Académique Documents
Professionnel Documents
Culture Documents
3MEa,
6MEb,
3MEb1,
6MEc,
6MEd,
96EDC
72Ea,
96Eb
72Eb1,
96Ec
96Ed
96Ea
96Eb1
1 phase
3 phase, 3 wire, balanced
3 phase, 4 wire, balanced
3 phase, 3 wire, unbalanced
3 phase, 4 wire, unbalanced
DC kWh meter
Change voltage
5 V DC
24V DC
230V AC
The instruments are suitable to measure the active energy on 1-phase or 3-phase, 3-wire or 4-wire,
balanced or unbalanced AC networks. These are also suitable to measure the energy on DC
networks (on request).
The kWh meters are accuracy class 1 as per norm IEC 1036. They have a 6-digit
electromechanical counter.
The case and the panel cut-out are according to norm DIN 43700 or for rail mounted (35x7.5mm)
according to DIN EN50022.
Technical data
Voltage input :
Nominal voltage UN AC
Nominal voltage UN DC
Referency range
Operating range
Overload
Maximal overload
Burden
Nominal frequency
Operating range
Referency range
:
:
:
:
:
:
:
:
:
:
Nominal current IN AC
Nominal current IN DC
Operating range
Continous overload
Maximal overload
Power consumption
:
:
:
:
:
:
Accuracy :
Current input :
Display :
Counter
Mains input display
Energy consumption display
:
:
:
:
: 5 V, 24 V DC or 230 V AC
High-voltage test
Environment
Referency temperature
Operating temperature
Storage temperature
Temperature coefficiency
Protection class
:
:
:
:
:
23C 2 C
-10+ 45C
-25+ 70C
0.05 % / K ( 0.1 x IN1.2 x IN; cos = 1)
II. according IEC 348
Case:
DIN EN 50022
Material
Terminals
Case protection
Terminals protection
Size
Weight
Fixing
DIN EN 43700
Material
Terminals
Case protection
Terminals protection
Size
Weight
Fixing
ROLL DOWN
ROLL DOWN
Wiring diagram :
2 - Phase L1
5 - Phase L2
8 - Phase L3
11 - Null N
L1 ( S1 )
1 - Current input
L1 ( S2 )
3 - Current input
L2 ( S1 )
4 - Current input
L2 ( S2 )
6 - Current input
L3 ( S1 )
7 - Current input
L3 ( S2 )
9 - Current input
17 - Input for tariff change 18 - Input for tariff change +
16; 19 - Pulse output
+
15; 20 - Pulse output
Note :
OUT : Pulse output (Relay or opto-coupler)
IN
: Input for tariff change
No input at types 3M, 72
Size :
3M
6M
Safety prescriptions
Keep following instructions to ensure a correct
installation!
Installation must be done by an expert.
Wiring must follow the wiring diagram.
Don't install a faulty instrument.
Control the separate wires and the polarity of the current transformer for right
connection (P1-P2; S1-S2)
5. Maintenance: not necessary
1.
2.
3.
4.
SCALE :
0.1 kWh
10 Wh / imp
pulse output:
LED blinking cycle: 10 Wh / imp
LED count
SW
CT rate
code
code
0
1.
2.
3.
4.
5.
6.
7.
8.
9.
A.
B.
C.
D.
E.
F.
1
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
5
6
7.5
8
10
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
kWh
0.1kWh /
0.1kWh /
CT rate
15
16
20
25
30
36
40
50
60
75
80
100
120
125
150
160
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
UN : 3 x 400V / 230V
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
10 kWh /
10 kWh /
CT rate
1500
1600
2000
2500
3000
3600
4000
5000
6000
7500
8000
10000
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
/ 5A
COUNTER
CYCLE
Time
346 41
324.75
259.80
207.84
173.20
144.33
129.90
103.92
86.60
69.28
64.95
51.96
43.30
41.56
34.64
32.47
sec
sec
sec
sec
sec
sec
sec
sec
sec
sec
sec
sec
sec
sec
sec
sec