58398 Federal Register / Vol. 70, No.

193 / Thursday, October 6, 2005 / Notices

submits a Large Generator The Commission encourages water withdrawal from Lake Rabun, as
Interconnection Agreement among electronic submission of protests and stated above. The existing 10-inch
Power Partners Midwest LLC, Midwest interventions in lieu of paper, using the piping from the intake pumps to the
ISO, and Interstate Power and Light Co. FERC Online links at http:// distribution main would be replaced
Filed Date: 09/26/2005. www.ferc.gov. To facilitate electronic with 16-inch piping. No significant
Accession Number: 20050927–0023. service, persons with Internet access construction activity would be required
Comment Date: 5 p.m. Eastern Time who will eFile a document and/or be within the project boundary. The EA
on Monday, October 17, 2005. listed as a contact for an intervenor finds that approval of the application
Docket Numbers: ER05–1509–000. must create and validate an would not constitute a major Federal
Applicants: Arizona Public Service eRegistration account using the action significantly affecting the quality
Company. eRegistration link. Select the eFiling of the human environment.
Description: Arizona Public Service link to log on and submit the A copy of the EA is attached to a
Co. submits a compliance filing to its intervention or protests. Commission order titled ‘‘Order
Open Access Transmission Tariff in Persons unable to file electronically Approving Non-Project Use of Project
response to FERC Order 2006. should submit an original and 14 copies Lands and Waters’’, issued September
Filed Date: 09/26/2005. of the intervention or protest to the 27, 2005, and is available at the
Accession Number: 20050928–0211. Federal Energy Regulatory Commission, Commission’s Public Reference Room.
Comment Date: 5 p.m. Eastern Time 888 First St., NE., Washington, DC A copy of the EA may also be viewed
on Monday, October 17, 2005. 20426. on the Commission’s Web site at
Docket Numbers: ER05–926–001 The filings in the above proceedings http://www.ferc.gov using the ‘‘elibrary’’
Applicants: Midwest Independent are accessible in the Commission’s link. Enter the docket number (P–2354)
Transmission System Operator, Inc. eLibrary system by clicking on the in the docket number field to access the
Description: Midwest Independent appropriate link in the above list. They document. For assistance, call (202)
Transmission System Operator, Inc. are also available for review in the 502–8222 or (202) 502–8659 (for TTY).
submits the Large Generator Commission’s Public Reference Room in Magalie R. Salas,
Interconnection Agreement among Washington, DC. There is an Secretary.
Okoboji Wind Farm, LLC, Midwest ISO, eSubscription link on the web site that
[FR Doc. E5–5511 Filed 10–5–05; 8:45 am]
and Interstate Power & Light Co. enables subscribers to receive e-mail
BILLING CODE 6717–01–P
Filed Date: 08/30/2005. notification when a document is added
Accession Number: 20050831–0052. to a subscribed dockets(s). For
Comment Date: 5 p.m. Eastern Time assistance with any FERC Online DEPARTMENT OF ENERGY
on Tuesday, October 11, 2005. service, please e-mail
Docket Numbers: ER05–949–001. FERCOnlineSupport@ferc.gov. or call Federal Energy Regulatory
Applicants: Midwest Independent (866) 208–3676 (toll free). For TTY, call Commission
Transmission System Operator, Inc. (202) 502–8659.
[Project No. 12514–000]
Description: Midwest Independent Magalie R. Salas,
Transmission System Operator, Inc Secretary. Northern Indiana Public Service
submits its Large Generator Company; Notice of Application
[FR Doc. E5–5503 Filed 10–5–05; 8:45 am]
Interconnection Agreement with Power READY For Environmental Analysis
BILLING CODE 6717–01–P
Partners Midwest, LLC, Midwest ISO, and Soliciting Comments,
and Northern Indiana Public Service Co. Recommendations, Terms and
Filed Date: 08/30/2005. Conditions, and Prescriptions
DEPARTMENT OF ENERGY
Accession Number: 20050831–0051.
Comment Date: 5 p.m. Eastern Time September 30, 2005.
Federal Energy Regulatory
on Tuesday, October 11, 2005. Commission Take notice that the following
Any person desiring to intervene or to hydroelectric application has been filed
[Project No. 2354–087 Georgia] with the Commission and is available
protest in any of the above proceedings
must file in accordance with Rules 211 for public inspection.
Georgia Power Company; Notice of a. Type of Application: Original Major
and 214 of the Commission’s Rules of Availability of Environment
Practice and Procedure (18 CFR 385.211 License.
Assessment b. Project No.: 12514–000.
and 385.214) on or before 5 p.m. Eastern
c. Date Filed: June 28, 2004.
Time on the specified comment date. It September 28, 2005.
d. Applicant: Northern Indiana Public
is not necessary to separately intervene An environmental assessment (EA) is Service Company.
again in a subdocket related to a available for public review. The EA was e. Name of Project: Norway and
compliance filing if you have previously prepared for an application filed by Oakdale Hydroelectric Project.
intervened in the same docket. Protests Georgia Power Company on June 2, f. Location: On the Tippecanoe River
will be considered by the Commission 2005, requesting the Commission’s in Carroll and White Counties, Indiana.
in determining the appropriate action to authorization to permit the Clayton- The project does not affect federal lands.
be taken, but will not serve to make Rabun County Water and Sewer g. Filed Pursuant to: Federal Power
protestants parties to the proceeding. Authority (Authority) to increase its Act 16 U.S.C. 791 (a)–825(r).
Anyone filing a motion to intervene or water withdrawal from Lake Rabun, a h. Applicant Contact: Jerome B.
protest must serve a copy of that reservoir of the North Georgia Project, Weeden, Vice President Generation;
document on the Applicant. In reference from 2.0 million gallons per day to 3.5 Northern Indiana Public Service
to filings initiating a new proceeding, million gallons per day for municipal Company; 801 East 86th Avenue;
interventions or protests submitted on water supply. Merrillville, IN 46410; (219) 647–5730.
or before the comment deadline need The EA evaluates the environmental i. FERC Contact: Sergiu Serban at
not be served on persons other and the impacts that would result from (202) 502–6211, or
Applicant. permitting the Authority to increase its sergiu.serban@ferc.gov.

VerDate Aug<31>2005 19:52 Oct 05, 2005 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\06OCN1.SGM 06OCN1
Federal Register / Vol. 70, No. 193 / Thursday, October 6, 2005 / Notices 58399

j. Deadline for filing comments, 10-mile-long, 10-foot average depth, accordance with 18 CFR 4.34(b), and
recommendations, terms and 1,291-acre reservoir; (3) a two-mile-long 385.2010.
conditions, and prescriptions is 60 days 69,000 volt transmission line; and (4) You may also register online at
from the issuance date of this notice; appurtenant facilities. http://www.ferc.gov/docs-filing/
reply comments are due 105 days from The Oakdale development includes esubscription.asp to be notified via e-
the issuance date of this notice. the following constructed facilities: (1) mail of new filings and issuances
All documents (original and eight A 1688-foot-long dam consisting of a related to this or other pending projects.
copies) should be filed with: Magalie R. 126-foot-long, 58-foot-maximum-height For assistance, contact FERC Online
Salas, Secretary, Federal Energy east concrete buttress and slab dam Support.
Regulatory Commission, 888 First connecting the left abutment to the n. Public notice of the filing of the
Street, NE., Washington, DC 20426. The powerhouse; a 114-foot-long, 70-foot- application, which has already been
Commission’s Rules of Practice require wide powerhouse integral with the dam given, established the due date for filing
all intervenors filing documents with containing three vertical Francis competing applications or notices of
the Commission to serve a copy of that turbines-generating units with a rated intent. Under the Commission’s
document on each person on the official head of 42 to 48 feet, total hydraulic regulations, any competing application
service list for the project. Further, if an capacity of 3,200 cubic feet per second must be filed in response to and in
intervenor files comments or documents (cfc) and a total electric output of 9.2 compliance with public notice of the
with the Commission relating to the MW; an 18-foot-wide structure initial application. No competing
merits of an issue that may affect the containing a nonfunctional fish ladder applications or notices of intent may be
responsibilities of a particular resource and a gated trash sluice; a 84-foot-long filed in response to this notice.
agency, they must also serve a copy of ogee-shaped concrete gated spillway
the document on that resource agency. with two 30-foot wide, 22-foot-high Magalie R. Salas,
Comments, recommendations, terms vertical lift gates; a 90-foot-long, six bay Secretary.
and conditions, and prescriptions may concrete gravity siphon-type auxiliary [FR Doc. E5–5495 Filed 10–5–05; 8:45 am]
be filed electronically via the Internet in spillway; and a 1,260-foot-long west BILLING CODE 6717–01–P
lieu of paper. The Commission strongly earth embankment with a maximum
encourages electronic filings. See 18 height of 58 feet and a 30-foot-wide
CFR 385.2001(a)(1)(iii) and the crest; (2) a 10-mile-long, 16-foot average DEPARTMENT OF ENERGY
instructions on the Commission’s web depth, 1,547-acre reservoir; and (3)
site (http://www.ferc.gov) under the ‘‘e- appurtenant facilities. Federal Energy Regulatory
Filing’’ link. After logging into the e- m. A copy of the application is Commission
Filing system, select ‘‘Comment on available for review at the Commission
Filing’’ from the Filing Type Selection in the Public Reference Room or may be Notice of Application and Applicant-
screen and continue with the filing viewed on the Commission’s website at Prepared EA Accepted for Filing,
process.’’ http://www.ferc.gov using the Soliciting Motions To Intervene and
k. This application has been accepted ‘‘eLibrary’’ link. Enter the docket Protests, and Soliciting Comments,
and is now ready for environmental number excluding the last three digits in and Final Recommendations, Terms
analysis. the docket number field (P–12514) to and Conditions, and Prescriptions
l. Description of the Project: The access the document. For assistance, September 30, 2005.
existing Norway Oakdale Hydroelectric contact FERC Online Support at Take notice that the following
Project consists of the Norway FERCOnlineSupport@ferc.gov or toll- hydroelectric application and applicant-
development and the Oakdale free at 1–866–208–3676, or for TTY, prepared environmental assessment has
development and has a combined (202) 502–8659. A copy is also available been filed with the Commission and is
installed capacity of 16.4 megawatts for inspection and reproduction at the available for public inspection.
(MW). The project produces an average address in item h above. a. Type of Application: New major
annual generation of 65,000 megawatt- All filings must: (1) Bear in all capital license.
hours (MWh). All power is dispatched letters the title ‘‘COMMENTS’’, ‘‘REPLY b. Project No.: 2219–020.
directly into the local grid and is used COMMENTS’’, c. Date Filed: April 29, 2005.
within the East Central Area Reliability ‘‘RECOMMENDATIONS,’’ ‘‘TERMS d. Applicant: Garkane Energy
Coordination Agreement. AND CONDITIONS,’’ or Cooperative, Inc. (Garkane).
The Norway development includes ‘‘PRESCRIPTIONS;’’ (2) set forth in the e. Name of Project: Boulder Creek
the following constructed facilities: (1) heading the name of the applicant and Hydroelectric Project.
A 915-foot-long dam consisting of a 410- the project number of the application to f. Location: On Boulder Creek about 6
foot-long, 34-foot-maximum-height which the filing responds; (3) furnish miles north of the town of Boulder in
earthfill embankment with a concrete the name, address, and telephone Garfield County, Utah. About 29.6 acres
corewall; a 225-foot-long, 29-foot-high number of the person submitting the are located on the Dixie National Forest.
concrete gravity overflow spillway with filing; and (4) otherwise comply with g. Filed Pursuant to: Federal Power
flashboards; a 120-foot-long, 30-foot- the requirements of 18 CFR 385.2001 Act 16 U.S.C. 791 (a)—825(r).
high concrete gated spillway with three through 385.2005. All comments, h. Applicant Contact: John
30-foot wide, 22-foot-high spillway recommendations, terms and conditions Spendlove, P.E., Jones and DeMille
gates; a 18-foot-wide, 30-foot-high trash or prescriptions must set forth their Engineering, 1535 South 100 West,
sluice housing with one 8-foot-wide, 11- evidentiary basis and otherwise comply Richfield, UT 84710; (435) 896–8266.
foot-high gate; and a 142-foot-long, 64- with the requirements of 18 CFR 4.34(b). i. FERC Contact: Dianne Rodman,
foot-wide powerhouse integral with the Agencies may obtain copies of the (202) 502–6077, E-mail:
dam containing four vertical Francis application directly from the applicant. Dianne.rodman@ferc.gov.
turbines-generating units with a rated Each filing must be accompanied by j. Deadline for filing motions to
head of 28 feet, total hydraulic capacity proof of service on all persons listed on intervene and protests, comments, and
of 3,675 cubic feet per second (cfc) and the service list prepared by the final recommendations, terms and
a total electric output of 7.2 MW; (2) a Commission in this proceeding, in conditions, and prescriptions is 60 days