Doc. No.

:
02-D-110-A4
REVISION:
P4
PAGE
1 OF
7
__________________________________________________________________

Sigma Aldrich Israel Ltd


New API Production Facility

LUDAN Project No. 134457


FWSTERIL Contract no. 1.BJ.3631A

Mobile CIP System


PG-3801
Data Sheet

02-D-110-A4-P4 PG-3801 CIP System

02-D-110-A4-P4 PG-3801 CIP System

Doc. No.:
02-D-110-A4
REVISION:
P4
PAGE
2 OF
7
_____________________________________________________________________
APPROVAL PAGE

Author:
Approved by:
Approved by:
Approved by:
Approved by:
Approved by:
Approved by:

Name
Giorgio Urbano
Giuseppe Abbate
Moshe Avron
Yoel Ben-Tolila
Avi Katz
Yael Asscher
Theo Ackermann

Function
FW Process Leader
FW Project Manager
LUD Project Engineer
LUD Project Manager
SAI Proj. Eng.
SAI Project Manager
SAI Q.A

Signature

REVISION HISTORY
Revision No
P0

Date
07/04/2006

Description

P1

02/08/2006

2nd issue

P2

01/09/2006

3rd issue

P3

17/09/2007

P4

31/11/2008

4th issue
UPDATE

1st issue

02-D-110-A4-P4 PG-3801 CIP System

Date

Doc. No.:
02-D-110-A4
REVISION:
P4
PAGE
3 OF
7
____________________________________________________________________
ATTACHED DOCUMENTS

Number

Revision

Description

02-D-003-FLL
02-D-058-A1

P4
P4

Fluid List
P&ID

02-D-110-A4-P4 PG-3801 CIP System

PROCESS SPECIFICATION FOR


MOBILE CIP SYSTEM
CLIENT:
PROJECT:
CONTRACT No:
SERVICE:
Date
Author
Reviewer

P3

Sigma Aldrich Israel Ltd


New API Production Facility
FWSTERIL Contract no. 1.BJ.3631A
CIP System
P0
P1
P2
P3
07-04-06
02-08-06
01-09-06
17-09-07
FDN
FDN
FDN
CC
GU
GU
GU
GU

UNIT:
ITEMS:
P&ID's:
No. REQD.:

38
PG-3801
02-D-058-A1
1

DOCUMENT No.:
FW PROCESS SPEC. No.:

02-D-110-A4
3631 1396J_01

SCOPE
Scope of this specification is to give the minimum requirements for the design, supply, install, start up and validate the mobile CIP System skids
for the pharmaceutical plant of SIGMA ALDRICH ISRAEL located in Jerusalem (Israel).
The skids will be installed in a class "ISO 8 at rest" area.
TECHNICAL REQUIREMENTS
Vendor must consider as essential conditions that:
- design, construction, materials of construction, components of supply shall be in accordance with the latest US and
European pharmaceutical standards, as well as recommendations of ISPE Baseline
- the equipment will be part of a system that must be fully validated to be in compliance with FDA codes and
European GMP rules
In case of non-compliance with EU GMP rules or FDA regulations, the Vendor shall have to take all required corrective
actions until the supply would meet the above requirements.
Weldings shall be inspected and shall be complete with documentation for validation.
Materials employed for pressure parts shall be certified by 3.1.B EN 10204 certificates.
Equipment must be designed, constructed and tested according to current European and Israelian Law requirements
concerning mechanical safety.
Vendor shall comply with standards, codes and specifications of qualified Israel and international Institutions (EN, DIN,
IEC, etc.; see in particular PED, DIN 24255 and IEC 34 norms).
Compliance with the listed codes and standards is Vendor responsibility.
Instruments and safety devices will be supplied calibrated by Vendor (with calibration certificate)
The equipment will be cleanable, drainable, easy access for maintenance and inspection.
The equipment will be designed and built according to EU standards: 97/23/CE-PED, 98/37/CE (DM) and 94/9/CE-ATEX
Pressure Vessel are according ASME VIII div.1
Piping will be designed and built according to BPE-2005 and the attached piping specification.
ATEX (PRELIMINARY INFORMATION)
The equipment will not be internally classified (N2 blanketing) (to be confirmed after risk analysis)
ATEX external classification is: II 3 G-D IIB < 135C; top of the tank and areas close to sampling valve are Zone 1.
Solvent utilized are:
Ethanol
Ethyl Acetate
Dichloromethane

ATEX IIA
IIA
D

< 300C
< 450C
Class I
according to NFPA

INSTALLATION
The equipment will be installed in pharmaceutical area, hence all external finishes must be realized to minimize
retention of dust / microbial growth, and shall minimize disruption of air flow
DOCUMENTATION:
Vendor will supply a full set of documents (4 copies), in English. Documents supplied will be described in the budget quotation.
CERTIFICATES
Vendor will issue PED certificates
FAT included
SAT to be quoted separately on a man-daily basis
IQ, OQ protocol (blank) to be quoted separately
IQ, OQ protocol execution to be quoted separately on a man-daily basis
EU 98/37 CE marking
GUARANTEES
The equipment is fully drainable; all nozzle are at minimum length.
The equipment performs according to this specification and other figures, if any.
Noise level is less than 65 dB(A) , measured at 1 meter all around the installed equipment.

02-D-110-A4-P4 PG-3801 CIP System

5 of 8

PROCESS SPECIFICATION FOR


MOBILE CIP SYSTEM
Sigma Aldrich Israel Ltd
38
UNIT:
New API Production Facility
PG-3801
ITEMS:
FWSTERIL Contract no. 1.BJ.3631A
02-D-058-A1
P&ID's:
CIP System
1
No. REQD.:
P0
P1
P2
P3
07-04-06
02-08-06
01-09-06
17-09-07
Date
FDN
FDN
FDN
CC
DOCUMENT No.:
02-D-110-A4
Author
GU
GU
GU
GU
3631 1396J_01
FW PROCESS SPEC. No.:
Reviewer
DESCRIPTION OF THE SUPPLY
The mobile Cleaning Packages prepare, hold and distribute the solutions needed to clean the process equipment.
The package will be provided with:
CLIENT:
PROJECT:
CONTRACT No:
SERVICE:

- a detergent mobile vessel for concentrated acid or soap detergent


- a detergent mobile vessel for concentrated base or NaClO
-1 Delivery pump
- Heat Exchanger
- 2 detergent pump
- Fluid filter
- wheels in white Teflon

- Instrumentation
- PLC
- Piping, valves, fittings
- Spare parts
- Documentation
- Electrical switchboard and transformers

GENERAL FEATURES
FOR THE SKIDS
Pharmaceutical standard

yes

Location
Layout
Piping layout

indoor
not applicable

Skid frame material

SS AISI 304

Installed power

by Vendor

Electr.area classification
Electrical protection
Weight

not applicable
IP 55
by Vendor

Mechanical code / stamp


Stamp
Material in contact with
cleaning fluids

PED, categ. IV, module G


CE marking
AISI 316L,ferrite content < 0.5%

Finishing

Ra < 0.5 m
Ra <1.2 m
PTFE

internal
external

Gaskets
Piping
Insulation
Welding
Electrical
Automation / Instrumentation
Test(s)
TANK

ITEM
Type
Volume
nominal/geometr.
Dimensions

Design pressure
Design temperature
Operating pressure
Operating temperature
Nozzles
Spray-ball(s)

Vent filter
Type

Weight (empty/filled)

02-D-110-A4-P4 PG-3801 CIP System

6 of 8

PROCESS SPECIFICATION FOR


MOBILE CIP SYSTEM
CLIENT:
PROJECT:
CONTRACT No:
SERVICE:
Date
Author
Reviewer

Sigma Aldrich Israel Ltd


New API Production Facility
FWSTERIL Contract no. 1.BJ.3631A
CIP System
P0
P1
P2
P3
07-04-06
02-08-06
01-09-06
17-09-07
FDN
FDN
FDN
CC
GU
GU
GU
GU
DELIVERY PUMP

UNIT:
ITEMS:
P&ID's:
No. REQD.:

38
PG-3801
02-D-058-A1
1

DOCUMENT No.:
02-D-110-A4
3631 1396J_01
FW PROCESS SPEC. No.:
RECIRCULATING PUMP

Head

P-3801
centrifugal, sanitary
open impeller self-drainable
to distribute CIP to all users
operating max 6 m3/h
design 8 m3/h
operating 5 bar

Head

NPSH
req'd/availab.
Operating temperature
Manufacturer / Model
Rotation speed
Nozzles
inlet/outlet
vent/drain
Efficiency
Seal

by Vendor
/
0.7 bar(a)
60C
by Vendor
variable (VFD shall be included)
DN 50
/
by Vendor
by Vendor
/
by Vendor
by Vendor
by Vendor

NPSH
req'd/availab.
Operating temperature
Manufacturer / Model
Rotation speed
Nozzles
inlet/outlet
vent/drain
Efficiency
Seal

Power inst. / absorbed

by Vendor

Power inst. / absorbed

ITEM
Type
Service
Flow rate

Not Required

ITEM
Type
Service
Flow rate

DETERGENT # 1 PUMP

/
/

DETERGENT # 2 PUMP

Related to
Type

P-3802
Dosing, diaphragm

Related to
Type

P-3803
Dosing, diaphragm

Service
Flow rate

to dose acid detergents


200 l/h

Service
Flow rate

to dose caustic detergents


200 l/h

Head

1.5 bar (Vendor to confirm)

Head

1.5 bar (Vendor to confirm)

NPSH
req'd/availab.
Operating temperature
Manufacturer / Model
Rotation speed
Nozzles
inlet/outlet
vent/drain
Efficiency
Seal

by Vendor
ambient
by Vendor
N/A
by Vendor
N/A
N/A

NPSH
req'd/availab.
Operating temperature
Manufacturer / Model
Rotation speed
Nozzles
inlet/outlet
vent/drain
Efficiency
Seal

by Vendor
ambient
by Vendor
N/A
by Vendor
N/A
N/A

Power inst. / absorbed

>7m

/
/

by Vendor
-

by Vendor
ACCESSORIES

Power inst. / absorbed

Fluid filter

in-line, 0.22 m, PTFE


housing SS AISI 316L
30 Nm3/h (compr. air @ 7 barg)

ITEM
Control board

F-3801

pressure drop

max 0.1 bar

>7m

/
/

by Vendor
-

by Vendor
HEAT-EXCHANGER

SERVICE
to heat chemical solutions and to adjust the
temperature of the fluid to be distributed
(note 1)
Duty: as a minimum 10 KW
ITEM

E-3801

Type

Electrical heat-exchanger Shell & Tubes


sanitary double tube sheet
by Vendor
by Vendor
by Vendor

Power board
Heat-transfer surface
Overall dimensions
Weight
NOTES:
1) The heat exchanger shall be designed as able to heat up the CIP fluid from 15 C to 60 C
in less than 15 minutes (to be guaranteed by Vendor)
02-D-110-A4-P4 PG-3801 CIP System

7 of 8

PROCESS SPECIFICATION FOR


MOBILE CIP SYSTEM
CLIENT:
PROJECT:
CONTRACT No:
SERVICE:
Date
Author
Reviewer

Sigma Aldrich Israel Ltd


New API Production Facility
FWSTERIL Contract no. 1.BJ.3631A
CIP System
P0
P1
P2
P3
07-04-06
02-08-06
01-09-06
17-09-07
FDN
FDN
FDN
CC
GU
GU
GU
GU
CONTROL UNIT

TYPE

SOFTWARE DEVELOP.

PLC Siemens serie S7/Allen


Bradley or approved equivalent
software specification and
development by vendor according to
specification.
"Automation Physical, Procedural
and Process model" ISA S88 and
Automation S88 Description 02-I005-APP

Ethernet (for FUTURE connection


with PAS)
ACQUIRING DATA SYST. PLC
INTEGRATION

OPERAT. INTERFACE

UNIT:
ITEMS:
P&ID's:
No. REQD.:

38
PG-3801
02-D-058-A1
1

DOCUMENT No.:
FW PROCESS SPECIFICATION No
ELECTRICAL

FEED (V/Ph/Hz)
POWER (kW)

02-D-110-A4
3631 1396J_01

400 / 3 / 50 3PH + N + G
installed
by vendor

absorbed

by vendor

PROTECTION CLASS

ATEX / IP 55

DESIGN CODE
CLASSIFICATION
NOTE:

CE /CENELEC EN60079-10
MCC supplied by Vendor
frequency converter supplied by Vendor

1 Local Panel (HMI or SCADA )

vendor std + local paper recorder


hardwired general alarm
signal to AMS (free contact)
CONN. TO OTHER EQUIPMENTS
CONNECTION TO AMS

02-D-110-A4-P4 PG-3801 CIP System

8 of 8