IN LASANOD HOSPITAL
Lasanod, Sool, Somaliland
September 2015
CONTENT
1.
2.
3.
4.
5.
Population Forecasting
Design of Demands
Determination of distribution Pipe Size
Determination of Total Dynamic Head of Pump and Power
Reservoir Capacity
Objective
The objective of this report is to provide the most important information which has been used to
design a gravity flow water supply system in Lasanod Hospital. Practical information and Basic
Design data is drawn from the SDF Lasanod Hospital mission report and consultation with
recommendations from SDF technical team.
1. Population Forecasting
After the design period is fixed, the next step is forecasting the population. Knowing the
proposed population of the hospital from the field survey report, it is possible to determine the
present demand, but for the design, what is required is the demand in future after 20 years.
Method 1. Arithmetic increase method:
In this method, the increase in the population is assumed constant
Pn = Po+Kn
Where
Pn -population at the end of n years
Po -present population
k-yearly increase of population
n-number of years
So, taking present population of Lasanod School 338 person and 5% of yearly increase,
Population of the school after 20 years is equal to;
Using
Arithmetic Increase method with 5% Increase
P2036 = 338+ (0.05*338)20
P2036 = 676 person
Geometric method
Using 5% increase P2026 = P2016(1+5%)^20
P2026 = 338(1+0.05) ^20
P2036= 897 person
2.
Table 1 Maximum Day demand (MDD) and peak hourly demand (PHF) population
Population
MDD factor
1.3
0-20000
20001-50000
PHD factor
1.25
2
1.9
2016
2036
9250
18495.36
1.3
1.3
12025
24043.97
2
1002
2
2003.66