Bill of Quantity

Mr.Sidarta Residence - Pulomas, East Jakarta

NO.

A.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
II.
2.1.
1

2.2.
1
2
3
2.3.

Description

MAIN BUILDING
Preliminary Works
Site clearing include cutting big tree at the back of the house
Uitzet & Stake out
Direksi keet ,Material Storage,Rest Worker Area,and Toilet
Water suply for construction works
Power suply electricyti for construstion works
Project construction billboard
Temporary construction fence with metal hollow frame and almunium cladding or seng
gelombang on the boundary of land,fins.metal painting
Bouplank
Colleted and removed all rubbish during and finished the project
Termite Treatment use Chemical Agenda (ex.bayer) on preconstruction and back filling
trench foundation process
Project docomentation and photo
Mobilisasi / demobilisasi
Procurement
Structure Works
Earth Works
Soil Excavation
~ Soil Excavation and Demolition old house Foundation , out of location for Basement and
foundation works until Elevation - 4.40 (Excavator & Dumptruck)
~ Soil Excavation for pilecap area (Manual)
~ Soil Excavation for Gutter Sumpit area (Manual)
~ Soil Excavation for T-Beam area (Manual)
Back Filling trenches
~ back filling foundation trenches
~ Provide and laying good soil for highest ground level elevation Basement Floor
slab Elevation - 3.05,-3.10,and -3.15
include compacting the layer with stamper machine
~ Provide and laying good humus soil for landscape and plantation area
Sand Layer
~ Sand layer for underlaying Pilecap foundation 10cm thickness
~ Sand layer for underlaying T-Beam, 10cm thickness
~ Sand layer for underlaying concrete slab basementfloor ,10cm thickness
Dewatering Works
Sumpit Pump kapasitas @ 2PK
~ Power Suply and Pipe Instalation
Recharge Well
~ Drilling and install cassing PVC 4" - 8m include Pipe Instalation from sumpit
Operator 24 hours
Sheet Pile for cut works guard and cerucuk bambu

units

Volume

m
m
Lot
Lot
Lot
pcs

1,552.00
1,552.00
1
1
1
1

113.50

m
Lot

167.00
1

776.78

Lot
1
Lot
1
Lot
1
Sub-Total Preliminary Works (I)

m
m
m
m

3,825.00
68.15
83.50
148.23

m
m

578.00
564.05

0.00

m
9.09
m
9.80
m
70.83
Sub-Total Earth Works (2.1)
Month
4.00
units

6.00

units

8.00

2,880.00
Sub-Total Dewatering Works (2.2)
hours

1
2
2.4.

2.5.

3
4

5
1
2
3

6
1
2
3

7
1
2
3

Provide and erection concrete sheet pile - L 6m


Cerucuk bambu
Foundation Pile 20x20cm
~ Provide and erection concrete pile 20x20cm
~ Demolished concrete pile for jointing pilecap & T-Beam (stek)

45.00
120.00
Sub-Total Sheet pile Works (2.3)
m
m

230.00
230.00
Sub-Total Foundation pile Works (2.3)
point
units

Cement Concrete Structure


Basement floor ELV.-3.10
Pilecap Foundation & Sloof/T-Beam
~ Lean concrete fine agregate and mortar 1:3:5, 5cm thickness
~ Bataco wall as Begisting T-Beam and pilecap
~ Pilecap foundation ,cement concrete K250 with reinforcement
~ Sloof /T-Beam cement cocrete K250 with reinforcement
Slab
~ Slab Type A ELV.-4.10 - t.12cm cement concreteK250 - 8mm-150
~ Slab Type B ELV.-4.05 - t.12cm cement concreteK250 - 8mm-150
~ Slab Type C ELV.-3,15 - t.15cm cement concreteK250 - 10mm-150
~ Slab Type D ELV.-3.10 - t.12cm cement concreteK250 - 8mm-150
~ Slab Type E ELV.-3,05 - t.12cm cement concreteK250 - 8mm-150
Coloumn
~ Cement concrete K250 with reinforcement
Retaining Wall
~ Type RW 1 t.15cm - ELV.-3.10 ,Cement concrete K250 with reinforcement
~ Typel RW 2 t.20cm - ELV.-3.15 /-1,70 ,Cement concrete K250 with reinforcement
~ Type RW 3 t.15cm - ELV.-3.15/-4.10 ,Cement concrete K250 with reinforcement
~ Type RW 4 t.20cm - ELV.-4.10 ,Cement concrete K250 with reinforcement
Floor ELV. -1.00
Slab
~ Flat Slab cement concreteK250 with reinforcement
Coloumn
~ Cement concrete K250 with reinforcement
Beam
~ Cement concrete K250 with reinforcement
1 st Floor ELV. +/- 0.00
Slab
~ Flat Slab cement concreteK250 with reinforcement
Coloumn
~ Cement concrete K250 with reinforcement
Beam
~ Cement concrete K250 with reinforcement
2 nd Floor ELV. + 4.50
Slab
~ Flat Slab cement concreteK250 with reinforcement
Coloumn
~ Cement concrete K250 with reinforcement
Beam
~ Cement concrete K250 with reinforcement

m
m
m
m

44.86
811.89
55.42
44.69

m
m
m
m
m

3.58
9.66
40.91
5.70
29.26

64.13

m
m
m
m

84.77
20.37
7.14
12.98

7.44

3.11

6.72

63.95

42.16

80.56

61.94

33.17

85.22

8
1
2
3

9
1
2
3

10
1
2
3

11
1
2
3

12
1
2
3
4

5
6

7
8
9

3 rd Floor ELV. + 9,00


Slab
~ Flat Slab cement concreteK250 with reinforcement
Coloumn
~ Cement concrete K250 with reinforcement
Beam
~ Cement concrete K250 with reinforcement
Roof Floor ELV. + 13.50
Slab
~ Flat Slab cement concreteK250 with reinforcement
Coloumn
~ Cement concrete K250 with reinforcement
Beam
~ Cement concrete K250 with reinforcement
Roof Stairs and Lift Area Floor ELV. + 13.50
Slab
~ Flat Slab cement concreteK250 with reinforcement
Coloumn
~ Cement concrete K250 with reinforcement
Beam
~ Cement concrete K250 with reinforcement
Swimming Pool
Slab
~ Flat Slab cement concreteK250 with reinforcement
Coloumn
~ Cement concrete K250 with reinforcement
Beam
~ Cement concrete K250 with reinforcement
Stairs
Main Stairs (1 st floor and 2 nd floor) - Hall
~ Flat Slab cement concreteK250 with reinforcement
Main Stair (As H 3 -4)
~ Lift Loby basement to Hall 1 st floor
Main Stair ( As E 3 -4 )
~ Hall 2 nd floor to 3 rd floor
Main Terace Stair
~ Front
~ Side
Service Stair (As E 6-7)
~ Garage to Maid Area in basement
Service Stair ( As E 7-8 )
~ Garage to Kitchen 1 st floor
~ Kitchen to Hall 2nd floor
~ Hall 2nd floor toTerace 3 rd floor
~ Terrace 3 rd floor to Roof
Service Stair ( As H 7-8)
~ Maid Kitchen to 1st floor
Stair to Genset room
Gym Area

56.50

10.26

67.54

16.08

1.42

28.44

1.44

0.00

4.00

30.76

1.26

8.75

units
m

1
10.25

3.21

3.02

m
m

2.78
2.78

0.86

m
m
m
m

2.62
3.18
3.18
3.18

m
m
m

2.48
2.02
2.48

Sub-Total Cement Concrete Str. ( 2-5 )


III.
3.1
1
1
2
1
2
1
2
1
1
1

3.2

3.3

3.4

Masonry
Hebel Wall
Basement Floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
1st floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Provided and laying lightbrick (bata ringan) Hebel 12 cm thickness - Double Wall
2 nd floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Provided and laying lightbrick (bata ringan) Hebel 12 cm thickness - Double Wall
3 rd floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Provided and laying lightbrick (bata ringan) Hebel 12 cm thickness - Double Wall
Roof floor
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Gym and Game Room Area
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness
Pos security Area
Provided and laying lightbrick (bata ringan) Hebel 10 cm thickness

Plastered & Skimed Hebel


Basement Floor
1st floor
2 nd floor
3 rd floor
Roof floor
Gym and Game Room Area
Pos security Area

Plastered & Skimed Concrete (retaining wall)


Basement Floor

Plastered & Skimed Concrete - Opening Doors and windows


Basement Floor
1st floor
2 nd floor
3 rd floor
Roof floor
Gym and Game Room Area
Pos security Area

430.86

m
m

573.05
469.54

m
m

826.65
574.42

m
m

664.25
384.02

214.37

311.82

m
70.31
Sub-Total Hebel Wall. ( 3-1)

m
861.72
m
1,086.44
m
1,829.91
m
1,463.93
m
428.75
m
623.63
m
140.63
Sub-Total Plastered & skimed Hebel . ( 3-2)

m
1,275.55
Sub-Total Plastered & skimed RetWall. ( 3-3)

m
m
m
m
m
m
m

171.18
126.34
136.47
141.90
12.11
36.73
22.84

Sub-Total Plastered & skimed Opening. ( 3-4)


3.5
1

Exterior Cement Profil Ornamen & Accessories


1st floor
Lisplank

108.00

2
3
4
5
6
7
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
2
3
1
2
3
4
1
2

Wall Bodyline
Coloumn
Crown, Ornamen Main Entrance Door
Spot Ornamen
Wall BodyProfil
Main Entrance Door profil
2 nd floor
Lisplank
Wall Bodyline
Coloumn
Crown, Ornamen Main Entrance Door
Spot Ornamen
Balcony
Flower Ornamen
Windows Profil (circle)
3 rd floor
Lisplank
Wall Bodyline
Coloumn
Flower Ornamen
Windows Profil (circle)
Edge Coloumn
Wall BodyProfil
Wall BodyProfil - h.100cm
Roof floor
Lisplank
Wall BodyProfil - h.100cm
Edge Coloumn
Carport
Lisplank
Edge Coloumn
Crown, Ornamen
Wall BodyProfil
Gym
Lisplank
Wall BodyProfil
Door & Windows

m
units
units
pcs
m
m

529.20
4.00
2.00
26.00
55.62
19.94

m
m
units
units
pcs
units
pcs
units

102.00
397.80
14.00
1.00
13.00
4.00
6.00
4.00

m
m
units
pcs
units
units
m
m

99.44
248.60
10.00
5.00
5.00
10.00
99.44
102.00

m
m
units

29.26
99.44
15.00

m
units
units
m

13.70
4.00
2.00
15.34

m
m
m

40.70
4.71
647.47

Sub-Total Cement Profil Works ( 3-5 )

Sub-Total Masonry Works ( III.1 )


IV
1
2
3
4
5
6
7

ROFFING WORKS
Light steel trusses zink-alum,gordeng & reng
Provided and laying Toping Roof ex.Owens
Provided and laying Multiplek 12mm P0 filmed
Insulation allmunium hollow structure sheet Retro shield or similar aproved
Provided and laying nok
Roof drain bowls
Metal Lispank panel

V.

WATERPROFFING WORKS
Basement Floor & Swimming Pool

m
221.74
m
221.74
m
221.74
m
221.74
m
57.55
pcs
34.00
m
79.78
Sub-Total Roofing Works ( V )

1
2
1
2
1
2
1
2
1
1
1
VI.
VII.
7.1.
7.2.
1
2
7.3.
1
2
7.4.
1

Floor Waterproffing ,sikatopseal 107


Wall Waterproffing 2 sides,sikatopseal 107
1st floor
Bathroom Floor Waterproffing ,sikatopseal 107
Terace Floor Waterproffing,sikatopseal 107
2 nd floor
Bathroom Floor Waterproffing ,sikatopseal 107
Terace Floor Waterproffing,sikatopseal 107
3 rd floor
Bathroom Floor Waterproffing ,sikatopseal 107
Terace Floor Waterproffing,sikatopseal 107
Roof floor
Roofdeck Waterproffing,sikatopseal 107
Roof Stair & Lift
Roofdeck Waterproffing,sikatopseal 107
Game & Gym Area
Floor Waterproffing ,sikatopseal 107

835.40
1,518.29

m
m

17.55
114.49

m
m

60.15
308.99

m
m

44.32
280.71

309.23

21.26

69.95

KOZEN,DOORS AND WINDOWS WORKS


FINISHING WORKS
Walls Finishing
Floors Finishing
Basement floor ELV.-3.10
~ Floor
~ Plint
Ceilings Finishing
Plafond area
Cornice
Painting Finishing
Wall Interior Painting

2
3

Wall Exterior Painting


Ceiling Interior Painting

VIII

MEKANIKAL WORKS

IX

ELECTRICAL WORKS

B.
1.1.

OUTSIDE MAIN BUILDING WORKS


Rainwater channel and infiltration wells

1.2.
1

Carport and Driveways Area


Rigid Pavement
~ Cut & Fill Elevation until pleasant good road
~ Compaction with stamper machine
~ Sand filling layer 10 cm thickness
~ Lean concrete fine agregate and mortar 1:3:5, 5cm thickness
~ Concrete slab K300 T.15cm with reinforcement wiremesh M8
Kansten / Kerb

m
m

m
m
m
m
m
m
m
Sub-Total Finishing Works (VII)

Units

1.00

454.03

m
224.60
Sub-Total Outside Main Building (B)

rta

Units Price

Amount

(IDR)

(IDR)

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Preliminary Works (I)

Earth Works (2.1)

Dewatering Works (2.2)

0.00

0.00
0.00
0.00

0.00

0.00

Sheet pile Works (2.3)

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Foundation pile Works (2.3)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Cement Concrete Str. ( 2-5 )

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Hebel Wall. ( 3-1)

Plastered & skimed Hebel . ( 3-2)

Plastered & skimed RetWall. ( 3-3)

Plastered & skimed Opening. ( 3-4)

500,000.00

0.00

54,000,000.00

250,000.00
4,000,000.00
500,000.00
200,000.00
250,000.00
300,000.00

132,300,000.00
16,000,000.00
1,000,000.00
5,200,000.00
13,905,000.00
5,982,000.00

500,000.00
250,000.00
3,500,000.00
3,000,000.00
200,000.00
3,000,000.00
1,500,000.00
500,000.00

51,000,000.00
99,450,000.00
49,000,000.00
3,000,000.00
2,600,000.00
12,000,000.00
9,000,000.00
2,000,000.00

500,000.00
250,000.00
2,000,000.00
1,500,000.00
500,000.00
2,000,000.00
250,000.00
500,000.00

49,720,000.00
62,150,000.00
20,000,000.00
7,500,000.00
2,500,000.00
20,000,000.00
24,860,000.00
51,000,000.00

500,000.00
500,000.00
2,000,000.00

14,630,000.00
49,720,000.00
30,000,000.00

500,000.00
2,000,000.00
3,000,000.00
250,000.00

6,850,000.00
8,000,000.00
6,000,000.00
3,835,000.00

500,000.00
250,000.00
250,000.00

20,350,000.00
1,177,500.00
161,867,500.00

Cement Profil Works ( 3-5 )

996,597,000.00

Masonry Works ( III.1 )

Roofing Works ( V )

0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00

Finishing Works (VII)

Outside Main Building (B)

0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00

158

108

0.1

0.15
0.15

0.3
0.4

0.00
0.00

0.12

ring balok
ring balok