3286 Federal Register / Vol. 71, No.

13 / Friday, January 20, 2006 / Notices

eLibrary system by clicking on the Partners Limited Partnership, Charles N. m. Comments, Protests, or Motions to
appropriate link in the above list. They Lucas, 7301 East Sundance, Suite D102, Intervene: Anyone may submit
are also available for review in the P.O. Box 2244, Carefree, AZ 85377, comments, a protest, or a motion to
Commission’s Public Reference Room in (952) 545–0975. Patrick J. Scully, Esq., intervene in accordance with the
Washington, DC. There is an Bernstein, Shur, Sawyer & Nelson, P.A., requirements of Rules of Practice and
eSubscription link on the Web site that 100 Middle Street, P.O. 9729, Portland, Procedure, 18 CFR 385.210, .211, .214.
enables subscribers to receive e-mail ME 04104, (207) 774–1200. In determining the appropriate action to
notification when a document is added h. FERC Contact: Etta L. Foster, (202) take, the Commission will consider all
to a subscribed dockets(s). For 502–8769. protests or other comments filed, but
assistance with any FERC Online i. Deadline for filing comments, only those who file a motion to
service, please e-mail protests, and motions to intervene: intervene in accordance with the
FERCOnlineSupport@ferc.gov. or call February 10, 2006. Commission’s Rules may become a
(866) 208–3676 (toll free). For TTY, call All documents (original and eight party to the proceeding. Any comments,
(202) 502–8659. copies) should be filed with Magalie R. protests, or motions to intervene must
Salas, Secretary, Federal Energy be received on or before the specified
Magalie R. Salas,
Regulatory Commission, 888 First comment date for the particular
Secretary.
Street, NE., Washington, DC 20426. application.
[FR Doc. E6–601 Filed 1–19–06; 8:45 am]
Comments, protests, and interventions n. Filing and Service of Responsive
BILLING CODE 6717–01–P
may be filed electronically via the Documents: Any filings must bear in all
Internet in lieu of paper; see 18 CFR capital letters the title ‘‘COMMENTS’’,
385.2001(a)(1)(iii) and the instructions ‘‘PROTEST’’, or ‘‘MOTION TO
DEPARTMENT OF ENERGY
on the Commission’s web site under the INTERVENE’’, as applicable, and the
Federal Energy Regulatory ‘‘e-Filing’’ link. The Commission Project Number of the particular
Commission strongly encourages electronic filings. application to which the filing refers.
Please include the project number (P– Any of the above-named documents
Notice of Application for Transfer of 4784–072) on any comments or motions must be filed by providing the original
License and Soliciting Comments, filed. and the number of copies provided by
Motions To Intervene, and Protests The Commission’s Rules of Practice the Commission’s regulations to: The
and Procedure require all intervenors Secretary, Federal Energy Regulatory
January 12, 2006. filing a document with the Commission Commission, 888 First Street, NE.,
Take notice that the following to serve a copy of that document on Washington, DC 20426. A copy of any
hydroelectric application has been filed each person in the official service list motion to intervene must also be served
with the Commission and is available for the project. Further, if an intervenor upon each representative of the
for public inspection: files comments or documents with the Applicant specified in the particular
a. Application Type: Partial Transfer Commission relating to the merits of an application.
of License. issue that may affect the responsibilities o. Agency Comments: Federal, state,
b. Project No.: 4784–072.
c. Date Filed: December 29, 2005. of a particular resource agency, they and local agencies are invited to file
d. Applicants: Teton Power Funding, must also serve a copy of the documents comments on the described application.
LLC (Teton), DaimlerChrysler Services on that resource agency. A copy of the application may be
North America LLC, and Topsham j. Description of Application: obtained by agencies directly from the
Hydro Partners Limited Partnership Applicants request approval, under Applicant. If an agency does not file
(Topsham), licensees, and section 8 of the Federal Power Act, of comments within the time specified for
DaimlerChrysler Financial Services a partial transfer of the license for the filing comments, it will be assumed to
America LLC. Pejepscot Project No. 4784 to reflect a have no comments. One copy of an
e. Name and Location of Project: The January 1, 2006 reorganization in which agency’s comments must also be sent to
Pejepscot Hydroelectric Project is licensee DaimlerChrysler Services North the Applicant’s representatives.
located on the Androscoggin River in America LLC was to be absorbed by
Magalie R. Salas,
the town of Topsham, in Sagadahoc, DaimlerChrysler Financial Services
Secretary.
Cumberland and Androscoggin America LLC, its wholly-owned
subsidiary. [FR Doc. E6–596 Filed 1–19–06; 8:45 am]
Counties, Maine.
f. Filed Pursuant to: Federal Power k. This filing is available for review at BILLING CODE 6717–01–P

Act, 16 U.S.C. 791(a)–825(r). the Commission in the Public Reference


g. Applicant Contacts: For Teton: Room or may be viewed on the
Teton Power Funding, LLC, c/o Barry E. Commission’s Web site at http:// DEPARTMENT OF ENERGY
Welch, c/o Atlantic Power Holdings, www.ferc.gov using the ‘‘eLibrary’’ link. Federal Energy Regulatory
LLC, 200 Clarendon Street, 55th Floor, Enter the project number excluding the Commission
Boston, MA 02117, (617) 531–6379. last three digits (P–4784) in the docket
Margaret A. Moore, Van Ness Feldman, number field to access the document. Notice of Application Accepted for
PC, 1050 Thomas Jefferson Street, NW., For online assistance, contact Filing and Soliciting Motions To
Washington, DC 20007, (202) 298–1800, FERCOnlineSupport@ferc.gov or call Intervene and Protests
For DaimlerChrysler: DaimlerChrysler toll-free (866) 208–3676, for TTY, call
Services North America LLC, Marco (202) 502–8659. A copy is also available January 13, 2006.
DeSanto, Esq., 27777 Inkster Road, for inspection and reproduction at the Take notice that the following
wwhite on PROD1PC65 with NOTICES

Farmington Hills, MI 48334–5326, (248) addresses in item g. hydroelectric application has been filed
427–2500. Andrew Holmes, Esq., l. Individuals desiring to be included with the Commission and is available
Holland & Knight LLP, 195 Broadway, on the Commission’s mailing list should for public inspection.
New York, NY 10007–3189, (212) 513– so indicate by writing to the Secretary a. Type of Applications: New Major
3243. For Topsham: Topsham Hydro of the Commission. Licenses.

VerDate Aug<31>2005 16:16 Jan 19, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\20JAN1.SGM 20JAN1
Federal Register / Vol. 71, No. 13 / Friday, January 20, 2006 / Notices 3287

b. Project Nos.: 12606–000 and 2545– channel of the Spokane River, a 127- n. Anyone may submit a protest or a
091. foot-long, 25-foot-high dam across the motion to intervene in accordance with
c. Date Filed: July 28, 2005. south channel, and a 215-foot-long, 64- the requirements of Rules of Practice
d. Applicant: Avista Corporation. foot-high dam across the middle and Procedure, 18 CFR 385.210,
e. Name of Projects: (1) Post Falls and channel; six 56-foot-long, 11.25-foot- 386.211, and 385.214. In determining
(2) Spokane River Development of the diameter penstocks; and a 6-unit the appropriate action to take, the
Spokane River. powerhouse integral to the middle Commission will consider all protests
f. Location: Post Falls—on the channel dam with a generator filed, but only those who file a motion
Spokane River and Coeur d’Alene Lake nameplate capacity of 14.75 megawatts. to intervene in accordance with the
in portions of Kootenai and Benewah The Spokane River Developments Commission’s Rules may become a
counties, Idaho. The project occupies include four hydroelectric party to the proceeding. Any protests or
Federal lands under the supervision of developments (HED) with a total motions to intervene must be received
the U.S. Bureau of Indian Affairs, and authorized capacity of 122.92 MW as on or before the specified deadline date
may occupy lands under the follows: for the particular application.
supervision of the U.S. Forest Service (1) Upper Falls HED is a run-of-river
and the U.S. Bureau of Land All filings must (1) Bear in all capital
facility consisting of a 366-foot-long, letters the title ‘‘PROTEST’’ or
Management. 35.5-foot-high dam across the north
Spokane River Developments—on the ‘‘MOTION TO INTERVENE;’’ (2) set
channel of the Spokane River; a 70-foot- forth in the heading the name of the
Spokane River in portions of Steven and long, 30-foot-high intake structure
Lincoln counties, Washington. No applicant and the project number of the
across the south channel; an 800-acre- application to which the filing
federal lands are included. foot reservoir; a 350-foot-long, 18-foot-
g. Filed Pursuant to: Federal Power responds; (3) furnish the name, address,
diameter penstock; and a single-unit and telephone number of the person
Act 16 U.S.C. 791(a)–825(r). powerhouse with a generator nameplate
h. Applicant Contact: Bruce F. protesting or intervening; and (4)
capacity of 10 MW. otherwise comply with the requirements
Howard, License Manager, Avista
(2) Monroe Street HED is a run-of- of 18 CFR 385.2001 through 385.2005.
Corporation, 1411 East Mission, P.O.
river facility consisting of a 240-foot- Agencies may obtain copies of the
Box 3727, Spokane, Washington 99220–
long, 24-foot-high dam; a 30-acre-foot application directly from the applicant.
3727; telephone: (509) 495–2941.
i. FERC Contact: John S. Blair, at (202) reservoir; a 332-foot-long, 14-foot- A copy of any protest motion to
502–6092, john.blair@ferc.gov. diameter penstock; and an underground intervene must be served upon each
j. Deadline for filing motions to single-unit powerhouse with a generator representative of the applicant specified
intervene and protests and requests for nameplate capacity of 14.82 MW. in the particular application.
cooperation agency status: 60 days from (3) Nine Mile HED is a run-of-river
the issuance date of this notice. facility consisting of a 466-foot-long, 58- Magalie R. Salas,
All documents (original and eight foot-high dam; a 4,600 acre-foot Secretary.
copies) should be filed with: Magalie R. reservoir; a 120-foot-long, 5 foot- [FR Doc. E6–607 Filed 1–19–06; 8:45 am]
Salas, Secretary, Federal Energy diameter diversion tunnel; and a 4-unit BILLING CODE 6717–01–P
Regulatory Commission, 888 First powerhouse with a nameplate capacity
Street, NE., Washington, DC 20426. of 26.4 MW.
The Commission’s Rules of Practice (4) Long Lake HED is a storage-type DEPARTMENT OF ENERGY
require all intervenors filing with the facility consisting of a 593-foot-long,
Commission to serve a copy of that 213-foot-high main dam; a 247-foot- Federal Energy Regulatory
document on each person on the official long, 108-foot-high cutoff dam; a Commission
service list for the project. Further, if an 105,080-acre-foot reservoir; four 236-
intervenor files comments or documents foot-long, 16-foot-diameter penstocks; [Docket Nos. AD06–2–000; ER06–406–000;
with the Commission relating to the and a 4-unit powerhouse with a ER02–2330–040; ER03–345–006; ER01–
merits of an issue that may affect the nameplate capacity of 71.7 MW. 3001–014]
responsibilities of a particular resource m. A copy of the application is
agency, they must also serve a copy of available for review in the Assessment of Demand Respose
the document on that resource agency. Commission’s Public Reference Room or Resources; PJM Interconnection,
Motions to intervene and protest and may be viewed on its Web site: http:// L.L.C.; ISO New England Inc.; ISO New
requests for cooperating agency status www.ferc.gov, using the ‘‘eLibrary’’ link. England Inc.; New York Independent
may be filed electronically via the Enter the docket number excluding the Transmission System Operator, Inc.;
Internet in lieu of paper. The last three digits in the docket number Notice of Agenda and Procedures for
Commission strongly encourages field to access the document. For Technical Conference on Demand
electronic filings. See 18 CFR assistance, contact FERC Online Response and Advanced Metering
385.2001(a)(1)(iii) and the instructions Support at
on the Commission’s Web site (http:// FERCOnlineSupport@ferc.gov or toll- January 13, 2006.
www.ferc.gov) under the ‘‘e-Filing’’ link. free at 1–866–208–3676, or for TTY, This notice establishes the agenda and
k. This application is accepted, but is (202) 502–8659. A copy is also available procedures for the technical conference
not ready for environmental analysis at for inspection and reproduction at the to be held on Wednesday, January 25,
this time. address in item h above. 2006, at 9:00 am (EST),1 on demand
l. The Post falls hydroelectric You may also register online at http:// response and advanced metering
development, has a seasonal storage www.ferc.gov/docs-filing/ regarding issues raised by the Energy
wwhite on PROD1PC65 with NOTICES

capacity consisting of the 40,402 acre esubscription.asp to be notified via e- Policy Act of 2005 (EPAct 2005) section
Coeur d’Alene Lake with a usable mail of new filings and issuances
storage capacity of 223,100 acre-feet. related to this or other pending projects. 1 The initial notice setting the date of this
The facility is composed of a 431-foot- For assistance, contact FERC Online technical conference was issued on December 12,
long, 31-foot-high dam across the north Support. 2005. 70 Fed. Reg. 74,804 (2005).

VerDate Aug<31>2005 16:16 Jan 19, 2006 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\20JAN1.SGM 20JAN1

Vous aimerez peut-être aussi