Company Profile
Coverage Area
Roof Management Program
Initial Survey
Annual Inspection
Roof Manager (database program)
Roof Design and Bidding
Construction Management
Warranties
Company Profile
Established in 1991
Recognized for our experience and expertise in handling roofing and
waterproofing for some of the largest national and global real estate
investors and owners
Global Presence
Actively managing assets throughout the United States, Canada,
Mexico, Brazil and Europe
Portfolio Management
Client Realizes:
- Extended Roof Service Lives
- Reduced Capital Expenditures
- Reduced Maintenance Costs
- Organized Approach For Planning And Forecasting Future
Capital Expenditures
- Maximum Benefit When Roofing Expenditures Are Required
Roof Program
Roof program
Consistency
Inspections
Reporting
Phase One
Initial Roof Condition Assessment
Complete analysis of entire roof system, which includes:
1. Benchmark of existing conditions and remaining service life
2. Roof Maintenance Plan with projected budgets designed to
address deficient conditions, reduce unplanned expenditures and
extend the useful life of the roof
3. Roof Replacement Plan with projected budgets designed to
complement the existing structure
Phase Two
Annual Roof Inspection
Completed prior to the budget period on a yearly basis
following the initial roof condition assessment
1. Updates Proactive Maintenance Plan and Budgets to
address deficient conditions related to aging, physical damage
and environmental damage such as high wind events, hail,
lightning, etc.
2. Updates Roof Replacement Plan and Budgets based on
observed conditions and current labor and materials pricing
3. Annual Inspections combined with proactive maintenance is the
Fundamental Key to Extending Roof Service Life
Phase Three
Roof Manager
Web based tool that allows management the ability to
quantify the information, recommendations and budgets
generated by Roof Management inspections
1. Performance and Budget Reporting
2. Provides Organized and Prioritized
approach to managing roofing assets
2. Confident, Performance Driven Decisions
can be exercised to increase the effectiveness
of roofing expenditures when armed with prior
performance histories
3. Online Service Requests automatically
documents and notifies assigned repair contractors
when facility management reports roof related issues
Roof Manager
Property Specific Roofing Details
Construction/assembly details
Historical roofing expenditures and details
Forecasted recommendations and budgets
Warranty information
Leak repair history
Roof related documents section
Roof Manager
Online Repair Requests and Tracking
Detailed histories
Email notifications
Roof Manager
Performance and Budget Reports
10 Year Capital Forecast
Annual Portfolio Repair Summary
Leak Repair Cost Analysis
Roof System Cost Data
Program Results
Case Study: Annual Roofing Cost per Square Foot
Portfolio Size: 300 million square feet (2010)
Roof Management Program Implemented in 1997
Highlights:
45% spending reduction within 5 years (~$30 million annually)
Program has maintained consistent spending despite aging portfolio
$0,18
$0,16
$0,14
$0,12
$0,10
$0,08
$0,06
$0,04
$0,02
$0,00
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Roof Type
BUR
Avg Age
2014 PM
Budget
2014 PM
Cost/SF
139,019,275
14.4
$3,626,633
$0.03
Coating
11,677,856
6.3
$288,535
$0.02
EPDM
88,118,816
12.1
$1,672,750
$0.02
Metal
37,946,933
13.0
$3,618,778
$0.10
Modified
13,296,629
12.1
$514,517
$0.04
PVC/TPO
76,956,941
5.3
$1,135,280
$0.01
Forecasting
10 Year Roofing Capital Forecast
$18.000.000
$1,40
$16.000.000
$1,20
$14.000.000
$1,00
$12.000.000
$10.000.000
$0,80
$8.000.000
$0,60
$6.000.000
$0,40
$4.000.000
$0,20
$2.000.000
$0
$0,00
2015
2016
2017
2018
2019
Capital Budget
2020
2021
2022
2023
2024
Cost/SF
Wood Deck
Hail Zone
Familiarity
Cost
Maintenance
Track Record
Contractor Base
Material Availability
Environmental Conditions
Familiarity
Product Availability
Project Management
Solutions that are cost effective and building specific
Cost
Maintenance
Proven systems that perform their entire serviceable life
Reduce Owners project administration time. Lead the project.
Project Management
Enhanced project management utilizing the Roof Manager
Projects tab provides access to and tracks
Scope of work
Job progress
Design information
Construction management information
Project contact lists
% Complete
Work items completed
Project notes/unit cost item updates
In progress photos of the project
Benefits
On demand access to project information (meeting minutes, field reports, contacts, drawings,
submittals)
Improved communication through project updates
Long term archival
Contractor self reporting
Project Management
Construction Management
Contractor Log:
Project Knowledge
Design
Knowledge and expertise that deliver economical solutions.
Use code to Owners advantage not Contractors and Manufacturers
Factory Mutual (wind uplift) and Fire Classification
ASHRAE (energy requirements)
Project Planning
Precision
1.
Correct selection
Single Ply
2.
Built-up
Overlay
Leverage of grouping
Savings
$298,109
Tear-off
Project Planning
January
February
Bid
March
April
May
June
July
Contract
Bid
Construction
Contractor 1
149,430
Contractor 2
150,660
Contractor 3
150,000
$5.76
$5.09
$5.47
$591,105.00
$229,342.00
$820,447.00
$515,000.00
$205,000.00
$720,000.00
$562,059.00
$215,250.00
$777,309.00
Contractor 1
151,860
Contractor 2
150,977
Contractor 3
149,446
$4.69
$4.17
$4.46
Base Bid
TPO with Coverboard
Alternate 2: Interior Protection
$498,649.00
$158,165.00
$428,129.00
$158,165.00
$483,828.00
$137,681.00
$6,552.00
$663,366.00
$0.00
$586,294.00
$7,800.00
$629,309.00
Compressed Schedule
Complicated project
2014 Re-Bid
Bidder
Estimated Square Footage
S.F. Cost ( Base)
Savings: $133,706
Project Management
Competitive Bidding
Competitive bidding with the right contractors ensures the best price
Savings
$482,097
Project Management
Construction Management
Even the most carefully thought out and designed roof systems
can be jeopardized by poor installation practices.
Complete on time
Within budget
Minimize disruption
Ensure contractor compliance to standards established in the
contract documents installation, night tie-offs, building &
grounds protection, safety
Warranties
Warranty Alliance:
Flat Rate Warranty Fee on all roof projects
The Alliance Manufacturers will provide a no dollar limit (NDL) warranty for a flat rate based on roof
size. The industry standard is to provide this warranty at 7 cents a square foot. On a 250,000
square foot roof renovation project this could provide a savings of $14,000.
Transferable Warranty
Alliance Manufacturers will allow warranties to be transferred to new ownership.
Warranty Extension
Alliance Manufacturers will provide extended warranties beyond the industry standard warranty
periods.
Edge Metal
60-80% of roofing failures in major
wind events begin at the edge
Benefits
Lifetime, transferable 215 mph wind rated warranty on fascia and coping systems
20 Year, 110 mph transferable wind rated warranty on gutter and drip edge systems
30 Year Kynar finish warranty on standard colors
Labor and material indemnification warranty that exceeds the industry standard
Spring engaged systems for protection in multiple wind events
Reusable fascia extrusion, environmentally friendly while reducing cost for color changes
Compliance with ANSI/SPRI ES-1, FM, Miami Dade, Florida Building Code to reduce client risk
Custom designed details that are tested and wind rated
Welded and Quick-locked miters and flashing for outstanding aesthetics
Post installation inspection of standard details for owner assurance
HVAC Reclaim
Partnered with AES Reclaim to take this old equipment from the
roof and decommission it and recycle the components
Facility Audits Analyze energy use for Lighting, HVAC and Gas
Sustainability
Create an Energy Efficiency Strategy