Académique Documents
Professionnel Documents
Culture Documents
ANURUEGBE BENJAMIN, N
Telephone: +971 522808596
Email:banascom@yahoo.com
Summary
Nationality: NIGERIAN
Date of Birth: 19/12/76
Sex: MALE
Marital Status: MARRIED
Visa Status: TOURIST
LANGUAGE KNOWN
English :Fluent
French :Basics
EDUCATIONAL BACKGROUND
Federal University Of Technology
Owerri Imo State Nigeria
M. Sc. in Project Management.
2000 To 2002.
B, Eng. In Electrical
Electronics Engineering Option Power 1994 To 1999
Abayi Umuocha High School Aba Abia State
1988-1993
General Certificate for Education (G.C.E) 1993
PROFESSIONAL TRAINING/SKILLS
WORK EXPERIENCE
Maintenance Installation and Overhaul For All Ac Motor (Up To 1600 Hp)
Maintenance Installation And Overhaul
Dc Motor (Up To 1000 Hp), Maintenance, Installation Generator (Cat) (Up To
1714 Kva), Diesel Engine
E (Cat) 1000kva Tgs5, 2mw, Power Generation In The Site (Sharing,
Synchronize, Excitation), Woodward 2301
Speed Control, Amphenol System (I / O Interface), Top Drive Nov (Tds11s &
Tds8s) Tesco Eci 900, Electrical
Power Cables Specification (Lv , Mv) ,Ups And Electrical Installation In Hazard
Area According To Api ,Nfpa
70, Grounding And Bounding System According To Ieee-142, Nec And Many
Projects
For New Rigs (On Shore And Offshore Ri Esv Ebdv
(Hps Prove Leadership Skills Involving Managing, Developing And Motivating
Teams To Achieve Their Objectives.
Reliable, Trustworthy and Meticulous, Gained A Good Understanding of What
Is Required Of An Electrical Engineer
Electrical /Power Generation Contracted On Month-On/Month-Off Rotation,
Responsible For Daily Operation
Of 4 X 11mw Power Generators, 2 X 2mw Diesel Generators and Associated
Hv/Lv Power Distribution
Network. Isolation and De-Isolation of Fpso Electrical Utilities (6.6kv, 400v,
230v).Completion Of All Outstanding Electrical
Conduct 3yrs Pm on Transformers with Delta 3000 Megger, .As Condition
Monitoring and Maintenance Crude
Transfer to Export Line Mov, Ensure That Valve Is Set On Limit or Torque per
Oem Recommendation, Check The
Motor for Physical Damage. Inspect The Terminal Box /Gladding On The Motor.
Run Pm On /Monthly Inspection
Of Protective Relay on Switchgears. Run Pm/Corrective In Our Falls
Equipment. /Installation of the New Equipment.
Verify Grounding And Bonding On 11kv Electrical Distribution Panel / Bus.
Experience in Elss/Pdcs.Basic
Knowledge on Transformer, High Voltage Networks, Distribution Systems,
Medium Voltage Switchgear, High
Voltage Circuit Breakers, and Conduit Systems and Admirable Experience
Working As an Electrical
Maintenance Ieee-142, Nec And Many Projects For New Rigs (On Shore) And
Offshore Rig Prove
Leadership Skills Involving Managing, Developing and Motivating Teams To
Achieve Their Objectives.
Reliable, Trustworthy and Meticulous, Gained A Good Pre-Commissioning,
Commissioning Of
Of 147 Square Kilometers. Our Daily Operations Included Interfacing with All
the Civil Site Construction
And Working closely With the Clients Engineering Team and Their
Consultants to Obtain Approval
For Our Network Designs, Qualify The Material Suppliers And Execute The Site
Installations.
The Following Departments Were Directly Reporting To Me: Engineering,
Construction,
Qa/Qc, Document Control, Project Controls, Scheduling and Procurement
&Logistics
(Open) 1recommendation For Project Management, Procurement Assists Site
Supervision.
Generate The Entire Qit Built Electrifications Drawing. Protection Divorce
Coordination
Supervision of All Power Installations, Transformer Generators Wiring And
Positioning For Lighting, Power Cables and Circuit Breakers for Protection
Provision of Power Sockets Layout
Job Responsibilities: Detailed Engineering, Design Calculations, Preparation
Of Overall Single Line Diagram, Power, Protection & Metering Three Line
Diagram, Equipments Layout, Gis and Ais Substation Layout And
Section, Substation Equipments& Switching Scheme Selection, Cable Sizing,
Voltage
Drop Calculation, Hv Cable Route Drawing, Grounding System. Cost Estimates
Preparation of Equipment's Technical Specifications, Tender Documents, Bid
Evaluations, Vendors Drawing Review. Projects: Power and Substation Projects
(Gis & Ais) 2004 Projects: 400kv & 220kv Gis Substation
Standards, the Production and the O&M of the Pumping Station, Hydroelectric
Power Plant and Its Two Ais Substations of 220kv. Phase 6 Power System
Expansion Inspection and Erection Activities for Both Subcontractors
(Abb and Siemens).Contract Value for Quality and Delivery 6 Weeks
After Confirmation of All Technical Details. In Charge Of Repairing And
Testing Switchboard In Where Transients Blow-Up 350kw Motor, , Ht Fuses On
Contactor And
Capacitor Bank In Various Panels. Analysis Showed That Prestriking Disappeared After Final Repair Test.Working Well In
Multinational Environment, Under Pressure, Have Tutorial Skills, Like
Challenges, Quickly Adaptable On Changes. Good Planning An
D Coordination Skills between Different Departments. Specialties: Switchgear
From 0,4-33kv GIs And Ais, Substations Up
To 220kv, Protection Relays Testing, Siemens Digital Fault Recorders, Project
Management, Market Analysis, Research,
Manufacturer of Switchgears, Mcc, Control Panels, Protective Relays In
Technical Collaboration
Job Responsibilities: Preparation Of Single Line Diagram, General
Arrangement/Layout Of Panels, Development Of
Control Schematic & Wiring Diagram, Terminal Details, Selection Of
Components, Bill Of Quantities
And Estimates For Motor
Control Centre, Controls & Relay Panels And Substations-Gis Type..
REFERENCES