MAIN BUILDING
Preliminary Works
Site clearing include cutting big tree at the back of the house
Uitzet & Stake out
Direksi keet ,Material Storage,Rest Worker Area,and Toilet
Water suply for construction works
Power suply electricyti for construstion works
Project construction billboard
Temporary construction fence with metal hollow frame and almunium cladding or seng
gelombang on the boundary of land,fins.metal painting
Bouplank
Colleted and removed all rubbish during and finished the project
Termite Treatment use Chemical Agenda (ex.bayer) on preconstruction and back filling
trench foundation process
Project docomentation and photo
Mobilisasi / demobilisasi
Procurement
Structure Works
Earth Works
Soil Excavation
~ Soil Excavation and Demolition old house Foundation , out of location for Basement and
foundation works until Elevation - 4.40 (Excavator & Dumptruck)
~ Soil Excavation for pilecap area (Manual)
~ Soil Excavation for Gutter Sumpit area (Manual)
~ Soil Excavation for T-Beam area (Manual)
Back Filling trenches
~ back filling foundation trenches
~ Provide and laying good soil for highest ground level elevation Basement Floor
slab Elevation - 3.05,-3.10,and -3.15
include compacting the layer with stamper machine
~ Provide and laying good humus soil for landscape and plantation area
Sand Layer
~ Sand layer for underlaying Pilecap foundation 10cm thickness
~ Sand layer for underlaying T-Beam, 10cm thickness
~ Sand layer for underlaying concrete slab basementfloor ,10cm thickness
Dewatering Works
Sumpit Pump kapasitas @ 2PK
~ Power Suply and Pipe Instalation
Recharge Well
~ Drilling and install cassing PVC 4" - 8m include Pipe Instalation from sumpit
Operator 24 hours
Sheet Pile for cut works guard and cerucuk bambu
units
Volume
m
m
Lot
Lot
Lot
pcs
1,552.00
1,552.00
1
1
1
1
113.50
m
Lot
167.00
1
776.78
Lot
1
Lot
1
Lot
1
Sub-Total Preliminary Works (I)
m
m
m
m
3,825.00
68.15
83.50
148.23
m
m
578.00
564.05
0.00
m
9.09
m
9.80
m
70.83
Sub-Total Earth Works (2.1)
Month
4.00
units
6.00
units
8.00
2,880.00
Sub-Total Dewatering Works (2.2)
hours
1
2
2.4.
2.5.
3
4
5
1
2
3
6
1
2
3
7
1
2
3
45.00
120.00
Sub-Total Sheet pile Works (2.3)
m
m
230.00
230.00
Sub-Total Foundation pile Works (2.3)
point
units
m
m
m
m
44.86
811.89
55.42
44.69
m
m
m
m
m
3.58
9.66
40.91
5.70
29.26
64.13
m
m
m
m
84.77
20.37
7.14
12.98
7.44
3.11
6.72
63.95
42.16
80.56
61.94
33.17
85.22
8
1
2
3
9
1
2
3
10
1
2
3
11
1
2
3
12
1
2
3
4
5
6
7
8
9
56.50
10.26
67.54
16.08
1.42
28.44
1.44
0.00
4.00
30.76
1.26
8.75
units
m
1
10.25
3.21
3.02
m
m
2.78
2.78
0.86
m
m
m
m
2.62
3.18
3.18
3.18
m
m
m
2.48
2.02
2.48
3.2
3.3
3.4
Masonry
Hebel Wall
Basement Floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
1st floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Provided and laying lightbrick (bata ringan) Hebel 12 cm thickness - Double Wall
2 nd floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Provided and laying lightbrick (bata ringan) Hebel 12 cm thickness - Double Wall
3 rd floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Provided and laying lightbrick (bata ringan) Hebel 12 cm thickness - Double Wall
Roof floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Gym and Game Room Area
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Pos security Area
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
430.86
m
m
573.05
469.54
m
m
826.65
574.42
m
m
664.25
384.02
214.37
311.82
m
70.31
Sub-Total Hebel Wall. ( 3-1)
m
861.72
m
1,086.44
m
1,829.91
m
1,463.93
m
428.75
m
623.63
m
140.63
Sub-Total Plastered & skimed Hebel . ( 3-2)
m
1,275.55
Sub-Total Plastered & skimed RetWall. ( 3-3)
m
m
m
m
m
m
m
171.18
126.34
136.47
141.90
12.11
36.73
22.84
108.00
2
3
4
5
6
7
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
2
3
1
2
3
4
1
2
Wall Bodyline
Coloumn
Crown, Ornamen Main Entrance Door
Spot Ornamen
Wall BodyProfil
Main Entrance Door profil
2 nd floor
Lisplank
Wall Bodyline
Coloumn
Crown, Ornamen Main Entrance Door
Spot Ornamen
Balcony
Flower Ornamen
Windows Profil (circle)
3 rd floor
Lisplank
Wall Bodyline
Coloumn
Flower Ornamen
Windows Profil (circle)
Edge Coloumn
Wall BodyProfil
Wall BodyProfil - h.100cm
Roof floor
Lisplank
Wall BodyProfil - h.100cm
Edge Coloumn
Carport
Lisplank
Edge Coloumn
Crown, Ornamen
Wall BodyProfil
Gym
Lisplank
Wall BodyProfil
Door & Windows
m
units
units
pcs
m
m
529.20
4.00
2.00
26.00
55.62
19.94
m
m
units
units
pcs
units
pcs
units
102.00
397.80
14.00
1.00
13.00
4.00
6.00
4.00
m
m
units
pcs
units
units
m
m
99.44
248.60
10.00
5.00
5.00
10.00
99.44
102.00
m
m
units
29.26
99.44
15.00
m
units
units
m
13.70
4.00
2.00
15.34
m
m
m
40.70
4.71
647.47
ROFFING WORKS
Light steel trusses zink-alum,gordeng & reng
Provided and laying Toping Roof ex.Owens
Provided and laying Multiplek 12mm P0 filmed
Insulation allmunium hollow structure sheet Retro shield or similar aproved
Provided and laying nok
Roof drain bowls
Metal Lispank panel
V.
WATERPROFFING WORKS
Basement Floor & Swimming Pool
m
221.74
m
221.74
m
221.74
m
221.74
m
57.55
pcs
34.00
m
79.78
Sub-Total Roofing Works ( V )
1
2
1
2
1
2
1
2
1
1
1
VI.
VII.
7.1.
7.2.
1
2
7.3.
1
2
7.4.
1
835.40
1,518.29
m
m
17.55
114.49
m
m
60.15
308.99
m
m
44.32
280.71
309.23
21.26
69.95
2
3
VIII
MEKANIKAL WORKS
IX
ELECTRICAL WORKS
B.
1.1.
1.2.
1
m
m
m
m
m
m
m
m
m
Sub-Total Finishing Works (VII)
Units
1.00
454.03
m
224.60
Sub-Total Outside Main Building (B)
rta
Units Price
Amount
(IDR)
(IDR)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
500,000.00
0.00
54,000,000.00
250,000.00
4,000,000.00
500,000.00
200,000.00
250,000.00
300,000.00
132,300,000.00
16,000,000.00
1,000,000.00
5,200,000.00
13,905,000.00
5,982,000.00
500,000.00
250,000.00
3,500,000.00
3,000,000.00
200,000.00
3,000,000.00
1,500,000.00
500,000.00
51,000,000.00
99,450,000.00
49,000,000.00
3,000,000.00
2,600,000.00
12,000,000.00
9,000,000.00
2,000,000.00
500,000.00
250,000.00
2,000,000.00
1,500,000.00
500,000.00
2,000,000.00
250,000.00
500,000.00
49,720,000.00
62,150,000.00
20,000,000.00
7,500,000.00
2,500,000.00
20,000,000.00
24,860,000.00
51,000,000.00
500,000.00
500,000.00
2,000,000.00
14,630,000.00
49,720,000.00
30,000,000.00
500,000.00
2,000,000.00
3,000,000.00
250,000.00
6,850,000.00
8,000,000.00
6,000,000.00
3,835,000.00
500,000.00
250,000.00
250,000.00
20,350,000.00
1,177,500.00
161,867,500.00
996,597,000.00
Roofing Works ( V )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
158
108
0.1
0.15
0.15
0.3
0.4
0.00
0.00
0.12
ring balok
ring balok