You are a Project Manager on site where work for 3K.m. long Tunnel
has been undertaken. The site is remote and takes about 2 days travel to
nearest town. Supervisors, Technicians & Skilled Workers are engaged
in dangerous / hazardous work. Absenteeism due to sickness, quarrels,
drinking is adding to less output of work and chances of accidents on
site are increasing. Management has urged to do something so that time
targets can be achieved. Discuss how will you tackle the problem and
increase the output of the work.
Solution:Introduction of Main Problem
1.
2.
3.
4.
Needs and Their Fulfillment on Site:Lack of Manpower Management (or) Planning: Prepare a proper schedule of the Project and Assign Resources to
each Task i.e. each Activity, Assigning Resources means Identify
manpower required for each Task and what is the availability of
manpower and how much work has been done till date and how much
work is to be done. Identify Type of manpower required i.e. Skilled (or)
unskilled .If manpower is in adequate try to get more manpower or Try
to use the available manpower Fully so that maximum amount of work
to complete and try to complete the Urgent woks such that it does not
affect our project duration, reschedule the project and updated schedule
to head office and inform them weekly work progress so that they can
help you to overcome the manpower problem (or) try to motivate the
available manpower by giving extra benefits if they complete the project
in time. (or) if manpower is very less than required then immediately
inform head office so that they can send some more manpower so that
the project can run smoothly.
Suggestion & Recommendation to Management on Manpower
Management (or) Planning:
4
more it is the one of the preliminary need for the employees &
workers.
Suggestion Methods for Hygiene Factors: Management has to well plan for the temporary shelters in
such a way that number of workers will be involved in the project
and how many shelters are required and for different category of
employees will be working at site and different types of shelters
should be constructed with different facility what all materials
required for construction any how much time required to construct
it so that all those thing should be completed before starting of
project, Management should built temporary shelters for the
workers who will be working at site because the site is at remote
area workers cannot be able to say at their home and come for
work it is the preliminary requirement for the workers so
management has to take extra precautions, A site office also be
built with all necessary requirements, drinking water should be
good because most of diseases are spread by water so it is
important step to taken care by management.
Lack of Medication: Management should send a medical team to site and they
should stay there till completion of project. They should be
supplied necessary equipment and medical kits so that they can
manage any hazardous situation i.e. any sudden accidents they can
handle the situation, any epidemic occurred they can overcome that
situation. By this work will be smoothly progressed and number of
workers absenteeism will be reduced. Worker who is sick will be
taken care by medical team he will be recovered quickly and he
can start doing the work so that manpower problem is solved.
7
Consumption and Availability of Alcohol:This is the major problem with labour because they drink
daily after work so that they get some relief from whole day work
and body pains, but management should try to avoid drinking
alcohol or try to get them in limited dose so that they have it n just
go for sleep if they get it in excess quantities they will be drinking
whole night and next day they will be absenteeism and also after
excess drinking they start quarreling between themselves its a big
problem for the project manager. If this quarreling happens
regularly then management has to take some precaution steps to
handle that problem. Such as try to avoid the availability of alcohol
near the site so that the labour cannot consume much alcohol and
this problem is solved and the project may continue smoothly.
Storage of Materials: This is also a major problem for such a big project and at
remote place materials will be at site well before start of project so
store rooms should be properly built well in advance so that it will
not create a problem while execution of work for that what all
employees required and how many number required should be
planned before so that materials are properly handled by this only
the cost of project depends.
Roof Spalling: The management should have complete knowledge of what
all technical problem may occurs while execution of project and it
has to take proper precautions and it should be well planned before
so that it would not affect the project duration, what are causes of
the problems and how to overcome the problems. The cause of
8
grouting should be done so that the rock will get more strength so
that it can stop the water seepage into the tunnel. This is the easy
method to overcome the seepage problem, the other method to
overcome the seepage problem covering the tunnel section with
water proofing membranes it will also not allow the water to
seepage into the tunnel so that work can be progress smoothly.
Recommendation to Management: Top Management should be more responsible and it should
have to properly monitor the progress of work and if any urgent
needs at site should be fulfilled as quickly as possible and it should
see that the lower and middle management is working properly are
not. If any accidents are hazardous situation then top management
has to urge to do some help to lower and middle management so
that they can overcome the situation they must send some team so
that will help them and work will be progress smoothly.
Tunnel project is a very large project it will take lot of time to
complete the whole project so management has to be well prepared
of all the fore coming situations i.e. labors problems, absenteeism
etc.
workers & clerks carryout the actual operations as per schedule. Their
authority & responsibility is limited & they have to follow the lines
drawn by the higher levels of management. The foremen or supervisors
are responsible for carrying out work orders allotted to their respective
departments. They pass on the instructions of middle management to the
workers. The quality of the workmanship & quality of output will
depend upon the hard labor, discipline & loyalty of the operating
personnel.
Motivation of Employees in Construction Project: Motivation is the driving force within individuals that drive them
physiologically and psychologically to pursue one or more goals to
fulfill their needs or expectations. Motivators may be intrinsic or
extrinsic. An example of an intrinsic motivator is the self-fulfillment of a
worker as a result of performing a task well.
Motivation of labor in Construction Project: Construction labor can be motivated. This is important because
dwindling productivity is a major problem confronting construction
today. Productivity has decreased every year for the past decade, in part
because of increasing design complexity, more rigorous federal and state
regulations and socio-economic changes affecting the work force. Our
findings indicate that a highly motivated workforce enhances
productivity and project effectiveness.
In construction, the work itself - that is, the building of a structure
for all to behold is a key motivator for all levels of management and the
12
13
14