Vous êtes sur la page 1sur 8

970 Federal Register / Vol. 71, No.

4 / Friday, January 6, 2006 / Notices

the Federal Register’s home page at registration or permit ‘‘grace periods’’ to bracket of 85 and over, we have
http://www.archives.gov and from the better distribute the annual registration redistributed the last age bracket
Government Printing Office’s Web page workload. provided by each State according to the
at http://www.gpoaccess.gov/nara. States report motor vehicle Census population data for those
Background: The FHWA collects and registrations by major vehicle classes: particular age brackets in that particular
publishes motor vehicle registration and automobiles, buses, trucks, and State.
licensed driver information obtained motorcycles. The truck category Conclusion: This notice seeks public
from the States, the District of includes light trucks to the extent they input from users on the quality,
Columbia, and Puerto Rico. This can be identified and separated from timeliness, comprehensiveness, and
information is collected from State automobiles. Data on trucks, buses, other characteristics of these data. Based
departments of transportation pursuant trailers, and semitrailers are given in on this input and other information, the
to 23 CFR 420.105 and is published in tables MV–9, MV–10, and MV–11, FHWA will determine whether it is
Highway Statistics.1 respectively. Although the detail of necessary to change the motor vehicle
The information in Highway Statistics motor-vehicle data has improved in registration and licensed driver
is used in the development of highway recent years, it is not yet possible to information collected, and the steps
legislation at the Federal level. The obtain from all States separate data on needed to ensure the quality of the
information is also used in preparing single-unit trucks and combinations. information.
legislatively required reports to Some States provide data for light trucks Specifically, the FHWA is interested
Congress, in keeping State governments and truck tractors, but for many States in comments from users of motor
informed, and, in general, as an aid to the FHWA estimates this information vehicle registration and licensed driver
highway planning, programming, using other data sources, such as the information on data uses, data quality,
budgeting, forecasting, and fiscal Vehicle Inventory and Use Survey data timeliness, data availability, and
management. This information is also conducted by the Bureau of the Census.2 how well data meets user needs.
used extensively in the evaluation of The table MV–9 light truck category Currently, the FHWA is considering
Federal, State, and local highway includes pickups, vans (full-size and various options for these data programs
programs. The FHWA has re-assessed mini), utility-type vehicles, as well as including investigating alternative
DOT internal needs for these data and other vehicles (panel trucks and sources of data from the public or
has preliminarily determined that the delivery vans generally of 10,000 private sector, developing enhanced
information in Highway Statistics meets pounds or less gross vehicle weight). software to capture and process the data
the Federal need of providing a national Registrations of publicly owned motor more efficiently, and maintaining the
perspective on highway program vehicles are reported in table MV–7. status quo.
activities. Registration practices for commercial
Issued on: December 28, 2005.
This notice seeks public input from vehicles also differ greatly among the
J. Richard Capka,
users on the quality, timeliness, States. Some States register a tractor-
comprehensiveness, and other semitrailer combination as a single unit; Acting Federal Highway Administrator.
characteristics of the motor vehicle others register the tractor and the [FR Doc. E6–11 Filed 1–5–06; 8:45 am]
registration and licensed driver data semitrailer separately. Regardless of BILLING CODE 4910–22–P
collected by the FHWA and published how they were registered, only the
in Highway Statistics. Based on this power units have been included in the
input and other information, the FHWA truck count in table MV–1. Some States DEPARTMENT OF TRANSPORTATION
will determine whether it is necessary register buses with trucks or
Federal Highway Administration
to change the motor vehicle registration automobiles; many States do not report
and licensed driver information light utility trailers separately from Safe, Accountable, Flexible, Efficient
collected. The motor vehicle registration commercial trailers or semitrailers; and Transportation Equity Act: A Legacy
data currently collected by the FHWA some States do not require registration for Users (SAFETEA–LU); Value
can be found in Highway Statistics of car or light utility trailers. Pricing Pilot Program Participation
tables MV–1, MV–2, MV–7, MV–9, MV– Drivers’ License: Each State, the
10 and MV–11. The licensed driver data District of Columbia, and Puerto Rico AGENCY: Federal Highway
currently collected by the FHWA can be administers its own driver licensing Administration (FHWA), DOT.
found in Highway Statistics tables DL– system. Since 1954 all States have ACTION: Notice; solicitation for
1C, DL–20 and DL–22. required drivers to be licensed, and participation.
Motor vehicle registration: The motor since 1959 all States have required
examination prior to licensing. Tests of SUMMARY: This notice invites State and
vehicle registration data collection
practices vary among the States. States knowledge of State driving laws and local governments and other public
register specific vehicle types on a practices, vision, and driving authorities to apply to participate in the
calendar year or fiscal year basis. States proficiency are now required for new Value Pricing Pilot (VPP) program and
may use some form of a ‘‘staggered’’ licensees. The State distribution of total presents guidelines for program
system to register motor vehicles to U.S. licensed drivers, by sex and age applications. This notice describes the
permit a distribution of the renewal group, is shown in table DL–1C. statutory basis for the VPP program and
workload throughout all months. In The distribution of total U.S. licensed updates a notice published in the
addition, most States allow pre- drivers, by sex and age group, is shown Federal Register on May 7, 2001 (66 FR
in table DL–20. 23077), by providing revised
procedures, process timelines, and
cprice-sewell on PROD1PC66 with NOTICES

1 Highway Statistics is an annual report DL–22 displays the number of drivers


containing analyzed data on motor fuel, motor by sex and age groups for each State. For guidance for program participation.
vehicles, driver licensing, highway user taxation, the States that do not provide the driver A companion notice referring to non-
State and local highway finance, highway mileage, grant programs, entitled ‘‘Safe,
and other selected data. This report has been license data broken out to the top age
published each year since 1945. It is available at the
Accountable, Flexible, Efficient
following URL: http://www.fhwa.dot.gov/policy/ 2 This report is available at the following URL: Transportation Equity Act: A Legacy for
ohpi/hss/. http://www.census.gov/svsd/www/tiusview.html. Users (SAFETEA–LU); Opportunities for

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices 971

States and Other Qualifying Agencies to Act: A Legacy for Users (SAFETEA–LU) Funds available for the VPP program
Gain Authority to Toll Facilities (Pub. L. 109–59; 119 Stat. 1144), can be used to support pre-
Constructed Using Federal Funds’’ is authorizes the Secretary of implementation study activities as well
published elsewhere in today’s edition Transportation (the Secretary) to create as to pay for implementation costs of
of the Federal Register. Both of these a Value Pricing Pilot Program. Value value pricing projects. Section
notices are intended to cover all of the pricing encompasses a variety of 1012(b)(6) of ISTEA provides that a
opportunities for States and other strategies to manage congestion on State may permit toll-paying vehicles
qualifying transportation agencies to highways, including tolling of highway with fewer than two occupants to
obtain approval to toll their respective facilities, as well as other strategies that operate in high occupancy vehicle
facilities and to secure funding to do not involve tolls, such as mileage- (HOV) lanes if the vehicles are part of
implement tolling and pricing. based charges for insurance, taxes, a local value pricing pilot program
DATES: Formal grant applications must leasing fees, and car sharing. The value under this section. SAFETEA–LU
be submitted no later than March 31, pricing concept of assessing relatively Section 1121, ‘‘HOV Facilities,’’ among
2006, for FY 2006 funds, October 1, higher prices for travel during peak other things, also allows for the
2006, for FY 2007 funds, and each periods is the same as that used in many conversion of HOV lanes to high
subsequent October 1 for funding other sectors of the economy to respond occupancy toll (HOT) lanes. Given that
through and including FY 2009. To be to peak-use demands. For example, the VPP program has only one more slot
assured of the maximum amount of airlines, hotels, and theaters often available for a new program partner to
constructive assistance from FHWA in charge more for peak than non-peak participate, Section 1121 authority
preparing a formal application, times. should be used, instead of VPP program
Expressions of Interest must be The FHWA is seeking applications for authority, for HOV-to-HOT lane
submitted two months prior, i.e., by the FY 2006 VPP program. According to conversions if an application comes
January 31, 2006, for FY 2006 funds, statute, the FHWA may enter into from a State that is not already in the
August 1, 2006, for FY 2007 funds, and cooperative agreements with up to VPP program.
fifteen State or local governments or Potential financial effects of value
each subsequent August 1 covering the
other public authorities (hereafter, pricing projects on low-income drivers
funding period.
States) to establish, maintain, and shall be considered and, where such
FOR FURTHER INFORMATION CONTACT: For effects are expected to be significant,
questions about this notice, please monitor value pricing pilot programs,
possible mitigation measures should be
contact Mr. Wayne Berman, Office of each including an unlimited number of
identified, such as providing new or
Operations, (202) 366–4069, or via email projects. The FHWA invites interested
expanded transit service as an integral
at mailto:wayne.berman@fhwa.dot.gov, States to apply to participate in the VPP
part of the value pricing project, toll
FHWA, 400 Seventh Street, SW., program for FY 2006. There are already
discounts or credits for low-income
Washington, DC 20590. For specific fourteen State-led programs currently in
motorists who do not have viable transit
information about the Value Pricing the VPP program: California, Colorado,
options, or fare or toll credits earned by
Pilot Program, please contact Mr. Florida, Georgia, Illinois, Maryland,
motorists on regular lanes which can be
Patrick DeCorla-Souza, Office of Policy Minnesota, New Jersey, North Carolina,
used to pay for tolls on priced lanes.
and Governmental Affairs, Highway Oregon, Pennsylvania, Texas, Virginia,
Mitigation measures can be included as
Pricing and System Analysis Team and Washington. Therefore, only one part of the value pricing project
Leader, (202) 366–4076, or via e-mail at new State is eligible to participate. Any implementation costs.
patrick.decorla-souza@fhwa.dot.gov. value pricing project included under The Secretary is required to report to
For legal questions, interpretations and these programs may involve the use of Congress every two years on the effects
counsel, please contact Mr. Michael tolls on the Interstate system. This is an of all value pricing pilot programs.
Harkins, Attorney Advisor, FHWA exception to the general provisions Annual evaluation data and reports
Office of the Chief Counsel, (202) 366– prohibiting tolls on the Interstate system shall be provided to the FHWA for use
4928, or via e-mail at as contained in 23 U.S.C. 129 and 301. in reports to Congress.
michael.harkins@fhwa.dot.gov. Office A maximum of $12 million is The VPP program is a continuation of
hours for the FHWA are from 7:45 a.m. authorized for each of the fiscal years the Congestion Pricing Pilot Program
to 4:15 p.m., e.s.t., Monday through 2006 through 2009 to be made available authorized by section 1012(b) of the
Friday, except Federal holidays. to carry out the VPP program ISTEA and amended by section 1216(a)
SUPPLEMENTARY INFORMATION: requirements. A set-aside of $3 million of TEA–21. To obtain up-to-date
per fiscal years 2006 through 2009 is information on the status of current
Electronic Access authorized only for value pricing pilot projects, please go to: http://
An electronic copy of this document projects that do not involve highway www.ops.fhwa.dot.gov/tolling_pricing/
may be downloaded from the Federal tolls. The Federal share payable under index.htm and go to ‘‘Resources’’ and
Register’s home page at: http:// the program is 80 percent of the cost of click on ‘‘Value Pricing Pilot Program
www.archives.gov and the Government the project. Funds allocated by the Knowledge Exchange’’.
Printing Office’s database at: http:// Secretary to a State or other public In addition to the VPP program,
www.access.gpo.gov/nara. entity under this section shall remain SAFETEA–LU offers States broader
available for obligation by the State for authority to use tolling on a pilot or
Background a period of three years after the last day demonstration basis to finance Interstate
Section 1012(b) of the Intermodal of the fiscal year for which funds are construction and reconstruction,
Surface Transportation Efficiency Act authorized. If, on September 30 of any promote efficiency in the use of
cprice-sewell on PROD1PC66 with NOTICES

(ISTEA) (Pub. L. 102–240; 105 Stat. year, the amount of funds made highways, and support congestion
1914), as amended by section 1216(a) of available for the VPP program, but not reduction by providing expanded
the Transportation Equity Act (TEA–21) allocated, exceeds $8 million, the excess flexibility under the following
(Pub. L. 105–178; 112 Stat. 107), and amount will be apportioned to all States programs: HOV facilities; Interstate
section 1604(a) of Safe, Accountable, as Surface Transportation Program System Reconstruction & Rehabilitation
Flexible, Efficient Transportation Equity funds. Pilot; Interstate System Construction

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
972 Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices

Toll Pilot; and Express Lanes pricing pilot programs, to provide for 2. Pricing at key traffic bottlenecks, of
Demonstration Program. For more the monitoring and evaluation of value multiple facilities in a single travel
information on those programs, please pricing projects included in such corridor, or on single highway facilities,
refer to the companion notice in today’s programs, and to report on these effects. including bridges and tunnels.
Federal Register entitled ‘‘Safe, The VPP program’s primary focus is on Applications to shift from a fixed to a
Accountable, Flexible, Efficient value pricing with road tolls, with a variable toll schedule on existing toll
Transportation Equity Act: A Legacy for secondary focus on other market-based facilities are encouraged (i.e.,
Users (SAFETEA–LU); Opportunities for approaches for congestion relief that do combinations of peak-period surcharges
State and Other Qualifying Agencies to not involve road tolls, such as parking and off-peak discounts). Pricing of
Gain Authority to Toll Facilities pricing or pay-as-you-drive insurance. queue jumps is also eligible. A queue
Constructed Using Federal Funds.’’ All projects should incorporate jump is defined as a facility that can be
significant pricing mechanisms used by certain types of traffic to bypass
What Is Value Pricing?
intended to reduce the level of points on the transportation network
‘‘Value pricing,’’ ‘‘congestion congestion. where congestion is particularly severe
pricing,’’ ‘‘peak-period pricing,’’ and occurs in a predictable pattern
‘‘variable pricing,’’ and ‘‘variable Potential Project Types (colloquially called ‘‘bottlenecks’’).
tolling’’ are all terms used to refer to The FHWA is seeking applications to Queue jumps can be as elaborate as an
direct non-constant charges for road use, use value pricing projects to reduce elevated facility or as simple as an at-
possibly varying by location, time of congestion, improve system grade lane addition.
day, severity of congestion, vehicle performance, and promote mobility. 3. Innovative parking pricing
occupancy, or type of facility. By Value pricing charges are expected to strategies, including time-of-day pricing
shifting some trips to off-peak periods, accomplish this purpose by encouraging and charges reflective of congestion
to mass transit or other higher- the use of alternative times, modes, conditions, provided the level and
occupancy vehicles, or to routes away routes, or trip patterns. As such, value coverage of proposed parking charges is
from congested facilities, or by sufficient to reduce congestion. Parking
pricing charges need to be targeted at
encouraging consolidation of trips, pricing strategies that are integrated
vehicles causing congestion, and prices
value pricing charges are intended to with other pricing strategies are
must be set at levels significant enough
promote economic efficiency both encouraged. Parking pricing strategies
to encourage drivers to use alternative
generally and within the commercial should be designed to influence trip-
times, routes, modes, or trip patterns
freight sector. They also achieve making behavior, and might include
during congested periods. Conversely,
congestion reduction, improved air surcharges for entering or exiting a
proposed projects that contemplate
quality, energy conservation, and transit parking facility during or near peak
value pricing charges that are not
productivity goals. periods, or a range of parking cash-out
A ‘‘value pricing project’’ means any significant enough to influence demand,
policies, where cash is offered to
implementation of value pricing such as minor increases in fees during
employees in lieu of subsidized parking,
concepts or techniques discussed in the peak-periods, or moderate toll increases
parking operators reimburse monthly
‘‘Potential Project Types’’ section of this instituted primarily for financing
patrons for unused parking days, or
notice and included under a State or purposes, will be given low priority.
renters or purchasers in multi-family
local ‘‘value pricing pilot program,’’ Similarly, value pricing concepts that
housing developments are provided
where such a program includes one or have become mainstream and have been
direct financial saving for not availing of
more value pricing projects serving a adopted as common practice, such as
car parking spaces. Pricing of a single
single geographic area, such as a HOV-to-HOT lane conversions, will not
parking facility, coverage of a few
metropolitan area or State. By be funded. To increase the likelihood of
employee spaces, or pricing of parking
definition, an entity with one or more generating information on a variety of spaces in a small area, for example, are
approved value pricing projects must useful value pricing strategies, proposed unlikely to receive priority, unless they
have a value pricing program. While the projects having as many of the following incorporate a truly unique element
distinction between ‘‘project’’ and characteristics as possible will receive which might facilitate broader
‘‘program’’ may appear to be merely a priority for Federal support. Projects of applications of value pricing across
technical one, it is significant in that, as interest include: local areas or States.
described in the ‘‘Background’’ section 1. Applications of value pricing 4. Pay-as-you-drive pricing, including
of this notice, the number of total VPP which are comprehensive and include car insurance premiums set on a per-
programs is statutorily limited to fifteen, pricing of currently free facilities, such mile basis and innovative car
while there is no limit to the number of as area wide pricing, pricing of multiple ownership, leasing, and usage
VPP projects allowed under each VPP facilities or corridors, and/or arrangements that reduce fixed costs
program. combinations of road pricing and and increase variable usage costs.
‘‘Cooperative agreement’’ means the parking pricing. The size or extent of 5. Projects that are likely to add to the
agreement signed between the FHWA road pricing programs, ranging from base of knowledge about the various
and a State to implement local value single facilities, to sections of, or design, implementation, effectiveness,
pricing pilot programs (See 49 CFR Part complete corridors, to comprehensive operational, and acceptability
18). ‘‘Toll agreement’’ means the area- or region-wide applications, are of dimensions of value pricing. The FHWA
agreement signed between the FHWA interest, along with their relative effect is seeking information related to the
and a State to grant the authority to on reducing congestion, altering travel impacts of value pricing on the
behavior, and encouraging the use of following: Travel behavior (e.g., trip
cprice-sewell on PROD1PC66 with NOTICES

collect tolls.
other transportation modes. Region- lengths, mode use, time-of-travel, trip
Program Objective wide pricing applications that use destinations, and trip generation by
The overall objective of the VPP technologies that provide drivers with private and commercial trip makers);
program is to support efforts by State real-time congestion and pricing traffic conditions (e.g., speeds and levels
and local governments or other public information on alternative routes are of service); implementation issues (e.g.,
authorities to establish local value especially encouraged. technology, innovative pricing

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices 973

techniques, public acceptance, value pricing only as one option, will for operation of a pilot project (e.g.,
administration, operation, enforcement, not be funded under this program. Electronic Toll Collection (ETC))
and legal and institutional issues); Broad planning studies can be funded technology, video equipment for traffic
revenues, their uses and financial plans; with regular Federal-aid highway or monitoring, and other instrumentation),
different types of users and businesses; transit planning funds. Applications for enforcement costs, costs of monitoring
and low-income motorists, including pre-implementation studies will be and evaluating project operations, and
possible mitigation measures and their selected based on the likelihood that costs of continuing public relations
effectiveness. These diverse information they will lead to implementation of activities during the period of
needs mean that the FHWA may fund pilot tests of value pricing conforming implementation.
different types of value pricing to the objectives described in the b. Costs of providing transportation
applications in different local contexts previous section. alternatives, such as new or expanded
to maximize the potential of the pilot In cases where the FHWA has made transit or ridesharing services provided
program. funds available to a State for pre- as an integral part of the value pricing
6. Projects that do not have adverse implementation studies, but the State project. Funds are not available to
effects on alternative routes or modes, or decides not to implement the project replace existing sources of support for
on low-income or other transportation- and has no other value pricing projects, these services.
disadvantaged groups are encouraged the FHWA may proceed to remove that Project implementation costs can be
under the VPP program. If such effects State from the program and replace it supported until such time that sufficient
are anticipated, proposed pricing with another State in the pilot program. revenues are being generated by the
programs should incorporate measures Since section 1012(b)(1) of ISTEA limits project to fund such activities without
to mitigate any major adverse impacts, participation in the pilot program to Federal support, but in any case for no
including enhancement of only fifteen slots (specifically, ‘‘States, longer than three years. Each
transportation alternatives for peak local governments or public implementation project included in a
period travelers, services such as ‘‘life- authorities,’’ colloquially termed States), local value pricing pilot program will be
line’’ toll rates aimed at low income the fifteen participating States must considered separately for this purpose.
travelers, and credit-based tolling intend to implement value pricing Funds may not be used to pay for
programs such as toll credits earned by projects and proceed accordingly. activities conducted prior to approval
motorists in regular lanes which can be for VPP program participation. Also,
Project Costs Eligible for Grant Funding funds made available through the VPP
used to pay tolls on priced lanes.
7. Pricing projects that lead to The FHWA will provide up to the program may not be used to construct
substantial congestion reduction and statutorily allowable 80 percent share of new highway lanes or bridges, even if
supplant or supplement existing tax- the estimated costs of an approved those facilities are to be priced, but toll
based approaches for generating surface project. Funds available for the VPP ramps or minor pavement additions
transportation revenues. program can be used to support pre- needed to facilitate toll collection or
8. Pricing projects that result in free- implementation study activities and enforcement are eligible.
flow peak period roadway conditions, also to pay for implementation costs of Complementary actions, such as lane
and where motorists earn or are value-pricing projects. Costs eligible for construction or the implementation of
provided with limited monetary credit reimbursement include costs of traffic control systems or transit projects
for their discretionary use, thereby planning for, setting up, managing, can be funded through other highway
allowing them a limited amount of free operating, monitoring, evaluating, and and transit programs eligible under
or discounted rush hour roadway access reporting on local value pricing pilot SAFETEA–LU and from new revenues
or transit trips before having to pay full projects. Costs cannot be reimbursed for raised as a result of a pilot. Those
fees. longer than three years. The three-year interested in participating in the VPP
While the FHWA is seeking funding limitation will begin on the program are encouraged to explore
applications that incorporate some or all date of the first disbursement of Federal opportunities for combining funds from
of these project characteristics, these funds for project activities. Examples of these other programs with VPP program
guidelines are intended only to specific costs eligible for reimbursement funds. Nevertheless, Federal funds may
illustrate selection priorities, not to include the following: not be used to match VPP program
limit potential program participants 1. Pre-Implementation Study Costs— funds unless permitted under specific
from proposing new and innovative Allowable pre-implementation study statutory authority.
pricing approaches for incorporation in costs include: Planning, public
Eligible Uses of Revenues
the program. participation, consensus building,
marketing, impact assessment, Sections 1012(b)(2) and (3) of ISTEA
Pre-Implementation Studies provide that revenues generated by any
modeling, financial planning,
The VPP program funds may also be technology assessments and value pricing pilot project must be used
used to assist State and local specifications, and other pre- for the project’s operating costs and for
governments in carrying out pre- implementation work that relates to the projects that are eligible for assistance
implementation study activities establishment of the value pricing under Title 23, United States Code.
designed to lead to implementation of a project including meeting Federal or Also, since section 1012(b)(2) requires
value pricing project. The intent of the State environmental or other planning the Secretary to fund a pilot project
pre-implementation study phase is to requirements. until such time that sufficient revenues
support efforts to identify and evaluate 2. Implementation Costs—Allowable are being generated to fund its operating
value pricing project alternatives, and to costs include those for setting up, costs, any revenues generated by a pilot
cprice-sewell on PROD1PC66 with NOTICES

prepare the necessary groundwork for managing, operating, evaluating, and project must be applied first to pay for
possible future implementation. Purely reporting on a value pricing project, pilot project operating costs. Any
academic studies of value pricing (not including: project revenues in excess of pilot
designed to lead to possible project a. Necessary salaries and expenses, or project operating costs may be used for
implementation), or broad, area wide other administrative and operational any projects eligible under Title 23, U.S.
planning studies which incorporate costs, such as installation of equipment Code. A project’s operating (or

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
974 Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices

implementation) costs include any costs to reduce confusion among interested The Tolling and Pricing Team reviews
necessary for a project’s applicants, given both the number and all Expressions of Interest for the
implementation; mitigation measures to differing structures of the various tolling various tolling opportunities contained
deal with adverse financial effects on and pricing programs, the Office of in current law but does not have
low-income drivers; the proper Operations has formed a working group responsibility to approve or disapprove
maintenance of the facility; any known as the ‘‘Tolling and Pricing specific projects. That responsibility
construction (including reconstruction, Team.’’ will remain with each of the respective
rehabilitation, restoration, or The key role for the Tolling and FHWA program offices responsible for
resurfacing) of the facility; any debt Pricing Team is to assist public administering a specific tolling or
service incurred in implementing the authorities by directing them to the pricing program. By requesting and
project; and a reasonable return on most appropriate program (or programs), reviewing all Expressions of Interest, the
investment by any private entity including to the VPP program, among Tolling and Pricing Team can effectively
financing the project. Uses of revenue the many options available. Members of guide an applicant to the most
are encouraged which will support the the Tolling and Pricing Team represent appropriate program.
goals of the VPP program, particularly the FHWA Offices of Operations, Policy
and Governmental Affairs, and The ‘‘Expression of Interest’’
uses designed to provide benefits to
those traveling in the corridor where the Infrastructure—the primary offices A public authority that wants to
project is being implemented. responsible for administering each of request tolling or pricing authority, or
Furthermore, for toll projects, the the tolling and pricing programs—and funding, is asked to submit an
FHWA and the public authority other oversight offices within the U.S. Expression of Interest to the Tolling and
(including the State transportation DOT and the FHWA, including, but not Pricing Team in care of the FHWA
department) having jurisdiction over a limited to the Office of the Secretary, Office of Operations in Washington, DC.
facility shall enter into a toll agreement and the FHWA Office of the An Expression of Interest template can
concerning the use of toll revenue to be Administrator and Office of Chief be downloaded via the Internet by going
generated under a value pricing project. Counsel. Members participate on the to the Tolling and Pricing Opportunities
The toll agreement will merely provide Tolling and Pricing Team because of webpage within the FHWA Office of
for the public authority’s commitment their direct program responsibilities or Operations Web site at http://
to use the revenues in accordance with because they are interested stakeholders www.ops.fhwa.dot.gov/tolling_pricing/
the applicable statutory requirements of in tolling and pricing programs within index.htm. Use of the template is
the VPP program and to annually audit the U.S. DOT. optional. The Expression of Interest may
its use of toll revenues for compliance The Tolling and Pricing Team has six be attached as an e-mail to
with such requirements. The execution purposes: TollingandPricingTeam@fhwa.dot.gov,
of a toll agreement is consistent with the 1. Coordinate all tolling and pricing or a hardcopy can be mailed to Mr.
requirements of other toll programs, activity within FHWA to facilitate the Wayne Berman, FHWA Office of
such as contained in 23 U.S.C. 129, and implementation and advancement of Operations, Room 3404, 400 Seventh
will facilitate adequate oversight of a tolling and pricing projects and Street, SW., Washington, DC 20590.
State’s compliance with revenue use standards in the United States; Concurrently, the Expression of Interest
requirements of the VPP program. The 2. Receive and review all Expressions should be copied to the respective State
FHWA Division Administrator, in of Interest submitted to the FHWA from FHWA Division Office.
coordination with the Office of Policy public authorities; The Expression of Interest is a
and Governmental Affairs and Office of 3. Direct the public authority or document—in letter, memo, or report
Chief Counsel, will execute value partnerships designated by the State to format—that provides the rationale for
pricing toll agreements. the tolling and pricing program (or funding or tolling authority and
programs) that can enable them to information about the intended project.
Who Is Eligible To Apply? accomplish the goals set forth in the A complete Expression of Interest, based
Qualified applicants include local, ‘‘Expression of Interest’’ section of this upon the information items listed
regional and State government agencies, notice; below, will enable the Tolling and
as well as public tolling authorities. The 4. Assist the Office of Operations in Pricing Team to provide the best
VPP program term ‘‘States’’ and the the promulgation of a final rule assistance and identify the range of
Tolling and Pricing Team term ‘‘public including requirements, standards, or options possible to meet intended goals
authorities’’ may be used performance specifications for the and timeframes.
interchangeably for purposes of interoperability of automated toll The information items requested for a
identifying that a responsible entity will collection systems as directed by complete Expression of Interest are as
enter into process of applying to the SAFETEA–LU Section 1604(b)(6); follows:
VPP program or another tolling 5. Support each of the FHWA program (a) A description of the agency or
program. Although project agreements offices that have responsibility for a requesting authority or authorities that
must be with public authorities, a local tolling and pricing program, in is/are requesting this tolling authority
VPP program partnership may also advancing formal proposals to gain where applicable;
include private tolling authorities and approval to toll or price motor vehicles (b) The name, title, email address, and
non-profit organizations. and facilitating coordination with the phone number of the person who will
appropriate FHWA Division Office; and act as the point of contact on behalf of
Program Coordination and 6. Establish program performance the requesting authority or authorities;
Assistance—The Tolling and Pricing goals; monitor achievements, and (c) A statement concerning the action
cprice-sewell on PROD1PC66 with NOTICES

Team prepare an annual report to Congress on being sought:


The Federal Highway Administration, the status and progress of all tolling and (i) Funding and/or tolling authority
Office of Operations is responsible for pricing programs, including describing via the Value Pricing Pilot program to
coordinating all tolling and pricing program successes in meeting support either pre-project study
programs that now exist under the congestion reduction and other activities or implementation activities as
Federal-aid Highway Program. In order performance goals. permitted; or

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices 975

(ii) Only authority to toll either to the specific FHWA program office the decision. If the project is approved,
existing or planned facilities; responsible for administering that a formal tolling agreement (and in the
(d) A description of the subject tolling and pricing initiative. The case of the VPP program, also a
facility or facilities proposed to be FHWA program office will then provide cooperative agreement) will then be
tolled; the public authority with the necessary prepared.
(e) Whether the subject facility is an information on how to formally apply
Interstate or non-Interstate facility; for authority to toll motor vehicles and, The Value Pricing Pilot Program
(f) Whether construction is involved in the case of the VPP program, request Application
and, if so, whether this is new funding. As stated under the DATES section in
construction, expansion, rehabilitation, Once a formal application is this notice, in order to be assured of the
reconstruction, or other; submitted, the appropriate FHWA maximum amount of constructive
(g) Whether an HOV lane or lanes program office will review the assistance from FHWA in preparing a
currently exist on the facility; application and determine whether or formal application, Expressions of
(h) A timetable to enact tolling (or not to approve the proposed project. Interest for tolling and pricing projects
modify tolling) on the subject facility; The public authority will then be seeking VPP program funding must be
(i) Any expressions or declarations of notified as to the determination. If submitted two months prior to the
support from public officials or the approved, a formal tolling agreement application deadline that applies to the
public, i.e., specifically, any public and/or cooperative agreement will be fiscal year for which funds are being
meetings that were held. If no public prepared between the FHWA and the sought. Once the Tolling and Pricing
meetings or expressions of support are public authority. The toll agreement Team provides feedback on the
available, please indicate if there are must be executed with the FHWA and Expression of Interest submittal, and
project plans for ensuring adequate address the use of revenues that are once the public authority has confirmed
public involvement and support prior to collected from the operation of the toll its course of action is to pursue VPP
implementation; facility. While program elements may program approval, the formal
(j) A plan for implementing tolls on vary, the restrictions generally require application should be submitted
the facility, where applicable. Where the revenues to be used first for debt directly through the State Department of
known, the range of anticipated tolls service, reasonable return on the Transportation to the appropriate
and the strategies to vary toll rates (i.e., investment for private parties, and the FHWA Division Administrator, with a
the formulae for variable pricing); operations and maintenance of the copy sent concurrently to Mr. Patrick
(k) The reasons for implementing facility. In addition, if the facility is DeCorla-Souza, FHWA’s Highway
tolls, such as financing construction, being adequately maintained, any Pricing and System Analysis Team
reducing congestion, or improving air revenues in excess of these uses may be Leader, c/o the Office of Policy and
quality; used for other title 23 U.S.C. eligible Governmental Affairs, 400 Seventh
(l) A description of the public agency purposes. The FHWA, the State Street, SW., Washington, DC 20590, or
or agencies that will be responsible for Department of Transportation, and the via e-mail at mailto:patrick.decorla-
operating, maintaining, and enforcing relevant toll authority or local souza@fhwa.dot.gov.
the tolling program; and governmental entity, if any, will execute Formal VPP program applications
(m) A description of how, if at all, any the toll agreement, and in the case of the (i.e., step #2) will be reviewed by a
private entities are involved either in VPP, also a ‘‘cooperative agreement’’ Federal Interagency Review Group,1
the up-front costs to enact tolling, or the that defines the scope of work that will which provides support to the FHWA in
cost sharing or debt retirement be funded. evaluating program applications (see the
associated with revenues.
Summary of the Two-Step Review ‘‘VPP Program Application Review
Program Participation—Overview of Process Process’’ section below). Ideally, the
the Process refined formal application will include:
The entire review process, resulting in
Submitting an Expression of Interest 1. A description of the congestion
the execution of a toll agreement and/
initiates a review process by the Tolling problem being addressed (current and
or a cooperative agreement, can be
and Pricing Team that leads to a projected);
summarized in two steps as follows:
recommendation as to which tolling or Step #1: Submit an Expression of 2. A description of the proposed
pricing program (or programs) will be Interest to the Tolling and Pricing Team. pricing program and its goals, including
appropriate and available to meet the The Tolling and Pricing Team will description of facilities included, and,
goals of the public authority. In some review the Expression of Interest, advise for implementation projects, expected
cases, if more than one tolling program the applicant as to which program or pricing schedules, technology to be
is available, the Tolling and Pricing programs are candidate to their project, used, enforcement programs, and
Team will work with the public and provide counsel as to which of operating details;
authority to help select the one program those is most appropriate to pursue. The 3. Preliminary estimates of the social
that is most appropriate and is most applicant will be directed to contact the and economic effects of the pricing
likely to lead to project approval. If the selected program office, wherein, the program, including potential equity
public authority prefers applying to a program office will then inform the impacts, and a plan or methodology for
tolling program other than the one public authority as to the procedures further refining these estimates for all
recommended, the Tolling and Pricing required for submitting a formal
1 The Federal Interagency Review Group was
Team will defer to this request; application for tolling authority and/or
established to assist the FHWA in assessing the
however, the Tolling and Pricing Team value pricing funding.
cprice-sewell on PROD1PC66 with NOTICES

likelihood that proposed local value pricing


will also provide advice as to the pros Step #2: Submit a formal application programs will provide valid and useful tests of
and cons of the decision. for tolling or pricing authority or value value pricing concepts. The Review Group is
Once there is agreement between the pricing funding to the FHWA program composed of representatives of the Tolling and
Pricing Team, along with representatives of the
public authority and the Tolling and office for formal review, ultimately Federal Transit Administration, the U.S.
Pricing Team as to the most appropriate leading to a decision on approval. The Environmental Protection Agency, and the U.S.
program, the applicant will be referred public authority will then be notified of Department of Energy.

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
976 Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices

pricing project(s) included in the indication that these items will be State and Other Qualifying Agencies to
program; completed within a short time. Gain Authority to Toll Facilities
4. The role of alternative Constructed Using Federal Funds.’’
VPP Program Application Review
transportation modes in the project, and Cooperative Agreement
Process
anticipated enhancements proposed to
be included in the pricing program; A. Requests for Funding The VPP program candidates
5. A time line for the pre- approved for funding will be invited to
After completion of an Expression of enter into negotiations with the FHWA
implementation study and Interest, and upon subsequent receipt of
implementation phases of the project to develop a cooperative agreement
the formal, refined application, the under which the scope of work for the
(applications indicating early FHWA’s Office of Policy and
implementation of pricing projects that value pricing project will be defined.
Governmental Affairs will engage the Federal statutes will govern the
will allow evaluation during the life of Federal Interagency Review Group and
SAFETEA–LU will receive priority); cooperative agreement. Regulations
proceed with final evaluation. cited in the agreement, and 49 CFR part
6. A description of tasks to be carried To ensure that all projects receive
out as part of each phase of the project, 18, Uniform Administrative
equal and fair consideration for the Requirements for Grants and
and an estimate of costs associated with limited available funds, the FHWA
each; Cooperative Agreements to State and
requires formal grant applications to be Local Governments, will also govern as
7. Plans for monitoring and evaluating submitted no later than March 31, 2006, they relate to the acceptance and use of
value pricing implementation projects, for FY 2006 funds, October 1, 2006, for Federal funds for this program. As a
including plans for data collection and FY 2007 funds, and each subsequent practical matter, each VPP program
analysis, before and after assessment, October 1 for funding through and project should have a separate
and long term monitoring and including FY 2009. To be assured of the cooperative agreement. Although, in the
documenting of project effects; maximum amount of constructive past, the FHWA has allowed some
8. A detailed finance and revenue assistance from FHWA in preparing a States to have a master cooperative
plan, including (for implementation formal application, Expressions of agreement that is subsequently amended
projects) a budget for capital and Interest must be submitted by January for each approved project, in the future
operating costs; a description of all 31, 2006, for FY 2006 funds, August 1, the FHWA will execute a separate
funding sources, planned expenditures, 2006, for FY2007 funds, and each agreement for each project. For value
proposed uses of revenues, and a plan subsequent August 1 thereafter. This pricing projects that do not involve
for projects to become financially self- timeline will allow for a fair comparison requests for Federal funds, a cooperative
sustaining (without Federal support) among formal applications received and agreement must still be executed. The
within three years of implementation. will also allow the FHWA to make FHWA Division Administrator will sign
9. Plans for involving key affected timely recommendations to the the cooperative agreement on behalf of
parties, coalition building, media Secretary with regard to allocation of FHWA.
relations, and related matters, including available funds in accordance with the
either demonstration of previous public criteria discussed in this notice. Based Other Requirements
involvement in the development of the on the recommendations of the Federal Prior to the FHWA approval of pricing
proposed pricing program or plans to Interagency Review Group, the U.S. project implementation, value-pricing
ensure adequate public involvement DOT will identify those VPP program programs must be shown to be
prior to implementation; applications that have the greatest consistent with Federal metropolitan
10. Plans for meeting all Federal, State potential for promoting the objectives of and statewide planning requirements
and local legal and administrative the VPP program, including (23 U.S.C. 135 (c)(1), (e)(2)(B),
requirements for project demonstrating the effects of value (f)(1)(B)(ii)(I) and (II), (f)(3)(A) and (B);
implementation, including relevant pricing on congestion, driver behavior, 49 U.S.C. 5323(1)).
Federal-aid planning and environmental traffic volume, ridesharing, transit Implementation projects involving
requirements. Priority will be given to ridership, air quality, and availability of tolls outside metropolitan areas must be
applications where projects are funds for transportation programs. The included in the approved statewide
included as a part of (or are consistent Secretary will make selections of transportation improvement program
with) a broad program addressing applications based on the and be selected in accordance with the
congestion, mobility, air quality and recommendations of the Federal requirements set forth in section
energy conservation, where an area has Interagency Review Group and criteria 1204(f)(3) of the TEA–21.
congestion management systems (CMS) contained in this notice. Implementation projects involving
for Transportation Management Areas tolls in metropolitan areas must be: (a)
(urbanized areas with over 200,000 B. Projects for Which No Funds Are Included in, or consistent with, the
population or those designated by the Requested approved metropolitan transportation
Secretary). Although most projects under the VPP plan (if the area is in nonattainment for
11. An explanation about how ETC program involve requests for value a transportation related pollutant, the
project components will be compatible pricing funds, some projects do not. In metropolitan plan must be in
with other ETC systems in the region. such cases, and especially where a State conformance with the State air quality
If some of these items are not is not already part of the VPP program, implementation plan); (b) included in
available or fully developed at the time the FHWA recommends that the public the approved metropolitan and
the formal application is submitted, authority investigate the other statewide transportation improvement
cprice-sewell on PROD1PC66 with NOTICES

applications will still be considered for opportunities to gain authority to toll programs (if the metropolitan area is in
support if they meet some of the priority that are listed in the companion notice a nonattainment area for a
interests of the FHWA, and related in today’s Federal Register, entitled transportation related pollutant, the
project characteristics, as described ‘‘Safe, Accountable, Flexible, Efficient metropolitan transportation
earlier in the section entitled ‘‘Potential Transportation Equity Act: A Legacy for improvement program must be in
Project Types,’’ and if there is a strong Users (SAFETEA–LU); Opportunities for conformance with the State air quality

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices 977

implementation plan); (c) selected in d. HOV to HOT lane (1121)—Jessie There are three categories of pipelines
accordance with the requirements in Yung. (202) 366–4672; that could realize an immediate benefit
Section 1203(h)(5) or (i)(2) of TEA–21; jessie.yung@fhwa.dot.gov. from such an increase in the MAOP: the
and (d) consistent with any existing e. Express Lanes Demonstration proposed Alaska Natural Gas
congestion management system in (SAFETEA–LU 1604(b))—Wayne Transmission System; new natural gas
Transportation Management areas, Berman (contact info above). pipelines that are being certificated by
developed pursuant to 23 U.S.C. f. Interstate System Construction the Federal Energy Regulatory
134(i)(3). (SAFETEA–LU 1604(c))—Greg Wolf. Commission; and pipelines constructed
Frequently Asked Questions (202) 366–4655; greg.wolf@fhwa.dot.gov. since 1980 with line pipe of known
g. Interstate Reconstruction and metallurgical and mechanical
1. Who will make up the Tolling and Rehabilitation (TEA–21 1216(b))—Greg properties.
Pricing Team? The Office of Operations Wolf (contact info above). This meeting provides the pipeline
is the lead office and will undertake h. 23 U.S.C. 129 Agreements—Greg industry, Federal and State regulators,
responsibility to gather and distribute Wolf (contact info above). and interested members of the public an
the Expressions of Interest for opportunity to share their knowledge
preliminary evaluation and to maintain Authority 23 U.S.C. 315; sec. 1216(a), Pub.
L. 105–178, 112 Stat. 107; Pub. L. 109–59; and experience about the impact of
the aforementioned website. The Tolling 117 Stat. 1144 49 CFR 1.48. increasing the MAOP to increase
and Pricing Team has representation pipeline efficiency. Individuals that
from all of the relevant program offices Issued on: December 28, 2005.
would like to make presentations
that have tolling and pricing oversight J. Richard Capka,
should notify the individual listed
responsibilities, including the FHWA Acting Federal Highway Administrator. under FOR FURTHER INFORMATION
Offices of Operations, Policy and [FR Doc. E6–12 Filed 1–5–06; 8:45 am] CONTACT by February 7, 2006, and
Governmental Affairs, and BILLING CODE 4910–22–P submit papers at this meeting.
Infrastructure. In addition, other
ADDRESSES: The March 21, 2006,
stakeholder offices within FHWA and
meeting will be held at the Hyatt
the U.S. Department of Transportation DEPARTMENT OF TRANSPORTATION
Regency Reston Hotel, 1800 Presidents
are represented, including the FHWA
Pipeline and Hazardous Materials Street, Reston, VA 20190. The telephone
Offices of Public Affairs and Chief
Safety Administration number for reservations at the Hyatt
Counsel, and the Office of the Secretary
Regency Reston Hotel is (703) 709–1234.
of Transportation. [Docket No. PHMSA–05–23447]
2. How often will the Tolling and The hotel will post the particular
Pricing Team meet? The group will meet meeting room the day of the meeting.
Pipeline Safety: Reconsideration of
as often as necessary in person, but FOR FURTHER INFORMATION CONTACT: Mr.
Natural Gas Pipeline Maximum
mostly will communicate via e-mail Allowable Operating Pressure for Joy Kadnar, Director, Engineering and
contact and access to a File Transfer Class Locations Emergency Support at (202) 366–4595
Protocol (FTP) Web site, which will or joy.kadnar@dot.gov about the subject
serve to post the Expressions of Interest AGENCY: Pipeline and Hazardous matter in this notice.
for private review by the team almost Materials Safety Administration, DOT. SUPPLEMENTARY INFORMATION:
immediately upon submittal. The Office ACTION: Notice of meeting; call for
Introduction
of Operations will act promptly to papers.
engage the Tolling and Pricing Team to Pipeline operators continually explore
review a project proposal, discuss SUMMARY: On March 21, 2006, the ways to reduce the cost of new
project eligibility under different Pipeline and Hazardous Materials Safety pipelines, or increase the efficiency of
programs, and recommend the project Administration (PHMSA) will hold a existing pipelines, without affecting
for further consideration under the most public meeting to discuss raising the reliability and safety. One way to
appropriate program. allowable operating pressure on certain achieve cost reductions is to use high-
3. If I have any questions, whom natural gas transmission pipelines. grade line pipe and employ new
should I contact? Any general questions Pipelines are the energy highways of the welding methods. Another method to
concerning the tolling and pricing Nation that provide the most efficient increase cost-effectiveness and to make
programs should be directed to Mr. means to transport vast volumes of the pipeline more efficient is to operate
Wayne Berman, Transportation natural gas on which we depend. pipelines at higher stress levels.
Specialist, in the Office of Operations at Raising the maximum allowable International pipeline regulations
202–366–4069. His e-mail address is operating pressures (MAOP) for natural generally limit design stresses to 72%
wayne.berman@fhwa.dot.gov. gas pipelines would allow more gas to specified minimum yield strength
Alternatively, there is an e-mail flow through these pipelines. This (SMYS). Under highly selective
‘‘mailbox’’ on the tolling and pricing notice is designed to announce a public conditions, some pipelines in the
Web site (address below). At the time of meeting and to invite papers on relevant United States and Canada operate at
this notice, the direct points of contact technical subjects. hoop stresses up to 80% SMYS.
are: Over the past 20 years, there has been Notwithstanding, the current United
a. Web site: http:// a drastic improvement in technology States Code of Federal Pipeline Safety
www.ops.fhwa.dot.gov/tolling_pricing/ pertaining to materials, metallurgy, Regulations (CFR) (49 CFR part 192)
index.htm controls, operations, and maintenance limits the stress to 72% SMYS for Class
b. Tolling and Pricing Team—Wayne of the pipeline network. Based on these 1 locations, while Canada limits it to
cprice-sewell on PROD1PC66 with NOTICES

Berman, HOP. (202) 366–4069; and other advances, PHMSA believes 80%. There are a lot of other countries
wayne.berman@fhwa.dot.gov. that certain pipelines in certain considering operating at higher levels.
c. Value Pricing (SAFETEA–LU locations could be safely and reliably Therefore, PHMSA believes it is
1604(a))—Patrick DeCorla-Souza. (202) operated above the operating pressure appropriate to explore the reliability
366–4076; patrick.decorla- established in current Federal pipeline and integrity implications of operating
souza@fhwa.dot.gov. safety regulation. pipelines at stress levels above 72%

VerDate Aug<31>2005 15:23 Jan 05, 2006 Jkt 208001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1

Vous aimerez peut-être aussi