Site ID:
Pre-install date:
Yes/No
Yes , No
Yes , No
Yes , No
Yes , No
Yes/No
Yes , No
6 Subcontractor check the connectivity of MW (power cable ,IF cable ,grounding cable )
Yes , No
Subcontractor check the NE and link Configuration compare with MW design document(NE IDIPName
,LLD)
Subcontractor check the temp_freq(7M bandwith) is avaiable base on the ODU scan. ( temp_freq<=8
85dBm)
7
Yes , No
Yes , No
Yes , No
Yes , No
12
Yes , No
13
Subcontractor make sure BTS be installed at left,TP48200A cabinet be installed at right,make sure the door
of cabinet can be opened normally
Yes , No
14 Subcontractor must pre-install new antenna behind existing antenna(if have free space)
Yes , No
15 Subcontractor check AISG cable connection is correct (From Antenna AISG IN Port to 3G RRU RET Port)
Yes , No
16
Subcontractor make sure jumper between feeder&RRU and antenna are not fixed with pole or bracket.(
Benefit for new antenna change to plannning location)
Yes , No
17
Subcontractor check POWER cable be fixed well or not(RRU power cable , AC power cable , DCDU
power cable , battery cable ,grounding cable )
Yes , No
(Scenario: TP48200A+BTS3900A) Subcontractor make sure 1*63A breaker connect to DCDU12A (for RFU),
18 1*63 breaker connect to DCDU12B(for RRU), 1*32 breker connect to DCDU12C(for BBU). 2*16A breaker
connect to DCDU12B for RTN.
Yes , No
(Scenario: TP48200A Only) Subcontractor make sure 2*63A breaker connect to DCDU12B (for RRU and
BBU), 2*16A breaker connect to DCDU12B for RTN.
Yes , No
20 Subcontractor make sure CPRI between BBU and RFU&RRU connection is right based on CPRI layout
Yes , No
21 Subcontractor check AC&DC is in the normal range(AC BOX ouput votalgeDCDU ouput votalge)
Yes , No
22 Subcontractor check battery installation is right and confirm battery serial connection is ok
Yes , No
Yes , No
24
Subcontractor make sure MRFU will be installed on correct slot (0,2,4 will be used on for 3 sectors;0,1,2,4
will be used for 4 sectors)
25
Subcontractor check CPRI connection from BBU to RFU(2G) and RRU(3G/4G) is right and the light of CPRI
port is on
Yes , No
26
Subcontractor check cable from UMPT to MW IDU is connected (1. For RTN950, port 3 of EG4 board will be
used 2. For RTN905, port GE3 will be used)
Yes , No
27
Subcontractor check monitor cable from the RS485/RS232 port (the lower one) on the SMU-02B board
in TP48200A to COM_OUT port of BTS3900A is connected(cable used is ethernet cable)
Yes , No
28
Subcontractor check monitor cable from COM_IN of FMU board to MON 0 of UPEU board(located in BBU) is
connected
Yes , No
Yes , No
Yes , No
31
Subcontractor check the label of cable is right( POWER cable CPRI cable Jumper cable Feeder cable
Ethernet cable)
Yes , No
32 Subcontractor should report ESN number(on left ear of the BBU) to OMC engineer
Yes , No
33 Subcontractor inform OMC wireless engineer to check transmission from HW BTS to BSC&RNC&MME is ok
Yes , No
Yes , No
Yes , No
Subcontractor verify enviroment monitor alarms with OMC engineer(water sensor alarmTemperature
sensor alarm Smoke sensor alarm door sensor alarm)
37 Subcontractor verify the light of lighting lamp is ok
36
Remark
Yes , No
9 Subcontractor check the the design Freq is avaiable base on the ODU scan.
19
Remark
Yes/No
Yes , No
Yes , No
Yes , No
39 Subcontractor must finish site clean and take picture before leave site
Yes , No
Remark