steam line at Superheater outlet.

8.40 The above valves shall have the following interlocks:


i. The main valve shall not open unless its motorized integral BY PASS valve is in fully
open position.
ii. The motorized integral BY PASS valve shall close simultaneously when its main valve
is closed.
9.0
i.
ii.

Motor operated valve interlock requirements


TOA design valves:
For gate valves upto and including 100 mm (4 inch), globe valves and regulating
Valves.

Valve closing:
Actuator motor tripping shall be done by torque switch. Limit switch shall not be
used in the control circuit for tripping.
Valve opening:
Actuator motor tripping shall be done by limit switch. Torque switch shall be used
as a backup in the control circuit.

PARLIint.doc

GO TO INDEX

Drg. NO.: 4-97-096-90874 /01


Sheet 15 of 16

0361 PARLI VOL D1T01-44

MAHARASHTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION
1 X 250 MW BOILER, UNIT # 1
810T/HR, 155 KG/CM (G), 540C / 540C
Customer No: 0361

TRICHIRAPALLI

GATE VALVES ABOVE 100 MM:


Valve closing / opening:
Actuator motor tripping shall be done by limit switch. Torque switch shall be used in
the control as a back up.
Non TOA Design VALVES:
Valve closing:
Actuator motor tripping shall be done by torque switch. Limit switch shall not be
used the control circuit for tripping.
Valve opening:
Actuator motor tripping shall be done by limit switch. Torque switch shall be used in
the control circuit as a back up.
10.0 REHEATER PROTECTION LOGIC:
REHEATER protection shall be provided as part of BHA interlock and protection
system. This protection is provided to protect the REHEATER against starvation of
steam flow during abnormal conditions. To take care of REHEATER protection, the
boiler shall be tripped after 10 seconds, when any of the following conditions occur:
1)

When boiler is working and if


i.
ii.

2)

Generator circuit breakers open.


HP BYPASS or LP BYPASS valves remain closed less than 2%. 01
When boiler is working and if

i. Turbine trips.
ii. ss HP BYPASS or LP BYPASS valves remain closed less than 2% 01
Copy of recommended Reheater protection logic is enclosed. (ANNEXUREA)

01

*****

PARLIint.doc

Drg. NO.: 4-97-096-90874 /01


Sheet 16 of 16

GO TO INDEX

0361 PARLI VOL D1T01-45

0361 PARLI VOL D1T01-46

GO TO INDEX

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

HLB
10&20
HLB
10&20
HLB
10&20
HLB
10&20
HLB
10&20
HLB
10&20
HLB
10&20
HLA
10&20
HLA
10&20
HLA
10&20
HLA
10&20
HLA
10&20
HLA
10&20
HLA
10&20
HHL
10&20

HHL
20
10&20

CY

103 &
104

CT 114
CT 302
CT

115 to
117

VT

FD FAN-A & B MOTOR BRG.- DE VIBRATION

TE

FD FAN-A & B MOTOR BRG.- DE


TEMPERATURE

--

--

L,I

--

--

--

--

D,I,A.N

125/
130

--

UNIT_OF_TEMP

50

MEDIUM

--

METAL

--

--

--

--

50

--

METAL

24

--

--

--

--

50

--

METAL
METAL

4
2

---

---

---

---

50
50

--

--

--

--

--

--

50

--

FD FAN-A & B BRG.- TEMPERATURE

--

--

--

--

50

--

METAL

C
C

---

---

---

---

---

--

D,I,A.N

6.3/
9.9

--

D,I,A.N

T+5/
T+10

--

--

--

--

--

--

L,I

--

--

--

--

--

--

D,I,A.N

90/
105

--

--

--

01

--

--

--

--

---

--

--

00

--

--

--

--

---

--

--

00

BHA INTERLOCKS

--

---

--

--

03

BHA INTERLOCKS
BHA INTERLOCKS

mm / Sec
C

--

--

--

--

---

--

--

01

--

--

--

--

---

--

--

00

--

--

--

--

---

--

--

00

BHA INTERLOCKS

--

---

--

--

03

BHA INTERLOCKS

--

50

--

--

--

--

--

--

D,I,A.N

6.3/
12.6

--

CT

303 to
305

TI

FD FAN-A & B BRG. - TEMPERATURE

METAL

--

--

--

--

50

--

--

--

--

--

--

L,I

--

--

PP

FD FAN SUCTION PRESS.

SEC AIR 2

--

-24

--

mmWC

27

50

--

--

--

--

--

--

--

SEC AIR 2
SEC AIR 4

TP

FD FAN-A & B OUTLET TEMPERATURE

SEC AIR 4

CP 403

PP

AH - A & B INLET PRESSURE

SEC AIR 2

CP 102

PT

AH - A & B INLET PRESSURE

SEC AIR 2

403 to
CT
408

TP

AH-A & B INLET TEMPERATURE

SEC AIR 12

CT 101

TE

AH-A & B INLET TEMPERATURE

SEC AIR 2

401 to
CT
406
CP 401

TP
PP

0361 PARLI VOL D1T01-47

HHL
24
10&20

105 &
CT
106

TE

CP 402

CP 101

CP

401 &
402

CP 101

TE
PT

AH -A OUTLET TEMPERATURE
AH - A OUTLET PRESSURE
AH-A & B OUTLET TEMPERATURE
AH - A & B OUTLET PRESSURE

SEC AIR 12
SEC AIR 2
SEC AIR 8
SEC AIR 2

3500 X
2300
3500 X
2300
3500 X
2300

--

--

FD FAN-A & B OUTLET PRESSURE

--

BENTLY
NEVADA
LLC,USA

--

FD FAN-A & B OUTLET PRESSURE

BHA INTERLOCKS

---

--

PP

BHA INTERLOCKS

--

PT

03

--

METAL

401&
402
401&
CT
402

--

FD FAN- A & B BRG.- VIBRATION

CP

--

--

VT

CP 101

--

105 &
106

2600 X
2800
2600 X
2800
2600 X
2800
2600 X
2600
2600 X
2600
2600 X
2600
2600 X
2600
3500 X
2300

---

CY

CP 401

--

mm / Sec

BENTLY
NEVADA
LLC,USA

--

--

--

--

--

--

--

--

--

--

328

--

mmWC

30

53

--

--

--

--

--

D,I,

--

--

--

--

--

--

--

328

--

mmWC

30

53

--

--

--

--

--

--

--

--

--

--

--

--

328

--

mmWC

30

53

--

--

--

--

--

--

--

--

--

--

--

--

302

--

mmWC

30

100

--

--

--

--

--

--

--

--

--

--

--

--

302

--

mmWC

30

100

--

--

--

--

--

D,I,

--

--

--

--

--

--

--

302

--

mmWC

30

100

--

--

--

--

--

--

--

--

--

--

--

--

302

--

mmWC

30

100

--

--

--

13

--

D,I

--

--

--

--

--

--

--

325

--

--

--

--

--

--

--

--

--

--

--

--

164
164
164
164

-----

mmWC
mmWC
mmWC
mmWC

321
321
321
321

--4-97-28890779
4-97-28890779
4-97-28890779
4-97-28890780
4-97-28890779
4-97-28890779
4-97-28890780
4-97-28890780
4-97-28890780
4-97-28890779

00

--

--

00

--

--

--

02

--

--

--

00

--

--

00

--

--

--

00

--

--

03

--

--

--

00

--

--

--

00

--

--

03

--

--

00

--

00

AIR FLOW CONTROLTEMP. COMPENSATION

--

--

20

--

D,I

--

--

--

--

--

--

--

325

--

--

--

--

--

D,I

--

--

--

--

--

--

--

325

1195

--

T/HR

--

--

D,I,C

--

--

--

--

--

--

--

1/2" SW
--

--

03

--

--

--

00

--

--

--

00

--

--

00

--

--

--

--

--

--

--

--

4-97-28890780
4-97-28890779

140

--

mmWC

321

325

--

--

--

10

--

D,I,C

--

--

--

--

--

--

--

PP

AEROFOIL OUTLET PRESSURE

SEC AIR 2

3000 X
2750

164

--

mmWC

321

325

--

--

--

--

--

--

--

--

--

--

--

--

4-97-28890779

PP

WIND BOX PRESSURE - L & R

SEC AIR 4

--

100

--

mmWC

321

325

--

--

--

--

--

--

--

--

--

--

--

--

PT

WIND BOX PRESSURE - L & R

SEC AIR 2

--

100

--

mmWC

321

325

--

--

--

--

--

D,I

--

--

--

--

--

--

--

PARLINST

--

--

--

--

SEC AIR 4

321

--

--

AEROFOIL OUTLET TEMPERATURE

mmWC

00

--

4-97-28890780

--

00

--

325

--

3000 X
2750

140

SEC AIR 4

AT AEROFOIL - FLOW

---

3000 X
2750

FT

---

325

GO TO INDEX

REMARKS

--

--

--

REV.

--

--

--

BENTLY
NEVADA
LLC,USA

SCOPE

--

--

--

CABL_CONNECTION

--

INSTR_END_CONN

--

METAL

mm / Sec

TAPPING_ POINT_
DETAILS_PROCESS

T+5/
T+10

MODEL

D,I,A.N

MAKE

RANGE_OF_INST

--

--

NO.OF _CONT.

SET_POINT

--

50

CONT_ACTION

FUNCTION

--

--

UNIT OF _ RANGE

INSULATION
THICKNESS(mm)

--

--

OP_OTHERS
--

MAX_TEMP

--

--

FD FAN-A & B MOTOR DE BRG.TEMPERATURE METAL

101 &
CF
102

HHL
15&25
HHL
27
15&25

6.3/
9.9

--

TE

HHL
23
10&20

26

D,I,A.N

TI

101 to
CT
104

HHL
10&20

--

METAL

HHL
21
10&20
HHL
22
10&20

25

MAX.
VELOCITY(m/Sec.)

102 TO
TE
113

--

OP_TEMP

TI

CT

--

UNIT_OF_PRESS

CT 301

FD FAN-A & B MOTOR BRG.-NDE


TEMPERATURE
FD FAN-A & B MOTOR NDE BRG.
TEMPERATURE
FD FAN-A &B MOTOR WINDING
TEMPERATURE

--

MAX_PRESS

TE

FD FAN-A & B MOTOR BRG.- NDE VIBRATION

OP_PRESS

CT 101

DESCRIPTION

TYPE OF_INST

TAG_2

TAG_3

VT

UNIT_OTHERS

101 &
102

MAX_OTHERS

HLB
10&20
HLB
10&20
HLB
10&20

CY

LINE_SIZE

HLB
10&20

MEASUREMENT AND CONTROL RECOMMENDATIONS FOR AIR AND FLUE GAS PATH

QTY/BLR

TAG_1

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST. NO:0361, BCR NO:590

4-97-28890779
4-97-28890779

DRG.NO.3-97-288-92118/03
PAGE 2 OF 7

MAX_OTHERS

UNIT_OTHERS

MAX.
VELOCITY(m/Sec.)

INSULATION
THICKNESS(mm)

FUNCTION

SET_POINT

RANGE_OF_INST

UNIT OF _ RANGE

NO.OF _CONT.

CONT_ACTION

MAKE

MODEL

325

--

--

--

--

--

--

--

--

--

--

--

--

PI

WIND BOX PRESSURE - L & R

SEC AIR 2

--

100

--

mmWC

321

325

--

--

--

--

--

L,I

--

0-200

mmWC

--

--

REFER
NOTE-14

4-97-28890780
4-97-28890779

--

--

--

00

1/2"
NPT(F)

--

03

REMARKS

OP_OTHERS

321

REV.

UNIT_OF_TEMP

mmWC

SCOPE

MAX_TEMP

--

CABL_CONNECTION

OP_TEMP

100

INSTR_END_CONN

UNIT_OF_PRESS

--

TAPPING_ POINT_
DETAILS_PROCESS

MAX_PRESS

SEC AIR 4

MEDIUM

WIND BOX TEMPERATURE - L & R

DESCRIPTION

OP_PRESS

CP 301

TP

TYPE OF_INST

TAG_3
401 &
402

LINE_SIZE

CT

MEASUREMENT AND CONTROL RECOMMENDATIONS FOR AIR AND FLUE GAS PATH

QTY/BLR

HHL
15&25
HHL
29
15&25

28

TAG_2

TAG_1

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST. NO:0361, BCR NO:590

30 HBK10 CP

201 &
202

PSHH FURNACE PRESSURE-L V.H.TRIP

FLUE
GAS

--

-5

+150
mmWC
-175

1130

1200

--

--

--

--

--

150

40 to mmHG to 2N0+
COI
0.05 Kg/sqcm 2NC

REFER
NOTE:13.1.

4-97-288- 1/2"NPT( 3/4" NPT


T
90776
F)
(F)

03

TO FSSS

31 HBK10 CP

203 &
204

PSLL FURNACE PRESSURE- L V.L.TRIP

FLUE
GAS

--

-5

+150
mmWC
-175

1130

1200

--

--

--

--

--

-175

40 to mmHG to 2N0+
COD
0.05 Kg/sqcm 2NC

REFER
NOTE:13.1.

4-97-288- 1/2"NPT( 3/4" NPT


T
90776
F)
(F)

03

TO FSSS

32 HBK10 CT 401
33 HBK10 CP

401 &
402

34 HBK10 CP 101
35 HBK10 CP

102 &
103

36 HBK10 CP 205
37 HBK10 CP 104

TP

FURNACE TEMPERATURE- L

PP

FURNACE PRESSURE- L

PT

FURNACE PRESSURE- L

PT

FURNACE PRESSURE- L

PDSA
DP ACROSS WINDBOX & FURNACE-L
H
PDT

DP ACROSS WINDBOX & FURNACE-L

PP

FURNACE PRESSURE- R

39 HBK20 CP 102

PDT

DP ACROSS WINDBOX & FURNACE- R

40 HBK20 CP 205

PDSA
DP ACROSS WINDBOX & FURNACE- R
H

41 HBK20 CP 101

PT

38 HBK20 CP

401&
402

FURNACE PRESSURE - R

FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS

42 HBK20 CP 201

PSAH FURNACE PRESSURE HIGH ALARM - R

FLUE
GAS

43 HBK20 CP 202

PSHH FURNACE PRESSURE V.H.TRIP - R

FLUE
GAS

44 HBK20 CT 401

TP

FURNACE TEMPERATURE- R

FLUE
GAS
FLUE
GAS

45 HBK20 CP 203

PSAL FURNACE PRESSURE LOW ALARM - R

46 HBK20 CP 204

PSLL FURNACE PRESSURE V.L.TRIP - R

FLUE
GAS

TP

FURNACE OUTLET TEMPERATURE- L & R

FLUE
GAS
FLUE
GAS

HBK
47
10&20

0361 PARLI VOL D1T01-48

HBK
48
10&20
49
50
51
52
53
54

HBK
30&35
HBK
30&35
HBK
30&35
HBK
30&35
HBK
30&35
HBK
40&45

CT 402
CT 101

TE

FURNACE OUTLET TEMPE. PROBE- L & R

CP 401

PP

PLATEN SH OUTLET PRESURE- L & R

CP 101

PT

PLATEN SH OUTLET PRESURE- L & R

CQ 401

AP

PLATEN SH OUTLET PRESURE- L & R(O2)

CT 101

TE

PLATEN SH OUTLET TEMPERATURE - L & R

CT 401

TP

PLATEN SH OUTLET TEMPERATURE - L & R

CP 401

PP

RH OUTLET PRESSURE- L & R

PARLINST

FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS

--

-5

--

-5

--

-5

--

-5

--

-5

--

-5

--

-5

--

-5

--

-5

--

-5

+150
-175
+150
-175
+150
-175
+150
-175

mmWC

1130

1200

--

--

--

--

--

--

--

--

--

--

--

--

mmWC

1130

1200

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

D,I

--

--

--

--

--

--

--

--

--

--

--

--

D,I,C

--

--

--

--

--

--

--

mmWC

2N0+
2NC

mmWC

1130

1200

mmWC

1130

1200

1200

+150
mmWC
-175
+150
-175
+150
-175
+150
-175
+150
-175
+150
-175

--

--

--

--

--

--

mmWC

1130

1200

--

--

--

--

--

--

--

--

--

--

--

--

mmWC

1130

1200

--

--

--

--

--

--

--

--

--

--

--

--

mmWC

1130

1200

--

--

--

--

--

--

--

--

--

--

--

--

mmWC

1130

1200

DP-100

--

--

--

--

150

--

mmWC

--

--

mmWC

1130

1200

--

--

--

--

--

D,I,C

--

--

--

--

--

--

--

--

--

--

N,A

+75

(+/-)
375

REFER NOTE40 to mmHG to 2N0+


COI
13.1
0.05 Kg/sqcm 2NC

-5

1130

1200

--

-5

+150
mmWC
-175

1130

1200

--

--

--

--

--

150

--

-5

1130

1200

--

--

--

--

--

--

--

--

+150
mmWC
-175
+150
mmWC
-175

--

-5

--

-5

+150
mmWC
-175

-5

+150
mmWC
-175
+150
mmWC
-175

--

--

-5

--

-6

--

-6

--

-6

--

-6

--

-6

--

-12

+150
-175
+150
-175
+150
-175
+150
-175
+150
-175
+150
-175

4-97-28890776

+150
mmWC
-175

1130

mmWC
mmWC

mmWC

--

2N0+
COI
2NC
--

--

REFER NOTE2N0+
COI
13.2
2NC

--

--

--

1200

--

--

--

--

--

A,N

-100

1130

1200

--

--

--

--

--

-175

REFER NOTE40 to mmHG to 2N0+


COD
13.1
0.05 Kg/sqcm 2NC

1200

--

--

--

--

--

--

--

--

--

--

--

--

00

03

--

--

--

00

--

--

--

00

--

--

--

--

--

--

--

1100

--

--

--

--

--

D,I

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

D,I

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

GO TO INDEX

00

--

TO FSSS

--

--

900

03

--

--

1100

4-97-288- 1/2"NPT( 3/4" NPT


T
90776
F)
(F)

--

--

750

TO FSSS

00

--

978

03

--

mmWC

--

mmWC

FURNACE DRAFT CONTROL.

--

00

00

1100

--

--

978

10

SADC CONTROL
SADC CONTROL

--

--

--

00
00

--

--

--

E
E

03

--

--

SADC CONTROL

00

--

--

00

--

--

--

--

--

--

--

SADC CONTROL

00

--

00

--

D,I,N

--

4-97-288-90776
4-97-288--90776
4-97-288-90776
4-97-288--90776
4-97-288--90776
4-97-288- 1/2"NPT( 3/4" NPT
90776
F)
(F)

--

--

FURNACE DRAFT CONTROL

4-97-28890777

10

1100

00
00

--

--

1100

P
P

TO FSSS

--

978

---

03

--

978

---

4-97-28890777

mmWC

00

4-97-288- 1/2"NPT( 3/4" NPT


T
90776
F)
(F)

mmWC

00

--

TO FSSS

1200

--

--

03

1130

978

--

--

4-97-288---90777
4-97-288- 1/2"NPT( 3/4" NPT
T
90776
F)
(F)

--

1130

1130

--

REFER NOTE2N0+
COD
13.2
2NC

(+/-)
375

mmWC

4-97-28890777
4-97-28890776
4-97-28890776
4-97-28890776

4-97-28890776
4-97-28890776
4-97-28890778
4-97-28890777
4-97-28890777
4-97-28890776

TYPE K, T /C ALONG WITH


FTP BY BHEL-T

DRG.NO.3-97-288-92118/03
PAGE 3 OF 7

58
59
60
61
62
63
64
65
66
67

CP 401

PP

CP 101

PT

CT 101

TE

CT 401

TP

CP 401

PP

CP 101

PT

CT 101

TE

CT 401

TP

CP 401

PP

CP 101

PT

CT 101

TE

CT 401

TP

70 HNA15 CQ 101

AT

68
69

71 HNA 25 CQ

101&
102

401 &
72 HNA25 CQ
402
403 &
73 HNA25 CQ
404
74
75
76

0361 PARLI VOL D1T01-49

77
78
79
80
81

HNA
30&35
HNA
30&35
HNA
30&35
HNA
30&35
HNA
40&45
HNA
40&45
HNA
40&45
HNA
40&45

AT
AP
AP

ECONOMISER OUTLET ANALAYSER TEST - R

FLUE
GAS

101CT
104

TE

AH-A & B INLET TEMPERATURE

CP 101

PT

AH-A & B INLET PRESSURE

CP 401

PP

AH-A & B INLET PRESSURE

CT 401

TP

AH- A & B INLET TEMPERATURE

CP 101

PT

AH - A & B OUTLET PRESSURE

101 to
CT
104

TE

AH- A&B OUTLET TEMPERATURE

CQ 101

AT

AH - A & B OUTLET ANALAYSER (O2)

CQ 401

HNA
82
40&45

CP 401

HNA
83
40&45

401 &
CT
409

AP
PP
TP

PARLINST

AH - A & B OUTLET ANALAYSER TEST

FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS

AH- A & B OUTLET PRESSURE

FLUE
GAS

AH- A&B OUTLET TEMPERATURE

FLUE
GAS

--

-16

--

-16

--

-16

--

-16

--

-27

--

--

--

10

900

--

--

--

--

--

mmWC

750

--

--

--

--

--

--

--

--

D,I

--

--

--

--

--

--

--

2
2
2

3300 X
7200

18

3300 X
7200

--

03

--

--

00

--

--

--

00

--

--

00

--

--

03

--

--

--

00

--

--

--

00

--

--

00

--

--

03

--

--

--

02

--

--

02

AIR FLOW CONTROL-

--

--

02

AIR FLOW CONTROL-

--

4-97-28890782

--

--

--

00

--

4-97-28890782

--

--

--

00

--

--

03

--

--

00

--

--

--

00

--

--

--

00

--

--

00

--

--

03

--

--

00

--

--

10

D,I

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

-185 mmWC

464

600

--

--

--

--

--

--

--

--

--

--

--

--

--

D,I

--

--

--

--

--

--

--

D,I

--

--

--

--

--

--

--

-185 mmWC

464

600

--

--

--

--

--

--

--

--

--

--

--

--

-61

-211 mmWC

352

400

--

--

--

--

--

--

--

--

--

--

--

--

400

--

--

--

--

--

D,I

--

--

--

--

--

--

--

D,I

--

--

--

--

--

--

--

--

--

--

--

--

--

--

-61

-211 mmWC

352

400

--

--

--

16

-61

-211 mmWC

352

400

--

--

--

--

--

-61

-211 mmWC

352

400

--

--

--

--

--

D,I

--

--

--

--

--

--

-61

-211 mmWC

352

400

--

--

--

--

--

D,I,C

--

--

--

--

--

--

3.54

--

mmWC
mmWC

352
352

400

400

C
C

---

---

---

---

---

T
T

---

---

---

---

---

---

-64

-221 mmWC

352

400

--

--

--

16

D,I

--

--

--

--

--

--

--

-64

-221 mmWC

352

400

--

--

--

--

--

D,I

--

--

--

--

--

--

--

-64

-221 mmWC

352

400

--

--

--

--

--

--

--

--

--

--

--

--

-64

-221 mmWC

352

400

--

--

--

--

--

--

--

--

--

--

--

--

-206

-386 mmWC

127

150

--

--

--

--

--

D,I

--

--

--

--

--

--

--

-206

-386 mmWC

127

150

--

--

--

16

--

D,I

--

--

--

--

--

--

--

-206

-386 mmWC

127

150

--

--

--

--

--

D,I

--

--

--

--

--

--

--

150

--

--

--

--

--

--

--

--

--

--

--

--

-206
-206
-206

-386 mmWC
-386 mmWC
-386 mmWC

127
127
127

150
150

C
C

---

---

---

---

---

T
T

GO TO INDEX

---

---

---

---

---

---

00

--

--

--

--

--

-27

3.54

--

00

800

352

--

00

800

-211 mmWC

03

--

-61

00

674

--

--

--

674

10

--

--

--

mmWC

--

--

--

mmWC

--

4-97-28890776
4-97-28890777
4-97-28890777
4-97-28890776
4-97-28890776
4-97-28890777
4-97-28890777
4-97-28890776
4-97-28890776
4-97-28890777
4-97-28890777
4-97-28890779
4-97-28890779
4-97-28890780
4-97-28890780
4-97-28890782
4-97-28890782

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

3500 X
7200
3500 X
7200
3500 X
7200
3500 X
7200
3300 X
7200
3300 X
7200
3300 X
7200
3300 X
7200

--

--

600

--

600

8797 X
15274

--

--

464

--

464

8797 X
15274

--

-185 mmWC

--

-185 mmWC

--

800

-27

--

800

-27

--

674

--

D,I

674

--

--

--

mmWC

8797 X
15274
8797 X
15274
8797 X
15274
8797 X
15274
8797 X
15274
8797 X
15274

--

mmWC

--

--

REMARKS

--

REV.

--

SCOPE

900

--

CABL_CONNECTION

750

D,I

INSTR_END_CONN

mmWC

--

TAPPING_ POINT_
DETAILS_PROCESS

--

MODEL

--

MAKE

--

NO.OF _CONT.

--

CONT_ACTION

UNIT OF _ RANGE

RANGE_OF_INST

900

SET_POINT

750

FUNCTION

-12

mmWC

INSULATION
THICKNESS(mm)

--

MAX.
VELOCITY(m/Sec.)

UNIT_OTHERS

-12

MAX_OTHERS

--

+150
-175
+150
-175
+150
-175
+150
-175
+150
-175
+150
-175
+150
-175

OP_OTHERS

MAX_PRESS

MEDIUM

ECONOMISER OUTLET ANALAYSER TEST - L

FLUE
GAS

-12

UNIT_OF_TEMP

TP

--

MAX_TEMP

CT 401

OP_TEMP

TE

FLUE
GAS
FLUE
RH OUTLET TEMPERATURE- L & R
GAS
FLUE
RH OUTLET TEMPERATURE- L & R
GAS
FLUE
FINAL SH OUTLET PRESSURE - L & R
GAS
FLUE
FINAL SH OUTLET PRESSURE- L & R
GAS
FLUE
FINAL SH OUTLET TEMPERATURE- L & R
GAS
FLUE
FINAL SH OUTLET TEMPERATURE- L & R
GAS
FLUE
LTSH OUTLET PRESSURE - L & R
GAS
FLUE
LTSH SH OUTLET PRESSURE - L & R
GAS
FLUE
LTSH SH OUTLET TEMPERATURE- L & R
GAS
FLUE
LTSH SH OUTLET TEMPERATURE- L & R
GAS
FLUE
ECONOMISER OUTLET PRESURE- L & R
GAS
FLUE
ECONOMISER OUTLET PRESSURE- L & R
GAS
FLUE
ECONOMISER OUTLET TEMPERATURE- L & R
GAS
FLUE
ECONOMISER OUTLET TEMPERATURE - L&R
GAS
FLUE
ECONOMISER OUTLET ANALAYSER (O2)- R
GAS
FLUE
ECONOMISER OUTLET ANALAYSER (O2) - L& R
GAS
RH OUTLET PRESSURE- L & R

OP_PRESS

CT 101

DESCRIPTION

TYPE OF_INST

TAG_3

TAG_2

PT

UNIT_OF_PRESS

57

CP 101

LINE_SIZE

56

HBK
40&45
HBK
40&45
HBK
40&45
HBK
50&55
HBK
50&55
HBK
50&55
HBK
50&55
HBK
60&65
HBK
60&65
HBK
60&65
HBK
60&65
HNA
10&15
HNA
10&15
HNA
10&15
HNA
10,15

MEASUREMENT AND CONTROL RECOMMENDATIONS FOR AIR AND FLUE GAS PATH

QTY/BLR

55

TAG_1

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST. NO:0361, BCR NO:590

4-97-28890780
4-97-28890779
4-97-28890779
4-97-28890780
4-97-28890779
4-97-28890780
4-97-28890782
4-97-28890782

--

--

--

00

--

4-97-28890779

--

--

--

00

--

4-97-28890780

--

--

--

01

DRG.NO.3-97-288-92118/03
PAGE 4 OF 7

MAX_TEMP

UNIT_OF_TEMP

OP_OTHERS

MAX_OTHERS

UNIT_OTHERS

MAX.
VELOCITY(m/Sec.)

INSULATION
THICKNESS(mm)

FUNCTION

SET_POINT

RANGE_OF_INST

UNIT OF _ RANGE

NO.OF _CONT.

CONT_ACTION

MAKE

MODEL

TAPPING_ POINT_
DETAILS_PROCESS

INSTR_END_CONN

CABL_CONNECTION

SCOPE

REV.

3000 X
3000

-220

-406 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

4-97-28890779

--

--

--

00

85

HQA
20&25

CP 401

PP

ESP - B INLET PRESSURE

FLUE
GAS

3000 X
3000

-220

-406 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

4-97-28890779

--

--

--

00

86

HQA
11&16

CQ 101

AT

ESP- A OUTLET ANALAYSER

FLUE
GAS

2600 X
2600

-237

-431 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

4-97-28890782

--

--

01

2600 X
2600

-237

-431 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

4-97-28890779

--

--

--

01

--

--

--

--

--

4-97-28890780

--

--

--

02

--

--

--

--

4-97-28890782

--

--

01

TAG_3

HQA
87
11&16

CP 401

PP

ESP- A OUTLET PRESSURE

FLUE
GAS

88

HQA
11&16

CT 401

TP

ESP- A OUTLET TEMPERATURE

FLUE
GAS

2600 X
2600

-237

-431 mmWC

127

150

--

--

--

--

--

--

--

89

HQA
21&26

CQ 101

AT

ESP- B OUTLET ANALAYSER

FLUE
GAS

2600 X
2600

-237

-431 mmWC

127

150

--

--

--

--

--

--

--

90

HQA
21&26

CP 401

PP

ESP- A OUTLET PRESSURE

FLUE
GAS

2600 X
2600

-237

-431 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

4-97-28890779

--

--

--

01

91

HQA
21&26

CT 401

TP

ESP- A OUTLET TEMPERATURE

FLUE
GAS

2600 X
2600

-237

-431 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

4-97-28890780

--

--

--

02

--

--

03

--

--

00

--

--

--

00

--

--

--

00

92
93
94
95
96
97
98
99
100
101

HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20

HNC
102
10&20

0361 PARLI VOL D1T01-50

103
104
105
106
107
108

HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20
HNC
10&20

HNC
109
15&25

CT 101

TE

ID FAN - A & B INLET TEMPERATURE

CP 101

PT

ID FAN - A & B INLET PRESSURE

CP 401

PP

ID FAN - A & B INLET PRESSURE

CT 401

TP

ID FAN - A & B INLET TEMPERATURE

CY

107 &
108

CT 301
CT 102
CT

VT
TI
TE

103 TO
TE
114

CT 115

TE

CT 302

TI

ID FAN-A & B MOTOR BRG. NDE VIBRATION


ID FAN -A & B MOTOR BRG.NDE
TEMPERATURE
ID FAN -A & B MOTOR BRG.NDE
TEMPERATURE
ID FAN -A & B MOTOR WINDING
TEMPERATURE
ID FAN -A & B MOTOR BRG. DE
TEMPERATURE

FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS

2
2
2
2

3650 X
3650
3650 X
3650
3650 X
3650
3650 X
3650

-289

-487 mmWC

127

150

--

--

--

16

--

D,I

--

--

--

--

--

--

--

-289

-487 mmWC

127

150

--

--

--

--

--

D,I

--

--

--

--

--

--

--

-289

-487 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

-289

-487 mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A,N

METAL

--

--

--

--

50

--

--

--

--

--

--

L,I

--

--

--

--

--

D,I,A.N

--

--

--

--

--

D,I,A.N

METAL

--

--

--

--

50

--

METAL

24

--

--

--

--

50

--

METAL

--

--

--

--

50

--

ID FAN -A & B MOTOR BRG. DE TEMPERATURE METAL

--

--

--

--

50

--

6.3/
9.9

--

--

--

--

--

T+5/
T+10
125/
130
T+5/
T+10

mm / Sec

--

--

--

--

--

--

BENTLY
NEVADA
LLC,USA

4-97-28890780
4-97-28890779
4-97-28890779
4-97-28890780

--

--

03

--

--

---

--

--

00

--

--

--

---

--

--

01

BHA INTERLOCKS

--

--

--

---

--

--

00

BHA INTERLOCKS

--

--

--

--

---

--

--

01

BHA INTERLOCKS

--

--

--

--

---

--

--

00

--

--

--

--

--

D,I,A.N

--

--

--

--

--

--

L,I

--

--

--

mm / Sec

--

--

BENTLY
NEVADA
LLC,USA

--

---

--

--

03

BHA INTERLOCKS

mm / Sec

--

--

BENTLY
NEVADA
LLC,USA

--

---

--

--

03

BHA INTERLOCKS

ID FAN- A & B MOTOR BRG. DE VIBRATION

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A,N

103 &
104

VT

ID FAN-A & B BRG. DE VIBRATION

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A,N

6.3/
12.6

--

TI

ID FAN-A & B BRG. DE TEMPERATURE

METAL

--

--

--

--

50

--

--

--

--

--

--

L,I

--

--

--

--

--

--

---

--

--

00

CT 116

TE

ID FAN-A & B BRG. DE TEMPERATURE

METAL

--

--

--

--

50

--

CT 117

TE

ID FAN-A & B BRG. NDE TEMPERATURE

METAL

--

--

--

--

50

--

--

CT 304
CY

101 &
102

CP 101

TI
VT
PT

PARLINST

ID FAN-A & B BRG. NDE TEMPERATURE

METAL

ID FAN-B BRG. NDE VIBRATION

METAL

ID FAN-A & B OUTLET PRESSURE

FLUE
GAS

--

--

3650 X
3650

--+32

--59

--mmWC

50
50
127

-150

BHA INTERLOCKS

VT

ESP-CONTROL

---

6.3/
9.9

CT 303

ESP-CONTROL

--

105 &
CY
106
CY

REMARKS

OP_TEMP

UNIT_OF_PRESS

OP_PRESS

FLUE
GAS

MAX_PRESS

LINE_SIZE

ESP - A INLET PRESSURE

DESCRIPTION

PP

TYPE OF_INST

CP 401

TAG_2

HQA
10&15

TAG_1

84

SL_NO

QTY/BLR

MEASUREMENT AND CONTROL RECOMMENDATIONS FOR AIR AND FLUE GAS PATH

MEDIUM

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST. NO:0361, BCR NO:590

--

--

--

--

--

D,I,A.N 77/ 82

--

--

--

--

--

---

--

--

00

BHA INTERLOCKS

--

--

--

--

--

D,I,A.N 77/ 82

--

--

--

--

--

---

--

--

00

BHA INTERLOCKS

--

--

--

--

--

---

--

--

00

--

---

--

--

03

--

4-97-28890779

--

--

00

C
C
C

----

----

----

----

----

L,I
D,I,A,N
D,I

GO TO INDEX

-6.3/
12.6
--

---

mm / Sec
--

---

---

BENTLY
NEVADA
LLC,USA
--

BHA INTERLOCKS

DRG.NO.3-97-288-92118/03
PAGE 5 OF 7

119
120
121
122
123
124

HFE
10&20
HFE
10&20
HFE
10&20
HFE
10&20
HFE
10&20
HFE
10&20

CY

101 &
102

VT

CT 301

TI

CT 101

TE

102 TO
TE
CT
113
CT 114

TE

CT 302

TI

PA FAN-A & B MOTOR BRG. NDE VIBRATION


PA FAN-A & B MOTOR BRG. NDE
TEMPERATURE
PA FAN-A & B MOTOR BRG. NDE
TEMPERATURE
PA FAN-A & B MOTOR BRG. WINDING
TEMPERATURE
PA FAN-A & B MOTOR BRG. DE
TEMPERATURE
PA FAN-A & B MOTOR BRG. DE
TEMPERATURE

--

--

--

--

--

--

--

--

--

--

--

--

+32

59

mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

150

--

--

--

--

--

--

--

--

--

--

--

--

+32

59

mmWC

127

--

00

--

--

00

--

--

--

00

--

--

--

00

--

--

03

59

mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

+32

59

mmWC

127

150

--

--

--

16

--

D,I

--

--

--

--

--

--

--

150

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

01

--

--

01

+32

59

mmWC

127

59

mmWC

127

150

FLUE
GAS

7300 X
3650

59

mmWC

127

150

FLUE
GAS

7300 X
3650

59

mmWC

127

150

-SOX=600
NOX=405

--

PPM

--

--

--

D,I

--

--

--

--

--

--

--

4-97-28890782

--

--

D,I

--

--

--

--

--

--

--

4-97-28890782

--

--

01

--

--

D,I

--

--

--

--

--

4-97-28890782

--

--

00

--

---

--

--

03

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A,N

6.3/
9.9

--

METAL

--

--

--

--

50

--

--

--

--

--

--

L,I

--

--

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A.N

--

--

--

--

--

+32

24

--

7300 X
3650

METAL

4-97-28890779
4-97-28890780
4-97-28890782
4-97-28890782
4-97-28890780

--

--

--

50

--

--

--

--

--

D,I,A.N

T+5/
T+10
125/
130

mm / Sec

BENTLY
NEVADA
LLC,USA

REMARKS

150

REV.

MODEL

127

SCOPE

MAKE

mmWC

CABL_CONNECTION

NO.OF _CONT.

CONT_ACTION

59

INSTR_END_CONN

UNIT OF _ RANGE

+32

TAPPING_ POINT_
DETAILS_PROCESS

RANGE_OF_INST

LINE_SIZE

SET_POINT

CHIMNEY INLET PARTICULATE (COMMON


LINE)

FUNCTION

AT

INSULATION
THICKNESS(mm)

118 HNC 30 CQ 103

CP 402

MAX.
VELOCITY(m/Sec.)

CHIMNEY INLETANALAYSER (O2) (COMMON


LINE)

CQ 401

UNIT_OTHERS

AT

AP

ID FAN-A & B OUTLET PRESSURE


(Sox / Nox)

MAX_OTHERS

117 HNC 30 CQ 102

ID FAN-A & B OUTLET TEMPERATURE

OP_OTHERS

AT

FLUE
GAS

TP

3650 X
3650
3650 X
3650
3650 X
3650
3650 X
3650
3650 X
3650
3650 X
3650

UNIT_OF_TEMP

116 HNC 30 CQ 101

CHIMNEY INLET ANALAYSER CO/Sox / NOx


(COMMON LINE)

115

CT 401

MAX_TEMP

PP

ID FAN-A & B OUTLET GATE BLOWER O/L


PRESSURE

114

ID FAN-A & B OUTLET PRESSURE

OP_TEMP

ID FAN-A & B OUTLET TEMPERATURE

113

PP

UNIT_OF_PRESS

ID FAN-A & B OUTLET PRESSURE (O2)

TE

112

CP 401

MAX_PRESS

AP

CT 101

111

HNC
15&25
HNC
15&25
HNC
15&25
HNC
15&25
HNC
15&25
HNC
15&25

OP_PRESS

CQ 402

FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS
FLUE
GAS

110

QTY/BLR

MEASUREMENT AND CONTROL RECOMMENDATIONS FOR AIR AND FLUE GAS PATH

MEDIUM

DESCRIPTION

TYPE OF_INST

TAG_3

TAG_2

TAG_1

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST. NO:0361, BCR NO:590

--

--

BHA INTERLOCKS

--

--

--

--

---

--

--

00

--

--

--

--

---

--

--

01

BHA INTERLOCKS

--

--

--

--

--

---

--

--

00

BHA INTERLOCKS

--

--

--

--

---

--

--

01

BHA INTERLOCKS

--

--

--

--

---

--

--

00

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A.N

T+5/
T+10

--

METAL

--

--

--

--

50

--

--

--

--

--

--

L,I

--

--

125

HFE
10&20

CY

103 &
104

VT

PA FAN-A & B MOTOR BRG. DE VIBRATION

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A,N

6.3/
9.9

--

mm / Sec

--

--

BENTLY
NEVADA
LLC,USA

--

---

--

--

03

BHA INTERLOCKS

126

HFE
10&20

CY

105 &
106

VT

PA FAN-A & B BRG. DE VIBRATION

METAL

--

--

--

--

50

--

--

--

--

--

--

D,I,A,N

6.3/
12.6

--

mm / Sec

--

--

BENTLY
NEVADA
LLC,USA

--

---

--

--

03

BHA INTERLOCKS

TI

PA FAN-A & B BRG. DE TEMPERATURE

METAL

--

--

--

--

50

--

--

--

--

--

--

L,I

--

--

--

--

--

--

---

--

--

00

--

--

--

--

--

D,I,A.N 77/ 82

--

--

--

--

--

---

--

--

00

BHA INTERLOCKS

--

--

--

--

--

D,I,A.N 77/ 82

--

--

--

--

--

---

--

--

00

BHA INTERLOCKS

--

--

--

--

--

---

--

--

00

--

---

--

--

03

--

--

--

00

--

--

00

--

--

--

00

--

--

00

--

--

00

HFE
10&20
HFE
128
10&20
HFE
129
10&20
HFE
130
10&20
127

0361 PARLI VOL D1T01-51

HFE
131
10&20
132
133
134
135
136

HFE
10&20
HFE
10&20
HFE
10&20
HFE
10&20
HFE
10&20

CT 303
CT 115

TE

PA FAN-A & B BRG. DE TEMPERATURE

METAL

--

--

--

--

50

--

CT 116

TE

PA FAN-A & B BRG. NDE TEMPERATURE

METAL

--

--

--

--

50

--

--

CT 304

TI

PA FAN-A & B BRG. NDE TEMPERATURE

METAL

--

--

--

--

50

--

--

--

--

L,I

--

--

D,I,A,N

6.3/
12.6

--

mm / Sec

--

--

--

--

--

--

--

--

--

--

--

107 &
CY
108

VT

PA FAN-A & B BRG.NDE VIBRATION

METAL

--

--

--

--

50

--

--

--

--

--

CP 401

PP

PA FAN-A & B INLET PRESSURE

PRI AIR

--

-20

--

mmWC

35

50

--

--

--

401 &
CT
402
402 &
CP
403

TP

PA FAN-A & B OUTLET TEMPERATURE

PRI AIR

PP

PA FAN-A & B OUTLET PRESSURE

PRI AIR

CP 101

PT

PA FAN-A & B OUTLET PRESSURE

PRI AIR

CP 102

PT

AH - A & B INLET PRESSURE

PRI AIR

PARLINST

-2300 X
2000
2300 X
2000
2300 X
2000

--

BENTLY
NEVADA
LLC,USA

959

--

mmWC

35

--

--

--

--

--

--

--

--

--

--

--

--

--

959

--

mmWC

35

--

--

--

--

--

--

--

--

--

--

--

--

--

959

--

mmWC

35

--

--

--

--

--

--

D.I

--

--

--

--

--

--

--

933

--

mmWC

35

100

--

--

--

--

--

D,I

--

--

--

--

--

--

--

GO TO INDEX

4-97-28890779
4-97-28890780
4-97-28890779
4-97-28890779
4-97-28890779

BHA INTERLOCKS

DRG.NO.3-97-288-92118/03
PAGE 6 OF 7

INSULATION
THICKNESS(mm)

FUNCTION

SET_POINT

RANGE_OF_INST

UNIT OF _ RANGE

NO.OF _CONT.

CONT_ACTION

MAKE

MODEL

--

mmWC

35

100

--

--

--

--

--

--

--

--

--

--

--

--

933

--

mmWC

35

100

--

--

--

13

--

D,I

--

--

--

--

--

--

--

100

--

--

--

--

--

--

--

--

--

--

--

--

933

--

mmWC

35

CP 101

PT

AH - A & B OUTLET PRESSURE

PRI AIR

--

848

--

mmWC

314

315

--

--

--

--

--

D,I

--

--

--

--

--

--

--

CP 401

PP

AH - A & B OUTLET PRESSURE

PRI AIR

2200

848

--

mmWC

314

315

--

--

--

--

--

--

--

--

--

--

--

--

TP

AH - A & B OUTLET TEMPERATURE

PRI AIR

12

2200

848

--

mmWC

314

315

--

--

--

--

--

--

--

--

--

--

--

--

TE

AH - A & B OUTLET TEMPERATURE

PRI AIR

2200

848

--

mmWC

314

315

--

--

--

20

--

D,I

--

--

--

--

--

--

--

401406
101 to
CT
104
CT

mmWC

127

150

--

--

--

--

--

D,A

145 HHQ10 CP 202

PDSH DP ACROSS SCANNER AIR FILTER

SCA AIR 1

NB 500

328

--

mmWC

127

150

--

--

--

--

--

D,A

15

0 TO
50

mmWC

146 HHQ10 CP 101

PDT

DP ACROSS SCANNER AIR FILTER

SCA AIR 1

NB 500

328

--

mmWC

127

150

--

--

--

--

--

D,I

--

--

--

--

--

147 HHQ10 CP 401

PP

SCANNER AIR FAN INLET PRESSURE

SCA AIR 1

NB 500

328

--

mmWC

127

150

--

--

--

--

--

--

--

--

--

--

148 HHQ20 CP 301

PI

SCANNER AIR FAN - A OUTLET PRESSURE

SCA AIR 1

NB 500

328

--

mmWC

127

150

--

--

--

--

--

L,I

--

0-600

mmwc

--

--

149 HHQ30 CP 301

PI

SCANNER AIR FAN - B OUTLET PRESSURE

SCA AIR 1

NB 500

328

--

mmWC

127

150

--

--

--

--

--

L,I

--

0-600

mmwc

--

--

--

--

--

--

REFER
NOTE-14
REFER
NOTE-14

150 HHQ40 CP 401

PP

SCANNER AIR FANS OUTLET PRESSURE

SCA AIR 1

NB 500

528

--

mmWC

127

150

--

--

--

--

--

--

--

--

--

--

--

--

151 HHQ40 CP 101

PT

SCANNER AIR FANS OUTLET PRESSURE

SCA AIR 1

NB 500

528

--

mmWC

127

150

--

--

--

--

--

D,I

--

--

--

--

--

--

--

NB 500

528

--

mmWC

127

150

--

--

--

--

--

150

501200

mmwc

NB 500

528

--

mmWC

127

150

--

--

--

--

--

D,I

--

--

--

0361 PARLI VOL D1T01-52


PARLINST

GO TO INDEX

--

--

00

--

--

00

--

--

--

00

--

--

--

00

--

--

03
03

LOW ALARM- NO FILTER

03

FILTER CHOKE

1/2"
3/4" NPT
T
NPT(F)
(F)

--

ACROSS SCANNER AIR/FURNACE DIFF.


PRESSURE

--

4-97-28890779

328

PDT

03

REFER NOTE2N0+
COI
13.3
2NC

NB 500

153 HHQ40 CP 102

00

mmwc

SCA AIR 1

ACROSS SCANNER AIR/FURNACE DIFF.


PRESSURE

--

--

1/2"
3/4" NPT
T
NPT(F)
(F)

PDSL DP ACROSS SCANNER AIR FILTER

PDSL

--

--

4-97-28890779

144 HHQ10 CP 201

152 HHQ40 CP 201

4-97-28890779
4-97-28890779
4-97-28890780
4-97-28890780

--

REFER NOTE2N0+
COD
13.3
2NC

0 TO
50

AIR /
FLUE
GAS
AIR /
FLUE
GAS

4-97-28890780
4-97-28890780
4-97-28890779

REFER NOTE2N0+
COD
13.4
2NC
--

--

--

--

4-97-28890779
4-97-28890779
4-97-28890779
4-97-28890779
4-97-28890779
4-97-28890779

--

--

01

--

--

--

01

--

03

--

03

1/2"
NPT(F)
1/2"
NPT(F)
--

--

--

01

--

--

01

4-97-288- 1/2"NPT( 3/4" NPT


T
90779
F)
(F)

03

4-97-28890779

02

--

--

REMARKS

MAX.
VELOCITY(m/Sec.)

933

TAPPING_ POINT_
DETAILS_PROCESS

UNIT_OTHERS

MAX_OTHERS

PRI AIR

OP_OTHERS

AH - A & B INLET PRESSURE

UNIT_OF_TEMP

PP

MAX_TEMP

OP_TEMP

PRI AIR

UNIT_OF_PRESS

AH - A & B INLET TEMPERATURE

2300 X
2000
2300 X
2000
2300 X
2000

MAX_PRESS

TE

LINE_SIZE

DESCRIPTION

TYPE OF_INST

TAG_3

TAG_2

12

REV.

143

PRI AIR

SCOPE

142

CP 404

AH - A & B INLET TEMPERATURE

CABL_CONNECTION

141

CT 117

TP

INSTR_END_CONN

140

403408

OP_PRESS

139

CT

QTY/BLR

138

HFE
10&20
HFE
10&20
HFE
10&20
HFE
15&25
HFE
15&25
HFE
15&25
HFE
15&25

MEASUREMENT AND CONTROL RECOMMENDATIONS FOR AIR AND FLUE GAS PATH

MEDIUM

137

TAG_1

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST. NO:0361, BCR NO:590

FAN AUTO CHANGE OVER FSSS

DRG.NO.3-97-288-92118/03
PAGE 7 OF 7

0361 PARLI VOL D1T01-53

GO TO INDEX

SET_POINT

RANGE_OF_INST

UNIT OF _RANGE

NO.OF_CONT

CONT_ACTION

MAKE

MODEL

TAPPING_ POINT_
DETAILS_PROCESS

INSTR_END_CONN

CABL_CONNECTIO
N

SCOPE

REV.

CPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

02 HFE40

CP 401

PP

PRES. AT HOT PRI.AIR COMMON HEADER

HPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

03 HFE40

CP 201

HPA

500

--

03 TO FSSS

--

03 TO FSSS
00

04 HFE40
05 HFE40
06 HFE 41,61,81
07 HFE41,61,81
08 HFE41,61,81
09 HFE41,61,81

PSAL PRESSURE AT HOT PRI.AIR COMMON HEADER

202 CP
PSCL PRES. AT HOT PRI.AIR COMMON HEADER
204
101 CP
PT PRES. AT HOT PRI.AIR COMMON HEADER
103
101 &
TEMP. AFTER GEN. SHUT OFFF GATE FOR MILL
CT
TE
102
AB,CD,EF
PRES. AFTER GEN. SHUT OFFF GATE FOR MILL
CP 101
PT
AB,CD,EF
PRES. AFTER GEN. SHUT OFFF GATE FOR MILL
CP 201
PSCH
AB,CD,EF
401 PRES. AFTER GEN. SHUT OFFF GATE FOR MILL
CT
TP
406
AB,CD,EF

2NO+
COD
2NC
2NO+
COD
350 260-1100 mmwc
2NC

HPA

75-1500 mmwc

REFER
NOTE-11
REFER
NOTE-14

1/2"
3/4"NPT(F)
NPT(F)
1/2"
4-97-288-90779
3/4"NPT(F)
NPT(F)
4-97-288-90779

HPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

2NO+
75-1500 mmWC
2NC

PA HEADER PRESS.
CONTROL
PULVERISER COAL TEMP.
00
CONTROL

00

REFER
NOTE-11

1/2"
4-97-288-90779
3/4"NPT(F)
NPT(F)

03 TO FSSS

MIXPA

550

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

COI

REMARKS

MEDIUM

PRES. AT COLD PRI.AIR COMMON HEADER

DESCRIPTION

PP

TAG_2

CP 401

TAG_1

01 HFE30

SL_NO

TYPE OF INST

MEASUREMENT AND CONTROL RECOMMENDATION FOR TUBE MILL SYSTEM

TAG_3

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST.NO:0361, BCR NO:082

10 HFE42,62,82

CT 401

TP

TEMP. AT MILL AB,CD & EF INLET -N DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

11 HFE42,62,82

CP 401

PP

PRES. AT MILL AB,CD & EF INLET -NDE

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

12 HFE42,62,82

CF

FT

FLOW.PRI AIR TO MILL AB,CD,EF INLET - NDE

MIXPA

--

--

--

---

--

--

00 MILL AIR FLOW CONTROL

TE

TEMP.PRI AIR TO MILL AB,CD,EF INLET -NDE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

13 HFE 42,62,82

101 &
102
101 &
CT
102

--

AIR FLOW TEMP.


COMPENSATION

0361 PARLI VOL D1T01-54

14 HFE 42,62,82

CT 402

TP

TEMP. PRI.AIR TO MILL-AB,CD,EF INLET- NDE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

15 HFE 42,62,82

CT 103

TE

TEMP. PRI.AIR TO MILL-AB,CD,EF INLET- NDE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

16 HFE 42,62,82

CP 101

PT

PRES. PRI.AIR TO MILL-AB,CD,EF INLET- NDE

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

17 HFE 42,62,82

CP 402

PP

PRES. PRI.AIR TO MILL-AB,CD,EF INLET- NDE

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

18 HFE 42,62,82

CT 104

TE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00 T/C BY BHEL-HYD FOR MFPS

19 HFE 43,63,83

CP 401

PP

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

20 HFE 43,63,83

CT 401

TP

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

21 HFE 43,63,83

CF

MIXPA

--

--

--

--

--

--

--

---

--

--

00 MILL AIR FLOW CONTROL

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

22 HFE 43,63,83

101 &
102
101 &
CT
102

PARLINST

FT
TE

TEMP. PRI.AIR TO MILL MILL-AB,CD,EF OUTLETNDE


PRES. PRI.AIR TO MILL-AB,CD,EF BYPASS LINE NDETEMP. PRI.AIR TO MILL-AB,CD,EF BYPASS LINE NDE
FLOW AT PRI.AIR TO MILL-AB,CD,EF BYPASS LINE
- NDE
TEMP. AT PRI.AIR TO MILL-AB,CD,EF BYPASS LINE
- NDE

GO TO INDEX

AIR FLOW TEMP.


COMPENSATION

DRG.NO:3-97-291-92119/03
PAGE 2 OF 6

SET_POINT

RANGE_OF_INST

UNIT OF _RANGE

NO.OF_CONT

CONT_ACTION

MAKE

MODEL

TAPPING_ POINT_
DETAILS_PROCESS

INSTR_END_CONN

CABL_CONNECTIO
N

SCOPE

REV.

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

24 HFE 44,64,84

CP 401

PP

PRES. AT MILL AB,CD,EF INLET-DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

FT

FLOW AT PRI.AIR TO MILL AB,CD,EF INLET - DE

MIXPA

--

--

--

--

--

--

--

---

--

--

00 MILL AIR FLOW CONTROL

TE

TEMP. PRI. AIR TO MILL AB,CD,EF INLET-DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

25 HFE 44,64,84
26 HFE 44,64,84

101 &
CF
102
101 &
CT
102

REMARKS

MEDIUM

TEMP. AT MILL AB,CD,EF INLET-DE

DESCRIPTION

TP

TAG_2

CT 401

TAG_1

23 HFE 44,64,84

SL_NO

TYPE OF INST

MEASUREMENT AND CONTROL RECOMMENDATION FOR TUBE MILL SYSTEM

TAG_3

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST.NO:0361, BCR NO:082

AIR FLOW TEMP.


COMPENSATION

0361 PARLI VOL D1T01-55

27 HFE 44,64,84

CT 103

TE

TEMP. PRI. AIR TO MILL AB,CD,EF INLET-DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

28 HFE 44,64,84

CP 101

PT

PRES. PRI. AIR TO MILL AB,CD,EF INLET-DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

29 HFE 44,64,84

CP 402

PP

PRES. PRI. AIR TO MILL AB,CD,EF INLET-DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

30 HFE 44,64,84

CT 402

TP

TEMP. PRI. AIR TO MILL AB,CD,EF INLET-DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

31 HFE 44,64,84

CT 104

TE

TEMP. TO MILL MILL AB,CD,EF OUTLET-DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00 T/C BY BHEL-HYD FOR MFPS

32 HFE 45,65,85

CP 401

PP

PRES. PRI. AIR TO MILL-AB,CD,EF BYPASS LINE DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

33 HFE 45,65,85

CT 401

TP

TEMP. AT PRI.AIR TO MILL-AB,CD,EF BYPASS LINE


- DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

34 HFE 45,65,85

CF

101 &
102

FT

FLOW AT PRI.AIR TO MILL-AB,CD,EF BYPASS LINE


- DE

MIXPA

--

--

--

--

--

--

--

---

--

--

00 MILL AIR FLOW CONTROL

35 HFE 45,65,85

CT

101 &
102

TE

TEMP. AT PRI.AIR TO MILL-AB,CD,EF BYPASS LINE


- DE

MIXPA

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

36 HFE 47

CP 101

PT

PRES AT MILL AB OUTLET PIPES - NDE -

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

37 HFE 47 & 48

CT 101

TE

TEMP. AT MILL AB MILL OUTLET - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

MILL OUTLET TEMP.


00 CONTROL & CONTRACTS TO
FSSS

38 HFE 49

CT 101

TE

TEMP. AT MILL AB MILL OUTLET - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

39 HFE 47 - 50

CP 401

PP

PRES. AT MILL AB OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

40 HFE 48 - 50

CP 402

PP

PRES. AT MILL AB OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

41 HFE 47 - 50

CT 401

TP

TEMP. AT MILL AB OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

42 HFE 47 - 50

CQ 401

AP

ANALY. AT MILL AB OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90782

--

--

--

02

43 HFE 51

CP 101

PT

PRES. AT MILL AB OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

PARLINST

GO TO INDEX

AIR FLOW TEMP.


COMPENSATION

DRG.NO:3-97-291-92119/03
PAGE 3 OF 6

RANGE_OF_INST

UNIT OF _RANGE

NO.OF_CONT

CONT_ACTION

MAKE

MODEL

TAPPING_ POINT_
DETAILS_PROCESS

INSTR_END_CONN

CABL_CONNECTIO
N

SCOPE

--

--

--

--

--

--

--

4-97-288-90780

--

--

MILL OUTLET TEMP.


00 CONTROL & CONTRACTS TO
FSSS

45 HFE 53

CT 101

TE

TEMP AT MILL AB MILL OUTLET - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

46 HFE 51 - 54

CP 401

PP

PRES. AT MILL AB OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

47 HFE 52 - 54

CP 402

PP

PRES. AT MILL AB OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

48 HFE 51 - 54

CT 401

TP

TEMP. AT MILL AB OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

49 HFE 51 - 54

CQ 401

AP

ANALY. AT MILL AB OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90782

--

--

--

02

50 HFE 67

CP 101

PT

PRES AT MILL CD OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

51 HFE 67 & 68

CT 101

TE

TEMP. AT MILL CD MILL OUTLET - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

MILL OUTLET TEMP.


00 CONTROL & CONTRACTS TO
FSSS

52 HFE 69

CT 101

TE

TEMP. AT MILL CD MILL OUTLET - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

53 HFE 67 - 70

CP 401

PP

PRES. AT MILL CD OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

54 HFE 68 - 70

CP 402

PP

PRES. AT MILL CD OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

55 HFE 67 - 70

CT 401

TP

TEMP. AT MILL CD OUTLET POPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

56 HFE 67 - 70

CQ 401

AP

ANALY. AT MILL CD OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90782

--

--

--

02

57 HFE 71

CP 101

PT

PRES. AT MILL CD OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

58 HFE 71 & 72

CT 101

TE

TEMP AT MILL CD MILL OUTLET - DE -

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

MILL OUTLET TEMP.


00 CONTROL & CONTRACTS TO
FSSS

59 HFE 73

CT 101

TE

TEMP AT MILL CD OUTLET - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

02

60 HFE 71 - 74

CP 401

PP

PRES. AT MILL CD OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

61 HFE 72 - 74

CP 402

PP

PRES. AT MILL CD OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

62 HFE 71 - 74

CT 401

TP

TEMP. AT MILL CD OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

63 HFE 71 - 74

CQ 401

AP

ANALY. AT MILL CD OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90782

--

--

--

02

64 HFE 87

CP 101

PT

PRES AT MILL EF OUTLET PIPES - NDE -

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

0361 PARLI VOL D1T01-56

PARLINST

GO TO INDEX

REMARKS

SET_POINT

AR/COAL

REV.

MEDIUM

TEMP AT MILL AB MILL OUTLET - DE

DESCRIPTION

TE

TAG_2

CT 101

TAG_1

44 HFE 51 & 52

SL_NO

TYPE OF INST

MEASUREMENT AND CONTROL RECOMMENDATION FOR TUBE MILL SYSTEM

TAG_3

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST.NO:0361, BCR NO:082

DRG.NO:3-97-291-92119/03
PAGE 4 OF 6

RANGE_OF_INST

UNIT OF _RANGE

NO.OF_CONT

CONT_ACTION

MAKE

MODEL

TAPPING_ POINT_
DETAILS_PROCESS

INSTR_END_CONN

CABL_CONNECTIO
N

SCOPE

--

--

--

--

--

--

--

4-97-288-90780

--

--

MILL OUTLET TEMP.


00 CONTROL & CONTRACTS TO
FSSS

66 HFE 89

CT 101

TE

TEMP. AT MILL EF OUTLET - NDE -

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

67 HFE 87 - 90

CP 401

PP

PRES. AT MILL EF OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

68 HFE 88 - 90

CP 402

PP

PRES. AT MILL EF OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

69 HFE 87 - 90

CT 401

TP

TEMP. AT MILL EF OUTLET POPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

70 HFE 87 - 90

CQ 401

AP

ANALY. AT MILL EF OUTLET PIPES - NDE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90782

--

--

--

02

71 HFE 91

CP 101

PT

PRES. AT MILL EF OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

00

72 HFE 91 & 92

CT 101

TE

TEMP AT MILL EF OUTLET - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

MILL OUTLET TEMP.


00 CONTROL & CONTRACTS TO
FSSS

73 HFE 93

CT 101

TE

TEMP AT MILL EF MILL OUTLET - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

00

74 HFE 91 - 94

CP 401

PP

PRES. AT MILL EF OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

75 HFE 92 - 94

CP 402

PP

PRES. AT MILL EF OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

76 HFE 91 - 94

CT 401

TP

TEMP. AT MILL EF OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

77 HFE 91 - 94

CQ 401

AP

ANALY. AT MILL EF OUTLET PIPES - DE

AR/COAL

--

--

--

--

--

--

--

4-97-288-90782

--

--

--

02

78 HFE 55,75,95

CT 401

PURG.AIR

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

01

79 HFE 55,75,95

CP 401

PURG.AIR

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

01

80 HFE 56,76,96

CP 401

PURG.AIR

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

81 HFE 56,76,96

CT 401

PURG.AIR

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

82 HFE 57,77,97

CP 401

PURG.AIR

--

--

--

--

--

--

--

4-97-288-90779

--

--

--

00

83 HFE 57,77,97

CT 401

PURG.AIR

--

--

--

--

--

--

--

4-97-288-90780

--

--

--

00

84 HFW 01,11,21

CP 201

SL.A

15

0-50

mmwc

03

85 HFW 01,11,21

CP 202

SL.A

0-50

03

0361 PARLI VOL D1T01-57

PARLINST

TEMP. AT COLD PURGE AIR LINE TO COAL PIPE


FOR MILL AB,CD,EF (COMMON LINE)
PRESS AT COLD PURGE AIR LINE TO COAL PIPE
PP
FOR MILL AB,CD,EF (COMMON LINE)
PRES. AT COLD PURGE AIR LINE FOR MILL
PP
AB,CD,EF - NDE
TEMP. AT COLD PURGE AIR LINE FOR MILL
TP
AB,CD,EF - NDE
PRES. AT COLD PURGE AIR LINE FOR MILL
PP
AB,CD,EF- DE
TEMP. AT COLD PURGE AIR LINE FOR MILL
TP
AB,CD,EF - DE
PRESS. DIFF. AT SEAL AIR VISCOUS FILTER - MILL
PDSAH
AB,CD,EF
PRESS. DIFF. AT SEAL AIR VISCOUS FILTER PDSAL
MILL AB,CD,EF
TP

2NO+
COI
2NC
2NO+
mmwc
COD
2NC

GO TO INDEX

REFER
NOTE-12
REFER
NOTE-12

-----

1/2"
3/4" NPT(F)
NPT(F)
1/2"
3/4" NPT(F)
NPT(F)

REMARKS

SET_POINT

AR/COAL

REV.

MEDIUM

TEMP. AT MILL EF OUTLET - NDE -

DESCRIPTION

TE

TAG_2

CT 101

TAG_1

65 HFE 87 & 88

SL_NO

TYPE OF INST

MEASUREMENT AND CONTROL RECOMMENDATION FOR TUBE MILL SYSTEM

TAG_3

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST.NO:0361, BCR NO:082

DRG.NO:3-97-291-92119/03
PAGE 5 OF 6

87 HFW 04,14,24

CP 201

88 HFW 04,14,24

CP 202

89 HFW 04,14,24

CP 101

90 HFW 04,14,24

CP 102

91 HFW 04,14,24

CP 203

92 HFW 05,15,25

CT 401

93 HFW 05,15,25

CP 401

94 HFW 06,16,26

CT 401

95 HFW 06,16,26

CP 401

96 HFW 07,17,27

CT 401

97 HFW 07,17,27

CP 401

98 HFW 08,18,28

CT 401

99 HFW 08,18,28

CP 401

HFB02 TO 06
100
CF-201

CF 201

0361 PARLI VOL D1T01-58

PARLINST

PT

PRES. AT SEAL AIR OUTLET - MILL AB,CD,EF

PRESS. DIFF. SEAL AIR FAN OUTLET TO MILL


AB,CD,EF INLET
PRESS. DIFF. AT SEAL AIR OUTLET FOR MILL
PDSL
AB,CD,EF
TEMP. AT SEAL AIR TO MILL AB,CD,EF BEARING TP
NDE
PRES. AT SEAL AIR TO MILL AB,CD,EF BEARING PP
NDE
TEMP. AT SEAL AIR TO MILL AB,CD,EF
TP
CONVEYOR - NDE
PRES. AT SEAL AIR TO MILL AB,CD,EF CONVEYOR
PP
-NDE
TEMP. AT SEAL AIR TO MILL AB,CD,EF BEARINGTP
DE
PRES. AT SEAL AIR TO MILL AB,CD,EF BEARINGPP
DE
TEMP. AT SEAL AIR TO MILL AB,CD,EF BEARINGTP
DE
PRES. AT SEAL AIR TO MILL AB,CD,EF CONVEYOR
PP
- DE
COAL FLOW AT BUNKER OUTLETFEEDER
FS
A TO F
PDT

UNIT OF _RANGE

NO.OF_CONT

CONT_ACTION

MAKE

MODEL

TAPPING_ POINT_
DETAILS_PROCESS

INSTR_END_CONN

CABL_CONNECTIO
N

SCOPE

REV.

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

2NO+
COI
2NC
2NO+
75-1500 mmwc
COD
2NC

75-1500 mmwc

REFER
NOTE-11
REFER
NOTE-11

1/2"
3/4" NPT(F)
NPT(F)
1/2"
3/4" NPT(F)
NPT(F)

REMARKS

RANGE_OF_INST

PRES. AT SEAL AIR FAN INLET FOR MILL


AB,CD,EF
PRES. AT SEAL AIR FAN OUTLET FOR MILL
PSCH
AB,CD,EF
PRES. AT SEAL AIR FAN OUTLET FOR MILL
PSCL
AB,CD,EF
PP

SET_POINT

DESCRIPTION

TYPE OF INST

TAG_3

CP 401

MEASUREMENT AND CONTROL RECOMMENDATION FOR TUBE MILL SYSTEM

MEDIUM

86 HFW 01,11,21

TAG_2

TAG_1

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,
CUST.NO:0361, BCR NO:082

SL.A

650

SL.A

600

SL.A

--

--

--

--

--

--

--

---

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

00

SL.A

300

REFER
NOTE-13

---

03 TO FSSS

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

SL.A

--

--

--

--

--

--

--

---

--

--

--

00

COAL

--

--

--

--

--

--

--

---

--

--

01

50-1200 mmwc

2NO+
COD
2NC

GO TO INDEX

-----

1/2"
3/4" NPT(F)
NPT(F)

03 TO FSSS (PR.OK)

03

TO FSSS (AUTO CHANGE


OVER)

SEAL AIR TO MILL INLET DP


CONTROL

ULTRASONIC COAL FLOW


DETECTOR.

DRG.NO:3-97-291-92119/03
PAGE 6 OF 6

0361 PARLI VOL D1T01-59

GO TO INDEX

PROJECT: NEW PARLI TPP


UNIT-1, 1X250 MW
CUST.NO: 0361
BCR 574

FUNCTION

--

--

--

--

--

D,I

--

--

--

--

--

--

1/2 inch SW

--

--

00

--

--

--

--

--

--

--

--

--

--

--

1/2 inch SW

--

--

--

01

HAC10

CT 101

TE

TEMP. AT ECO. INLET

WATER

OD 638x48

174.80

187.5

Kg/cm2

247.80

250

--

--

--

80

--

--

--

--

--

--

4-97-288-90783

--

--

03

D,I

CONT.ACTION

DESCRIPTION

SCOPE

INSULATION
THICKNESS(mm)

250

REVISION

MAX.
VELOCITY(m/Sec.)

250

247.80

HAC10

CT 401

TW

TEMP. AT ECO. INLET

WATER

OD 638x48

174.80

187.5

Kg/cm

247.80

250

--

--

--

--

--

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

HAC10

CP 301

PI

PRESS. AT ECO. INLET

WATER

174.80

187.5

Kg/cm2

247.80

250

--

--

--

--

--

L,I

--

0-250

Kg/cm2

--

REF
NOTE:10

--

1/2 inch SW

1/2"NPT(M)

--

03

HAC10

CQ 101

AT

PH ANALYSER AT FEED WATER SAMPLING

WATER

174.80

187.5

Kg/cm2

247.80

250

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

HAC10

CQ 102

AT

O2 ANALYSER AT FEED WATER SAMPLING

WATER

D14.0x2.9

174.80

187.5

Kg/cm2

247.80

250

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

HAC10

CQ 103

AT

H2 ANALYSER AT FEED WATER SAMPLING

WATER

D14.0x2.9

174.80

187.5

Kg/cm2

247.80

250

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

HAC10

CQ 104

AT

Si ANALYSER AT FEED WATER SAMPLING

WATER

D14.0 X2. 9

174.80

187.5

Kg/cm

247.80

250

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

Kg/cm

10 HAC10

CQ 105

AT

CCT ANALYSER AT FEED WATER SAMPLING

WATER

11 HAC11

CT 101

TE

TEMP. AT ECO. OUTLET-LEFT

WATER

12 HAC11

CT 401

TW

TEMP. AT ECO. OUTLET-LEFT

WATER

13 HAC11

CP 401

PP

PRESS. AT ECO. OUTLET-LEFT

WATER

14 HAC12

CT 401

TW

TEMP. AT ECO. OUTLET -RIGHT

WATER

15 HAC12

CT 101

TE

TEMP. AT ECO. OUTLET -RIGHT

WATER

16 HAC12

CP 401

PP

PRESS. AT ECO. OUTLET -RIGHT

WATER

17 HAD01

CL

W&S

W&S

18 HAD01
19 HAD01
20 HAD01

106 &
107

301 &
302
101 CL
103
104 &
CL
105
CL

21 HAD01

CL 108

22 HAD01

101 CT
106

EWLI DRUM LEVEL-L & R

DWLG DRUM LEVEL-L&R


LT

DRUM LEVEL

EWLS DRUM LEVEL VALIDATION VESSEL


LT
TE

DRUM LEVEL
DRUM METAL TEMP.(MTM)

247.80

250

--

--

170.00 182.70

Kg/cm2

301

301

--

--

--

80

170.00 182.70

Kg/cm

301

301

--

--

--

--

--

170.00 182.70

Kg/cm

301

301

--

--

--

--

--

170.00 182.70

Kg/cm2

301

301

--

--

--

--

--

170.00 182.70

Kg/cm

301

301

--

--

--

80

170.00 182.70

Kg/cm

301

301

--

--

--

--

--

ID-1778

170.00 182.50

Kg/cm2

351

357

--

--

--

--

D14.0 X2. 9
OD323.9X
36
OD323.9X
36
OD323.9X
36
OD323.9X
36
OD323.9X
36
OD323.9X
36

174.80

187.5

ID-1778

170.00 182.50

Kg/cm

351

357

W&S

ID-1778

170.00 182.50

Kg/cm

351

357

W&S

ID-1778

170.00 182.50

Kg/cm

351

357

W&S

ID-1778

170.00 182.50

Kg/cm

351

357

Kg/cm

METAL

ID-1778

170.00 182.50

351

--

NWL =
C 250mm
C

--

NWL =
C 250mm
NWL =
0
C 250mm
NWL =
0
C 250mm

357

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

--

--

--

--

--

--

4-97-288-90783

--

--

03

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

--

--

--

--

--

--

1/2 inch SW

--

--

--

01

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

--

--

--

--

--

--

4-97-288-90783

--

--

03

--

--

--

--

--

--

1/2 inch SW

--

--

--

01

L,I,N

NOTE-6

--

--

--

BHEL

BHEL
VISION
20M

---

--

--

00

L,I

--

--

--

--

--

---

--

--

00

--

--

--

--

--

---

--

--

01

REFER NOTE-5

--

--

--

--

--

---

--

--

01

TO FSSS

D,I

D,I

D,C,I,A,
NOTE-6
N
N

--

D,C,I,A,
NOTE-6
N
D,I

--

--

-0

--

--

--

---

--

--

01

REFER NOTE-5

--

--

---

--

--

00

MTM T/C's UPTO JB BY BHEL T

03

23 HAD01

CP 301

PI

DRUM PRESS.

W&S

ID-1778

170.00 182.50

Kg/cm

351

357

--

--

--

--

--

L,I

--

0-250

Kg/cm

--

REF
NOTE:10

--

1/2 inch SW

1/2"NPT(M)

--

24 HAD01

CP 401

PP

DRUM PRESS.

W&S

ID-1778

170.00 182.50

Kg/cm2

351

357

--

--

--

--

--

--

--

--

--

--

--

1/2 inch SW

--

--

--

01

25 HAD01

CP 302

PI

DRUM PRESS.- FMG

W&S

ID-1778

170.00 182.50

Kg/cm2

351

357

--

--

--

--

--

L,I

--

0-250

Kg/cm2

--

REF
NOTE:11

--

1/2 inch SW

1/2"NPT(M)

--

03

26 HAD01

CP

PT

DRUM PRESS.

W&S

ID-1778

170.00 182.50

351

357

--

--

--

--

D,I,C

--

--

--

--

--

--

1/2 inch SW

--

--

00

--

27 HAD01

CP 103

PT

DRUM PRESS.

W&S

ID-1778

170.00 182.50

Kg/cm

351

357

--

--

--

--

--

D,I,C

--

--

--

--

--

--

1/2 inch SW

--

--

01

28 HAD01

CQ 101

AT

PH ANALYSER - AT DRUM (CBD)

WATER

D14.0 X2. 9

170.00 182.50

Kg/cm

351

357

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

29 HAD01

CQ 102

AT

CCT ANALYSER AT DRUM (CBD)

WATER

D14.0 X2. 9

170.00 182.50

Kg/cm

351

357

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

30 HAD01

CQ 103

AT

SI ANALYSER AT DRUM WATER (CBD)

WATER

D14.0 X2. 9

170.00 182.50

Kg/cm

351

357

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

31 HAD01

CQ 104

AT

PO4 ANALYSER AT DRUM WATER (CBD)

WATER

D14.0 X2. 9

170.00 182.50

Kg/cm2

351

357

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

32 HAH01

CQ 101

AT

STEAM

D14.0 X2. 9

170.00 182.50

Kg/cm

351

357

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

33 HAH01

CQ 102

AT

STEAM

D14.0 X2. 9

170.00 182.50

Kg/cm

351

357

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

Kg/cm

357

--

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

0361 PARLI VOL D1T01-60

Kg/cm

34 LBA01

CQ 101

AT

PH ANALYSER - SATURATED STEAM (DRUM


STEAM)
CCT. ANALYSER - SATURATED STEAM (DRUM
STEAM)
PH. ANALYSER AT SH STEAM SAMPLING

PARLI INS574

STEAM

D14.0 X2. 9

170.00 182.50

351

GO TO INDEX

TRIP CONTACTS TO FSSS &


INDICATIONS AT DRUM, OP.
FLOOR & UCB

COI

101 &
102

REMARKS

CABLE CONNECTION

UNIT OF OTHERS

INSTR_END_CONN

MAX. OTHERS.

247.80

Kg/cm2

MODEL

OP. OTHERS.

Kg/cm2

187.5

MAKE

MAX.TEMP

UNIT OF TEMP.

187.5

174.80

UNIT OF RANGE

OP.TEMP

174.80

OD 638x48

RANGE OF INST.

UNIT OF PRESS

OD 638x48

SET POINT

MAX.PRESS

WATER

OP.PRESS

WATER

PRESS. AT ECO. INLET

LINE SIZE

PRESS. AT ECO. INLET

PP

QTY / BOILER

PT

CP 401

MEDIUM

CP 101

HAC10

TYPE OF INST

HAC10

TAG-3

TAG-1

TAG-2

SL.NO

TAPPING_ POINT_
DETAIL_PROCESS

MEASUREMENT AND CONTROL RECOMMENDATION FOR WATER AND STEAM SYSTEM

FMG (Dial size 250mm)

DRG NO: 3-97-599-92120/03


SHEET 2 OF 4

PROJECT: NEW PARLI TPP


UNIT-1, 1X250 MW
CUST.NO: 0361
BCR 574

INSULATION
THICKNESS(mm)

FUNCTION

SET POINT

RANGE OF INST.

UNIT OF RANGE

CONT.ACTION

MAKE

MODEL

TAPPING_ POINT_
DETAIL_PROCESS

INSTR_END_CONN

CABLE CONNECTION

SCOPE

REVISION

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

357

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

37 LBA01

CQ 104

AT

CAT ANALYSER AT SH STEAM SAMPLING

STEAM

D14.0 X2. 9

170.00 182.50

Kg/cm

351

357

--

--

--

D,I

--

--

--

--

--

--

---

--

--

00

DESCRIPTION

38 HAH10

CT 401

TW

TEMP. AT HEADER SHH9

STEAM

1 OD 368 X 50 166.20

178.7

Kg/cm

353

360

--

--

--

--

--

39 HAH10

CT 101

TE

MTM AT HEADER SHH9

STEAM

1 OD 368 X 50 166.20

178.7

Kg/cm2

353

360

--

--

--

40

80

40 HAH20

CT

TE

LTSH METAL TEMP (MTM)

METAL

23

178.7

Kg/cm2

353

360

--

--

--

--

--

101 123

--

166.20

T
D,I
D,I
D,I

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

--

--

--

--

--

--

4-97-288-90783

--

--

03

COI

--

--

---

--

--

01

466

41 HAH21

CT 101

TE

TEMP. AT SH DESH - I IN LET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm2

400

410

--

--

--

40

80

--

--

--

--

--

--

4-97-288-90783

--

--

03

42 HAH21

CT 401

TW

TEMP. AT DESH - I IN LET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm2

400

410

--

--

--

--

--

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

43 HAH21

CP 101

PT

PRESS. AT DESH - I OUTLET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm

400

410

--

--

--

--

--

D,I

--

--

--

--

--

--

1/2 inch SW

--

--

01

44 HAH21

102 CT
104

TE

TEMP. AT DESH - I OUTLET

STEAM

3 OD 368 X 40 165.40

177.9

Kg/cm

400

410

--

--

--

40

80

D,I,C

--

--

--

--

--

--

4-97-288-90783

--

--

03

45 HAH21

CT 402

TW

TEMP. AT DESH - I OUTLET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm2

400

410

--

--

--

--

--

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

46 HAH22

CT 401

TW

TEMP. AT DESH - 2 IN LET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm

400

410

--

--

--

--

--

47 HAH22

CT 101

TE

TEMP. AT DESH - 2 IN LET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm

400

410

--

--

--

40

80

48 HAH22

CT

TE

TEMP. AT DESH - 2 OUTLET

STEAM

3 OD 368 X 40 165.40

177.9

Kg/cm2

400

410

--

--

--

40

80

49 HAH22

CP 101

PT

PRESS. AT DESH - 2 OUTLET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm

400

410

--

--

--

80

50 HAH22

CT 402

TW

TEMP. AT DESH - 2 OUTLET

STEAM

1 OD 368 X 40 165.40

177.9

Kg/cm

400

410

--

--

--

51 HAH25

101CT
146

Kg/cm

520

--

--

--

102 104

TE

PLATEN SH METAL TEMP. (MTM)

METAL

46

52 HAH31

CT 401

TW

TEMP. AT SHH12 O/L-LEFT

STEAM

53 HAH31

CT 101

TE

TEMP. AT SHH12 O/L. -LEFT

STEAM

54 HAH32

CT 401

TW

TEMP. AT SHH12 O/L - RIGHT

STEAM

55 HAH32

CT 101

TE

TEMP. AT SHH12 O/L - RIGHT

STEAM

101121

56 HAH40

CT

57 LBA01

CP 301

58 HAJ10

CT

101 126

520

--

--

--

--

--

509

520

--

--

--

40

80

160.10

172.6

Kg/cm

509

520

--

--

--

--

--

160.10

172.6

Kg/cm

509

520

--

--

--

40

80

--

--

--

Kg/cm

--

--

--

--

--

--

--

155.00

--

Kg/cm

540

--

--

--

--

--

--

TE

REHEATER METAL TEMP

METAL

26

--

--

--

Kg/cm2

--

--

--

--

--

--

--

1
1

61 LAE10

CP 101

PT

SH SPRY CONTRL STN. I/L PRESS.

WATER

62 LAE15

CP 301

PI

SH SPRY CONTRL STN. O/L PRESS.- LEFT

WATER

63 LAE15

CP 401

PP

SH SPRY CONTRL STN. O/L PRESS.- LEFT

WATER

0361 PARLI VOL D1T01-61

WATER

TE

SH SPRY CONTRL STN. O/L - LEFT

WATER

FT

FLOW AT SH SPRY WATER LINE - LEFT

WATER

66 LAE16

CP 301

PI

PR. AT SH SPRY CONTRL STN. O/L .- RIGHT

WATER

67 LAE16

CP 401

PP

PR. AT SH SPRY CONTRL STN. O/L .- RIGHT

WATER

101 &
102

509

D255.6 X47

WATER

CF

Kg/cm

Kg/cm2

TEMP.AT SH SPRY CONTROL STN. I/L TEMP.

69 LAE16

172.6
172.6

21

SH SPRY CONTRL STN. I/L PRESS.

CT 101

160.10
160.10

METAL

PI

68 LAE16

--

STEAM

TE

101 &
102

--

FINAL SH O/LTUBES METAL TEMP.(MTM)

CT 101

CF

509

PRESSURE AT MAIN STEAM LINE-FMG

CP 301

CT 101

--

PI

60 LAE10

65 LAE15

--

--

TE

59 LAE10

64 LAE15

-OD 406.4 X
65
OD 406.4 X
65
OD 406.4 X
65
OD 406.4 X
65

--

TE

TEMP. SH SPRY CONTRL STN. O/L - RIGHT

WATER

FT

FLOW AT SH SPRY WATER LINE - RIGHT

WATER

PARLI INS574

D 168.3 X
21.95
D 168.3 X
21.95
D 168.3 X
21.95
D 88.9 X
11.13
D 88.9 X
11.13
D 88.9 X
11.13
D 88.9 X
11.13
D88.9 X
11.13
D88.9 X
11.13
D 88.9 X
11.13
D 88.9 X
11.13

--

--

--

--

--

--

4-97-288-90784

--

--

--

01

--

--

--

--

--

--

4-97-288-90783

--

--

03

D,I,C

--

--

--

--

--

--

4-97-288-90783

--

--

03

D,I

--

--

--

--

--

--

1/2 inch SW

--

--

01

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

COI

--

--

---

--

--

01

D,I

D,I
T
D,I
T
D,I
D,I
L,I
D,I
D,I

554

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

--

--

--

--

--

--

4-97-288-90783

--

--

03

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

--

--

--

--

--

--

4-97-288-90783

--

--

03

580
--

0-250

Kg/cm
0

615

C
2

--

---

--

--

01

MTM T/C's UPTO JB BY BHEL T

--

1/2 inch SW

1/2"NPT(M)

--

03

FMG (Dial size 250mm)

COI

--

--

---

--

--

01

MTM T/C's UPTO JB BY BHEL T

--

4-97-288-90783

--

--

03

1/2 inch SW

1/2"NPT(M)

--

03

187.5

Kg/cm

247.80

250

--

--

--

80

--

--

--

--

--

187.5

Kg/cm

247.80

250

--

--

--

--

--

L,I

--

0-250

Kg/cm2

--

REF
NOTE:10

174.80

187.5

Kg/cm

247.80

250

--

--

--

--

--

D,I

--

--

--

--

--

--

1/2 inch SW

--

--

01

174.80

187.5

Kg/cm

247.80

250

--

--

--

--

--

L,I

--

0-250

Kg/cm2

--

REF
NOTE:10

--

1/2 inch SW

1/2"NPT(M)

--

03

174.80

187.5

--

--

--

--

--

--

250

--

--

--

80

247.80

250

--

--

T/Hr

--

--

--

--

--

--

--

--

--

--

--

--

174.80

187.5

Kg/cm

174.80

187.5

Kg/cm

247.80

250

247.80

250

174.80

187.5

Kg/cm

174.80

187.5

Kg/cm

174.80

187.5

Kg/cm2

247.80

250

--

--

--

80

174.80

187.5

Kg/cm2

247.80

250

--

--

T/Hr

--

--

T
D,I
D,I

--

--

--

--

--

--

1/2 inch SW

--

--

--

01

--

--

--

--

--

--

4-97-288-90783

--

--

03

--

--

--

--

REFER
NOTE:12
REF
NOTE:10

--

---

--

--

03

--

1/2 inch SW

1/2"NPT(M)

--

03

L,I

--

0-250

Kg/cm

--

--

Kg/cm

--

--

--

1/2 inch SW

--

--

--

01

--

--

--

--

--

--

4-97-288-90783

--

--

03

--

--

--

--

REFER
NOTE:12

--

---

--

--

03

D,I
D,I

GO TO INDEX

MTM T/C's UPTO JB BY BHEL T

--

174.80

250

SH TEMP. CONTROL

REF
NOTE:11

174.80

247.80

SH TEMP. CONTROL

--

247.80

MTM T/C's UPTO JB BY BHEL T

COI

REMARKS

MAX.
VELOCITY(m/Sec.)

357

351

UNIT OF OTHERS

MAX.TEMP

UNIT OF TEMP.

351

Kg/cm2

MAX. OTHERS.

OP.TEMP

Kg/cm2

170.00 182.50

OP. OTHERS.

UNIT OF PRESS

170.00 182.50

D14.0 X2. 9

MAX.PRESS

D14.0 X2. 9

OP.PRESS

LINE SIZE

STEAM

MEDIUM
STEAM

TYPE OF INST

CCT ANALYSER AT SH STEAM SAMPLING


SI ANALYSER AT SH STEAM SAMPLING

TAG-3

AT
AT

TAG-2

CQ 102
CQ 103

TAG-1

35 LBA01
36 LBA01

SL.NO

QTY / BOILER

MEASUREMENT AND CONTROL RECOMMENDATION FOR WATER AND STEAM SYSTEM

--

ORIFICE PLATE BY BHEL-T

ORIFICE PLATE BY BHEL-T

DRG NO: 3-97-599-92120/03


SHEET 3 OF 4

PI

PRESS.AT RH SPRY CONTRL STN. OUTLET -L

WATER

CP 401

PP

PRESS.AT RH SPRY CONTRL STN. OUTLET -L

WATER

75 LAE25

CT 101

TE

TEMP. ATRH SPRY CONTRL STN. OUTLET -L

WATER

76 LAE25

CF

FT

FLOW RH SPRY WATER LINE - LEFT

WATER

77 LAE26

CP 301

PI

PRESS. AT RH SPRY CONTRL STN. OUTLET -R

WATER

78 LAE26

CP 401

PP

PRESS. AT RH SPRY CONTRL STN. OUTLET -R

WATER

101 &
102

79 LAE26

CT 101

80 LAE26

CF

81 HCB11

CP 301

82 HCB11

CP

83 HCB11

174.80

187.5

Kg/cm2

247.80

250

--

--

--

80

174.80

187.5

Kg/cm2

247.80

250

--

--

--

--

80

L,I

--

0-250

Kg/cm2

--

REF
NOTE:10

--

1/2 inch SW

1/2"NPT(M)

--

03

--

--

--

--

--

--

4-97-288-90783

--

--

03

--

--

--

--

--

--

1/2 inch SW

--

--

01
03

D,I
D,I

174.80

187.5

--

247.80

250

--

--

--

--

--

L,I

--

0-250

Kg/cm

--

REF
NOTE:10

--

1/2 inch SW

1/2"NPT(M)

--

174.80

187.5

Kg/cm2

247.80

250

--

--

--

--

--

--

--

--

--

--

--

1/2 inch SW

--

--

--

01

174.80

187.5

Kg/cm2

247.80

250

--

--

--

--

--

--

--

--

--

--

4-97-288-90783

--

--

--

03

174.80

187.5

Kg/cm2

247.80

250

--

--

T/Hr

--

--

D,I

--

--

--

--

D60.3X8.74

174.80

187.5

Kg/cm2

247.80

250

--

--

--

--

--

L,I

--

0-250

Kg/cm2

--

D60.3X8.74

174.80

187.5

Kg/cm2

247.80

250

--

--

--

--

--

--

--

--

--

247.80

250

--

--

--

--

--

--

--

--

247.80

250

--

--

T/Hr

--

--

D,I

--

--

--

--

0-250

Kg/cm
--

D,I

D,I

TE

TEMP. AT RH SPRY CONTRL STN. OUTLET.-R

WATER

D60.3X8.74

174.80

187.5

Kg/cm

FT

FLOW RH SPRY WATERLINE - RIGHT

WATER

D 60.3 X
8.74

174.80

187.5

Kg/cm2

PI

PRESS.AT BEFORE SBPRV

STEAM

D60.3X8.74

165.40

177.9

Kg/cm

400

410

--

--

--

--

--

L,I

--

PT

PRESS. AT AFTER SBPRV

STEAM

D60.3X3.91

30.00

40.0

Kg/cm2

279

304

--

--

--

--

--

D,I,C

--

--

CP 302

PI

PRESS.AT AFTER SBPRV

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

279

304

--

--

--

--

--

L,I

--

0-60

84 HCB11

CF 201

FS

FLOW AFTER SBPRV

STEAM

D 88.9 X
5.49

30.00

40.0

Kg/cm

279

304

--

--

--

--

--

2.2

85 HCB11

CP 201

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

279

304

--

--

--

--

--

18

2.1 -42

Kg/cm

--

--

--

86 HCB11
87 HCB21

101 &
102

101 &
102

CT 101
CP 201

PSCH PRESS. AFTER SBPRV


TE

TEMP. AFTER SBPRV

PSCH PRESS AT AHSB LINE - AH -'A'

STEAM
STEAM

1
1

D60.3X3.91
D60.3X3.91

30.00
30.00

40.0
40.0

Kg/cm

Kg/cm2

279
279

304
304

C
C

---

---

--

D,I

60
--

--

18

Kg/cm

--

---

--

--

03

--

1/2 inch SW

1/2"NPT(M)

--

03

--

--

1/2 inch SW

--

--

--

01

--

--

4-97-288-90783

--

--

--

03

--

---

--

--

03

--

1/2 inch SW

1/2"NPT(M)

--

03

REFER
NOTE:12
REF
NOTE:10

---

--

--

1/2 inch SW

--

--

00

--

REF
NOTE:10

--

1/2 inch SW

1/2"NPT(M)

--

03

REFER
NOTE:9

2.1 -42

REFER
NOTE:12
REF
NOTE:10

---

--

--

03

TO SB CONT. PANEL

REFER NOTE:8

1/2 NPT-F

1/2"NPT(F)

3/4"
NPT

03

SBC PANEL

4-97-288-90783

--

--

03

1/2 NPT-F

1/2"NPT(F)

3/4"
NPT

03

Kg/cm2 COD

--

PI

PRESS AT AHSB LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm2

279

304

--

--

--

--

--

L,I

--

0-60

Kg/cm2

--

CT 101

TE

TEMP. AT AHSB DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm2

279

304

--

--

--

60

--

D,I,C

Refer
remarks

--

--

--

--

CT 401

TW

TEMP. AT AHSB DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

279

304

--

--

--

--

--

--

--

--

91 HCB22

CP 301

PI

PRESS AT AHSB DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

279

304

--

--

--

--

--

L,I

--

0-60

92 HCB22

CP 201

93 HCB24

CT 401

94 HCB24

0361 PARLI VOL D1T01-62

95 HCB25

96 HCB25

PSCH PRESS AT AHSB LINE - AH -'B'


TW

TEMP. AT LRSB DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm2

279

304

--

--

--

--

--

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

279

304

--

--

--

--

--

279

304

--

CT 101

TE

TEMP. AT LRSB DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

CT 401

TW

TEMP. AT WALL BLOWE DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

279

304

--

Kg/cm

279

304

--

279

304

--

279

304

--

--

120

--

CT 101

TE

TEMP. AT WALL BLOWE DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

97 HCB26

CT 401

TW

TEMP. AT WALL BLOWE DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

98 HCB26

CT 101

TE

TEMP. AT WALL BLOWE DRAIN LINE

STEAM

D60.3X3.91

30.00

40.0

Kg/cm

98 HCB50

101to
CT
132

TE

HEAT FLUX TEMP. SENSORS (Diff. Temp.


transmitters)

METAL

32

--

--

--

--

PARLI INS574

---

--

--

60

--

--

--

60

--

--

--

60

--

--

--

--

--

--

REFER NOTE:8

CP 301

Kg/cm

--

1/2 inch SW

1/2"NPT(M)

--

03

--

4-97-288-90783

--

--

03

--

--

--

4-97-288-90784

--

--

--

01

--

REF
NOTE:10

--

1/2 inch SW

1/2"NPT(M)

--

03

1/2 NPT-F

1/2"NPT(F)

3/4"
NPT

03

Kg/cm2 COD

REFER NOTE:8

18

2.1 -42

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

D,I,C

Refer
remarks

--

--

COI

--

--

4-97-288-90783

--

--

03

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

D,I,C

Refer
remarks

--

--

COI

--

--

4-97-288-90783

--

--

03

--

--

--

--

--

--

4-97-288-90784

--

--

--

00

D,I,C

Refer
remarks

--

--

COI

--

--

4-97-288-90783

--

--

03

--

--

--

--

--

--

---

--

--

02

GO TO INDEX

TO SB CONT. PANEL

COD
--

ORIFICE PLATE BY BHEL-T

REFER NOTE:9

89

HCB
21&22
HCB
90
21&22

ORIFICE PLATE BY BHEL-T

COD

REF
NOTE:10

88 HCB21

REMARKS

--

SCOPE

--

REVISION

--

CABLE CONNECTION

--

MODEL

--

INSTR_END_CONN

CP 301

74 LAE25

TAPPING_ POINT_
DETAIL_PROCESS

73 LAE25

MAKE

250

CONT.ACTION

PRESS. BEFORE RH SPRAY CONTROL STATION WATER

247.80

UNIT OF RANGE

PT

Kg/cm2

RANGE OF INST.

CP 101

187.5

SET POINT

72 LAE20

174.80

FUNCTION

INSULATION
THICKNESS(mm)

WATER

MAX.
VELOCITY(m/Sec.)

TEMP..BEFORE RH SPRAY CONTROL STATION

UNIT OF OTHERS

TE

MAX. OTHERS.

CT 101

OP. OTHERS.

71 LAE20

D88.9 X
11.13
D 88.9 X
11.13
D 88.9 X
11.13
D 60.3 X
8.74
D 60.3 X
8.74
D 60.3 X
8.74
D 60.3 X
8.74

MAX.TEMP

UNIT OF TEMP.

WATER

OP.TEMP

PRESS.BEFORE RH SPRAY CONTROL STATION

UNIT OF PRESS

PI

MAX.PRESS

CP 301

OP.PRESS

70 LAE20

LINE SIZE

QTY / BOILER

MEDIUM

MEASUREMENT AND CONTROL RECOMMENDATION FOR WATER AND STEAM SYSTEM

DESCRIPTION

TYPE OF INST

TAG-3

TAG-2

TAG-1

SL.NO

PROJECT: NEW PARLI TPP


UNIT-1, 1X250 MW
CUST.NO: 0361
BCR 574

SBC PANEL

SBC TO DCS
OPEN - 260, CLOSE - 300

SBC PANEL

SBC TO DCS
OPEN - 260, CLOSE - 300

SBC TO DCS
260, CLOSE - 300

OPEN -

SBC TO DCS
OPEN 260, CLOSE - 300
FOR SMART WALL BLOWING
IN SB CONTROL.

DRG NO: 3-97-599-92120/03


SHEET 4 OF 4

0361 PARLI VOL D1T01-63

GO TO INDEX

HJF25

CP
CP

HJF25

CP

HJF25

CP

HJF01

CT

10

HJF01,02

CP

11

HJF01,02

CP

12

HJF01,02

CP

13

HJF03

14

HJF 04 &
05

15
16
17

HJF06

CP
CP
CP

201
301

PI

PR. AFTER STRAINERS A & B

PSAL

PR. BEFORE LDO PUMP A & B


INTER CONNECTION.

PI

PR. AFTER LDO PUMP A & B

LFO DISCHARGE PR. AT PUMP


201
PSAL
COMMON LINE
LFO DISCHARGE PR. AT PUMP
202
PSCL
COMMON LINE
LFO DISCHARGE PR. AT PUMP
101 &
PT
102
COMMON LINE -PRSS. CONTROL
TEMP. AT HFO PUMP SUCTION
301
TI
STRAINERS INLET COMMON LINE
PR. BEFORE HFO PUMP SUCTION
301
PI
STRAINERS A & B
DIFF.PR.ACROSS HFO PUMP
201 PDSAH
SUCTION STRAINERS A & B
'PR. AFTER HFO PUMP SUCTION
302
PI
STRAINERS A & B
PR. INTER CONNECTION LINE
201
PSAL
BEFORE PUMP
301
201

HJF06

CP

HJF06

101 &
CP
102

202

PI

PR.AFTER HFO PUMP.A & B

PSCL PR.AFTER HFO PUMP.


PSAL
PT

LFO
LFO
LFO
LFO

2
2
1
2
1

NB80
NB80
NB80
NB50
NB40

0.00
0.00
18.00
18.00

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

50

C
C

-----

------

------

--

--

--

--

--

--

--

--

--

--

D,A
L,I
D,A
L,I
D,A

0.35
-(-) 0.6
-17.5

(-)1 to 1 Kg/ cm2


0.1 to
1.5

0 - 40
1.4-28

NB40

18.00

-- Kg/cm

50

--

--

--

--

--

--

17.0

1.4-28

Kg/cm

COD

18.00

-- Kg/cm2

50

--

--

--

--

--

--

D,I,C

--

--

--

--

HFO

NB150

0.00

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

0 - 100

HFO

2 NB 150

0.00

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

(-)1 to 1 Kg/ cm2

HFO

2 NB 150

0.00

-- Kg/cm2

55

--

--

--

--

--

--

D,A

0.35

HFO

2 NB 150

0.00

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

HFO
HFO

1 NB 150
2
1

NB100
NB100

0.00

-- Kg/cm2

28.0

28.0

-- Kg/cm

-- Kg/cm

50
55
55

0.1-1.5

(-)1 (+)1

--

--

--

--

--

--

--

D,A

27.5

2.1-42

--

--

--

--

--

D,I,C,N

28.0

--

PR.AFTER HFO PUMP.

HFO

NB100

28.0

-- Kg/cm

55

--

PR. AFTER HFO PUMPS COMMON


LINE. - PR. CONTROL

HFO

NB100

28.0

-- Kg/cm2

55

--

C
C
C

----

----

----

--

--

--

--

--

--

D,A
L,I
N

(-) 0.6
-27.0

0 - 60
2.1-42

TEMP.BEFORE HFO HEATER

HFO

NB100

28.0

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

0 - 100

19

HJF30

CT

401

TW

TEMP. BEFORE HFO HEATER

HFO

NB100

28.0

-- Kg/cm2

55

--

--

--

--

--

--

--

20

HJF30

CT

101

TE

TEMP.BEFORE HFO HEATER

HFO

NB100

28.0

-- Kg/cm2

55

--

--

--

--

--

--

D,I

--

22

HJF33

TEMP.AFTER HFO HEATER

TE

TEMP.AFTER HFO HEATER - HFO


TEMP. CONTROL

HFO
HFO

1
2

NB50
NB50

27.0

-- Kg/cm2

27.0

-- Kg/cm

125

0361 PARLI VOL D1T01-64

--

--

--

--

--

--

--

--

--

--

--

--

--

Kg/cm2

Kg/cm2

-COI
-COD

--

COD

Kg/cm

COD

--

--

Kg/ cm
Kg/cm

--

--

REFER
NOTE:16
REFER
NOTE:15
REFER
NOTE:11
REFER
NOTE:15
REFER
NOTE:8
REFER
NOTE:15
REFER
NOTE:9
REFER
NOTE:9
--

--

REFER
NOTE:16

15 mm SW

1/2" NPT(F)

15 mm SW 1/2" NPT(M)
15 mm SW

1/2" NPT(F)

15 mm SW 1/2" NPT(M)

--

03

3/4"NPT(F)

03 TO FOCP

--

03

3/4"NPT(F)

03 TO FOCP

--

03

03 TO FOCP

15 mm SW

1/2" NPT(F)

3/4"NPT(F)

15 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FOCP

25 mm SW

--

--

00 TO FOCP

M20X1.5(F) M20X1.5(M)

--

03

25mm SW

1/2" NPT(M)

--

03

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FOCP

25mm SW

1/2" NPT(M)

--

03

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FOCP

25mm SW

1/2" NPT(M)

--

03

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FOCP

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FOCP

25 mm SW

--

--

00 TO FOCP

M20X1.5(F) M20X1.5(M)

--

03

--

--

--

--

--

--

M20X1.5(F)

--

--

--

00

--

--

--

--

--

M33X2(F)

--

--

03

--

03

L,I

--

0 - 200

--

D,I,C

--

--

--

REFER
NOTE:16

REMARKS

INSTR_END_CONN

TAPPING_ POINT_
DETAILS_PROCESS

15 mm SW 1/2" NPT(M)

-3

--

REFER
NOTE:14
REFER
NOTE:10
REFER
NOTE:14
REFER
NOTE:7
REFER
NOTE:14
REFER
NOTE:7
REFER
NOTE:6

--

M20X1.5(F) M20X1.5(M)

--

--

--

--

--

M33X2(F)

--

--

03

--

--

--

--

--

--

M20X1.5(F)

--

--

--

00

23

HJF33

CT

401

TW

TEMP.AFTER HFO HEATER

HFO

NB50

27.0

-- Kg/cm

125

--

24

HJF33

CP

101

PT

PR.AFTER HFO HEATER

HFO

NB50

27.0

-- Kg/cm2

125

--

--

--

--

--

--

D,I

--

--

--

--

--

--

25 mm SW

--

--

00 TO FOCP

25

HJF33

CP

401

PP

PR . AFTER HFO HEATERS

HFO

NB50

27.0

-- Kg/cm2

125

--

--

--

--

--

--

--

--

--

--

--

--

25 mm SW

--

--

--

00

25mm SW

1/2" NPT(M)

--

03

M33X2(F)

M20X1.5(M)

3/4"NPT(F)

03 TO FSSS

PR . AFTER HFO HEATERS

HFO

NB50

27.0

-- Kg/cm2

125

--

--

--

--

--

--

L,I

--

0 - 60

TSAH TEMP.AFTER HFO HEATER

HFO

NB50

27.0

-- Kg/cm2

125

--

--

--

--

--

--

D,A

130.0

70-170

PR. BEFORE HOTCV

STM

NB80

9.0

-- Kg/cm2

210

--

--

--

--

--

--

L,I

--

PI

PR.AFTER HOTCV

STM

NB80 7 TO 4 -- Kg/cm2

210

--

--

--

--

--

--

L,I

TI

PR.AFTER HOTCV

STM

NB80 7 TO 4 -- Kg/cm2

210

--

--

--

--

--

--

L,I

26

HJF33

CP

301

27

HJF33

CT

202

28

HJT01

CP

301

PI

29

HJT01

CP

302

30

HJT01

CT

301

PARLINST / 582

125

(-)1 to 1 Kg/ cm2

--

TI

COD

Kg/cm

NB40

TI

301

--

Kg/ cm

301

101 &
CT
102

COD

Kg/cm

CT

CT

--

LFO

HJF30

HJF33

COI

Kg/cm

LFO

18

21

(-)1 to 1 Kg/ cm
(-)1 (+)1

--

MODEL

--

MAKE

L,I

CONT_ACTION

--

UNIT OF PY. INST.

--

50

--

--

RANGE_OF_PY_INS
T

--

50

--

SET_POINT

--

50

--

FUNCTION

--

50

--

INSULATION
THICKNESS(mm)

--

MAX_OTHERS

UNIT_OTHERS
MAX.
VELOCITY(M/Sec )
MAX.
VELOCITY(m/Sec.)

--

HFO

50

OP_OTHERS

0.00

UNIT_OF_TEMP

UNIT_OF_PRESS

MAX_PRESS

OP_PRESS

LFO

-- Kg/cm2

REV.

HJF 22,23

CP

302

0.00

SCOPE

HJF24

CP

201

NB80

CABL_CONNECTION

HJF20,21

CP

OP_TEMP

HJF20,21

LFO

MAX_TEMP

PR. BEFORE PUMP SUCTION


STRAINERS A & B
DIFF.PR.ACROSS LFO PUMP
PDSAH
SUCTION STRAINER A & B
PI

LINE_SIZE

301

QTY/BLR

TAG_3

CP

MEDIUM

TAG_2

HJF20,21

MESAUREMENT AND CONTROL RECOMMENDATION FOR FUEL OIL SYSTEM

DESCRIPTION

TAG_1

INST

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,CUST. NO:0361,
BCR NO:582

PI

GO TO INDEX

Kg/ cm2
0

--

REFER
NOTE:15
REFER
NOTE:12

COI

0 - 16

Kg/ cm2

--

REF NOTE:14

15 mm SW 1/2" NPT(M)

--

03

--

0 - 16

Kg/ cm2

--

REF NOTE:14

15 mm SW 1/2" NPT(M)

--

03

--

0 - 400

--

REF NOTE:16 M20X1.5(F) M20X1.5(M)

--

03

DRG.NO.3-97-599-92121/03
sheet 2 OF 5

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,CUST. NO:0361,
BCR NO:582

PT

33

HJF40

CP

201

34

HJF40

CF

101

FT

35

HJF40

CP

101 &
102

PT

36
37
38
39
40
41

HJF40
HJF40
HJF40
HJF40
HJN10
HJN10

CP

302

CP

401

CP

202 204

CP
CP
CP

205
301
101

42

HJN10

CP

401

43

HJN10

CP

201 203

44

HJN10

CP

204

45

HJF50

CP

301

46

HJF50

CP

201

47

HJF50

CT

201

48

HJF50

CT

301

49
50
51

HJF50
HJF50
HJF50

CP
CT
CP

202
101
302

PR. BEFORE LOTV

PP

PI
PT

-- Kg/cm

--

--

--

0 - 25

Kg/ cm2

--

REFER
NOTE:14

--

D,I

--

-- Kg/cm

50

--

FLOW. BEFORE LOTV

LFO

NB 40

12.0

-- Kg/cm2

50

--

4320

--

PR. AFTER LOFCV - FLOW CONTRL

LFO

NB 40

-- Kg/cm2

50

--

--

--

--

--

--

--

--

--

--

--

--

--

L,I

--

0 - 10

--

--

--

--

--

--

D,I

--

PR. AFTER LOFCV


PR. AFTER LOFCV

PR. AFTER LOFCV


PR.AT ATOM. AIR LINE
PR.AT ATOM. AIR LINE

LFO
LFO
LFO
LFO
AIR
AIR

1
1
3
1
1
1

NB 40
NB 40
NB 40
NB 40
NB50
NB50

6.0
6.0

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

50
50
50
50
50

C
C
C
C

-----

-----

REFER
NOTE:19

--

--

--

--

03

--

D,I,C,

--

--

--

--

15 mm SW

--

--

00

15 mm SW 1/2" NPT(M)

--

03

15 mm SW

--

--

--

01

15 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FSSS

15 mm SW

1/2" NPT(F)

3/4"NPT(F)

03

15 mm SW 1/2" NPT(M)

--

03

25 mm SW

--

00

------

---

--

--

--

--

--

--

--

L,I
T
N
D,A

--

-0 - 16

-3.5
4.0

--

--

Kg/ cm
Kg/ cm

COD
COD

Kg/ cm

--

--

--

--

--

--

--

--

--

--

--

0.7-14

Kg/cm
Kg/cm

--

--

--

--

--

--

--

--

--

--

--

--

3.5

0.36-7.0 Kg/cm2

COD

PSAL

AIR

NB50

6.0

-- Kg/cm2

50

--

--

--

--

--

--

D,A

4.0

0.35-7.0 Kg/cm2

COD

HFO

NB50

21.0

-- Kg/cm2

120

--

--

--

--

--

--

L,I

--

0 - 40

Kg/ cm2

--

HFO

NB50

21.0

-- Kg/cm2

120

--

--

--

--

--

--

21

2.1-42

Kg/cm2

COI

HFO

NB50

21.0

-- Kg/cm2

120

--

--

--

--

--

--

120

70-170

HFO

NB50

21.0

-- Kg/cm2

120

--

--

--

--

--

--

L,I

--

0 - 200

21.0

--

--

--

--

--

--

--

--

--

--

--

PI

PR.AT BEFORE HOTV


BEFORE HOTV

HFO

0361 PARLI VOL D1T01-65

HJF50

CF

101

FM

FLOW

HFO

53

HJF50

CP

303

PI

PR. AFTER HOFCV

HFO

54

HJF50

101 &
CP
102

PT

PR. AFTER HOFCV - FLOW


CONTROL

HFO

55

HJF50

CT

401

TW

TEMP. AFTER HOFCV

HFO

56

HJF50

CP

401

PP

PR. AFTER HOFCV

HFO

NB50
NB50

21.0
21.0

16.5
TO 5.2
16.5
NB50
TO 5.2
16.5
NB50
TO 5.2
16.5
NB50
TO 5.2
NB50

-- Kg/cm

120

--

--

--

--

120

--

20395

--

-- Kg/cm2

120

--

--

--

--

COI
-2

--

D,A

0.7

0.1-1.5

Kg/cm

--

D,I

--

--

--

--

L,I

COI
--

REFER
NOTE:6
REFER
NOTE:6
REFER
NOTE:15
REFER
NOTE:9
REFER
NOTE:12
REFER
NOTE:16
REFER
NOTE:11
--

--

25 mm SW

--

--

--

01

1/2" NPT(F)

3/4"NPT(F)

03 TO FSSS

15 mm SW

1/2" NPT(F)

3/4"NPT(F)

03

25mm SW

1/2" NPT(M)

--

03

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FSSS

M33X2(F)

M20X1.5(M)

3/4"NPT(F)

03 TO FSSS

--

03

M20X1.5(F) M20X1.5(M)
25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03

--

--

03

--

25mm SW

1/2" NPT(M)

--

03

FLANGE

--

--

03

25mm SW

1/2" NPT(M)

--

03

0 - 40

LPH

--

REFER
NOTE:17
REFER
NOTE:15

--

D,I,C

--

--

--

L,I

--

0 - 25

Kg/ cm2

--

-- Kg/cm

120

--

--

--

--

--

--

D,I,C

--

--

--

--

--

--

25 mm SW

--

--

00

-- Kg/cm2

120

--

--

--

--

--

--

--

--

--

--

--

--

M20X1.5(F)

--

--

--

00

-- Kg/cm2

120

--

--

--

--

--

--

--

--

--

--

--

--

25 mm SW

--

--

--

00

GO TO INDEX

ORIFICE PLATE
BY BHEL-T

15 mm SW

M33X2(F)

--

Kg/ cm

--

REFER
NOTE:15

2296
TO
30000

Kg/
-hr

-- Kg/cm2

REFER
NOTE:6
REFER
NOTE:6
REFER
NOTE:14

0.7-14

--

120

REFER
NOTE:14

50

03 TO FSSS

--

50

-- Kg/cm

--

-- Kg/cm2

21.0

3/4"NPT(F)

--

-- Kg/cm

NB50

1/2" NPT(F)

--

6.0

15 mm SW

D,I,C,

6.0

HFO

01

--

NB50

120

Kg/
-hr

NB50

--

COI

-- Kg/cm

--

Kg/cm

NB50

15 mm SW

1.4-28

AIR

03

12.0

AIR

HFO

PR.AT ATOM. AIR LINE

PR. BEFORE STRAINER AT


PI
OPERATING FLOOR
PR. BEFORE STRAINER AT
PSCH
OPERATING FLOOR
TEMP. BEFORE STRAINER
TSCH
OPERATING FLOOR
TEMP. BEFORE STRAINER
TI
OPERATING FLOOR
DIFF. PR. ACROSS OPERATING
PDSAH
FLOOR STRAINERS
TEMP. BEFORE STRAINER
TE
OPERATING FLOOR

--

--

PSCL PR.AT ATOM. AIR LINE


PR.AT ATOM. AIR LINE

REFER
NOTE:6

15 mm SW 1/2" NPT(M)

--

--

PP

50

--

Kg/ cm

12.0

REMARKS

MAKE

--

INSTR_END_CONN

CONT_ACTION

L,I

TAPPING_ POINT_
DETAILS_PROCESS

UNIT OF PY. INST.

--

MODEL

RANGE_OF_PY_INS
T

--

--

SET_POINT

--

FUNCTION

50

--

INSULATION
THICKNESS(mm)

MAX_OTHERS

UNIT_OTHERS
MAX.
VELOCITY(M/Sec )
MAX.
VELOCITY(m/Sec.)

UNIT_OF_TEMP

--

NB 40

8.0 TO
4.32
8.0 TO
4.32
8.0 TO
4.32
8.0 TO
4.32
8.0 TO
4.32

OP_OTHERS

12.0

--

52

PARLINST / 582

NB 40

--

--

LFO

PSCL PR. AFTER LOFCV


PSAL

--

50

PSCH PR. BEFORE LOTV

PI

LFO

-- Kg/cm2

REV.

103

12.0

SCOPE

CP

NB 40

CABL_CONNECTION

HJF40

OP_TEMP

32

LFO

MAX_TEMP

PR. BEFORE LOTV

UNIT_OF_PRESS

DESCRIPTION

PI

MAX_PRESS

INST

301

OP_PRESS

TAG_3

CP

LINE_SIZE

TAG_2

HJF40

QTY/BLR

TAG_1

31

MEDIUM

SL_NO

MESAUREMENT AND CONTROL RECOMMENDATION FOR FUEL OIL SYSTEM

PD METER BY
BHEL-T

DRG.NO.3-97-599-92121/03
sheet 3 OF 5

HJF50

203

CP

204 206

CT

202

CT

203 205

PSAL

PR. AFTER HOFCV

PSCL PR. AFTER HOFCV


TSAL
TSCL

TEMP. AFTER HOFCV


TEMP. AFTER HOFCV

HFO
HFO
HFO
HFO

1
3
1
3

NB50
NB50
NB50
NB50

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

--

--

--

1855

--

--

--

120
120
120

C
C
C
C

-----

-----

-----

-----

Kg/
-hr

--

D,I

--

--

-----

D,A
N
D,A
N

5.0

1.4-28

--

REFER
NOTE:16

-2

COD

Kg/cm

1.4-28

Kg/cm

COD

70-170

COD

105.0

70-170

COD

LPH

--

Kg/ cm2

--

4.5
115.0

--

D,I,C

--

10
TO 100

--

L,I

--

0 - 25

63

HJF57

CF

101

FM

FLOW BEFORE HORV

HFO

NB 40

3.5

-- Kg/cm

120

--

64

HJF57

CP

301

PI

PR. AFTER HORV

HFO

NB 40

3.5

-- Kg/cm2

120

--

3.5

--

--

--

--

--

--

--

L,I

--

0 - 16

Kg/ cm

--

--

--

--

--

--

--

D,I,C

--

--

--

--

--

--

66
67
68
69

HJF57

CT

301

HJM 31

CP

HJM 31

101 &
CP
102

HJM 31
HJM 31

301

CP

302

CP

201203

TI
PI
PT
PI

TEMP. AFTER HORV


PR. BEFORE ASPRV
PR. AFTER ASPRV - PR. CONTROL
PR. AFTER ASPRV

PSCL PR. AFTER ASPRV

HFO
AS
AS
AS
AS

NB 40

1 NB 100
2 NB 100
1 NB 100
3 NB 100

9.5
9.5
9.5
9.5

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

-- Kg/cm

210
210
210
210

70

HJM 31

CP

204

PSAL

PR. AFTER ASPRV

AS

1 NB 100

9.5

-- Kg/cm

210

--

71

HJM 31

CT

301

TI

TEMP. AFTER ASPRV

AS

1 NB 100

9.5

-- Kg/cm2

210

--

CP

301

PI

PR. AT BURNER - ELVN-AB

HFO/LFO 4

NB100

--

CP

302

PI

PR. AT BURNER - ELVN-AB

STM/AIR 4

NB100

--

CP

301

PI

PR. AT BURNER - ELVN - CD

CP

302

PI

PR. AT BURNER - ELVN - CD

72
73
74
75
76
77

HJA 11 to
14
HJA 11 to
14
HJA 21 to
24
HJA 21 to
24
HJA 31 to
34
HJA 31 to
34

CP
CP

301
302

PI
PI

PR. AT BURNER - ELVN - EF


PR. AT BURNER - ELVN - EF

HFO

NB100

STEAM 4

NB100

HFO

STEAM 4

NB100
NB100

120

14.65 /
120 /
-- Kg/cm2
7.35
50
50 /
6/6
-- Kg/cm2
210
120 /
14.65 /
-- Kg/cm2
50
7.35
50 /
6/6
-- Kg/cm2
210
120 /
14.65 /
-- Kg/cm2
50
7.35
50 /
6/6
-- Kg/cm2
210

C
C

--

---

--

---

---

---

---

---

--

---

L,I

L,I
N

--

-3.5

0 - 200

0 - 16

--

C
2

--

COD

COD

Kg/ cm

0.7-14.0 Kg/cm

--

--

--

--

--

D,A

4.0

--

--

--

--

--

L,I

--

0 - 400

--

--

--

--

--

--

L,I

--

0 - 25

Kg/ cm2

--

--

--

--

--

--

L,I

--

0 - 10

Kg/ cm2

--

--

--

--

--

--

--

L,I

--

0 - 25

Kg/ cm2

--

--

--

--

--

--

--

L,I

--

0 - 10

Kg/ cm2

--

--

0 - 25

--

--

--

--

--

--

--

L,I

--

0 - 10

Kg/ cm

--

--

--

--

--

--

L,I

--

0.7-14.0 Kg/cm
0

Kg/ cm

--

--

REFER
NOTE:9
REFER
NOTE:9
REFER
NOTE:12
REFER
NOTE:12
REFER
NOTE:18

M20X1.5(F) M20X1.5(M)

--

REFER
NOTE:14
REFER
NOTE:6
REFER
NOTE:6
REFER
NOTE:16
REFER
NOTE:15
REFER
NOTE:14
REFER
NOTE:15
REFER
NOTE:14
REFER
NOTE:15
REFER
NOTE:14

03

M33X2(F)

--

--

03

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FSSS

M33X2(F)

M20X1.5(M)

3/4"NPT(F)

03

M33X2(F)

M20X1.5(M)

3/4"NPT(F)

03 TO FSSS

FLANGE

--

--

03

--

03

--

03

--

03

--

00

--

03
03 TO FSSS

REFER NOTE:
25mm SW 1/2" NPT(M)
15
REFER NOTE:
M20X1.5(F) M20X1.5(M)
16
REFER
15 mm SW 1/2" NPT(M)
NOTE:14
--

--

REMARKS

--

120

--

REV.

--

SCOPE

--

CABL_CONNECTION

--

0 - 200

INSTR_END_CONN

--

--

TAPPING_ POINT_
DETAILS_PROCESS

120

L,I

MODEL

--

--

MAKE

--

CONT_ACTION

--

UNIT OF PY. INST.

--

65

--

UNIT_OF_TEMP

UNIT_OF_PRESS

-- Kg/cm

RANGE_OF_PY_INS
T

NB50

SET_POINT

--

FUNCTION

HFO

120

INSULATION
THICKNESS(mm)

TEMP. AFTER HOFCV

-- Kg/cm2

MAX_OTHERS

62

HJF50

CP

TE

16.5
TO 5.2
16.5
TO 5.2
16.5
TO 5.2
16.5
TO 5.2
16.5
TO 5.2
16.5
TO 5.2

UNIT_OTHERS
MAX.
VELOCITY(M/Sec )
MAX.
VELOCITY(m/Sec.)

61

HJF50

102

NB50

OP_OTHERS

60

HJF50

CT

OP_TEMP

59

HJF50

HFO

MAX_TEMP

58

TEMP. AFTER HOFCV

MAX_PRESS

TI

OP_PRESS

INST

302

LINE_SIZE

TAG_3

CT

QTY/BLR

TAG_2

HJF50

MEDIUM

TAG_1

57

MESAUREMENT AND CONTROL RECOMMENDATION FOR FUEL OIL SYSTEM

DESCRIPTION

SL_NO

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,CUST. NO:0361,
BCR NO:582

15 mm SW

--

15 mm SW 1/2" NPT(M)
15 mm SW

1/2" NPT(F)

3/4"NPT(F)

15 mm SW

1/2" NPT(F)

PD METER BY
BHEL-T

3/4"NPT(F)

03

M20X1.5(F) M20X1.5(M)

--

03

25mm SW

1/2" NPT(M)

--

03

15 mm SW 1/2" NPT(M)

--

03

25mm SW

1/2" NPT(M)

--

03

15 mm SW 1/2" NPT(M)

--

03

25mm SW

1/2" NPT(M)

--

03

15 mm SW 1/2" NPT(M)

--

03

--

00 Mech. Type

DRAIN OIL TANK INSTRUMENTS

0361 PARLI VOL D1T01-66

HJF34

CL

301

LI

LEVEL AT HFO DRAIN OIL TANK


(PUMP HOUSE)

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

--

--

--

HJF34

CL

201

LSAH

LEVEL AT HFO DRAIN OIL TANK


(PUMP HOUSE)

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A

--

--

MM

COI

REFER
NOTE:13

--

1"NPT(M)

03 TO FOCP

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A

MM

COD

REFER
NOTE:13

--

1"NPT(M)

03 TO FOCP

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A,N

MM

COD

REFER
NOTE:13

--

1"NPT(M)

03 TO FOCP

--

03

3/4"NPT(F)

03 TO FOCP

HJF34

CL

202

LSAL

LEVEL AT HFO DRAIN OIL TANK


(PUMP HOUSE)

HJF34

CL

203

LSLL

LEVEL AT HFO DRAIN OIL TANK


(PUMP HOUSE)

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

0 - 100

--

REFER
NOTE:16

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A

60

25-95

COI

REFER
NOTE:12

HJF34

CT

301

TI

TEMP. AT HFO DRAIN OIL TANK


(PUMP HOUSE)

HJF34

CT

201

TSAH

TEMP. AT HFO DRAIN OIL TANK


(PUMP HOUSE)

PARLINST / 582

GO TO INDEX

--

--

M20X1.5(F) M20X1.5(M)
M33X2(F)

M20X1.5(M)

DRG.NO.3-97-599-92121/03
sheet 4 OF 5

PROJECT: NEW PARLI - TPP,


UNIT- 1, 1X250MW,CUST. NO:0361,
BCR NO:582

MAX_OTHERS

UNIT_OTHERS
MAX.
VELOCITY(M/Sec )
MAX.
VELOCITY(m/Sec.)

INSULATION
THICKNESS(mm)

FUNCTION

SET_POINT

RANGE_OF_PY_INS
T

UNIT OF PY. INST.

CONT_ACTION

MAKE

TAPPING_ POINT_
DETAILS_PROCESS

INSTR_END_CONN

CABL_CONNECTION

SCOPE

REV.

--

--

--

--

--

D,A

0.35

0.1-1.5

Kg/cm2

COI

REFER
NOTE:11

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03 TO FOCP

PR. AFTER STRAINERS - DRAIN


OIL SYSTEM (PUMP HOUSE)

HFO

NB40

0.00

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

(-)1 to1

Kg/ cm2

--

REFER
NOTE:15

25mm SW

1/2" NPT(M)

--

03

PI

PR. AFTER DRAIN OIL PUMP


(PUMP HOUSE)

HFO

NB25

10.00

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

0 - 16

Kg/ cm2

--

REFER
NOTE:15

25mm SW

1/2" NPT(M)

--

03

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

--

--

--

--

00 Mech. Type

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A,N

450

MM

COD

REFER
NOTE:13

--

1"NPT(M)

03

--

1"NPT(M)

03

03

3/4"NPT(F)

03

HJF35

CP

301

PI

HJF35

CP

302

INST

10

HJF60

CL

301

LI

LEVEL AT HFO DRAIN OIL TANK


(BOILER AREA)

11

HJF60

CL

201

LSLL

LEVEL AT HFO DRAIN OIL TANK


(BOILER AREA)

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A

550

--

MM

COD

REFER
NOTE:13

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A

1052

--

MM

COI

REFER
NOTE:13

--

1"NPT(M)

M33X2(F)

M20X1.5(M)

12

HJF60

CL

202

LSAL

LEVEL AT HFO DRAIN OIL TANK


(BOILER AREA)

13

HJF60

CL

203

LSAH

LEVEL AT HFO DRAIN OIL TANK


(BOILER AREA)

TEMP AT HFO DRAIN OIL TANK


TSAH
(BOILER AREA)

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

D,A

70

25-95

COI

REFER
NOTE:12

--

REFER
NOTE:16

M20X1.5(F) M20X1.5(M)

--

03

14

HJF60

CT

202

15

HJF60

CT

301

TI

TEMP. AT HFO DRAIN OIL TANK


(BOILER AREA)

HFO

--

--

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

0 - 100

16

HJF61

CP

301

PI

PR. BEFORE SUCTION STRAINER DRAIN OIL SYSTEM (BOILER AREA)

HFO

NB40

0.00

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

(-)1 to1

Kg/ cm2

--

REFER
NOTE:15

25mm SW

1/2" NPT(M)

--

03

17

HJF61

CP

201

HFO

NB40

0.00

-- Kg/cm2

55

--

--

--

--

--

--

D,A

0.35

0.1-1.5

Kg/cm2

COI

REFER
NOTE:11

25 mm SW

1/2" NPT(F)

3/4"NPT(F)

03

18

HJF61

CP

302

PI

PR. PUMP - DRAIN OIL SYSTEM


(BOILER AREA)

HFO

NB40

0.00

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

(-)1 to1

Kg/ cm2

--

REFER
NOTE:15

25mm SW

1/2" NPT(M)

--

03

19

HJF61

CP

303

PI

PR. AFTER PUMP - DRAIN OIL


SYSTEM (BOILER AREA)

HFO

NB25

10.0

-- Kg/cm2

55

--

--

--

--

--

--

L,I

--

0 - 16

Kg/ cm2

--

REFER
NOTE:15

25mm SW

1/2" NPT(M)

--

03

DIFF.PR. ACROSS SUCTION


PDSAH STRAINER -DRAIN OIL SYSTEM
(BOILER AREA)

0361 PARLI VOL D1T01-67


PARLINST / 582

GO TO INDEX

REMARKS

OP_OTHERS

DP.ACROSS PUMP SUCTION


PDSAH STRAINER - DRAIN OIL SYSTEM (
PUMP HOUSE)

MODEL

OP_TEMP

MAX_TEMP

201

UNIT_OF_TEMP

OP_PRESS

--

CP

UNIT_OF_PRESS

LINE_SIZE

55

HJF35

MAX_PRESS

QTY/BLR

-- Kg/cm2

DESCRIPTION

0.00

TAG_3

NB40

TAG_2

TAG_1

HFO

SL_NO

MEDIUM

MESAUREMENT AND CONTROL RECOMMENDATION FOR FUEL OIL SYSTEM

DRG.NO.3-97-599-92121/03
sheet 5 OF 5

TAB - 2

GO TO INDEX

0361 PARLI VOL D1T02-68

GO TO INDEX

PROJECT:NEW PARLI -TPP,


UNIT-1,1x250MW,
Cust.No:0361,
BCR NO : 588

SCHEDULE OF DAMPERS

STARTER SCOPE

KW

FLC(AMPS)

OLR SET VALUE

ACTION - AIR TO OPEN(AO)/


AIR TO CLOSE (AC)

ACTION ON LOSS OF
POWER AIR (FAIL OPEN-FO
/FAIL CLOSE-FC /STAYPUTSP)

ACTION ON LOSS OF
SIGNAL AIR (FAIL OPEN-FO
/FAIL CLOSE-FC /STAYPUTSP)

I/P CONVERTOR SCOPE


FOR REG. ACT.

SOLENOID VALVE (YES(Y) /


NO(N))

POSITION TRANSMITTER
FOR REG.ACT.(Y/N)

REVISION

FOOT

---

---

---

---

---

---

---

---

---

SP

---

PEM

00

97 PG CIPE

90

---

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

0.62

3.2

2.4

---

---

---

---

---

---

02

48 PG D&D

146

90

---

2600X
2600

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

0.62

3.2

2.4

---

---

---

---

---

02

48 PG CIPE

01

136

360

---

1200X
2600

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

2.2

12.5 12.5

---

---

---

---

---

---

02

48 PG CIPE

01

53

90

---

1200X
2600

INCH

DIRECT

415V,3P,50HZ

S/F/U

TRY

0.27

1.2

2.1

---

---

---

---

---

02

48 PG D&D

90

---

4000X
3500

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

1.2

4.3

6.7

---

---

---

---

---

02

48 PG D&D

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

01

REG

TRUNNION

---

---

---

---

---

---

---

---

SP

---

EDN

00

FUEL SYSTEM

WINDBOX - OVER FIRE AIR DAMPER - (OFA) 08

01

REG

TRUNNION

---

---

---

---

---

---

---

---

SP

---

EDN

01

FUEL SYSTEM

BURNER TILT POWER CYLINDER

04

01

REG

TRUNNION

---

---

---

---

---

---

---

---

SP

---

PEM

00

FUEL SYSTEM

HHQ 15 AA 201

SCANNER AIR EMERGENCY DAMPER

01

01

O/C

DIRECT

---

---

---

---

---

---

---

---

---

---

---

00

FUEL SYSTEM

SIS 2A & 2B

HHQ 20 AA 301
HHQ 30 AA 301

SCANNER AIR FAN A&B INLET DAMPER

02

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

SIS 3

HHQ 40 AA 201

SCANNER AIR FAN A&B OUTLET AUTO


TRANSFER DAMPER

01

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

14

GD 1A & 1B

HNA 30 AA 301
HNA 35 AA 301

AH - A&B INLET DAMPER FLUE GAS LINE

02

01

748

90

---

7200X
3500

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

1.2

4.5

7.7

---

---

---

---

---

---

02

48 PG D&D

15

GD 2A & 2B

HNA 40 AA 301
HNA 45 AA 301

AH - A&B OUTLET DAMPER FLUE GAS LINE

02

01

771

90

---

7200X
3300

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

1.2

4.5

7.7

---

---

---

---

---

---

02

48 PG D&D

16

GD 2A1, 2A2,
2B1 & 2B2

HQA 10,20 AA 301


HQA 15,25 AA 301

EP A&B INLET GATE FLUE GAS LINE

04

01

272

360

---

3000X
3000

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

4.0

26

26

---

---

---

---

---

---

02

48 PG D&D

17

GD 3A1, 3A2,
3B1 & 3B2

HQA 11,16 AA 301


HQA 21,26 AA 301

EP A&B OUTLET GATE FLUE GAS LINE

04

01

222

360

---

2600X
2600

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

2.2

12.5 12.5

---

---

---

---

---

---

02

48 PG D&D

18

GD 5A & 5B

HNC 10 AA 301
HNC 20 AA 301

ID FAN A&B INLET GATE FLUEGAS LINE

02

01

885

360

---

3650X
3650

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

7.5

44.6 44.6

---

---

---

---

---

---

02

48 PG D&D

19

GD 6A & 6B

HNC 10 AA 101
HNC 20 AA 101

ID FAN A&B INLET DAMPER CONTROL

02

01

800

90

248

---

REG

FOOT

---

---

---

---

---

---

SP

PEM

01

97 PG CIPE

20

GD 7A & 7B

HNC 15 AA 301
HNC 25 AA 301

ID FAN A&B OUTLET GATE FLUE GAS LINE

02

01

1353

360

---

3650X
3650

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

15.0

---

---

---

---

---

02

48 PG D&D

FD FAN -A&B - BLADE PITCH CONTROL

SAD 2A & 2B

HLA 10 AA 301
HLA 20 AA 301

FD FAN -A&B -DISCHARGE DAMPER - COLD


SEC.AIR

02

01

146

SAD 3A & 3B

HLA 10 AA 302
HLA 20 AA 302

AIRHEATER A&B INLET DAMPER-COLD


SEC.AIR

02

01

SAD 5A & 5B

HLA 11 AA 301
HLA 21 AA 301

AIR BYPASS GATE -COLD SEC.AIR

02

SAD 6A & 6B

HLA 11 AA 201
HLA 21 AA 201

AIR BYPASS DAMPER (INCHING) -COLD


SEC.AIR

02

SAD 4A & 4B

HHL 10 AA 301
HHL 20 AA 301

AIR HEATER - A&B O/L DAMPER - HOT


SEC.AIR

02

01

331

__

HHL 30 AA 201 to
HHL 30 AA 204

WINDBOX AUX.AIR DAMPER -ELEVATION AA 04

--

---

__

HHL 31 TO 42
AA 101 TO 104

WIND BOX AUX. AIR DAMPERS-(FULE &


AUX.AIR )

48

__

HHL 43 & 44
AA 101 TO 104

10

__

HBK 11 AA 101 TO
HBK 14 AA 101

11

SIS 1

12

13

DESCRIPTION

HLB 10 AA 101
HLB 20 AA 101

KKS TAG NO.

SAD 1A & 1B

GO TO INDEX

---

---

64.0 64.0

---

REMARKS

INTEGRAL STARTER
(YES(Y)/ NO(N))

REG

DUCT SIZE(mm)

BHEL TAG NO

--2600X
2600

SL NO

POWER SUPPLY SOURCE

0361 PARLI VOL D1T02-69

TYPE OF POWER SUPPLY


(NORMAL(N)/
EMERGENCY(E))

200

VOLTAGE (POWER
SUPPLY)

90

INTLK REQD. Y/ N

LEVER LENGTH (mm)

MOUNTING

ANGLE OF MOVMT (DEG)

01

FOR PNEUMATIC ACTUATORS

OPERN (O/C, REG., INCH.)

RATED TORQUE (KGM)

02

FOR ELECTRICAL ACTUATORS

ACTUATOR (ELECTRIC-E,
PNEUMATIC-P, MANUAL-M,
AUTO-A)

QTY / BLR (NO.)

ACT. PER DAMP (NO.)

TYPE OF

DRG. NO :3-97-599-92163 / 02.


SHEET - 2 OF 4

PROJECT:NEW PARLI -TPP,


UNIT-1,1x250MW,
Cust.No:0361,
BCR NO : 588

SCHEDULE OF DAMPERS

02

48 PG D&D

4.4

---

---

---

---

---

---

02

48 PG D&D

2.4

3.2

---

---

---

---

---

---

02

48 PG D&D

---

---

---

SP

---

PEM

00

97 PG CIPE

---

---

---

---

SP

---

PEM

00

97 PG CIPE

---

---

---

---

---

---

---

---

00

48 PG D&D

---

---

---

---

---

---

SP

---

PEM

00

97 PG CIPE

---

---

---

---

---

---

---

SP

---

PEM

00

97 PG CIPE

---

---

---

---

---

---

---

---

SP

---

PEM

00

97 PG CIPE

---

---

---

---

---

---

---

---

SP

---

PEM

00

97 PG CIPE

DIRECT

415V,3P,50HZ

S/F/U

HYD

3.7

19.0 72.0

---

---

---

---

---

---

00

HYDRABAD

O/C

DIRECT

415V,3P,50HZ

S/F/U

HYD

3.7

19.0 72.0

---

---

---

---

---

---

00

HYDRABAD

O/C

DIRECT

415V,3P,50HZ

S/F/U

HYD

3.7

19.0 72.0

---

---

---

---

---

---

00

HYDRABAD

530X530

O/C

DIRECT

415V,3P,50HZ

S/F/U

HYD

3.7

19.0 72.0

---

---

---

---

---

---

00

HYDRABAD

---

530X530

O/C

DIRECT

415V,3P,50HZ

S/F/U

HYD

3.7

19.0 72.0

---

---

---

---

---

---

00

HYDRABAD

---

---

---

O/C

DIRECT

415V,3P,50HZ

S/F/U

HYD

3.7

19.0 72.0

---

---

---

---

---

---

00

HYDRABAD

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

---

---

---

---

---

---

---

---

360

---

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

7.5

44.6 44.6

125

90

---

2000X
2300

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

0.72

3.4

01

154

90

---

2000X
2800

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

0.62

03

01

27

90

230

1000X
1000

REG

FOOT

---

---

---

---

---

03

01

105

90

310

2000X
1900

REG

FOOT

---

---

---

---

HFE 41, 61, 81


AA 201

GENERAL SHUT OFF GATE MILL AB,CD & DE 03

01

258

---

---

1900X
2000

O/C

FOOT

---

---

---

PAD 8 A,C,E

HFE 42, 62, 82


AA 101

AIR TO MILL CONTROL DAMPER -NDE (MILL


AB,CD EF)

03

01

58

90

230

1600X
1250

REG

FOOT

---

---

PAD 9 A,C,E

HFE 43, 63, 83


AA 101

BYPASS AIR TO MILL CONTROL DAMPER NDE (MILL AB,CD EF)

03

01

32

90

270

DIA 900

REG

FOOT

---

30

PAD 8 B,D,F

HFE 44, 64, 84


AA 101

AIR TO MILL CONTROL DAMPER -DE (MILL


AB,CD EF)

03

01

58

90

230

1600X
1250

REG

FOOT

31

PAD 9 B,D,F

HFE 45, 65, 85


AA 101

BYPASS AIR TO MILL CONTROL DAMPER DE (MILL AB,CD EF)

03

01

32

90

270

DIA 900

REG

FOOT

32

HFE 47 AA 201 TO
CAD 1A TO 4A
'HFE 50 AA 201

CLASSIFIER OUTLET GATE ELEVATION -A

04

01 7.8Nm

---

---

530X530

O/C

33

CAD 1B TO 4B

HFE 51AA 201 TO


'HFE 54 AA 201

CLASSIFIER OUTLET GATE ELEVATION -B

04

01 7.8Nm

---

---

530X530

HFE 67 AA 201 TO
34 CAD 1C TO 4C
HFE 70 AA 201

CLASSIFIER OUTLET GATE ELEVATION -C

04

01 7.8Nm

---

---

530X530

HFE 71 AA 201 TO
HFE 74 AA 201

CLASSIFIER OUTLET GATE ELEVATION -D

04

01 7.8Nm

---

---

36

HFE 87 AA 201 TO
CAD 1E TO 4E
'HFE 90 AA 201

CLASSIFIER OUTLET GATE ELEVATION -E

04

01 7.8Nm

---

37

CAD 1F TO 4F

HFE 91 AA 201 TO
'HFE 94 AA 201

CLASSIFIER OUTLET GATE ELEVATION -F

04

01 7.8Nm

38

HFE 47 AA 202 TO
CAD 5A TO 8A
'HFE 50 AA 202

COAL BURNER ISOLATION GATE


ELEVATION -A

04

--

39

CAD 5B TO 8B

HFE 51 AA 202 TO
'HFE 54 AA 202

COAL BURNER ISOLATION GATE


ELEVATION -B

04

40 CAD 5C TO 8C

HFE 67 AA 202 TO
'HFE 70 AA 202

COAL BURNER ISOLATION GATE


ELEVATION -C

04

PAD 2A & 2B

PA FAN A&B OUTLET GATE

02

01

831

23

PAD 3A & 3B

HFE 10 AA 302 &


HFE 20 AA 302

AH INLET DAMPER - PRIMARY AIR

02

01

24

PAD 4A & 4B

HFE 15 AA 301 &


HFE 25 AA 301

AH OUTLET DAMPER - PRIMARY AIR

02

25 PAD 6AB,CD,EF

HFE 46, 66, 86


AA 101

COLD AIR REGULATING DAMPER TO MILL


AB,CD &EF

26 PAD 5AB,CD,EF

HFE 41, 61, 81


AA 101

HOT AIR REGULATING DAMPER TO MILL


AB,CD &EF

27 PAD 7AB,CD,EF

28

29

DESCRIPTION

22

HFE 10 AA 301 &


HFE 20 AA 301

KKS TAG NO.


HFE 10 AA 101 &
'HFE 20 AA 101

PA FAN A&B INLET GUIDE &VANE CONTROL

DUCT SIZE(mm)

FOOT

BHEL TAG NO

REG

SL NO

PAD 1A & 1B

GO TO INDEX

REMARKS

REVISION

---

FLC(AMPS)

---

OLR SET VALUE

---

KW

---

STARTER SCOPE

---

INTEGRAL STARTER
(YES(Y)/ NO(N))

---

POWER SUPPLY SOURCE

97 PG CIPE

TYPE OF POWER SUPPLY


(NORMAL(N)/
EMERGENCY(E))

00

VOLTAGE (POWER
SUPPLY)

INTLK REQD. Y/ N

MOUNTING

PEM

OPERN (O/C, REG., INCH.)

---

ACTUATOR (ELECTRIC-E,
PNEUMATIC-P, MANUAL-M,
AUTO-A)

SP

--2300X
2000

21

35 CAD 1D TO 4D

0361 PARLI VOL D1T02-70

POSITION TRANSMITTER
FOR REG.ACT.(Y/N)

248

SOLENOID VALVE (YES(Y) /


NO(N))

90

I/P CONVERTOR SCOPE


FOR REG. ACT.

LEVER LENGTH (mm)

500

ACTION ON LOSS OF
SIGNAL AIR (FAIL OPEN-FO
/FAIL CLOSE-FC /STAYPUTSP)

ANGLE OF MOVMT (DEG)

01

FOR PNEUMATIC ACTUATORS

ACTION ON LOSS OF
POWER AIR (FAIL OPEN-FO
/FAIL CLOSE-FC /STAYPUTSP)

RATED TORQUE (KGM)

02

FOR ELECTRICAL ACTUATORS


ACTION - AIR TO OPEN(AO)/
AIR TO CLOSE (AC)

QTY / BLR (NO.)

ACT. PER DAMP (NO.)

TYPE OF

DRG. NO :3-97-599-92163 / 02.


SHEET - 3 OF 4

PROJECT:NEW PARLI -TPP,


UNIT-1,1x250MW,
Cust.No:0361,
BCR NO : 588

SCHEDULE OF DAMPERS

FOR ELECTRICAL ACTUATORS

ANGLE OF MOVMT (DEG)

LEVER LENGTH (mm)

DUCT SIZE(mm)

ACTUATOR (ELECTRIC-E,
PNEUMATIC-P, MANUAL-M,
AUTO-A)

OPERN (O/C, REG., INCH.)

MOUNTING

INTLK REQD. Y/ N

VOLTAGE (POWER
SUPPLY)

TYPE OF POWER SUPPLY


(NORMAL(N)/
EMERGENCY(E))

POWER SUPPLY SOURCE

INTEGRAL STARTER
(YES(Y)/ NO(N))

STARTER SCOPE

KW

FLC(AMPS)

OLR SET VALUE

ACTION - AIR TO OPEN(AO)/


AIR TO CLOSE (AC)

ACTION ON LOSS OF
POWER AIR (FAIL OPEN-FO
/FAIL CLOSE-FC /STAYPUTSP)

ACTION ON LOSS OF
SIGNAL AIR (FAIL OPEN-FO
/FAIL CLOSE-FC /STAYPUTSP)

I/P CONVERTOR SCOPE


FOR REG. ACT.

SOLENOID VALVE (YES(Y) /


NO(N))

POSITION TRANSMITTER
FOR REG.ACT.(Y/N)

REVISION

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

42

04

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

43

CAD 5F TO 8F

HFE 91 AA 202 TO
'HFE 94 AA 202

COAL BURNER ISOLATION GATE


ELEVATION -F

04

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

44

BFD 1AB, 1CD HFC 01, 02, 03


& 1EF
AA 201

BALL FEEDING GATE UPPER

03

01 3.6Nm

---

---

DIA 250

O/C

DIRECT

415V,3P,50HZ

S/F/U

HYD

1.5

2.6

13

---

---

---

---

---

---

00

HYDRABAD

45

BFD 2AB, 2CD HFC 01, 02, 03


& 2EF
AA 202

BALL FEEDING GATE LOWER

03

01 3.6Nm

---

---

DIA 250

O/C

DIRECT

415V,3P,50HZ

S/F/U

HYD

1.5

2.6

13

---

---

---

---

---

---

00

HYDRABAD

46

SLD 1A TO 1F

SEAL AIR FAN A&B INLET DAMPER (MILL


AB,CD & EF)

06

--

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

01

47

HFW
SLD 2A TO 2F 02,03,12,13,22,23
AA 202

SEAL AIR FAN A&B OUTLET DAMPERS (MILL


06
AB,CD &EF)

01

O/C

FOOT

---

---

---

---

---

---

---

---

---

---

---

---

01

FUEL SYSTEM

48

SLD 3AB, 3CD, HFW 04,14,24


3EF
AA 101

SEAL AIR FAN CONTROL DAMPER (MILL


AB,CD &EF)

03

01

REG

FOOT

---

---

---

---

---

---

---

---

SP

---

PEM

00

FUEL SYSTEM

49

HFW 05,15,25
SLD 4A,4C,4E
AA 201

SEAL AIR LINE TO MILL -NDE (MILL AB,CD &


EF)

03

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

50

SLD 4B,4D,4F

HFW 07,17,27
AA 201

SEAL AIR TO TURNNION -DE (MILL AB,CD


&EF)

03

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

51

SLD 5A,5C,5E

HFW 09,19,29
AA 201

SEAL AIR TO FEEDER A,C,E

03

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

52

SLD 5B,5D,5F

HFW 10,20,30
AA 201

SEAL AIR FEEDER B,D,F

03

--

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

COLD PURGE AIR TO MILL AB,CD,EF

03

---

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

HFE 56 AA 201 TO
HFE 56 AA 204

COLD PURGE AIR TO COAL PIPE DAMPERELE-A

04

01

90

230

DIA 500

O/C

FOOT

---

---

---

---

---

---

---

---

A0

---

---

---

00

97 PG CIPE

HFW 02,03,12,
13,22,23 AA 201

PAD
HFE 55,75,95
53 10AB,10CD,10E
AA 201
F
54 PAD 11ATO 14A

---

REMARKS

RATED TORQUE (KGM)

--

COAL BURNER ISOLATION GATE


ELEVATION -E

DESCRIPTION

04

HFE 87 AA 202 TO
CAD 5E TO 8E
'HFE 90 AA 202

41 CAD 5D TO 8D

KKS TAG NO.

COAL BURNER ISOLATION GATE


ELEVATION -D

BHEL TAG NO

HFE 71 AA 202 TO
'HFE 74 AA 202

SL NO

QTY / BLR (NO.)

FOR PNEUMATIC ACTUATORS

ACT. PER DAMP (NO.)

TYPE OF

0361 PARLI VOL D1T02-71

55

PAD 11B TO
14B

HFE 57 AA 201 TO
HFE 57 AA 204

COLD PURGE AIR TO COAL PIPE DAMPERELE-B

04

01

90

230

DIA 500

O/C

FOOT

---

---

---

---

---

---

---

---

A0

---

---

---

00

97 PG CIPE

56

PAD 11C TO
14C

HFE 76 AA 201 TO
HFE 76 AA 204

COLD PURGE AIR TO COAL PIPE DAMPERELE-C

04

01

90

230

DIA 500

O/C

FOOT

---

---

---

---

---

---

---

---

A0

---

---

---

00

97 PG CIPE

57

PAD 11D TO
14D

HFE 77 AA 201 TO
HFE 77 AA 204

COLD PURGE AIR TO COAL PIPE DAMPERELE-D

04

01

90

230

DIA 500

O/C

FOOT

---

---

---

---

---

---

---

---

A0

---

---

---

00

97 PG CIPE

58

PAD 11E TO
14E

HFE 96 AA 201 TO
HFE 96 AA 204

COLD PURGE AIR TO COAL PIPE DAMPERELE-E

04

01

90

230

DIA 500

O/C

FOOT

---

---

---

---

---

---

---

---

A0

---

---

---

00

97 PG CIPE

59

PAD 11F TO
14F

HFE 97 AA 201 TO
HFE 97 AA 204

COLD PURGE AIR TO COAL PIPE DAMPERELE-F

04

01

90

230

DIA 500

O/C

FOOT

---

---

---

---

---

---

---

---

A0

---

---

---

00

97 PG CIPE

60

CD 1A TO 1F

HFB 01,02,11,12,
21,22 AA 201

COAL BUNKER A TO F OUTLET GATE

06

01

---

O/C

DIRECT

415V,3P,50HZ

S/F/U

TRY

0.4

2.2

---

---

---

---

---

---

01

FUEL SYSTEM

61

CD 2A TO 2F

HFB 01,02,11,12,
21,22 AA 202

FEEDER A TO F INLET GATE

06

---

---

---

---

---

O/C

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

00

62

CD 3A TO 3F

HFB 01,02,11,12,
21,22 AA 203

FEEDER A TO F OUTLET GATE

06

01

---

---

---

---

O/C

FOOT

---

---

---

---

---

---

---

---

A0

---

---

---

00

GO TO INDEX

FUEL SYSTEM

DRG. NO :3-97-599-92163 / 02.


SHEET - 4 OF 4

0361 PARLI VOL D1T02-72

GO TO INDEX

PROJECT:PARLI TPP,
UNIT-1,1 X 250MW,
CUST.NO:0361,
BCR NO:615 .

STARTER TYPE
(REVERSIBLE(R) /
NONREVERSIBLE(NR))

STARTER SCOPE

LOAD (NORMAL(N) /
STANDY(S))

CONTROLLED FROM

REVISION

LTMCC

NR

MSEB

DDCMIS

02

AIR HEATER-A&B-LUB. OIL PUMP-1&2-SUPPORT


BEARING

2+2

0.75

1.9

1405 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

DDCMIS

02

AIR HEATER-A&B-LUB. OIL PUMP-1&2-GUIDE


BEARING

2+2

0.75

1.9

1405 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

DDCMIS

02

LIGHT FUEL OIL PUMP-1&2

1+1

9.3

17.0 3000 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

DDCMIS

04

HEAVY FUEL OIL PUMP-1&2

1+1

45

75.0 1500 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

DDCMIS

04

SCANNER AIR FAN -AC MOTOR

5.5

10.1 3000 415V,3PH,50HZ

LTMCC

NR

MSEB

FSSS

04

PA FAN-A&B- LUBE OIL PUMP-1&2

2+2

1.1

2.35 1500 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

DDCMIS

04

FD FAN-A&B- LUBE OIL PUMP-1&2

2+2

2.2

4.55 1500 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

DDCMIS

04

ID FAN-A&B- LUBE OIL PUMP-1&2

2+2

2.2

1500 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

DDCMIS

04

2.2

4.55 3000 415V,3PH,50HZ

LTMCC

NR

MSEB

LOCAL

02 NOTE-5

SL NO
2

10 PENT HOUSE COOLING FAN-1 to 4

4.5

SOURCE

TYPE (NORMAL(N)/
EMERGENCY(E))

1450 415V,3PH,50HZ

VOLTAGE

20

AIR HEATER-A&B-MAIN DRIVE

SPEED (RPM)

FLC

11

(AMP)

RATING (KW)

DESCRIPTION

QTY (NO)

POWER SUPPLY

0361 PARLI VOL D1T02-73

11

TUBE MILL-AB,CD&EF-GIRTH GEAR HOUSING SEAL


AIR FAN

0.75

2810 415V,3PH,50HZ

LTMCC

NR

MSEB

FSSS

00

12

TUBE MILL-AB,CD&EF- AUXILIARY


MOTOR(INCHING MOTOR)

37.0

1500 415V,3PH,50HZ

LTMCC

NR

MSEB

FSSS

00

13 TUBE MILL-AB,CD&EF-BEARING LP PUMP-1&2

3+3

7.5

950 415V,3PH,50HZ

N+E LTMCC

NR

MSEB

N+S

FSSS

02

14

TUBE MILL-AB,CD&EF-BEARING HP PUMP-1&2


(FOR RAISING TURNNION)

3+3

11.0

965 415V,3PH,50HZ

N+E LTMCC

NR

MSEB

N+S

FSSS

02

15

TUBE MILL-AB,CD&EF-BEARING-BALL & SOCKETPUMP MOTOR

3+3

3.7

950 415V,3PH,50HZ

N+E LTMCC

NR

MSEB

N+S

FSSS

02

16

TUBE MILL-AB,CD&EF-REDUCER LUB OIL PUMP


MOTOR

3+3

5.5

1400 415V,3PH,50HZ

N+E LTMCC

NR

MSEB

N+S

FSSS

02

PARLOAD

GO TO INDEX

REMARKS

SCHEDULE OF LT MOTORS

DRG NO: 3-97-599-92097/04


SHEET:2 OF 3

PROJECT:PARLI TPP,
UNIT-1,1 X 250MW,
CUST.NO:0361,
BCR NO:615 .

STARTER SCOPE

LOAD (NORMAL(N) /
STANDY(S))

CONTROLLED FROM

REVISION
00

5.5

10.4 1500 415V,3PH,50HZ

LTMCC

NR

MSEB

FOCP

04

5.5

10.4 1500 415V,3PH,50HZ

LTMCC

NR

MSEB

DDCMIS

04

3+3

120

208.9 3000 415V,3PH,50HZ

LTMCC

NR

MSEB

N+S

FSSS

04

0.37

1400 415V,3PH,50HZ

LOCAL
STARTER

NR

BHEL(T)

LOCAL

03

22 FURNACE STARTUP TEMP. PROBE

0.37

1365 415V,3PH,50HZ

LOCAL
STARTER

NR

BHEL(T)

DDCMIS

00

23 LR SOOTBLOWER -TRAVERSE MOTORS

18

0.56

1500 415V,3PH,50HZ

SBMCC

BHEL(T)

SBCP

03

24 LR SOOTBLOWER -ROTARY MOTORS

18

0.736

1425 415V,3PH,50HZ

SBMCC

NR

BHEL(T)

SBCP

03

25 WALLBLOWER-TRAVERSE MOTORS

56

0.45

1425 415V,3PH,50HZ

SBMCC

BHEL(T)

SBCP

00

26 WALLBLOWER-ROATARY MOTORS

56

0.09

1425 415V,3PH,50HZ

SBMCC

NR

BHEL(T)

SBCP

00

27 AIR HEATER-SOOT BLOWER

0.18

1350 415V,3PH,50HZ

SBMCC

NR

BHEL(T)

SBCP

00

28 ID FAN-A&B

2.2

4.5

2835 415V,3PH,50HZ

LTMCC

NR

MSEB

DDCMIS

04

29 GRAVI.FEEDER MAIN MOTOR

5.5

11.3 1440 415V,3PH,50HZ

FEEDER
PANEL

NR

BHEL(T)

FSSS

04

30 GRAVI. FEEDER A TO F CLEANOUT CONVEYOR

0.25

1.0

910 415V,3PH,50HZ

FEEDER
PANEL

NR

BHEL(T)

FEEDER
PANEL

04

31 SCANNER AIR FAN -DC MOTOR

5.5

31

3000 220V DC

DC STARTER

NR

BHEL(T)

FSSS

04

32 SPARE

7.5

3000 415V,3PH,50HZ

LTMCC

NR

MSEB

--

--

03

33

5.5

3000 415V,3PH,50HZ

LTMCC

NR

MSEB

--

--

03

19 HFO DRAIN OIL TANK PUMP-BOILER FRONT


20 SEAL AIR FAN-MILL- AB,CD&EF
21

SEAL AIR FILTER MOTOR-MILL-AB,CD&EF (AUTO


VISCOUS FILTER)

0361 PARLI VOL D1T02-74

SPARE

PARLOAD

OUTLET GATE BLOWER MOTOR

(AMP)

SL NO

18 HFO DRAIN OIL TANK PUMP-PUMP HOUSE

GO TO INDEX

SOURCE

FSSS

TYPE (NORMAL(N)/
EMERGENCY(E))

0.55

TUBE MILL-AB,CD&EF-GIRTH GEAR GREASING


SYSTEN PUMP MOTOR

VOLTAGE

MSEB

17

SPEED (RPM)

NR

FLC

LTMCC

RATING (KW)

QTY (NO)

1500 415V,3PH,50HZ

DESCRIPTION

STARTER TYPE
(REVERSIBLE(R) /
NONREVERSIBLE(NR))

POWER SUPPLY

REMARKS

SCHEDULE OF LT MOTORS

DRG NO: 3-97-599-92097/04


SHEET:3 OF 3

0361 PARLI VOL D1T02-75

GO TO INDEX

DATA OF LT MOTORS

--

50

10

20

89

0.85

600

210

TEFC

160L

DELTA 00

APH/RANIPET

0.75

1405

S1

415

50

10

1.9

74

0.76

600

190

TEFC

SqCage/ 90S STAR 00

APH/RANIPET

0.75

1405

S1

415

50

10

1.9

74

0.76

600

190

TEFC

SqCage/ 90S STAR 00

APH/RANIPET

LIGHT FUEL OIL PUMP-1&2

1+1 KEC 9.3

2920

S1

415

50

10

17

85

0.90

600

250

IP55

HEAVY FUEL OIL PUMP-1&2

1+1 KEC 45.0

1470

S1

415

50

10

75.0

92

0.91

600

200

IP55

SCANNER AIR FAN -AC MOTOR

CGL/
5.5
KEC

2880

S1

415

50

10

10.1

85

0.89

600

250

TEFC

SCANNER AIR FAN -DC MOTOR

CGL 5.5

2865

S1

220V
DC

--

--

(+)10,
(-)15

--

31

80

--

215

200

PA FAN-A&B- LUBE OIL PUMP-1&2 2+2 BBL 1.1

2840

S1

415

50

10

2.35

79

0.82

590

FD FAN-A&B- LUBE OIL PUMP-1&2 2+2 BBL 2.2

1415

S1

415

50

10

4.55

82

0.82

10 ID FAN-A&B- LUBE OIL PUMP-1&2 2+2 KEC 2.2

2830

S1

415

50

10

4.5

BBL/
CGL/ 2.2
KEC

2850

S1

415

50

10

11 PENT HOUSE COOLING FAN-1 to 4 4

TYPE/FRAME SIZE

POWER FACTOR

EFFIENCY IN %

CURRENT(Amps)

VOLTAGE IN %

FREQUENCY

PHASE

VOLTAGE

DUTY CYCLE

RATED SPEED IN RPM

FLPCAGE/
'LE160
FLPCAGE/
'LE225

REMARKS

REVISION

415

WINDING CONNECTION

S1

CLASS OF INSULATION

1460

RATED OUTPUT (KW)

SUPPLIER

QTY (NO)/BLR

AIR HEATER-A&B-LUB. OIL PUMP2+2 -1&2-SUPPORT BEARING


AIR HEATER-A&B-LUB. OIL PUMP2+2 -1&2-GUIDE BEARING

FULL LOAD

TYPE OF ENCLOSURE

STARTING TORQUE CURRENT


IN % OF FULL LOAD TORQUE

DESCRIPTION

SL NO
2

AIR HEATER-A&B-MAIN DRIVE

FREQUENCY IN %

11.0

POWER SUPPLY

ALLOWABLE
VARIATION

STARTING CURRENT IN % OF
FULL LOAD CURRENT

PROJECT: NEW PARLI TPS, 1X250MW.


CUST.NO:0361.
BCR NO:423.

DELTA 00

FUEL SYSTEMS

DELTA 00

FUEL SYSTEMS

TEFC/112M DELTA 00

FUEL SYSTEMS

TEFC

AFS180M

--

270

TEFC

sqCage/80

DELTA 01

FANS ENGG /RANIPET

570

250

TEFC

sqCage/
100L

DELTA 01

FANS ENGG /RANIPET

81% 0.84

600

300

TEFC

90L

STAR 00

FANS ENGG /RANIPET

4.55

81

0.83

600

330

TEFC

90L

DELTA 01

FANS ENGG /RANIPET

00

FUEL SYSTEMS

0361 PARLI VOL D1T02-76

12

TUBE MILL-AB,CD&EF-GIRTH GEAR


3
HOUSING SEAL AIR FAN

--

0.8

2810

S1

415

50

10

1.6

78

0.83

---

---

---

71

---

00

MILLS ENGG
/HHDERABAD

13

TUBE MILL-AB,CD&EF- AUXILIARY


3
MOTOR(INCHING MOTOR)

--

37.0

1480

Intermi
415
ttent

50

10

63

92.5 0.88

---

---

---

ND225S

---

00

MILLS ENGG
/HHDERABAD

3+3 --

7.5

950

S1

415

50

10

NA

86

0.78

---

---

---

160M

---

00

MILLS ENGG
/HHDERABAD

3+3 --

11.0

965

S1

415

50

10

21.6

89.5 0.80

---

---

---

160L

---

00

MILLS ENGG
/HHDERABAD

3+3 --

3.0

1450

S1

415

50

10

7.7

77

0.77

---

---

---

100L

---

00

MILLS ENGG
/HHDERABAD

3+3 --

5.5

1440

S1

415

50

10

12

84

0.77

---

---

---

---

---

00

MILLS ENGG
/HHDERABAD

TUBE MILL-AB,CD&EF-BEARING LP
PUMP-1&2
TUBE MILL-AB,CD&EF-BEARING HP
15 PUMP-1&2 (FOR RAISING
TURNNION)
TUBE MILL-AB,CD&EF-BEARING16
BALL & SOCKET-PUMP MOTOR
TUBE MILL-AB,CD&EF-REDUCER
17
LUB OIL PUMP MOTOR

14

GO TO INDEX

Drg.No:3-97-599-92413 / 01
Page.no:2of 3.

DATA OF LT MOTORS

S1

415

50

10

1.65

68

0.75

---

---

---

AT80L14VI

---

BBL

5.50

1445

S1

415

50

10

10.4

86

0.85

600

220

IP55

FLP/132M

STAR 00

FUEL SYSTEMS

BBL

5.50

1445

S1

415

50

10

10.4

86

0.85

600

220

IP55

FLP/132M

STAR 00

FUEL SYSTEMS

3+3 CGL 120.00 2965

S1

415

50

10

209

94

0.94

600

200

IP55

SCR / ND
315M

DELTA 01

FANS ENGG /RANIPET

--

0.55

1440

--

415

50

10

--

--

--

--

--

IP55

--

--

--

00

FUEL SYSTEMS

--

0.37

1365

S2415
15MIN

50

10

0.86

75

0.88

--

--

IP55

IS2223
TYPE C/80

---

00

SB ENGG

18

--

0.37

1365

S2415
15MIN

50

10

0.86

75

0.88

--

--

IP55

IS2223
TYPE C/80

---

00

SB ENGG

25 LR SOOTBLOWER -ROTARY MOTORS

18

--

0.45

1425

S2415
30MIN

50

10

1.26

71

0.68

--

--

IP55

IS2223
TYPE C/80

---

00

SB ENGG

26 WALLBLOWER-TRAVERSE MOTORS

56

--

0.45

1425

S2415
30MIN

50

10

1.26

71

0.68

--

--

IP55

---

00

SB ENGG

27 WALLBLOWER-ROATARY MOTORS

56

--

0.09

1425

S1

415

50

10

0.64

44

0.48

--

--

IP55

---

00

SB ENGG

28 AIR HEATER-SOOT BLOWER

--

0.18

1330

S1

415

50

10

0.75

50

0.6

600

200

TEFC

ID FAN-A&B OUTLET GATE


BLOWER MOTOR

KEC 2.2

2835

S1

415

50

10

4.5

81

0.81

600

300

TEFC

30 GRAVI.FEEDER MAIN MOTOR

CGL 5.50

1500

S1

415

50

10

11.3

85.7 0.82

600

200

TEFC

GRAVI. FEEDER A TO F CLEANOUT


6
CONVEYOR

CGL 0.25

930

S1

415

50

10

1.0

61

400

200

TEFC

21 SEAL AIR FAN-MILL- AB,CD&EF

REVISION

TYPE/FRAME SIZE

POWER FACTOR

EFFIENCY IN %

CURRENT(Amps)

FREQUENCY IN %

VOLTAGE IN %

FREQUENCY

PHASE

VOLTAGE

DUTY CYCLE

RATED SPEED IN RPM

RATED OUTPUT (KW)

SUPPLIER

QTY (NO)/BLR

DESCRIPTION

SL NO

HFO DRAIN OIL TANK PUMP-PUMP


HOUSE
HFO DRAIN OIL TANK PUMP20
BOILER FRONT

19

REMARKS

1400

TUBE MILL-AB,CD&EF-GIRTH GEAR


3
GREASING SYSTEN PUMP MOTOR

WINDING CONNECTION

0.6

18

FULL LOAD

CLASS OF INSULATION

--

POWER SUPPLY

TYPE OF ENCLOSURE

STARTING TORQUE CURRENT


IN % OF FULL LOAD TORQUE

ALLOWABLE
VARIATION

STARTING CURRENT IN % OF
FULL LOAD CURRENT

PROJECT: NEW PARLI TPS, 1X250MW.


CUST.NO:0361.
BCR NO:423.

00

MILLS ENGG
/HHDERABAD

SEAL AIR FILTER MOTOR-MILL22 AB,CD&EF (AUTO VISCOUS

FILTER)
23 FURNACE STARTUP TEMP. PROBE
24

0361 PARLI VOL D1T02-77

29

31

LR SOOTBLOWER -TRAVERSE
MOTORS

GO TO INDEX

0.68

IS2223
TYPE C/80
IS2223
TYPE C/71
Sq.cage/
IM71

STAR 00

SB ENGG/AH ENGG

90L

STAR 01

D&D

SD132MD

DELTA 01

C&I/PE

AD80D

STAR 01

C&I/PE

Drg.No:3-97-599-92413 / 01
Page.no:3of 3.

0361 PARLI VOL D1T02-78

GO TO INDEX

POSITION TRANSMITTER.
YES(Y) / NO(N)

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 01

MSEB

DDCMIS 01

MSEB

DDCMIS 00

REMARKS

STARTER / FEEDER
SCOPE

REVISION

INTEGRAL STARTER Y/N

CONTROLLED FROM

STARTER
TYPE(REVERSIBLE(R) /
NONREVERSIBLE(NR)

SOURCE

TYPE (NORMAL(N) /
EMERGENCY(E)

VOLTAGE

OLR (AMP)

FLC (AMP)

POWER SUPPLY
RATING (KW)

QTY (NO)

DESCRIPTION

TYPE OF SERVOMOTOR

SCHEDULE OF SERVOMOTORS

BHEL TAG NO.

KKS TAG NO

SL NO

PROJECT:NEW PARLI -TPP,


1 X 250MW ; CUST NO : 0361
BCR NO: 617

REGULATING INCHING VALVES


1

HAN14AA101

B090

CBD VALVE - REG

SA15A32

0.55 1.80

1.80 415V,3PH,50HZ

HAN015AA101

B093

CBD VALVE - REG

SA15A32

0.55 1.80

1.80 415V,3PH,50HZ

HAN16AA101

B096

DRUM EMERGENCY DRAIN - REG

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

HAD21AA101

B098

INTERMITTENT BLOWDOM DRAIN-REG

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

HAH45AA101

S031

SH STARTUP VENT - REG

SA50E90

4.00 10.20 11.0 415V,3PH,50HZ

HJF57AA101

H048

HFO SHORT RECIRCULATION VALVE

K30

0.09 0.90

0.60 415V,3PH,50HZ

HJF35AA501

H013

BYPASS VALVE FOR HOPCV

DC0A702AMF 0.18 1.06

1.20 415V,3PH,50HZ

HJF27AA501

L013

BYPASS VALVE FOR LOPCV

K30

0.60 415V,3PH,50HZ

SPARE

415V,3PH,50HZ

0.09 0.90
2.00

V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC

ISOLATING ON/OFF VALVES

00

HAC10AA201

E002

ECO INLET LINE - ISOL

SMB3-150

HAC10AA202

E003

INTEGRAL BYPASS FOR 'ECO INLET LINE - ISOL

HAC13AA201

E020

ECO RECIRCULATION - ISOL

HAD01AA201

B001

HAD01AA202

0361 PARLI VOL D1T02-79

415V,3PH,50HZ

L120-10-3-8P 0.10 1.25

1.30 415V,3PH,50HZ

SA50AB32

2.20 4.10

5.40 415V,3PH,50HZ

DRUM AIR VENT VALVE -ISOL

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

B002

DRUM AIR VENT VALVE -ISOL

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

HAD01AA203

B022

DRUM AIR VENT VALVE -ISOL

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

HAD01AA204

B023

DRUM AIR VENT VALVE -ISOL

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

HAN16AA201

B095

DRUM EMERGENCY DRAIN - ISOL

SA50AB32

2.20 4.10

5.40 415V,3PH,50HZ

HAD21AA201

B097

INTERMITTENT BLOWDOM-ISOL

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

10 HCB11AA201

S022

SOOT BLOWER MAIN LINE - ISOL.

SA30A32

1.10 2.90

3.20 415V,3PH,50HZ

11 HAH45AA203

S030

SH STARTUP VENT - ISOL

SA50E90

4.00 10.20 11.0 415V,3PH,50HZ

12 LAE11AA201

S069

SH SPRAY-ISOL

K800

3.70 18.00 12.5 415V,3PH,50HZ

PARLI-LOAD/617

7.12 42.0

42

GO TO INDEX

V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 00

MSEB

DDCMIS 01

DRG NO :-3-97-599-92244/01
PAGE NO:2

OF 3

K800

3.70 18.00 12.5 415V,3PH,50HZ

14 LAE13AA201

S071

SH SPRAY-ISOL

K800

3.70 18.00 12.5 415V,3PH,50HZ

15 LAE14AA201

S072

SH SPRAY-ISOL

K800

3.70 18.00 12.5 415V,3PH,50HZ

16 LAE21AA201

R023

RH SPRAY-ISOL

DC2A706CMF 1.50 5.50

6.40 415V,3PH,50HZ

17 LAE22AA201

R024

RH SPRAY-ISOL

DC2A706CMF 1.50 5.50

6.40 415V,3PH,50HZ

18 LAE23AA201

R025

RH SPRAY-ISOL

DC2A706CMF 1.50 5.50

6.40 415V,3PH,50HZ

19 LAE24AA201

R026

RH SPRAY-ISOL

DC2A706CMF 1.50 5.50

6.40 415V,3PH,50HZ

SPARE

415V,3PH,50HZ

20

2.2

0361 PARLI VOL D1T02-80


PARLI-LOAD/617

GO TO INDEX

V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC
V&D
MCC

MSEB

DDCMIS 01

MSEB

DDCMIS 01

MSEB

DDCMIS 01

MSEB

DDCMIS 01

MSEB

DDCMIS 01

MSEB

DDCMIS 01

MSEB

DDCMIS 01

MSEB

DDCMIS 00

REMARKS

REVISION

CONTROLLED FROM

POSITION TRANSMITTER.
YES(Y) / NO(N)

STARTER / FEEDER
SCOPE

SH SPRAY-ISOL

INTEGRAL STARTER Y/N

S070

STARTER
TYPE(REVERSIBLE(R) /
NONREVERSIBLE(NR)

13 LAE12AA201

SOURCE

TYPE (NORMAL(N) /
EMERGENCY(E)

VOLTAGE

OLR (AMP)

FLC (AMP)

POWER SUPPLY
RATING (KW)

QTY (NO)

TYPE OF SERVOMOTOR

SCHEDULE OF SERVOMOTORS

DESCRIPTION

BHEL TAG NO.

KKS TAG NO

SL NO

PROJECT:NEW PARLI -TPP,


1 X 250MW ; CUST NO : 0361
BCR NO: 617

DRG NO :-3-97-599-92244/01
PAGE NO:3

OF 3

BHARAT HEAVY ELECTRICALS LTD


TIRUCHIRAPALLI - 14
PRODUCT ENGINEERING / VALVES
Order No: 3502170
PO No: 0361-PARLI-250MW
Project: 0361-PARLI-250MW
Customer: BHEL-FB - TRICHY,
Item No
PGMA / DU
Document No/Version
Doc. Reld Date
Valve Part Number
Quantity(Nos)
Valve Description
ACTR Material Code
Model / RPM / Make
Rated Power(KW)
Full Load Current(Amp)
Starting Current(Amp)
OLR Set Value(Amp)
Close Position Setting by:
Open Position Setting by:
Set Close Torque(Kgm)
Set Open Torque(Kgm)
Valve Operating Time(Sec)
Remarks - 1
Remarks - 2
Remarks - 3
Remarks - 4
Remarks - 5
Tag Numbers:

VALVE-ACTUATOR DATA SHEET


01 of
7
02.09.2005

Printed On:

000067
0361496142300 / 13
602536/01
12.01.2005
H240A108
1
1-1/2-C800-RV-SW-MO-A105
964537419400
K30 / 18RPM / ROTORK
0.09
0.90
3.00
0.60
TORQUE Switch
Limit Switch
3.10
1.40
20.00

000075
0361361142030 / 10148
602727/00
04.02.2005
H218A108
1
2-C800-RV-SW-MO-A105
964537449400
DC0A702AMF / 15RPM / ANTRIEB
0.18
1.06
1.91
1.20
TORQUE Switch
Limit Switch
3.10
1.00
24.00

000105
0361348124260 / 11
602589/00
12.01.2005
H206A106S115
1
1-1/2-C1500-SV-SW-MO-A105
964537649300
SA30A32/32RPM/AUMA
1.10
2.90
16.00
3.20
TORQUE Switch
Limit Switch
16.50
10.00
9.00

( HO48 )

( HO13 )

( B097 )

0361 PARLI VOL D1T02-81

GO TO INDEX

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

BHARAT HEAVY ELECTRICALS LTD


TIRUCHIRAPALLI - 14
PRODUCT ENGINEERING / VALVES
Order No: 3502170
PO No: 0361-PARLI-250MW
Project: 0361-PARLI-250MW
Customer: BHEL-FB - TRICHY,
Item No
PGMA / DU
Document No/Version
Doc. Reld Date
Valve Part Number
Quantity(Nos)
Valve Description
ACTR Material Code
Model / RPM / Make
Rated Power(KW)
Full Load Current(Amp)
Starting Current(Amp)
OLR Set Value(Amp)
Close Position Setting by:
Open Position Setting by:
Set Close Torque(Kgm)
Set Open Torque(Kgm)
Valve Operating Time(Sec)
Remarks - 1
Remarks - 2
Remarks - 3
Remarks - 4
Remarks - 5
Tag Numbers:

VALVE-ACTUATOR DATA SHEET


02 of
7
02.09.2005

Printed On:

000106
0361348124260 / 12
602590/00
12.01.2005
5729A108S115
1
1-1/2-C1500-RV-SW-MO-A105
964537649400
SA30A32/32RPM/AUMA
1.10
2.90
16.00
3.20
TORQUE Switch
Limit Switch
16.50
10.00
9.00

000107
0361348124260 / 13
602591/00
12.01.2005
H348A108
2
1-1/2-C1500-BD-SW-MO-A105-3/4
964537659400
SA15A32 / 32RPM / AUMA
0.55
1.80
9.00
1.80
TORQUE Switch
Limit Switch
13.50
3.00
9.00

000108
0361348124260 / 14
602592/00
12.01.2005
3426B6AM4350
1
GNV 2 1/2 1500 WCB BW MO
964537649400
SA30A32/32RPM/AUMA
1.10
2.90
16.00
3.20
TORQUE Switch
Limit Switch
16.00
16.00
18.00

( B098 )

( B090, B093 )

( B096 )

0361 PARLI VOL D1T02-82

GO TO INDEX

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

BHARAT HEAVY ELECTRICALS LTD


TIRUCHIRAPALLI - 14
PRODUCT ENGINEERING / VALVES
Order No: 3502170
PO No: 0361-PARLI-250MW
Project: 0361-PARLI-250MW
Customer: BHEL-FB - TRICHY,
Item No
PGMA / DU
Document No/Version
Doc. Reld Date
Valve Part Number
Quantity(Nos)
Valve Description
ACTR Material Code
Model / RPM / Make
Rated Power(KW)
Full Load Current(Amp)
Starting Current(Amp)
OLR Set Value(Amp)
Close Position Setting by:
Open Position Setting by:
Set Close Torque(Kgm)
Set Open Torque(Kgm)
Valve Operating Time(Sec)
Remarks - 1
Remarks - 2
Remarks - 3
Remarks - 4
Remarks - 5
Tag Numbers:

VALVE-ACTUATOR DATA SHEET


03 of
7
02.09.2005

Printed On:

000115
0361348124260 / 21
602589/00
12.01.2005
H224A106S115
1
2-C1500-SV-SW-MO-F22
964537649300
SA30A32/32RPM/AUMA
1.10
2.90
16.00
3.20
TORQUE Switch
Limit Switch
16.50
10.00
9.00

000118
0361348124260 / 24
602593/00
12.01.2005
A3126B6AMA405
1
GLV 2 1/2 1500 WCB BW MO
964531819300
SA50AB32/ 32RPM / AUMA
2.20
4.10
35.00
5.40
TORQUE Switch
Limit Switch
25.00
25.00
10.00

000121
0361348124260 / 27
602594/00
12.01.2005
A3126B8A2MA405
1
GLV 3 1500SP WCB BW MO
964531819300
SA50AB32/ 32RPM / AUMA
2.20
4.10
35.00
5.40
TORQUE Switch
Limit Switch
35.00
35.00
12.00

( S022 )

( B095 )

( E020 )

0361 PARLI VOL D1T02-83

GO TO INDEX

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

BHARAT HEAVY ELECTRICALS LTD


TIRUCHIRAPALLI - 14
PRODUCT ENGINEERING / VALVES
Order No: 3502170
PO No: 0361-PARLI-250MW
Project: 0361-PARLI-250MW
Customer: BHEL-FB - TRICHY,
Item No
PGMA / DU
Document No/Version
Doc. Reld Date
Valve Part Number
Quantity(Nos)
Valve Description
ACTR Material Code
Model / RPM / Make
Rated Power(KW)
Full Load Current(Amp)
Starting Current(Amp)
OLR Set Value(Amp)
Close Position Setting by:
Open Position Setting by:
Set Close Torque(Kgm)
Set Open Torque(Kgm)
Valve Operating Time(Sec)
Remarks - 1
Remarks - 2
Remarks - 3
Remarks - 4
Remarks - 5
Tag Numbers:

VALVE-ACTUATOR DATA SHEET


04 of
7
02.09.2005

Printed On:

000127
0361348124260 / 33
602595/00
12.01.2005
A3128B15C2MS001
1
GLV 6 2500SP WC9 BW MO
964537199300
SA50E90/ 90RPM / AUMA
4.00
10.20
65.00
11.00
TORQUE Switch
Limit Switch
21.00
21.00
35.00
GBX GK25.1

000128
0361348124260 / 34
602596/00
12.01.2005
3428B15C2M4106
1
GNV 6 2500SP WC9 BW MO
964537199400
SA50E90/ 90RPM / AUMA
4.00
10.20
65.00
11.00
TORQUE Switch
Limit Switch
18.00
18.00
35.00
GBX GK25.1

000130
0361348124260 / 36
602597/00
12.01.2005
E5128B35AMS003
1
GV 14 2500 WCB BW MO
964673939300
SMB3-150/4P/24.3RPM/LIMITORQUE
7.12
42.00
260.00
42.00
LIMIT SWITCH
Limit Switch
474.00
474.00
48.00

( S030 )

( S031 )

( E002 )

0361 PARLI VOL D1T02-84

GO TO INDEX

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

BHARAT HEAVY ELECTRICALS LTD


TIRUCHIRAPALLI - 14
PRODUCT ENGINEERING / VALVES
Order No: 3502170
PO No: 0361-PARLI-250MW
Project: 0361-PARLI-250MW
Customer: BHEL-FB - TRICHY,
Item No
PGMA / DU
Document No/Version
Doc. Reld Date
Valve Part Number
Quantity(Nos)
Valve Description
ACTR Material Code
Model / RPM / Make
Rated Power(KW)
Full Load Current(Amp)
Starting Current(Amp)
OLR Set Value(Amp)
Close Position Setting by:
Open Position Setting by:
Set Close Torque(Kgm)
Set Open Torque(Kgm)
Valve Operating Time(Sec)
Remarks - 1
Remarks - 2
Remarks - 3
Remarks - 4
Remarks - 5
Tag Numbers:

000130 BYPASS
0361348124260 / 36
602598/00
12.01.2005
E5128B35AMS003
1
GV 14 2500 WCB BW MO
964538029300
L120-10-3-8P / 18RPM/LIMITORQ
0.10
1.25
3.10
1.30
TORQUE Switch
Limit Switch
3.10
2.00
10.00

VALVE-ACTUATOR DATA SHEET


05 of
7
02.09.2005

Printed On:

000133
0361348124260 / 39
602589/00
12.01.2005
H274A106S115
4
2-C1500-SV-SW-MO-A105
964537649300
SA30A32/32RPM/AUMA
1.10
2.90
16.00
3.20
TORQUE Switch
Limit Switch
16.50
10.00
9.00

000157
2/0361-LU-359-1-42-010 / 10107
602988/00
12.04.2005
H238A108
1
1-C800-RV-SW-MO-A105
964537419400
K30 / 18RPM / ROTORK
0.09
0.90
3.00
0.60
TORQUE Switch
Limit Switch
3.10
1.40
20.00

( B001, B002, B022, B023 )

( LO13 )

0361 PARLI VOL D1T02-85

GO TO INDEX

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

BHARAT HEAVY ELECTRICALS LTD


TIRUCHIRAPALLI - 14
PRODUCT ENGINEERING / VALVES
Order No: 3502170
PO No: 0361-PARLI-250MW
Project: 0361-PARLI-250MW
Customer: BHEL-FB - TRICHY,
Item No
PGMA / DU
Document No/Version
Doc. Reld Date
Valve Part Number
Quantity(Nos)
Valve Description
ACTR Material Code
Model / RPM / Make
Rated Power(KW)
Full Load Current(Amp)
Starting Current(Amp)
OLR Set Value(Amp)
Close Position Setting by:
Open Position Setting by:
Set Close Torque(Kgm)
Set Open Torque(Kgm)
Valve Operating Time(Sec)
Remarks - 1
Remarks - 2
Remarks - 3
Remarks - 4
Remarks - 5
Tag Numbers:

VALVE-ACTUATOR DATA SHEET


06 of
7
02.09.2005

Printed On:

000269
2/0361-LU-654-1-24-215 / 10106
603089/00
04.05.2005
A3128B8AMA702
2
GLV 3 2500 WCB BW MO
964527509300
K800 / 36RPM / ROTORK
3.70
18.00
72.00
12.50
TORQUE Switch
Limit Switch
51.00
51.00
9.00

000271
2/0361-LU-654-1-24-215 / 20410
603089/00
04.05.2005
A3128B8AMA702
2
GLV 3 2500 WCB BW MO
964527509300
K800 / 36RPM / ROTORK
3.70
18.00
72.00
12.50
TORQUE Switch
Limit Switch
51.00
51.00
9.00

000273
2/0361-LU-654-1-24-215 / 30509
603088/00
04.05.2005
5221A106S115
2
2-C2500-SV-SW-MO-A105
964520669300
DC2A706CMF / 25RPM / ANTRIEB
1.50
5.50
29.00
6.40
TORQUE Switch
Limit Switch
18.50
12.00
14.00

( S069, S070 )

( S071, S072 )

( R023, R024 )

0361 PARLI VOL D1T02-86

GO TO INDEX

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

BHARAT HEAVY ELECTRICALS LTD


TIRUCHIRAPALLI - 14
PRODUCT ENGINEERING / VALVES
Order No: 3502170
PO No: 0361-PARLI-250MW
Project: 0361-PARLI-250MW
Customer: BHEL-FB - TRICHY,
Item No
PGMA / DU
Document No/Version
Doc. Reld Date
Valve Part Number
Quantity(Nos)
Valve Description
ACTR Material Code
Model / RPM / Make
Rated Power(KW)
Full Load Current(Amp)
Starting Current(Amp)
OLR Set Value(Amp)
Close Position Setting by:
Open Position Setting by:
Set Close Torque(Kgm)
Set Open Torque(Kgm)
Valve Operating Time(Sec)
Remarks - 1
Remarks - 2
Remarks - 3
Remarks - 4
Remarks - 5
Tag Numbers:

VALVE-ACTUATOR DATA SHEET

Printed On:

07 of
7
02.09.2005

000275
2/0361-LU-654-1-24-215 / 40709
603088/00
04.05.2005
5221A106S115
2
2-C2500-SV-SW-MO-A105
964520669300
DC2A706CMF / 25RPM / ANTRIEB
1.50
5.50
29.00
6.40
TORQUE Switch
Limit Switch
18.50
12.00
14.00

( R025, R026 )

0361 PARLI VOL D1T02-87

Prepared
---------------------------Approved
----------------------------

GO TO INDEX

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

0361 PARLI VOL D1T02-88

GO TO INDEX

0361 PARLI VOL D1T02-89

GO TO INDEX

0361 PARLI VOL D1T02-90

GO TO INDEX

0361 PARLI VOL D1T02-91

GO TO INDEX

0361 PARLI VOL D1T02-92

GO TO INDEX

ON/OFF Duty SMB type actuators( Without electronic position Transmitter)

0361 PARLI VOL D1T02-93

GO TO INDEX

0361 PARLI VOL D1T02-94

GO TO INDEX

GO TO INDEX

0361 PARLI VOL D1T02-95

GO TO INDEX

0361 PARLI VOL D1T02-96

0361 PARLI VOL D1T02-97

GO TO INDEX

0361 PARLI VOL D1T02-98

GO TO INDEX

TAB - 3

GO TO INDEX

0361 PARLI VOL D1T03-99

GO TO INDEX

GO TO INDEX

0361 PARLI VOL D1T03-100

GO TO INDEX

0361 PARLI VOL D1T03-101

GO TO INDEX

0361 PARLI VOL D1T03-102

GO TO INDEX

0361 PARLI VOL D1T03-103

GO TO INDEX

0361 PARLI VOL D1T03-104

GO TO INDEX

0361 PARLI VOL D1T03-105

GO TO INDEX

0361 PARLI VOL D1T03-106

GO TO INDEX

0361 PARLI VOL D1T03-107

GO TO INDEX

0361 PARLI VOL D1T03-108

GO TO INDEX

0361 PARLI VOL D1T03-109

0361 PARLI VOL D1T03-110

GO TO INDEX

TAB - 4

GO TO INDEX

MAHARASTRA STATE ELECTRICITY BOARD


NEW PARLI THERMAL POWER STATION-EXTN.
UNIT 1, 1X 250 MW
CUST. NO. 0361

WRITE UP
ON
FURNACE SAFEGUARD SUPERVISORY
SYSTEM

PREPARED
P.L.PRAMILA
-sd-sd-

CHECKED
S.RAMACHANDRAN
-sd-sd-

APPROVED
S.RAMACHANDRAN
-sd-sd-

GO TO INDEX

REV.

DATE

00
01
02

18/10/2004
12/01/2005
03/05/2005

0361 PARLI VOL D1T04-111

IMPORTANT NOTE

This write up is meant for general guidelines and better understanding of the system.
However it may be noted that All the logic conditions spelt in English Language
may not be exact equivalent of pictorial representation of logics. It is mandatory that
the operating personal should refer to the respective contract logics.

It must be recognised that no amount of written instruction can replace


intelligent thinking and reasoning on the part of boiler operators, especially
when coping with unforeseen operating conditions. It is operators
responsibility to become thoroughly familiar, not only with immediate steam
generating equipment but also with all pertinent control equipment.
Satisfactory performance and safety depend to a great extent on proper
functioning of controls and auxiliary equipment.

2 of 2

GO TO INDEX

0361 PARLI VOL D1T04-112

KEY
The logic sequences are represented in English as statements, which are to
be executed in certain order of precedence as described below.
The logical gates are represented in Upper case Letters, preceded and
followed by dots.
eg. .AND. , .OR.
The logical function combining two statements in the same line is executed
first.
eg. xxxxxxxxxxxxxxx .AND. xxxxxxxxxxxxxxx
The logical function in the right most position is executed next and so on.
eg. xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
.AND.
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
The logical function at the left most position is executed last.
eg. xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
.OR.
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Both logical operators .AND. , .OR. have equal precedence between them. For
better understanding the following example with mixed logical expressions is
marked with the order of execution.
eg. xxxxxxxxxxxxx
.OR.5
xxxxxxxxxxxxx
.AND.4
xxxxxxxxxxxxxxxxxxxxxxxxxx .OR.1 xxxxxxxxxxxxxxxxxxxx
.AND.2
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
.OR.3
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
NB: xxxxxxxxxxxx represent logical statements.

3 of 3

GO TO INDEX

0361 PARLI VOL D1T04-113

CONTENTS:
1.0
Figures ( Fig 1 to 7 )
2.0

Introduction

3.0

Heavy oil recirculation

4.0

Furnace purge

5.0

Selection of Light oil / Heavy oil firing

6.0

Light oil trip valve control.

7.0

Light oil elevation start (elevation AB - pair mode)

8.0

Heavy oil trip valve control

9.0

Heavy oil elevation start (elevation AB,CD,EF - pair mode)

10.0

Elevation mode operation - (typical for LO & HO)

11.0

Tube Mill Ignition permit & PA Fan Logic

12.0

Tube Mill Lubrication control

13.0

Tube Mill Seal Air control

14.0

Tube Mill and associated gates control

15.0

Raw coal feeder and associated gates control

16.0

Coal elevation / Tube Mill start up

17.0

Coal elevation / Tube Mill shutdown

18.0

Elevation shutdown (typical for LO & HO)

19.0
20.0
21.0
22.0

Pair mode shutdown (typical for LO & HO)


Boiler trip conditions
Scanner air fan control
Secondary air damper control

4 of 4

GO TO INDEX

0361 PARLI VOL D1T04-114

GO TO INDEX

0361 PARLI VOL D1T04-115

0361 PARLI VOL D1T04-116

GO TO INDEX

0361 PARLI VOL D1T04-117

GO TO INDEX

0361 PARLI VOL D1T04-118

GO TO INDEX

0361 PARLI VOL D1T04-119

GO TO INDEX

0361 PARLI VOL D1T04-120

GO TO INDEX

0361 PARLI VOL D1T04-121

GO TO INDEX

0361 PARLI VOL D1T04-122

GO TO INDEX

2.0

INTRODUCTION

The Furnace Safeguard Supervisory System (FSSS) is designed to ensure the


execution of a safe, orderly operating sequence in the start up and shutdown of fuel
firing equipment and to prevent errors of omission and commission in following
such a safe operating procedure.
The system provides protection, should there be a malfunction of fuel firing equipment
and associated air systems. The safety features of the system are designed for
protection in most common emergency situations. However the system cannot
supplement the intelligence and the reasonable judgement of the operator in
all the situations.
In some phases of operation the Furnace Safeguard Supervisory System provides
permissive interlocks only to ensure safe start up sequence of equipment. Once the
equipment is in service, the operator must use normally acceptable safe operating
practices.
It is important that the operator is familiar with the overall operation of the uni t
and the operation of individual equipments as outlined in the various equipment
sections of operating and instruction manual.
It is essential that all parts of the Furnace Safeguard Supervisory System are in
service at all times, if the system is to provide protection for which it is designed.
Proper maintenance and periodic inspection of the system and associated
hardware is essential for continued reliable operations.
This instruction section of the system gives a complete description of the Furnace
Safeguard Supervisory System furnished for this unit as it is related to the various
operating phases and operation of the fuel firing equipment and associated air
systems.
Basically the system is designed to perform the following functions:

Prevent any fuel firing unless a satisfactory furnace purge sequence has first
been completed.

Prevent start-up of individual fuel firing equipment unless certain permissive


interlocks have first been satisfied.

Monitor and control the proper sequence (Manual or Automatic) during start-up
and shut-down of fuel firing equipment.

Make continued operation of fuel firing equipment subject to certain safety


interlocks remaining satisfied.

Provide status feedback to the operator and in some cases, to the unit control
system.

Provide flame supervision when fuel firing equipment is in service and effect a
fuel trip upon certain adverse operating conditions.
5 of 5

GO TO INDEX

0361 PARLI VOL D1T04-123

Initiate a fuel trip when certain abnormal operating conditions exists.

Furnace safeguard supervisory system (FSSS) provided for this


project is
designed for a natural circulation boiler with coal as the primary fuel, Light Oil (LO) as
the start-up fuel and Heavy Oil (HO) as the fuel for warm up and stabilisation. This
system provides for the remote/manual operation of three elevations of high energy
arc (HEA) ignitors, three elevations of oil guns with provision for firing heavy oil in
elevation AB, CD & EF and three Tube Mills, serving 24 coal nozzles, in six
elevations from a remote, CRT / console mounted in control room.
From the CRT / console insert light oil trip valve, Heavy oil trip valve, Heavy oil return
trip Valve can be opened / closed, Purge cycle can be started, Scanner Fans &
Seal Air Fans can be started/stopped, Tube Mill Outlet Gate & Hot Air Gate can be
opened / closed, Tube Mill & Feeder can be started / stopped. Indicating lights on
the console insert shows the operating status of various field equipments connected
to FSSS.
The following operational functions are included in FSSS.

Furnace purge supervision


Secondary air damper modulation, on / off control and supervision.
Light oil on off control and supervision.
Heavy oil on-off control and supervision.
Tube Mill and feeder on-off control and supervision
Flame scanner intelligence and checking
Overall boiler flame failure protection
Boiler trip protection.

The Furnace Safeguard Supervisory System has been designed for Energise to
open & Energise to Close philosophy. This means any on/off device or equipment
has to get an impulse/command to change its present state and has to get again,
another impulse/command to regain to the original state.

3.0 HEAVY OIL RETURN TRIP VALVE ( Ref: Fig. 3)


Before any main fuel can be fired the heavy oil must be brought to proper
temperature. This is accomplished by recirculating HO through the oil Return trip
valve system by means of the HO Trip Valve and HO Return Trip Valve.

6 of 6

GO TO INDEX

0361 PARLI VOL D1T04-124

Depressing the HO Return Trip Valve (HORV) OPEN PB will open the Return
Trip Valve, provided following conditions are satisfied;
All the HO nozzle Valves are closed.
. AND.
HO Return Trip Valve close PB not depressed.
.AND.
HO return line bypass manual valve not closed
When HO Return Trip Valve (HORV) starts opening, the HORV closed ( Green
) lamp indication goes off and when the valve is fully open HORV open ( Red ) lamp
indication comes on.
Now, depressing the HOTV open PB will open the HOTV provided the HOTV
closed PB is not depressed and HORV is fully opened. This will establish Heavy oil
recirculation.
During firing, both HO return line bypass manual valves ( HO43 & HO44C) shall be
closed. This shall be considered as one of the conditions of O elev. Start permit.
To re-establish the oil recirculation after the furnace purge cycle has been
completed, OPEN HOTV as described in the respective section.
4.0 FURNACE PURGE
Before any fuel firing can take place, (initially or after a boiler trip) a successful
furnace purge cycle must be completed. To start a furnace purge cycle proceed as
follows:

Establish AC & DC power to FSSS and the related equipment.


Establish proper drum water level.
Place atleast one ID and one FD fan in service.
Establish air flow between 30% and 40 % MCR through furnace.
Depress the purge start push button.

This will start the furnace purge if all the requirements are satisfied, as
indicated by the yellow PURGE READY light.
NOTE1 :
If the Purge ready light does not come on ,check to see that:

The light oil trip valve is proven closed.


All the light oil nozzle valves are proven closed.
The heavy oil trip valve is proven closed.
All the heavy oil nozzle valves are fully closed.
All PA Fans are off

7 of 7

GO TO INDEX

0361 PARLI VOL D1T04-125

All mills are off


All Mill outlet gates are fully closed.
All the flame scanners show No Flame (Both fire ball and discriminating
scanners).
No boiler trip command is present (See boiler trip section for specifics).
Air flow between > 30% and < 40 % MCR
All aux. Air dampers are modulating.
When the furnace purge cycle is started by the operator, by pressing PURGE
START PB, a 300 secs. purge timer is energised as indicated by the PURGING
light coming on. At the end of the 300 secs. ,the boiler trip circuit is reset, provided
no boiler trip command is present.
(See boiler trip section). The PURGING light
goes out and Yellow PURGE COMPLETE& NO MFT light comes on.
Once the boiler trip circuit is reset ( on purge complete) the close circuits of HO trip
valve and LO trip valve are de-energised permitting the operator to open it as
described below.
5.0 SELECTION OF LIGHT OIL/HEAVY OIL FIRING
Oil elevation AB is provided with Light Oil (LO)/ Heavy Oil (HO) firing. Light oil
or Heavy oil firing can be selected from the console insert by pressing the
appropriate PB, provided following conditions are satisfied:
Both pairs are stopped.
.AND.
All HO & LO nozzle valves are closed in elevation AB.
. AND.
HO/LO Start permit available.
6.0 LIGHT OIL TRIP VALVE CONTROL ( Ref: Fig. 2)
Once the boiler trip circuit is reset and all the light oil nozzle valves are proven
closed, pressing the Light Oil Trip Valve (LOTV) OPEN PB, will open LOTV
provided the light oil supply pressure is adequate.
When the LOTV is moved from the fully closed position, the (green) LOTV
CLOSED light goes out. When the trip valve reaches the fully open position, the
(red) LOTV OPEN light comes on.
Pressing the LOTV CLOSE PB will close the valve provided the valve is not
closed already. The LOTV also closes automatically under following conditions
provided the valve is not closed :
Master fuel trip
.OR.
Any light oil nozzle valve not closed
.AND .

8 of 8

GO TO INDEX

0361 PARLI VOL D1T04-126

Light oil header pressure very low


.OR.
Any light oil nozzle valve not closed
.AND .
Atomising air pressure very low . AND. No light oil elevation in start or stop.

The LOTV is also commanded to close on Loss of unit Critical Power (+24V DC).
7.0 LIGHT OIL ELEVATION START (Elevation AB - PAIR MOD E)
Light oil can be fired at elevation AB only and in pair basis. Corners 1
and 3 make one pair, while corners 2 and 4 make the other pair. The corners
making up a pair are diagonally opposite. To place the light oil guns in service
proceed as follows:

Select light oil firing.


Establish light oil elevation start permit by
satisfied.
a) No master fuel trip.
b) Light oil trip valve proven fully open.
c) Pulverizer / feeder start permit is available.

the following conditions being

NOTE2 :
Pulverizer / feeder start permit is established under following conditions :
Air flow <40% MCR
.OR.
Any coal elev. In service
.OR.
Any oil elevation in service
.AND.
No MFT
Pressing the associated pair start (1-3 or 2-4) PB, provided the above
conditions are satisfied will initiate a 70 seconds start time to place the associated
pair of light oil guns in service. Refer heavy oil elevation start for the sequence of
introduction of oil gun in service, which is similar except that atomising medium
being air and the respective air valve is open / closed.
Light oil elevation trip occurs under any of the following conditions:
Master fuel trip.
Light oil trip valve not open.
8.0 HEAVY OIL TRIP VALVE CONTROL (Ref: Fig. 3)

9 of 9

GO TO INDEX

0361 PARLI VOL D1T04-127

Once the boiler trip circuit is reset and all the Heavy Oil Nozzle Valves
are proven closed and HO Recirculation Valve is opened , pressing HOTV OPEN
PB, will open the HOTV provided the heavy oil supply pressure and heavy oil
temperature is adequate.
When the HOTV is moved from the fully closed position, the (green) HOTV
CLOSED light goes out. When the trip valve reaches the fully open position, the
(red) HOTV OPEN light comes on.
Pressing the HOTV CLOSE PB will close the HOTV provided the valve is not
already closed. The HOTV also closes automatically under any one of the following
circumstances provided the valve is not closed.
Master-fuel trip .AND. HO return trip valve not open
.OR.
The following conditions exist for more than 5 sec.
Any heavy oil nozzle valve not closed
.AND.
Atomising steam pressure very low .AND. no
more than 2 seconds.
.OR.
Any heavy oil nozzle valve not closed
.AND.
Heavy oil Header pressure v.low
.OR.
Any heavy oil nozzle valve not closed
.AND.
Heavy oil header temperature very low

oil elevation in start or stop for

The HOTV is also commanded to close on Loss of unit Critical Power (+24V DC).
9.0 HO ELEVATION START (ELEV. AB, CD, EF - PAIR MODE)
Heavy oil can be fired at Elevations AB and/or CD and/or EF either
independently or in combination. Heavy oil Elevation is placed in service on pair
basis when associated Raw Coal Feeders are off. Corners 1 and 3 make one
pair, while the corners 2 & 4 make the other pair. Corners making up a pair are
diagonally opposite. To place the heavy oil guns in service at any elevation
proceed as follows:

Select heavy oil firing.


Establish heavy oil elevation start permit by the following conditions being
satisfied.
a) No master fuel trip.

10 of 10

GO TO INDEX

0361 PARLI VOL D1T04-128

b) Heavy oil trip valve proven fully open.


c) Pulverizer / feeder start permit available

Pressing the associated PAIR START push button, (for corners 1 and 3 or
corners 2 and 4) when the above conditions are satisfied will initiate a 70 sec.
start time to place the associated pair of heavy oil guns in service as follows:
a) A start command is sent to oil corner 1 (when corners 1 and 3
have been started) or to oil corner 2 (when 2 and 4 have been
started).
b) Fifteen seconds later, a start command is sent to oil corner 3 (when
corners 1 and 3 have been started) or to oil corner 4 (when corners 2 and 4
have been started).

When an individual oil corner receives a start command , it is placed in


service in the following sequence.
When the oil gun is properly positioned in firing position, the oil gun
engaged indicating lamp (Red) will come on. The steam nozzle valve will open
up on receiving the open command provided scavenge nozzle valve is closed.
When the atomising steam nozzle valve (air nozzle valve in the case of light
oil ) is proven open, HO nozzle valve gets open command and HEA Ignitor gets
command for advancing. When HEA rod is advanced it gets command for
sparking. 15 seconds later, both HEA Rod Advance and spark command is
removed.
If the flame is established within the above 15 sec. then the oil gun is said to
have been successfully placed in service and will continue to operate.
If the flame is not established by the end of 15 secs., corner trip will be
initiated which will close the oil valve, atomising valve of the particular corner.
At the end of 70 secs., heavy oil pair start time , a main oil corner trip is
initiated for any corner where the heavy oil nozzle valve is not proven fully open
(Heavy oil nozzle valve Open red light not on ) or where the associated atomising
steam valve is not proven fully open.
Heavy

oil elevation trip occurs under any of the following circumstances.


a) Master fuel trip.
b) HO Trip valve not open.

10.0 ELEVATION MODE OPERATION ( TYPICAL FOR LO - HO )

11 of 11

GO TO INDEX

0361 PARLI VOL D1T04-129

The elevation mode of operation is


following conditions exist:

selected automatically when the

Either adjacent feeder associated with the HFO elevation is proven on


(feeder on for more than fifty seconds) or the associated oil elevation start auto is
established.
When the elevation mode is selected, the HFO elevation is in service as
follows: (assuming the OIL ELEVATION START PERMIT remains established).

An elevation start command is established for corners 1 and 3 on the


associated elevation.

After the elevation start command is established, a forty second counting


period is started to establish an elevation start command for corners 2 and 4.

Corners 1 and 3 are now placed in service in the same manner as


described in the PAIR MODE OPERATION section.
After the forty second counting period expires, corners 2 and 4 are placed in
operation in the same manner as described in the PAIR MODE OPERATION
section.
At the end of 70 secs. Heavy oil pair start trial time of the second pair of oil
guns, a minimum of 3 out of 4 HO nozzle valves at that elevation must be proven
open, if not, an unsuccessful elevation start alarm is initiated. This will stop
corners 1-3 and 40 seconds later corner 2-4 as described in shut down procedure.
11.0

TUBE MILL IGNITION PERMIT

8.1

IGNITION PERMIT TO COAL ELEVATIONS:

Prior to starting any coal elevation, the ignition energy must be adequate to light-off
coal. The ignition energy must be adequate (to support coal firing) for the coal
elevation selected when the conditions listed below are satisfied. Ignition permit
for coal elevation is available, if any of the following conditions listed below are
present at the respective coal elevation :
Coal Elevation A :
nozzle valves proven in elev. AB.
.OR.
Elev. B air flow > 60%. .AND. Boiler load > 30% MCR.
Coal Elevation B :

12 of 12

GO TO INDEX

0361 PARLI VOL D1T04-130

nozzle valves proven in elev. AB.


.OR.
Elev. A or C air flow > 60% .AND. Boiler load > 30% MCR.
.OR.
nozzle valves proven in Elev. CD .AND. Elev. C airflow > 60%
Coal Elevation C :
nozzle valves proven in elev. AB
.AND.
Elev. B air flow > 60%.
.OR.
nozzle valves proven in elev. CD.
.OR.
Elev B .OR. D air flow > 60%. .AND. Boiler load > 30% MCR.
Coal Elevation D :
nozzle valves proven in elev. CD.
.OR.
Elev. C .OR. E air flow > 60% .AND. Boiler load > 30% MCR.
.OR.
nozzle valves proven in Elev. EF & Elev. E > 60%
Coal Elevation E :
nozzle valves proven in elev. EF.
.OR.
nozzle valves proven in elev. CD .AND.
Elev. D air flow > 60%
.OR.
Elev. D .OR. F air flow > 60% .AND. Boiler load > 30% MCR.
Coal Elevation F :
nozzle valves proven in elev. EF.
.OR.
Elev. E air flow > 60% .AND. Boiler load > 30% MCR .
For each mill, Tube Mill Ignition energy available is indicated by an indication lamp.
11.1 PA FAN LOGIC:
2 FD fans and 2 PA fans are provided per boiler.
Respective Coal elevation in service signal is generated if the following conditions
are satisfied.
Mill ON
PA general shut off gate open
13 of 13

GO TO INDEX

0361 PARLI VOL D1T04-131

Mill outlet gate open


The coal elevation in service is accounted and used in elevation permit logic as
described below.
Coal elevation start permit is established under the following conditions:

When all PA fans and all FD fans are ON .AND. PA header pressure not low.,
coal elevation permit is extended to all coal elevations.
When 1 PA fan& 1 FD fan are ON, and if 2 or more coal elevations are not in
service .AND. PA header pressure not low, coal elevation permit is given to all
elevations.
When 3 or more El. are in service, and only one PA fan is ON, or one FD fan in
ON, no. of working elevations is to be reduced to 2. From top, working
elevations are automatically cut off one after another at regular interval of 2
secs.
PA trip to individual coal elevations (Coal El. F, E, D& C) , Mill-CD & Mill-EF
are generated. PA trip to Mill EF, Mill CD in turn issues the trip command to
respective coal elevations by issuing close command to respective Mill outlet
gates of NDE/ DE sides.

12.0

TUBE MILL LUBRICATION CONTROL

12.1

LOW PRESSURE (LP) PUMP INTERLOCKS

Two LP pumps is provided per mill - One for normal (Main) operation and the other
as stand-by. Any pump can be put into service by depressing respective PBs from
the CRT / Console Insert.
The Main LP pump gets start command when, clean oil compartment lub. oil level is
adequate . AND. Start PB is depressed.
The LP pump gets stop command, if any of the following conditions are present:
The stop PB is depressed.
The pump is in operation > 60 sec. and the oil flow rate in mill side-NDE or mill side DE is low for more than 5 sec.
Clean oil compartment oil level low.
The standby LP pump gets start command automatically if the main pump does not
start with in 5 sec . AND. Auto start command for main pump is not present
.OR. If the running pump is on > 60 sec. .AND. Any side oil flow is low ( NDE / DE
side ) , provided clean oil compartment oil level is adequate.
Stop command for both pumps is issued if auto start command for LP pump-1 & LP
pump-2 available for more than 5 secs.

14 of 14

GO TO INDEX

0361 PARLI VOL D1T04-132

Status of LP pumps is displayed on the CRT / Console insert.


12.1.1 HEATER ELEMENTS :
The heater elements are energised if the lub. oil temperature is low and any LP
pump is on, and, de-energised if lub oil temp. is not low .OR. if both LP pumps are
off.
12.2

HIGH PRESSURE (HP) PUMP INTERLOCKS

Two HP pumps are provided per mill. One for normal (Main) operation and the other
as standby. Any pump can be selected for normal operation by depressing
respective PBs from CRT / Console insert.
The main HP pump gets start command when all the following conditions are present:

Any LP pump is on.( with one sec. off delay to take care of LP Pump auto change
over)
Pump suction header oil pressure is not low.
Lub. oil temperature is adequate.
HP pump start PB depressed .OR. If the other pump is on for more than 5 sec.
. AND.
HP pump discharge pressure low at any side for more than 2 sec.
After issue of this start command the running pump is tripped after 5
secs.

The selected HP (Main) pump gets a stop command when :


The stop PB is depressed
.OR.
Both the LP pumps are off
.OR.
Any of the HP pump discharge pressure is too low >2 sec. and that pump is on
for > than 5 sec.
The stand-by pump is started automatically if the main pump does not start within
5 sec. from the command given under starting .AND. Auto start for main pump is not
available.
Stop command for both pumps is issued if auto start command for HP pump-1 & HP
pump-2 available for more than 5 secs.
Status of HP pumps is displayed on CRT / Console insert.

15 of 15

GO TO INDEX

0361 PARLI VOL D1T04-133

12.3

BALL & SOCKET (B&S) HP PUMP :

Two B&S HP pumps are provided per mill. One for normal (Main) operation and the
other as standby. Any pump can be selected for normal operation by depressing
respective PBs from CRT / Console insert.
The main B&S HP pump gets start command when all the following conditions are
present:
Any LP pump on
Pump suction header oil Pressure in feeding line not low .AND. Lub oil temperature
adequate
Any B&S HP pump on .AND. Pressure low for more than 2 secs.
This pump is stopped when B&S H.P pump stop PB is depressed
.OR.
Both LP pumps are off
.OR.
Pump suction header oil pressure in the ball and socket pump discharge is low. for
more than 2 sec. .AND. the selected pump is ON for more than 10 Sec.
Stop command for both pumps is issued if auto start command for B&S pump-1 &
B&S pump-2 available for more than 5 secs.
Status of B&S and HP pump are displayed on the CRT / Console insert.
The condition Mill Bearing Lubrication OK is generated if all the conditions
mentioned below are present :
Any LP pump is in operation ( With one sec. off delay to take care of pump auto
starting)
Lub. oil flow in LP circuit OK( with 3 sec. off delay)
Any HP pump is in operation
Pressure at HP pump discharge pressure ok (4 places).
The condition Mill Bearing Lubrication not ok is generated, if any of the above
conditions mentioned is not present .
12.4 TUBE MILL REDUCER LUBRICATION :
Two Red. Lub oil pumps are provided per mill. One for normal/ main operation
and the other as stand by. Any pump can be started for normal operation by
depressing respective PB from CRT/ Console Insert.
The main pump gets start command if the following conditions are satisfied:
Start pump-1 is depressed
Any pump on for more than 10 secs. and Lub oil flow low.

16 of 16

GO TO INDEX

0361 PARLI VOL D1T04-134

Auto start command for main Pump is available.


The running pump gets stop command if the following conditions are satisfied.
Stop PB is depressed
Running pump is ON for more than 15 secs. and oil flow low for more than 5 sec.
Auto start command for both pumps is available for more than 5 secs.
Mill Reducer Lubrication ok condition is generated if all the following conditions are
present:
Any reducer Lub. Oil Pump is ON for > 10 secs.
Reducer Oil Flow rate is not low.
Reducer Oil Temperature is not high.
Mill Reducer Lubrication not ok condition is generated if any one or more of the
above conditions are not present for more than 10 sec.
12.5

GIRTH GEAR GREASING SYSTEM :

Girth Gear (GG) Greasing System gets start command with any one of the following
commands:
Automatically when main or aux. mill motor is started.
Automatically when aux.motor is ON and grease pump is stopped for > 10 min.
By depressing the start PB.
The start command will start the GG grease pump which starts supplying grease to all
the nozzles and the limit switch is activated. As soon as the limit switch is
actuated, the grease atomizing (compressed air) solenoid valve is opened for a
duration of 30 sec. (to be adjusted at site). The greasing sequence will repeat after
fresh nozzle fill up.
The greasing system gets a stop command either
Manually through the stop PB when both Main & Aux. Motors are off
.OR.
Automatically 30 sec. after the main & aux. mill motors are OFF
.OR.
Automatically after 5 min. running of the grease pump when aux. motor is ON.
The status of GG grease pump is shown on the CRT / Console insert.
The condition Girth Gear Greasing Sequence OK is generated if all the following
conditions are present.
Grease pump motor ON.
Time between two successive limit switch activations is less than 2 min.
Grease atomizing air pressure is correct 2 sec. after energizing the solenoid
valve.
Grease level I barrel is O.K.
Air pressure low for more than 2 sec. while energising the solenoid valve

17 of 17

GO TO INDEX

0361 PARLI VOL D1T04-135

The condition Greasing Sequence not correct is generated if any one of the
above conditions are not present or if the limit switch continues to e in
activated position for more than 60 secs.
12.6

TUBE MILL LUBRICATION CHECK :

Mill Lubrication ok signal is generated when all the following conditions are
present :
Any LP pump on.
Oil flow in LP circuit on both NDE & DE side is OK.
Any HP pump on.
Greasing sequence correct.
Reducer pump on.
Reducer lube oil temp. not high.
Reducer lube oil flow not low.
HP pump discharge pressure adequate.
Any B&S pump ON & pressure not low on both sides
Mill lubrication not OK is generated when any one of the above conditions are not
present.
13.0

TUBE MILL SEAL AIR FAN CONTROL :

The seal air system consists of two Trunnion Seal Air Fans (one main and the other
standby) and one Girth Gear Seal Air Fan.
13.1

GIRTH GEAR SEAL AIR FAN :

Girth Gear Seal Air Fan can be either started up manually by depressing its start PB
or automatically when mill start sequence first step is (for the side NDE / DE)
completed and pre light up steam inerting of mill & classifiers are completed.
Girth Gear Seal Air Fans can be stopped either manually by depressing its stop PB
or automatically 30 sec. after both main & aux. mill motors are OFF.

13.2

TRUNNION SEAL AIR FANS :

The selected trunnion seal air fan gets start command if any one of the following
conditions is present :
Start PB depressed
Mill start order .AND. mill starting sequence first step completed and any side (NDE
/ DE) all mill outlet gates are open.
The selected trunnion seal air fan is shut down under the following conditions :

18 of 18

GO TO INDEX

0361 PARLI VOL D1T04-136

Main mill motor is OFF for >30 sec.


.OR.
Seal air fan on for more than 80 sec. and seal air pressure not ok.
.OR.
Stop P.B depressed.
STOP command for both pumps is issued of auto start command for seal air fan 1&2
available for more than 5 secs.
The standby trunnion seal air fan is started automatically under any of the following
condition :
The selected seal air fan ON for >60 sec. .AND. seal air pressure low > 10
sec.
If the selected SA Fan is not started within 5 sec. .OR. if it trips while in
operation.
14.0 TUBE MILL AND ASSOCIATED GATES CONTROL :
14.1

TUBE MILL BALL LOADING SEQUENCE :

The ball loading system ensures filling up of the mill by balls when it is in operation.
The ball loading sequence will work only when the mill is rotating (i.e. either main
motor or aux. motor is ON).
The ball loading sequence for a mill can be started by depressing the LOAD P.B.
from the local when mill running with either of the motors.
The following sequence of operations will take place
The first shut off gate (Ball loading inlet gate) will open provided the second
shut off gate (Ball feeding outlet gate) is closed.
60 sec. after opening, the first shut off gate will close.
The second shut off gate of the mill selected for ball loading will open after the
first shutoff gate is closed.
180 sec. after opening, the second shut off gate will close.
The Upper & Lower Ball feeding gates are kept in open position during Steam Inerting
of Mill and Classifiers for a period of 240 sec. during the starting of mill ( either
NDE / DE side ) and shutdown of both sides and during emergency steam inerting in
case of a mill fire. Once the steam inerting is completed the steam (main inerting)
valve open command is removed. On closure of the inerting steam main valve, the
Upper & Lower ball feeding gates are commanded to close.
When both mill motors are not in operation at any point of the above sequence, both
the shut off gates will get close command.
14.2

LEVEL PROBES BLOW DOWN:

19 of 19

GO TO INDEX

0361 PARLI VOL D1T04-137

The level probe blow down allows the blow down of the level probes (3 Nos.), probe
by probe on either end of the mill cyclically.
The blow down sequence starts automatically if main or aux. motor is started or if
start command is given by depressing the start PB on the console insert or at local.
The following sequence of operations will take place as soon as the start command is
given.
The first electro valve on side - NDE of the mill will open for blow down operation.
Two seconds later, the general compressed air valve will open and blow-down
operation begins. An indication blow down in progress will appear on the console
insert. The level control signal going to feeder is blocked.
Ten seconds after starting blow-down operation, general compressed air valve is
closed.
Three seconds after general compressed air valve closure, if the pressure is low,
the level control signal is switched to measuring position. If the pressure is high,
an alarm is initiated, the level control signal is not switched to measuring position
and the sequence is blocked. The switching is done only after the air pressure
goes low. The same sequence is repeated for the other two probes on the same
side (side - NDE) one after the other.
30 minutes after the closure of the last electro valve on side - NDE the three electro
valves on side - DE will blow down one after other in the same sequence as
explained earlier.
NOTE4 :
During start-up of main or aux. motor, the sequence first enables a forced blowdown of the two sides of the mill, one after the other without thirty minutes interval.
This forced blow-down can also be initiated by the operator by depressing the start
push button.

14.3

SCREW CONVEYOR SPEED MONITOR:

A speed monitor is provided at each end of the mill to monitor the screw Conveyor
shaft rotation when the mill is ON.
The main motor start logic signal is initiated in FSSS through Power Monitor relay
provided in the Speed Monitor Console.

20 of 20

GO TO INDEX

0361 PARLI VOL D1T04-138

The main motor trip relay shall get actuated through FSSS only when the Screw
Conveyor shaft fails or runs at low speed (< 8 rpm) ANDed with mill ON condition.
An alarm and indication is also initiated from the speed monitor console during
above condition of Mill ON ANDed with shaft rotation failure.
14.4 TUBE MILL MAIN MOTOR :
The mill main motor start/stop commands are automatically generated during mill
start/stop sequence.
Main motor gets start command if all the conditions listed below exists:

PC pipes purge shut off dampers closed.


Mill Start order. (Side NDE / DE)
Mill release available comprising of
Electromagnetic brake is in locked position.
Mill lubrication is OK.
No MFT.
Mill ignition energy available.
Girth gear seal air fan motor is on.
Mill starting sequence step-2 completed.
Any Trunnion Seal Air Fan on and Mill/ Seal DP OK.
Jaw clutch disengaged.
Mill start from screw conveyor monitoring system.

The main motor gets trip command if any one or more of the following conditions
exists :

MFT.
Jaw clutch engaged.
Mill lubrication not correct.
Mill bearing temperature very high. (NDE / DE side)
Mill Motor bearing temperature very high. (NDE / DE side)
PA pressure very low .OR. All PA/FD fans OFF.
Mill/Seal air DP not OK > 60 sec.
Mill ignition energy not available.
Electromagnetic brake engaged.
Both Trunnion Seal Air Fans off > 30 sec.
Aux. motor on > 10 sec.
Mill emergency trip P.B. activated.
Loss of Elev. 24 V DC power.
PA trip to coal elevation NDE & DE sides ( Under loss of one FD/PA fans) (
Applicable for Mill CD& EF only).

14.5

PRIMARY AIR GENERAL SHUT OFF GATE :

21 of 21

GO TO INDEX

0361 PARLI VOL D1T04-139

PA general shut off gate is common for both the sides of the mill. It is opened if all the
following conditions are existing :

Side NDE / DE start order present ( whichever is started first ).


Mill start sequence step 3 completed.
Open PA general shut off gate is available.

The PA General shut off gate is closed if any one of the following conditions are
present :

Mill main motor off.


Loss of Elev.+24V DC power.
Any mill main motor trip condition exists.

14.6

TUBE MILL OUTLET GATES SIDE NDE (Typical for side DE ) :

Mill outlet gates on side NDE, DE open automatically when all the following
conditions are present:
Mill side NDE ignition permit available.
Mill side NDE start order existing.
Girth Gear Seal air Fan ON.
Pre light up purge complete on side NDE / DE and Steam inerting completed.
Mill outlet gates on side NDE are closed if any one or more conditions listed below
exists :

Mill side -NDE stop order .AND. mill side-DE no stop order present.
Mill stop order for > 10 min.
Any mill trip conditions described earlier present.
Loss of Elevation 24V DC power.
Mill ignition energy not available.
Primary air trip under loss of any FD/ PA fan ( Applicable for C, D, E& F only)

14.7

PURGE AIR DAMPERS SIDE-NDE & SIDE-DE :

SIDE NDE:
Purge air dampers are opened on two occasions:

When pre light up purge command is present (Mill start order side NDE)
.AND.
Mill outlet gates are closed (side NDE)

When post light up purge command is present

22 of 22

GO TO INDEX

0361 PARLI VOL D1T04-140

Mill stop order (side NDE) is present


.AND.
Support ignition (side NDE) is available
.AND.
Mill outlet gates are closed (side NDE)
.AND.
Mill release available
Mill trip not present .
Purge air dampers on side-NDE are closed if any of the following condition exist.
60sec. after the purge air dampers opening for pre light up purge.
.OR.
10 min. after the purge air dampers opening for post light up purge.
.OR.
Mill. Trip.
SIDE DE:
Purge air dampers of DE side are opened and closed during DE side Start order
and Stop order as explained for NDE side.
14.8

AUX. MOTOR :

Aux. motor is provided for Barring and Inching the Mill.


14.8.1 BARRING :
This allows the mill to rotate at a slow speed for some time when, the mill is stopped
with coal inside, to prevent coal gasification, burning or formation of a thick layer on
the surface.
When the mill is stopped for a very long duration in order to make sure that all the
parts are lubricated.
The aux. motor can be started from the CRT / Console insert for the purpose of
barring if all the following conditions are present :
Start PB depressed .OR. Both sides of the mill stop order
Mill lubrication OK.
Electromagnetic brake in locked position.
Main Motor off for > 10 secs.
Any B&S pump ON and pressure not low
Jaw clutch engaged.
The aux. motor stops if any of the following conditions exists :

Local control selected.


23 of 23

GO TO INDEX

0361 PARLI VOL D1T04-141

Mill start up order.


Main motor on.
Mill lubrication not OK.
Aux. motor shutdown command
Electromagnetic brake unlocked position.
Auxiliary motor is ON for more than 5 secs and Jaw clutch is not in engaged
position.
14.8.2 INCHING :
Inching operation slowly rotates the mill until it reaches a given position (e.g.
inspection door).Inching can be performed only locally, when all the following
conditions exist :
Mill lubrication OK.
Any B&S pump ON & discharge pressure O.K ( NDE/DE)
Main motor off.
Electromagnetic brake unlocked position.
Local control selected
Jaw clutch engaged
Inching can be performed by continuously / repeatedly pressing the local inching push
button.
When the inching push button is depressed, the electromagnetic brake coil will be
energized and brake is unlocked. Aux. motor will rotate and trips one second after the
brake is locked.
When the inching push button is released, the electromagnetic brake coil is deenergized and the brake is locked. Due to the braking action, mill is held in the
required position.
15.0

RAW COAL FEEDER AND ASSOCIATED GATES CONTROL :

Each mill is provided with two feeders, one for each side. The feeder on side-NDE &
side-DE are started when respective feeder start PB is pressed or through mill start
sequence when all the following conditions are present:

Mill release available.


Mill outlet temperature on side NDE OK.
Mill outlet gates on side NDE open.
Bunker O/L gate open and Feeder inlet gate open.
Mill start order side-NDE
Step-4 in mill start-up sequence completed

The feeder is stopped if any of the conditions listed below exists:

Respective feeder stop PB is pressed

24 of 24

GO TO INDEX

0361 PARLI VOL D1T04-142

Feeder stop command from mill stop sequence.


MFT
Feeder ON for >20 sec. and Feeder outlet gate not opened.
Feeder ON and No coal flow for >100 sec.
Mill main motor off.
Mill O/L gates closed (side-NDE)
Loss of 24 V DC in mill section
15.1 FEEDER OUTLET ISOLATION GATES
Feeder outlet gates are opened automatically during start order- prelightup PC pipe
purging and steam inerting of mill / classifier completed and PA General shut off
Gate opened (.OR.) automatically opens when the respective feeder is on and is
closed if feeder is off or feeder trip command is existing.
16.0

COAL ELEVATION / TUBE MILL START-UP

Coal elevation connected to either side of the mill can be started first.
16.1

STARTING OF TUBE MILL SIDE-NDE WHEN SIDE-DE NOT


SERVICE

IN

Mill release available.


PA permit available
Coal burners main shut off Gates open.
Purge air shut off damper open.

If all the above conditions are existing, when elevation start PB is pressed, the
elevation is brought into service in the following manner in 5 steps automatically.
STEP-1:

Checking that the following conditions are present.

PA General shut off gate closed.


PA bypass control dampers closed (side NDE & DE)
PA to mill control dampers closed (side NDE & DE)
Purge air dampers closed. (side NDE & DE)
Feeder outlet gate closed (side NDE & DE)
Mill outlet gates closed (side NDE & DE)
Start order (side NDE / DE)
Auxiliary motor is OFF.

STEP-2.
described
way:

PC pipe purging is done on the selected side if the conditions


under " purge air dampers" are fulfilled. Purging is done in the following

Initiate purge air dampers of side-NDE / side-DE open command.


25 of 25

GO TO INDEX

0361 PARLI VOL D1T04-143

If purge air dampers are opened and mill outlet gates are closed, a 60 sec. purge
timer is started.
At the end of 60 sec. purging time, the following will take place.
After PC pipes purging Mill and Classifiers are inerted with steam for 240 sec.
During which period upper & lower ball feeding gates are commanded to open,
and closing of steam inerting valves after 240 sec.( This is done for the first start or
prior to starting of Mill Main Motor). Opening of upper and lower ball loading gates
during steam inerting period and closing the same after the closure of inert steam
main valve.
Starting of Girth Gear Seal Air Fan
Opening of NDE side Mill Outlet Gates
Starting of any one Trunnion Seal Air Fan
STEP-3.
Mill main motor starting, if the condition described earlier under " Mill main motor"
are present and Mill Auxiliary Motor is stopped before starting of main motor.
Establishing Girth gear greasing system when the Mill Main Motor is ON.
STEP-4.

PA General shut off gate opening


Opening of Feeder outlet gate of side NDE
Hot and Cold Air Dampers of NDE side are released to AUTO.
By pass and Air To Mill control dampers of side NDE are released to AUTO.

STEP-5.
If the mill outlet temperature is correct, the feeder on the selected side is
started (If the interlocks as described earlier are satisfied).
As soon as the feeder is ON. a command feeder set point to filling value is given
to Auto controls for rapid filling of the mill. 30 sec. later if the coal level in the mill is
representative and Mill DP value is more than adequate, the feeder is released to
Auto operation.
NOTE5 :
As a general rule, to give order to any step the completion of the previous steps must
be fulfilled and the start order must exist.
NOTE6 :
If the feeder trips after an elevation start-up it can be restarted by depressing the
feeder start PB starting of mill side-DE is similar to mill side-NDE when the other
side is not in operation.

26 of 26

GO TO INDEX

0361 PARLI VOL D1T04-144

16.1.3 STARTING OF MILL SIDE-NDE WHEN MILL SIDE-DE IS IN SERVICE


This can be done if the mill outlet gates of side-NDE are closed and mill side_NDE
is selected on manual in three steps as detailed below.
STEP 1& 3.

Bypassed

STEP 2.
PC Pipe purging of side NDE .
Opening of Mill Outlet Gates of side NDE (In step 2 other operations are already
completed during starting of Mill Main Motor)
STEP 4.
Opening of side NDE Feeder outlet gates .
Hot and Cold Air Dampers of NDE side are released to AUTO.
By pass and Air To Mill control dampers of side NDE are released to AUTO.
STEP 5.
If the Mill outlet Temperature is correct the Feeder on side NDE is started as
mentioned earlier.
Starting of mill side-DE when mill side-NDE is in service is typical.
17.0

COAL ELEVATION / TUBE MILL SHUT DOWN:

17.1

SHUTDOWN OF MILL SIDE-NDE WHEN SIDE-DE IS IN SERVICE

If elevation stop P.B is depressed the following will occur:

Side-NDE feeder gets stop command and the feeder speed control is set to
manual mode.
Feeder outlet gate on side-NDE closes.
Mill outlet gates on side-NDE closes.
PA to mill & bypass air control dampers closes.
PC pipes purge air dampers on side-NDE opens, provided ignition energy is
available.

27 of 27

GO TO INDEX

0361 PARLI VOL D1T04-145

10 minutes after PC pipes purge air dampers are which where opened purging,
are closed.
Shutdown sequence of side-DE when side-NDE is in service is similar to
shutdown sequence of side-NDE when side-DE is in service.

17.2

SHUTDOWN OF MILL SIDE-NDE WHEN SIDE-DE IS NOT IN SERVICE

When elevation stop PB is depressed the following will take place:


Instantaneously:
Feeder on side-NDE will stop and feeder speed control is set to manual mode.
Raw coal gate on side-NDE closes.
After 10 minutes:
PA to mill bypass control & PA to mill control damper closes.
PC outlet gates on side-NDE closes.
PA general inlet shut off gate closes.
Mill main motor is stopped.
Aux. motor is started.
PC pipes purging on side-NDE starts i.e. Purge air damper on side-NDE open
provided ignition energy is available.
When the Mill main motor is stopped either under shutdown order or under Mill trip
order, a command is initiated for steam inerting of mill and classifiers, for a duration
of 4 minutes provided both NDE / DE side mill outlet gates are closed. During steam
inerting period the upper and lower ball feeding gates are opened. After the expiry
of the inerting period, steam inerting valves, ball feeding gates are commanded to
close.
After 20 minutes:
Purge air dampers on side-NDE is closed.
NOTE7 :
If the mill trips PC pipes purging is not done. Shutdown of mill side-DE when mill
side-NDE is not in service is typical.
18.0 OIL ELEVATION SHUTDOWN
The oil elevation can be shut down in either "pair" mode or "elevation" mode
manually. When all feeders are off .AND. associated Pulverizer of the oil elevation is
in Manual mode then "pair" mode is selected. If either feeder associated with the
oil elevation is proven "on" the elevation mode is selected.

28 of 28

GO TO INDEX

0361 PARLI VOL D1T04-146

19.0 PAIR MODE SHUTDOWN


The description below is given for Heavy Oil elevation. For Light Oil
elevation (applicable for AB) the description is similar as below, except that the
atomising medium being air and the respective atomising air valve is opened/closed
in place of atomising steam valve.

Heavy oil elevation shut down (Elevation AB ,CD & EF)


The Heavy Oil Elevation can be removed from service on a pair basis if
adjacent Raw Coal Feeders are not in service. Depressing the associated elevation
PAIR STOP push button (for corners 1 & 3 or for corners 2 & 4) will initiate a 375
seconds stop time to shut down and scavenge the associated pair of Heavy Oil
guns as follows.
a) A stop command is issued to oil corner 1(when corner 1 & 3 have been
stopped) and to oil corner 2 (when corner 2 & 4 have been stopped )
b) 15 secs. later, a stop command is issued to oil corner 3 or 4 depending on
which pair stop command has been initiated.

When an individual Heavy Oil gun that in service receives a stop command the
following will occur.

A scavenge command for that corner is initiated and the Heavy Oil Nozzle valve
closes. The atomising steam valve remains open.

When Heavy Oil Nozzle valve is proven fully closed and the atomising steam
valve has remained open , the scavenge valve opens.

When scavenge valve lift off from close position, HEA Rod is advanced and
sparks for 15 secs.

When the scavenge valve is proven fully open, a 5 minute scavenge period is
started.

At the end of the 5 minute scavenge period, the atomising


scavenge valves are closed.

steam and the

Six minutes after both PAIR STOP PUSH BUTTONS depressed, a back up
trip signal is established .This initiates a close signal to all of the Heavy Oil Nozzle

29 of 29

GO TO INDEX

0361 PARLI VOL D1T04-147

valves , all of the atomising steam valves and all of scavenge valves at the
elevation to ensure that they are closed.
After both pair stop time is expired an unsuccessful elevation shut down
alarm is announced if any LO/HO Nozzle valve is not closed .OR. Any HEA rod not
retracted.
A Heavy Oil gun that is in service may also be scavenged individually by
placing its local maintenance control switch to the scavenge position. The Heavy Oil
gun will be shut down, scavenged and retracted as described above. The individual
Heavy Oil
gun can only be restarted by initiating another pair start sequence from
the console.
20.0 BOILER TRIP
A BOILER TRIP command stops all fuel inputs by tripping all the pulverizers,
all the feeders and all oil guns, closing the Heavy oil trip valve and closing the light oil
trip valve. A boiler trip command is initiated by any one of the following conditions
being present.

Less than fire ball and loss of A.C. at any oil elevation in service.
Drum water level very low for more than 5 seconds.
Drum water level very high for more than 10 seconds.
Both FD Fans off
Both ID Fans off
Unit air flow is less than 30%
Furnace pressure very low
Furnace pressure very high
Loss of all fuel trip (See the NOTE 11 )
Unit flame failure trip (See the NOTE 12 )
Both emergency trip P.B. pressed (Operator initiated boiler trip)
Spare trip
Loss of reheater protection
Loss of 220V DC for more than 2 sec.

GO TO INDEX

NOTE1 1 :
The loss of fuel trip circuit becomes armed once any one nozzle valves lifts off
from closed position in any elevation.
Once the trip circuit is armed loss of fuel trip will occur if,
All feeders are off
.AND.
HO trip valve is not open

30 of 30

0361 PARLI VOL D1T04-148

.OR.
Elev. AB Back up trip .OR. All HO nozzle valves closed
.AND.
Elev.CD Back up trip .OR. All HO nozzle valves closed
.AND.
Elev.EF Back up trip .OR. All HO nozzle valves closed
.AND.
LO trip valve not open .OR. Elev. AB All LO nozzle valves closed
During light up and until any main fuel (coal) is in service at a fire condition, the
optical flame scanners do not take part in the overall flame failure protection
system.
A fire ball condition is established for coal firing when either or both the adjacent
feeders are proven .AND. 2 out of 4 fireball scanners show flame.
An elevation Voting for "No Flame" condition is as described below for the
respective coal and oil elevations.
ELEVATION A
Elev.A mill outlet gates not closed .
.OR.
Elevation AB 3 out of 4 Fireball scanners show no flame .AND. HO/LO 2 out of 4
nozzle valves not open .
.OR.
Elevation AB started and loss of power.
ELEVATION B
Elev.B mill outlet gates not closed .
.OR.
Elevation AB 3 out of 4 Fireball scanners show no flame .AND. HO/LO 2 out of 4
nozzle valves not open .
.OR.
Elevation AB started and loss of power.
.AND.
Elevation BC 3 out of 4 fire ball scanners show no Flame

GO TO INDEX

ELEVATION C
Elev.C mill outlet gates not closed .
.OR.

31 of 31

0361 PARLI VOL D1T04-149

Elevation CD 3 out of 4 Fireball scanner show no flame .AND. HO 2 out of 4 nozzle


valves not open .
.OR.
Elevation CD started and loss of power.
.AND.
Elevation BC 3 out of 4 fire ball scanners show no flame

ELEVATION D
Elev.D mill outlet gates not closed .
.OR.
Elevation CD 3 out of 4 Fireball scanners show no flame .AND. HO 2 out of 4 nozzle
valves not open .
.OR.
Elevation CD started and loss of power.
.AND.
Elevation DE 3 out of 4 fire ball scanners show no flame

ELEVATION E
Elev.E mill outlet gates not closed .
.OR.
Elevation EF 3 out of 4 Fireball scanners show no flame .AND. HO/LO 2 out of 4
nozzle valves not open .
.OR.
Elevation EF started and loss of power.
.AND.
Elevation DE 3 out of 4 fire ball scanners show no flame

ELEVATION F

GO TO INDEX

Elev.F mill outlet gates not closed .


.OR.
Elevation EF 3 out of 4 Fireball scanners show no flame .AND. HO 2 out of 4 nozzle
valves not open .
.OR.
Elevation EF started and loss of power.
NOTE12:
UNIT FLAME FAILURE

32 of 32

0361 PARLI VOL D1T04-150

All elevation voting for " No Flame" as described above will cause a unit trip on
Flame Failure, provided the flame failure circuit is armed. ( The flame failure circuit is
armed when any feeder is proven.
20.1

FIRST OUT TRIP SYSTEM

First Out Trip System provided allows the operator to determine the cause of a
boiler trip by observing the indication lamps located on the Unit Console insert under
First Cause Of Trip.
When an event that causes occurrence of boiler trip, the indicating lamps
associated with the first trip command, responsible for the boiler trip is illuminated
and the Cause Of Trip memory is set, while successive trip commands to the other
indications are blocked.
When the event that caused the boiler trip is corrected & boiler purging is completed
the Cause Of Trip memory is reset.
This indicates that a No Boiler Trip Command is established. The memories
are reset automatically after a successful five minute furnace purge cycle has
been completed. The FIRST CAUSE OF TRIP light that caused the boiler trip will go
off.

20.2

POST PURGE EXCURSION PROTECTION

A post purge excursion protection circuit has been designed in


Safeguard Supervisory System. It operates as described below:
When all
started.

the

Furnace

the following conditions are satisfied, a five minute counting period is

Heavy oil trip valve closed.

All elevation all HO nozzle valves closed.

All Tube Mills off.

Air flow > 30 % MCR.

All scanners show no flame.

All coal outlet gates closed.

All aux. air dampers modulating

All PA fans off.

LO trip valve closed

GO TO INDEX

33 of 33

0361 PARLI VOL D1T04-151

El. AB all nozzle valve closed

After five minute counting period expires, if very high or very low furnace pressure
exists, the Post Purge Fan Trip memory is set and post purge fan trip command is
issued (for tripping FD& ID fans). When any HO valve is open, this is reset.
20.3

FEED FORWARD COMMAND TO FURNACE DRAFT CONTROL

A 30 sec. Feed Forward command to Furnace draft control is given if either of the
conditions listed below exists.

Loss of unit 24V DC (critical) power when the boiler is on (i.e. loss of all fuel trip
arming present).
Occurrence of Master Fuel Trip, when the boiler is working.

20.4

FURNACE PRESSURE RECORDER SPEED CHANGE

This contact has been provided to switch the Furnace Pressure Recorder to the
alternate speed (if Dual speed recorder is provided) under the conditions mentioned
below, to observe Furnace Draft fluctuations.
1. MFT
2. Loss of unit 24V DC (critical) power
3. Furnace Pressure High or Low
For conditions 1 & 3 mentioned above, the Recorder speed is reverted back to
original value after 30 sec. For condition 3, the Recorder is set to original value 30
sec. after condition 3 is removed.
21.0

SCANNER AIR FAN CONTROL

Two scanner air fans (1 AC main + 1 DC stand-by)are provided for the unit.
Either scanner air fan can be placed in service in the following manner.

GO TO INDEX

Start command to any of the scanner fan can be given from the CRT / Unit Console
insert.
A start command is also established automatically for scanner air fan A (AC
operated), if the scanner duct to furnace diff. pressure is low for more than 5
sec. If this low condition exists for more than 10 sec., the same is annunciated as
Scanner Duct To Furnace DP Low more than 10 sec. signal.

A start command is also established for the stand -by scanner air fan (i.e. DC)
if the first fan fails to start within 5 sec. after receiving the start command .AND.
auto start for main fan is not available.

34 of 34

0361 PARLI VOL D1T04-152

Loss of unit 24 V DC establishes start command for both scanner air fans.

If auto start command is available for both fans for more than 5 sec. then also,
stop command is issued for both the fans.

The scanner air fan can be stopped by momentarily depressing the STOP PB ,
provided the scanner duct of furnace diff. pressure is not low.
The status of Scanner air Fans is displayed on the CRT / Console insert.
The scanner emergency damper is opened when both FD fans are off .OR. Unit
24VDC power is lost. If both these conditions are not present, the scanner emergency
damper will be closed.

22.0

SECONDARY AIR DAMPER CONTROL (SADC)

For a complete description of the Secondary Air Damper Control refer the
write up on SADC system. Operation of the secondary air damper control as
effected by the FSSS is described here.
22.1

AUXILIARY AIR DAMPER CONTROL

All elevations of the aux. air dampers will be automatically switched to Manual
control and then commanded to open 100%, if any one of the following conditions
exist.

Both FD fans are off.


Both ID fans are off.
Master fuel trip exists for more than 2 sec.
Loss of Unit 24 V DC .

When the aux. air control is placed in the Auto mode of operation , the aux. air
dampers modulate to control wind box to furnace diff. pressure at a predetermined
set point.

GO TO INDEX

During the furnace purge cycle, all aux. air dampers modulate to maintain wind
box to furnace diff. pressure at a predetermined set point.
When the unit load exceeds 30% of MCR, the following events occurs:
The wind box to furnace diff. set point is gradually increased as the unit load is
increased. Conversely, the diff. pressure set point is gradually decreased as unit

35 of 35

0361 PARLI VOL D1T04-153

load is decreased. The rate of increase (or decrease) is controlled by the aux.
damper controller.
When the Unit Load is increased above 30% MCR, the Aux. air dampers on elev. AB,
BC, CD, DE, EF & FF are closed in a timed sequence (10 sec. interval) provided
the associated coal elevations are not in service and the associated oil elevations
are not in service. The auxiliary air dampers are closed, starting from the top
elevation, progressing towards the lowest elevation.
When the unit load is reduced below 30% of MCR, the following events occur:

The wind-box to furnace differential pressure set point reverts to its original
value.
The auxiliary air dampers associated with the coal and HO elevations not in
service are opened in a timed sequence (10 sec. interval) starting at the lowest
elevation, progressing towards the top.

When a HO Elevation is started (i.e. when the associated elevation back-up trip is
removed) the associated auxiliary air dampers in that elevation are set to preset
position for HO firing.
When the Post Trip Purge Time Expired command is established and both
FD / ID fans are not off and a Master fuel trip command doesnt exist, then a 35 sec.
counting period is started. After it expires, the Open All Auxiliary Air Dampers
command is removed from memory.
22.2

FUEL (coal) AIR DAMPERS CONTROL

All elevations of fuel air dampers are commanded to open 100% when any one of
the following conditions exist.

Both F.D. fans are off.


Both I.D. fans are off.
Master fuel trip exists for more than 2 sec.
Loss of Unit 24V DC.

GO TO INDEX

When a coal elevation is in service, the associated fuel air dampers modulate as a
function of mill air flow as indicated by the associated coal elevation MODULATING
light coming on.
When the coal elevation is shut down, the associated fuel air dampers are closed, as
indicated by a CLOSED light .
When the Post Trip Purge Time Expired command is established and both
F.D. and I.D. fans are not off and a Master fuel trip command doesnt exist, the

36 of 36

0361 PARLI VOL D1T04-154

open upper fuel air dampers (elevation F, E & D) command is removed from
memory. Thirty seconds later, the open lower fuel air dampers (elevation C, B &
A ) command is removed from memory.

GO TO INDEX

37 of 37

0361 PARLI VOL D1T04-155

0361 PARLI VOL D1T04-156

GO TO INDEX

0361 PARLI VOL D1T04-157

GO TO INDEX

0361 PARLI VOL D1T04-158

GO TO INDEX

0361 PARLI VOL D1T04-159

GO TO INDEX

0361 PARLI VOL D1T04-160

GO TO INDEX

0361 PARLI VOL D1T04-161

GO TO INDEX

0361 PARLI VOL D1T04-162

GO TO INDEX

0361 PARLI VOL D1T04-163

GO TO INDEX

0361 PARLI VOL D1T04-164

GO TO INDEX

0361 PARLI VOL D1T04-165

GO TO INDEX

0361 PARLI VOL D1T04-166

GO TO INDEX

0361 PARLI VOL D1T04-167

GO TO INDEX

0361 PARLI VOL D1T04-168

GO TO INDEX

0361 PARLI VOL D1T04-169

GO TO INDEX

0361 PARLI VOL D1T04-170

GO TO INDEX

0361 PARLI VOL D1T04-171

GO TO INDEX

0361 PARLI VOL D1T04-172

GO TO INDEX

0361 PARLI VOL D1T04-173

GO TO INDEX

0361 PARLI VOL D1T04-174

GO TO INDEX

0361 PARLI VOL D1T04-175

GO TO INDEX

0361 PARLI VOL D1T04-176

GO TO INDEX

0361 PARLI VOL D1T04-177

GO TO INDEX

0361 PARLI VOL D1T04-178

GO TO INDEX

0361 PARLI VOL D1T04-179

GO TO INDEX

0361 PARLI VOL D1T04-180

GO TO INDEX

0361 PARLI VOL D1T04-181

GO TO INDEX

0361 PARLI VOL D1T04-182

GO TO INDEX

0361 PARLI VOL D1T04-183

GO TO INDEX

0361 PARLI VOL D1T04-184

GO TO INDEX

0361 PARLI VOL D1T04-185

GO TO INDEX

0361 PARLI VOL D1T04-186

GO TO INDEX

0361 PARLI VOL D1T04-187

GO TO INDEX

0361 PARLI VOL D1T04-188

GO TO INDEX

0361 PARLI VOL D1T04-189

GO TO INDEX

0361 PARLI VOL D1T04-190

GO TO INDEX

0361 PARLI VOL D1T04-191

GO TO INDEX

0361 PARLI VOL D1T04-192

GO TO INDEX

0361 PARLI VOL D1T04-193

GO TO INDEX

0361 PARLI VOL D1T04-194

GO TO INDEX

0361 PARLI VOL D1T04-195

GO TO INDEX

0361 PARLI VOL D1T04-196

GO TO INDEX

0361 PARLI VOL D1T04-197

GO TO INDEX

0361 PARLI VOL D1T04-198

GO TO INDEX

0361 PARLI VOL D1T04-199

GO TO INDEX

0361 PARLI VOL D1T04-200

GO TO INDEX

0361 PARLI VOL D1T04-201

GO TO INDEX

0361 PARLI VOL D1T04-202

GO TO INDEX

0361 PARLI VOL D1T04-203

GO TO INDEX

0361 PARLI VOL D1T04-204

GO TO INDEX

0361 PARLI VOL D1T04-205

GO TO INDEX

0361 PARLI VOL D1T04-206

GO TO INDEX

0361 PARLI VOL D1T04-207

GO TO INDEX

0361 PARLI VOL D1T04-208

GO TO INDEX

0361 PARLI VOL D1T04-209

GO TO INDEX

0361 PARLI VOL D1T04-210

GO TO INDEX

GO TO INDEX

0361 PARLI VOL D1T04-211

0361 PARLI VOL D1T04-212

GO TO INDEX

0361 PARLI VOL D1T04-213

GO TO INDEX

0361 PARLI VOL D1T04-214

GO TO INDEX

0361 PARLI VOL D1T04-215

GO TO INDEX

0361 PARLI VOL D1T04-216

GO TO INDEX

0361 PARLI VOL D1T04-217

GO TO INDEX

0361 PARLI VOL D1T04-218

GO TO INDEX

0361 PARLI VOL D1T04-219

GO TO INDEX

0361 PARLI VOL D1T04-220

GO TO INDEX

0361 PARLI VOL D1T04-221

GO TO INDEX

0361 PARLI VOL D1T04-222

GO TO INDEX

0361 PARLI VOL D1T04-223

GO TO INDEX

0361 PARLI VOL D1T04-224

GO TO INDEX

0361 PARLI VOL D1T04-225

GO TO INDEX

0361 PARLI VOL D1T04-226

GO TO INDEX

0361 PARLI VOL D1T04-227

GO TO INDEX

0361 PARLI VOL D1T04-228

GO TO INDEX

0361 PARLI VOL D1T04-229

GO TO INDEX

0361 PARLI VOL D1T04-230

GO TO INDEX

0361 PARLI VOL D1T04-231

GO TO INDEX

0361 PARLI VOL D1T04-232

GO TO INDEX

0361 PARLI VOL D1T04-233

GO TO INDEX

0361 PARLI VOL D1T04-234

GO TO INDEX

0361 PARLI VOL D1T04-235

GO TO INDEX

0361 PARLI VOL D1T04-236

GO TO INDEX

0361 PARLI VOL D1T04-237

GO TO INDEX

0361 PARLI VOL D1T04-238

GO TO INDEX

0361 PARLI VOL D1T04-239

GO TO INDEX

0361 PARLI VOL D1T04-240

GO TO INDEX

0361 PARLI VOL D1T04-241

GO TO INDEX

0361 PARLI VOL D1T04-242

GO TO INDEX

0361 PARLI VOL D1T04-243

GO TO INDEX

0361 PARLI VOL D1T04-244

GO TO INDEX

0361 PARLI VOL D1T04-245

GO TO INDEX

0361 PARLI VOL D1T04-246

GO TO INDEX

0361 PARLI VOL D1T04-247

GO TO INDEX

TAB - 5
GO TO INDEX

Parli SADC write-up, Rev. 01.

MAHARASHTRA STATE ELECTRICITY BOARD

NEW PARLI THERMAL POWER PROJECT- EXTN.


UNIT - 1, 1 X 250 MW

CUST. NO. 0361

WRITE UP
ON

SECONDARY AIR DAMPER CONTROL SYSTEM

GO TO INDEX
PREPARED
P.L.PRAMILA

CHECKED
S.RAMACHANDRAN

APPROVED
S.RAMACHANDRAN

REVISION

DATE

-sd-

-sd-

-sd-

00
01

20/10/2004
10/01/2005

Page 1 of 1

sadcwrup1

0361 PARLI VOL D1T05-248

Parli SADC write-up.

CONTENTS

1.0

Figures ( Fig. 1 - 4 )

2.0

Introduction.

3.0

Description &Terminology.

4.0

Control philosophy.

5.0

Operation.

GO TO INDEX

Page 2 of 2

sadcwrup1

0361 PARLI VOL D1T05-249

GO TO INDEX

0361 PARLI VOL D1T05-250

0361 PARLI VOL D1T05-251

GO TO INDEX

Parli SADC write-up.

IMPORTANT NOTE

This write up is meant for general guidelines and better understanding of the system.
However, it may be noted that All the logic conditions spelt in English Language
may not be exact equivalent of pictorial representation of logics. It is mandatory that the
operating personal should refer to the respective contract logics.
The various set point values, damper position values and the characteristics shown in
the relevant figures and control schemes are only indicative values for start-up/initial
operations. However, the same have to be adjusted for proper operations as detailed in
the control philosophy (under 4.0)
It must be recognized that no amount of written instruction can replace
intelligent thinking and reasoning on the part of boiler operators, especially
when coping with unforeseen operating conditions. It is operators responsibility
to become thoroughly familiar, not only with immediate steam generating
equipment but also with all pertinent control equipment. Satisfactory
performance and safety depend to a great extent on proper functioning of
controls and auxiliary equipment.

GO TO INDEX

Page 3 of 3

sadcwrup1

0361 PARLI VOL D1T05-252

Parli SADC write-up.

2.0

INTRODUCTION

In tangential firing concept, the furnace itself constitutes the burner. Fuel and air are introduced
into the furnace through four wind box assemblies. Fuel and air nozzles in the corners are
pointed in a line, tangent to an imaginary circle, at the center of the furnace. The result of this
arrangement is a rotative swirling action that is very effective in mixing the burning fuel with
secondary air.
The total combustion air flow supplied in the boiler consists of two part, one, the primary air,
which is used for drying and transporting the coal from the mills through the coal piping into the
furnace and is supplied by the primary air fans and two, the secondary air sent through the four
corners of the wind box and is supplied by the FD fans.
The total secondary air flow is controlled by forced draft fan, in proportion to the fuel being fired.
Total air secondary flow is measured by a flow metering devices called aero-foil meter. The
measured air flow is compared against the fuel flow, with the resultant signal positioning the FD
fan inlet guide. This inlet guide is positioned to maintain the required air flow regardless of and
independent of secondary air damper position.
The secondary air dampers located in wind box apportions the total secondary air between
various elevations. How this air is proportioned, depends on which fuel is being burnt, the
number of elevations in service and the firing rate at each elevation.
The function of Secondary Air Damper Control System (SADC) is to proportion the total
secondary air around the firing elevation as per the criteria spelt above. In fact the SADC
system is a combination of both analog and digital system, as the amount of fuel fired and the
number of firing elevations decide the damper position.
Prior to stepping into control philosophy and damper operation it is essential to distinguish the
different terminology associated with secondary air.
3.0

DESCRIPTIONS AND TERMINOLOGY (Ref. Fig. 1)

In total, each wind box assembly is divided into 13 compartments and 2 over fire air damper (
Upper& Lower) sections. Each compartment is designated either by single or double alphabet
constituting 13 elevations. An elevation designates all the four corner compartments.
There are 6 elevations which houses coal nozzles for firing the main fuel. These are designated
with single English letter A through F. There are 3 elevations which houses oil burner
assembly for firing start up/ stabilizing fuel viz. Oil. These are designated as AB, CD & EF.
Each oil compartment is interposed between two coal compartments

GO TO INDEX

In AB elevation, either HFO or LDO can be fired according to the fuel being selected. In other oil
elevations viz. CD & EF, HFO can be fired.
There are two nos. of over fire air compartment at the top of the windbox. They are designated
as OFA-L ( Lower over fire air ) and OFA-U ( Upper over fire air ) respectively.
The other elevations viz.. BC, DE & FF house only air nozzles to direct air stream into furnace
aiding combustion of fuel.

Page 4 of 4

sadcwrup1

0361 PARLI VOL D1T05-253

Parli SADC write-up.

At the inlet of each compartment there are control dampers. Each damper is operated by a
damper drive unit. All four damper drives in any one elevation receive the same signal from the
secondary air control system.
If secondary air is admitted to a fuel compartment in service, it is referred as fuel air.
Secondary air is admitted to the furnace through air compartments and fuel compartments not
in service, is termed as auxiliary air.
The auxiliary air damper control is separate from the fuel air damper control.
4.0

CONTROL PHILOSOPHY

The auxiliary air damper control system positions the auxiliary air dampers to maintain a wind
box to furnace differential pressure (Ref. Fig 2). The auxiliary air dampers are positioned to
maintain the required wind box to furnace differential pressure according to the boiler load.
The wind box to furnace differential pressure indicated in Fig. 2 is the suggested value to start
with during commissioning. In the initial periods of operation, the flame condition with reference
to ignition stability, ignition point relative to fuel nozzles, overall combustion conditions in the
furnace are to be studied for various wind box to furnace differential pressures and the values
are to be optimised at site (The arrow marks indicated in Fig. 2, represents that the values are
adjustable). Based on this the final curve showing the relationship between the wind box to
furnace differential pressure versus the boiler load is to be decided for the type of coal used.
The fuel air damper control system positions the fuel air damper in proportion to the air through
mill (Ref. Fig. 3). The fuel air damper position as indicated in Fig. 3 is the suggested value to
start with during commissioning. In the initial periods of operation, the flame condition with
reference to ignition stability, ignition point relative to fuel nozzles, overall combustion conditions
in the furnace are to be studied for various fuel air damper positions and the values are to be
optimised at site (The arrow marks indicated in Fig. 3 represents that the values are adjustable).
Based on this the final curve showing the relationship between the fuel air damper positions
versus the air through mill is to be decided, for the type of coal used.
The final setting must not produce hazardous condition either from ignition stability or from
ignition point being too close to fuel nozzles in all possible loads, number of mills in service, etc.
On coal fired boilers, the characteristics of fuel like, Fixed Carbon, Volatile Matter and Ash
composition will determine the optimum wind box to furnace differential pressures and the fuel
air damper positions. Accordingly the optimised settings are to be decided as above for the
coal used.

GO TO INDEX

Later, if the coal quality changes or the coal source itself is changed, it shall be
necessary to once again carryout optimisation studies for the new coal and revised
settings are to be finalised.
This unit is equipped with oil elevation for warm up and stabilisation (designed for 7.5 - 22.5%
MCR). In this case, the oil elevation dampers are positioned to a fixed % opening during oil firing.
When oil is not fired, these dampers are controlled to maintain the wind box to furnace
differential pressure in line with other auxiliary dampers.

5.0

OPERATION

Page 5 of 5

sadcwrup1

0361 PARLI VOL D1T05-254

Parli SADC write-up.

Auxillary air dampers :


All elevations of the aux. air dampers will be automatically switched to Manual control and then
commanded to open 100%, if any one of the following conditions exists.
Both FD fans are off.
Both ID fans are off.
Master fuel trip exists for more than 2 sec.
Loss of unit critical power (+24V DC).
Also, the auxiliary air control loop is tripped to manual if any of the following conditions exists.
DP transmitter deviation high.
Failure of selected DP transmitter
Furnace to Windbox DP very high (> 240mm WCL).
Priority interlocks for selection of auxiliary air control loop to auto is that none of the Trip to
manual conditions should be present.
When the aux. air control is placed in the Auto mode of operation, the aux. air dampers
modulate to control windbox to furnace diff. pressure at a predetermined set point as per the
optimised values for different loads as finalised above during initial operation of the units.
During the furnace purge period and initial operation of the unit upto 30% MCR load, all
elevations of auxiliary air dampers (AB, BC, CD, DE, EF, & FF ) modulate to maintain a
predetermined set point (approximately 40 mm of water column) differential pressure between
furnace and wind box. As the unit loading increases above 30% MCR, the set point ramps up
automatically and at predetermined break point the slope of the ramp changes. The wind box to
furnace differential pressure set point is gradually increased as the unit load is increased.
Conversely, the differential pressure set point is gradually decreased as unit load is decreased.
The rate of increase (or decrease) is controlled by the aux. damper controller.
Above 30% MCR boiler load, the auxiliary air elevation associated with the main fuel elevation in
service modulate to maintain the varying DP. Those not associated with any elevation in
service are closed from top to bottom. The closing signal comes from FSSS.
When the Unit Load is increased above 30% MCR, the Aux. air dampers on elev. AB, BC, CD,
DE, EF & FF are closed in a timed sequence (10 sec. interval) provided the associated
coal elevations are not in service and the associated oil elevations are not in service. The
auxiliary air dampers are closed, starting from the top elevation, progressing towards the
lowest elevation.

GO TO INDEX

When the unit load is reduced below 30% MCR, the following events occur:
The wind-box to furnace differential pressure set point reverts to its original value.
The auxiliary air dampers associated with the coal and HFO elevations not in service
are opened in a timed sequence (10 sec. interval) starting at the lowest elevation,
progressing towards the top.
When the Post Trip Purge Time Expired command is established and Both FD / ID
fans are not off and a Master fuel trip command doesnt exist, then a 35 sec. counting
period is started. After it expires, the Open All Auxiliary Air Dampers command is
removed from memory.

Page 6 of 6

sadcwrup1

0361 PARLI VOL D1T05-255

Parli SADC write-up.

Fuel air dampers :


When an elevation of main fuel is started, the associated fuel (coal ) air dampers open and
modulate as a function of Air through mill (Ref. Fig. 3). A fuel (coal) elevation is selected to be
closed when the associated feeder is tripped.
The auxiliary elevation dampers act as fuel (oil) air dampers when oil firing is taking place and is
open to a preset position. The fuel (oil) elevation dampers are selected to be closed if there is a
back-up trip in that elevation and adjacent mills are off and No Boiler Trip signal is present.
When a HFO Elevation is started (i.e. when the associated elevation back-up trip is
removed) the associated auxiliary air dampers in that elevation are set to preset position for
HFO firing. All elevations of fuel air dampers are commanded to open 100% when any one of
the following conditions exist.

Both FD fans are off.


Both ID fans are off.
Master fuel trip exists for more than 2 sec.
Loss of Unit Critical Power (+24V DC).

When a coal elevation is in service, the associated fuel air dampers modulate as a function of
air through mill as indicated by the associated coal elevation MODULATING light coming on.
When the coal elevation is shut down, the associated fuel air dampers are closed, as indicated
by a CLOSED light.
When the Post Trip Purge Time Expired command is established and Both FD and
ID fans are not off and a Master fuel trip command doesnt exist, the Open upper fuel
air dampers (elevation F, E, D & both OFA ) command is removed from memory. Thirty
seconds later, the Open lower fuel air dampers ( elevation C, B & A ) command is
removed from memory.
Fuel (coal) air damper control loop will be tripped to manual if any of the following conditions
exist.
Air through mill signal failed.
Close fuel air damper command (From FSSS)
Priority interlocks for selection of fuel air control loop to auto is that none of the Trip to manual
conditions should be present.

GO TO INDEX

Whenever a coal elevation is started, the associated fuel air damper control loop is
automatically selected to auto mode provided no trip to manual condition is present.
Over fire air dampers :
The over fire air dampers are positioned as a function of the boiler load.
The lower OFA dampers start opening at 50 % boiler load and are fully open when the boiler
load reaches 75 %. The upper OFA dampers start opening at 75 % boiler load and are
fully open when the boiler load reaches 100 % (Ref. Fig. 4).

Page 7 of 7

sadcwrup1

0361 PARLI VOL D1T05-256

Parli SADC write-up.

The two elevations of the over fire air dampers will be automatically switched to Manual
control and then commanded to open 100%, if any one of the following conditions exist. (Ref.
Fig. 4)
Both FD fans are off.
Both ID fans are off.
Master fuel trip exists for more than 2 sec.
Loss of unit critical power (+24V DC) .
All open and close commands are generated from FSSS.

GO TO INDEX

Page 8 of 8

sadcwrup1

0361 PARLI VOL D1T05-257

0361 PARLI VOL D1T05-258

GO TO INDEX

0361 PARLI VOL D1T05-259

GO TO INDEX

0361 PARLI VOL D1T05-260

GO TO INDEX

0361 PARLI VOL D1T05-261

GO TO INDEX

0361 PARLI VOL D1T05-262

GO TO INDEX

0361 PARLI VOL D1T05-263

GO TO INDEX

0361 PARLI VOL D1T05-264

GO TO INDEX

0361 PARLI VOL D1T05-265

GO TO INDEX

0361 PARLI VOL D1T05-266

GO TO INDEX

TAB - 6

GO TO INDEX

GO TO INDEX

0361 PARLI VOL D1T06-267

GO TO INDEX

0361 PARLI VOL D1T06-268

GO TO INDEX

0361 PARLI VOL D1T06-269

GO TO INDEX

0361 PARLI VOL D1T06-270

GO TO INDEX

0361 PARLI VOL D1T06-271

GO TO INDEX

0361 PARLI VOL D1T06-272

GO TO INDEX

0361 PARLI VOL D1T06-273

GO TO INDEX

0361 PARLI VOL D1T06-274

0361 PARLI VOL D1T06-275

GO TO INDEX

0361 PARLI VOL D1T06-276

GO TO INDEX

0361 PARLI VOL D1T06-277

GO TO INDEX

0361 PARLI VOL D1T06-278

GO TO INDEX

0361 PARLI VOL D1T06-279

GO TO INDEX

0361 PARLI VOL D1T06-280

GO TO INDEX

0361 PARLI VOL D1T06-281

GO TO INDEX

0361 PARLI VOL D1T06-282

GO TO INDEX

0361 PARLI VOL D1T06-283

GO TO INDEX

0361 PARLI VOL D1T06-284

GO TO INDEX

0361 PARLI VOL D1T06-285

GO TO INDEX

0361 PARLI VOL D1T06-286

GO TO INDEX

0361 PARLI VOL D1T06-287

GO TO INDEX

0361 PARLI VOL D1T06-288

GO TO INDEX

0361 PARLI VOL D1T06-289

GO TO INDEX

0361 PARLI VOL D1T06-290

GO TO INDEX

0361 PARLI VOL D1T06-291

GO TO INDEX

0361 PARLI VOL D1T06-292

GO TO INDEX

0361 PARLI VOL D1T06-293

GO TO INDEX

TP-DG-1-96-188-02700
CORPORATE DRG ID

GO TO INDEX
TP-DG-1-96-188-02700
CORPORATE DRG ID

0361 PARLI VOL D1T06-295

GO TO INDEX

0361 PARLI VOL D1T06-296

GO TO INDEX

0361 PARLI VOL D1T06-297

GO TO INDEX

0361 PARLI VOL D1T06-298

GO TO INDEX

0361 PARLI VOL D1T06-299

GO TO INDEX

0361 PARLI VOL D1T06-300

GO TO INDEX

0361 PARLI VOL D1T06-301

GO TO INDEX

0361 PARLI VOL D1T06-302

GO TO INDEX

0361 PARLI VOL D1T06-303

GO TO INDEX

0361 PARLI VOL D1T06-304

GO TO INDEX

TAB - 7

GO TO INDEX

GO TO INDEX

0361 PARLI VOL D1T07-305

GO TO INDEX

0361 PARLI VOL D1T07-306

GO TO INDEX
0361 PARLI VOL D1T07-307

GO TO INDEX

0361 PARLI VOL D1T07-308

GO TO INDEX

0361 PARLI VOL D1T07-309

GO TO INDEX

0361 PARLI VOL D1T07-310

GO TO INDEX

0361 PARLI VOL D1T07-311

GO TO INDEX

0361 PARLI VOL D1T07-312

GO TO INDEX

0361 PARLI VOL D1T07-313

GO TO INDEX

0361 PARLI VOL D1T07-314

GO TO INDEX

0361 PARLI VOL D1T07-315

GO TO INDEX

0361 PARLI VOL D1T07-316

GO TO INDEX

0361 PARLI VOL D1T07-317

0361 PARLI VOL D1T07-318

GO TO INDEX

0361 PARLI VOL D1T07-319

GO TO INDEX

0361 PARLI VOL D1T07-320

GO TO INDEX

0361 PARLI VOL D1T07-321

GO TO INDEX

0361 PARLI VOL D1T07-322

GO TO INDEX

0361 PARLI VOL D1T07-323

GO TO INDEX

0361 PARLI VOL D1T07-324

GO TO INDEX

0361 PARLI VOL D1T07-325

GO TO INDEX

0361 PARLI VOL D1T07-326

GO TO INDEX

0361 PARLI VOL D1T07-327

GO TO INDEX

0361 PARLI VOL D1T07-328

GO TO INDEX

0361 PARLI VOL D1T07-329

GO TO INDEX

0361 PARLI VOL D1T07-330

GO TO INDEX

0361 PARLI VOL D1T07-331

GO TO INDEX

0361 PARLI VOL D1T07-332

GO TO INDEX

0361 PARLI VOL D1T07-333

GO TO INDEX

0361 PARLI VOL D1T07-334

GO TO INDEX

0361 PARLI VOL D1T07-335

GO TO INDEX

0361 PARLI VOL D1T07-336

GO TO INDEX

0361 PARLI VOL D1T07-337

GO TO INDEX

0361 PARLI VOL D1T07-338

GO TO INDEX

0361 PARLI VOL D1T07-339

GO TO INDEX

0361 PARLI VOL D1T07-340

GO TO INDEX

0361 PARLI VOL D1T07-341

GO TO INDEX

0361 PARLI VOL D1T07-342

GO TO INDEX

GO TO INDEX
0361 PARLI VOL D1T07-343

GO TO INDEX
0361 PARLI VOL D1T07-344

0361 PARLI VOL D1T07-345

GO TO INDEX

GO TO INDEX
0361 PARLI VOL D1T07-346

0361 PARLI VOL D1T07-347

GO TO INDEX

0361 PARLI VOL D1T07-348

GO TO INDEX

GO TO INDEX

0361 PARLI VOL D1T07-349

GO TO INDEX

0361 PARLI VOL D1T07-350

GO TO INDEX

0361 PARLI VOL D1T07-351

GO TO INDEX
0361 PARLI VOL D1T07-352

GO TO INDEX
0361 PARLI VOL D1T07-353

GO TO INDEX
0361 PARLI VOL D1T07-354

GO TO INDEX
0361 PARLI VOL D1T07-355

0361 PARLI VOL D1T07-356

GO TO INDEX

GO TO INDEX
0361 PARLI VOL D1T07-357

GO TO INDEX
0361 PARLI VOL D1T07-358

GO TO INDEX
0361 PARLI VOL D1T07-359

0361 PARLI VOL D1T07-360

GO TO INDEX

GO TO INDEX
0361 PARLI VOL D1T07-361

GO TO INDEX

0361 PARLI VOL D1T07-362

GO TO INDEX

0361 PARLI VOL D1T07-363

0361 PARLI VOL D1T07-364

GO TO INDEX

0361 PARLI VOL D1T07-365

GO TO INDEX

GO TO INDEX
0361 PARLI VOL D1T07-366

0361 PARLI VOL D1T07-367

GO TO INDEX

GO TO INDEX

0361 PARLI VOL D1T07-368

GO TO INDEX

0361 PARLI VOL D1T07-369

GO TO INDEX

0361 PARLI VOL D1T07-370

GO TO INDEX

0361 PARLI VOL D1T07-371

GO TO INDEX

0361 PARLI VOL D1T07-372

GO TO INDEX

0361 PARLI VOL D1T07-373

GO TO INDEX
0361 PARLI VOL D1T07-374

GO TO INDEX
0361 PARLI VOL D1T07-375

0361 PARLI VOL D1T07-376

GO TO INDEX

GO TO INDEX
0361 PARLI VOL D1T07-377

0361 PARLI VOL D1T07-378

GO TO INDEX

0361 PARLI VOL D1T07-379

GO TO INDEX

GO TO INDEX
0361 PARLI VOL D1T07-380

0361 PARLI VOL D1T07-381

GO TO INDEX

0361 PARLI VOL D1T07-382

GO TO INDEX