Vous êtes sur la page 1sur 1

74810 Federal Register / Vol. 70, No.

241 / Friday, December 16, 2005 / Notices

Proposed Revised Land Resource Implementation, Second Seminole January 17, 2006, Contact: Linda
Management Plan, Implementation, War Site, City of Ocala, Marion Dansby 505–988–6095.
Several Counties, AR; and LeFlore County, FL, Comment Period Ends:
Amended Notices
and McCurtain Counties, OK. January 30, 2006, Contact: Tim
Summary: No formal comment letter Bemisderfer 404–562–3124. EIS No. 20050411, Draft EIS, IBR, CA,
was sent to the preparing agency. EIS No. 20050516, Draft Supplement, Central Valley Project, West San
DOI, 00, Upper Mississippi River Joaquin Division, San Luis Unit Long-
EIS No. 20050466, ERP No. F–COE–
National Wildlife and Fish Refuge, Term Water Service Contract
C39018–NJ, Liberty State Park
Comprehensive Conservation Plan, A Renewal, Cities of Avenal, Coalinga
Ecosystem Restoration Project,
New Alternative E: Modified Wildlife and Huron, Fresno, King and Merced
Hudson Raritan Estuary Study, To
and Integrated Public Use, Counties, CA, Comment Period Ends:
Address the Adverse Impacts Implementation, MN, WI, IL and IA, January 17, 2006, Contact: Shane
Associated with Past Filling Comment Period Ends: February 3, Hunt, 559–487–5138 Revision to FR
Activities, Port Authority of New and 2005, Contact: Don Hultman 507– Notice Published October 7, 2005:
New Jersey City, Hudson County, NJ. 452–4232. This document is available Comment Period Extend from
Summary: No formal comment letter on the Internet at http://www.fws.gov/ November 25, 2005 to January 17,
sent to preparing agency. midwest/planning/uppermiss/ 2006.
EIS No. 20050467, ERP No. F–COE– index.html. Dated: December 13, 2005.
C39017–NY, Montuak Point Storm EIS No. 20050517, Final EIS, FHW, PA,
Robert W. Hargrove,
Damage Reduction Project, Proposed US–219 Improvements Project,
Reinforcement of an Existing Stone Meyersdale to Somerset, SR 6219, Director, NEPA Compliance Division, Office
Section 020, Funding, U.S. Army COE of Federal Activities.
Revetment Wall, Suffolk County, NY.
Section 404 Permit, Somerset County, [FR Doc. E5–7446 Filed 12–15–05; 8:45 am]
Summary: No comment letter was
sent was sent to the proposing agency. PA, Wait Period Ends: January 23, BILLING CODE 6560–50–P
2006, Contact: James A. Cheatham
EIS No. 20050477, ERP No. F–COE–
717–221–3461.
K36141–AZ, Santa Cruz River, Paseo EIS No. 20050518, Draft EIS, BLM, WY, ENVIRONMENTAL PROTECTION
de las Iglesias Feasibility Study, To Atlantic Rim Natural Gas Field AGENCY
Identify, Define and Solve Development Project, Proposed [EPA–HQ–OPP–2005–0471; FRL–7753–1]
Environmental Degradation, Flooding Natural Gas Development to 2000
and Water Resource Problems, City of Wells, 1800 to Coal Beds and 200 to FIFRA Scientific Advisory Panel;
Tucson, Pima County, AZ. Other Formations, Carbon County, Notice of Public Meeting
Summary: No formal comment letter WY, Comment Period Ends: January
was sent to the preparing agency. 30, 2006, Contact: David Simons 307– AGENCY: Environmental Protection
EIS No. 20050352, ERP No. FS–NPS– 328–4328 Agency (EPA).
L65264–WA, Elwha River Ecosystem EIS No. 20050519, Final EIS, FHW, RI, ACTION: Notice.
Restoration Implementation Project, U.S. Route 6/Route 10 Interchange
SUMMARY: There will be a 3–day meeting
Updated Information, Olympic Improvement Project, To Identify
of the Federal Insecticide, Fungicide,
Peninsula, Challam County, WA. Transportation Alternative, Funding,
and Rodenticide Act Scientific Advisory
Summary: No formal comment letter City of Providence County, RI, Wait
Panel (FIFRA SAP) to consider the
was sent to the preparing agency. Period Ends: January 17, 2006,
Review of Worker Exposure Assessment
Contact: Ralph Rizzo 401–528–4548.
Dated: December 13, 2005. EIS No. 20050520, Draft EIS, BIA, OR, Methods.
Robert W. Hargrove, Coyote Business Park, Confederated DATES: The meeting will be held on
Director, NEPA Compliance Division, Office Tribes of the Umatilla Indian February 14–16, 2006, from 8:30 a.m. to
of Federal Activities. Reservation, Proposes to Develop, approximately 5:00 p.m. eastern time.
[FR Doc. E5–7444 Filed 12–15–05; 8:45 am] Build and Manage a Light Industrial Comments. For the deadlines for the
BILLING CODE 6560–50–P Commercial Business Park, Umatilla submission of requests to present oral
County, OR, Comment Period Ends: comments and submission of written
January 30, 2006, Contact: Jerry L. comments, see Unit I.E. of the
ENVIRONMENTAL PROTECTION Lauer 541–278–3786. SUPPLEMENTARY INFORMATION.
AGENCY EIS No. 20050521, Draft EIS, BLM, AZ, Nominations. Nominations of
Arizona Strip Field Office Resource scientific experts to serve as ad hoc
[ER–FRL–6670–3]
Management Plan, which includes: members of the FIFRA SAP for this
Environmental Impacts Statements; Vermilion Cliffs National Monument, meeting should be provided on or before
Notice of Availability Grand Canyon-Parashant National December 28, 2005.
Monument (Parashant) BLM Portion, Special accommodations. For
Responsible Agency: Office of Federal General Management Plan for the information on access or services for
Activities, General Information (202) Grand Canyon-Parashant National individuals with disabilities, and to
564–7167 or http://www.epa.gov/ Monument NPS Portion of Parashant, request accommodation of a disability,
compliance/nepa/. Implementation, AZ, Comment Period please contact the Designated Federal
Weekly receipt of Environmental Impact Ends: January 30, 2006, Contact: Official (DFO) listed under FOR FURTHER
Statements Diana Hawks 435–688–3266. INFORMATION CONTACT, preferably at least
Filed December 5, 2005 Through EIS No. 20050522, Final EIS, NPS, TX, 10– days prior to the meeting, to give
December 9, 2005 Big Thicket National Preserve Oil and EPA as much time as possible to process
Pursuant to 40 CFR 1506.9. Gas Management Plan, your request.
EIS No. 20050515, Draft EIS, NPS, FL, Implementation, Hardin, Jefferson, ADDRESSES: The meeting will be held at
Fort King National Historic Orange, Liberty, Tyler, Jasper and [the Holiday Inn Rosslyn at Key Bridge,
Landmark, Special Resource Study, Polk Counties, TX, Wait Period Ends: 1900 North Fort Myer Drive, Arlington,

VerDate Aug<31>2005 19:37 Dec 15, 2005 Jkt 208001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\16DEN1.SGM 16DEN1

Vous aimerez peut-être aussi