Vous êtes sur la page 1sur 22
NICMAR- SODE PGP-CM - MODULE NO: 01 ASSIGNMENT NO: THREE MATERIALS AND EQUIPMENT MANAGEMENT COURSE CODE: NCP 24- NCP 25 PREPARED & SUBMITTED BY: NAME: M.S.MADHURI REG NO: 212-06-11-10652-2141 MATERIALS AND EQUIPMENT MANAGEME! INTRODUCTION Machines and Materials are a vital resource to the accomplishment of any construction project. They enable effective working at any construction site for works that eannot be practically be executed only by manpower. SCOPE OF WORK Civil works for development of 100m wide landing strip, International Airport ‘+ Carrying out earthwork in excavation in any material met on site, up to the required level by mechanical means i.e, excavators. ‘+ Backfilling in burrow to achieve required level 80,000 Cum earth, ‘waste of 20,000 Cum to a lead of 3Kms and spreading the same. sposal of overburden ‘+ Proving and laying sand over leveled surface, 3,000 Cum from 20kms, including spreading & leveling. ‘© Procure, store and applying Bitumen over sand bed, from Bangaigon, Assam, of 150,000 Liters. DESCRIPTION OF EQUIPMENTS CONSIDERED FOR THE WORK Earthmovers: These machines used for earth cutting, moving or transporting large volume of earth. A brief description of the equipments used for excavation is reported as follows. Here we have considered the following machinery for the task to be executed: + 1 Nos. crawler mounted Hydraulic excavator, TATAEX350 LCH - V Super BUCKET CAPACITY : 1.30 - 1.90 m3. For excavation & loading to dump truck, © Hydraulic Excavators-Crawle 1 Nos. Motor Grader-Articulated TATA Hitachi Motor grader TG-14 for dozing, surface dressing, leveling spreading of sand. 5 Nos. Truck Tipplers TATA HYVA 2516 for Hauling of earth excess earth ‘mass 20000 Cum 3kms away from the site & dumping of earth where filling is required 80000 Cum, also to bring sand from 20Kms of Vol.3000 Cum. These are Single-bucket excavator’s. names as classified according to running gear as crawler-mounted, wheeled, walking, rail, floating, and combination rubber-tyres. These are used for excavation, moving earth & loading. ‘The benefit of crawler is that it can easily move in any type of soil, Easily load earth to the hauling machine Hydraulic Excavator ‘+ Motor Grader- Articulated: These commonly referred to as a road grader, a blade, @ maintainer, or a motor grader, i is a construction machine with a long blade used to create a flat earth surface. These machines have blades which can be positioned at front as well as centre depending on site and nature of work. These are generally used for area grading and where low cutting and filling is to be done. © Truck Tipper: A tipper, is a dump truck used to haul earth mass, rock, sand gravel, asphalt, trash and anything else that needs hauling and dumping. It is widely used for construction purpose, mining purpose, domestic goods transportation purpose and many other. It is rubber mounted, uses hydraulic hoist to dump the materials mechanically. Generally itis rear duping system. There are also dumpers with side unloading systems. ‘+ Asphalt Paver: The asphalt pavers are capable of laying large quantities of hot asphalt and leveling it to the required condition. ‘+ Asphalt Sprayer: The asphalt sprayer melts the bitumen and sprays it at the required area, It has a burner in it which can maintain the temperature of the bitumen at over 350 degree C. CALCULATION OF PER DAY WORK The total work to be planned for execution per day can be calculated as below. Total No. of days = 100. Working Hours. ~ 10 hours/ Day. IDENTIFICATION OF ACTIVITH ‘The major activities can be listed as below: 1, Earthwork in excavation 100000 Cum. 2. Hauling of overburden 20000 Cum, Up to lead of 3Kms. 3. Bringing Sand 3000 Cum, From 20Kms, 4. Leveling of surface & spreading of sand. 5, Procurement of 150000 liters of Bitumen. 6. Planning for application of bitumen and procurement keeping in view that total available storage at a time is 1/3 of total requirement. PLANNING OF ACTIVI Activity Earthwork in excavation Leveling and dressing ‘Sand filling Order for Bitumen a] Delivery of Bitumen Replenishing oF Bitumen Removal of over burden Spreading of Soil ors That Affect Selection of Equipment 1. Barth Moving Equipment: ‘The selection of earthmoving equipment mainly dependents on:- * Quantity of earth to be moved. + Completion Time. ‘© The decision to choose between crawler-mounted earthmoving equipment and a wheel- ‘mounted one depends to a large extent on the prevailing job conditions © Payload & Cycle time + The number of associated equipment required to support the main equipment ie. Loaders & Dumpers. # Cost of Owing & Operation. * Average age In-Service & Equipment useful age. 2, Earth Hauling Equipment: ‘The selection of earth hauling depends mainly dependents on:- + Quantum of Work. Space for maneuvering & terrain, Cost of Owing & Operation. Fleet equipment characteristics Expected project duration. Nature of Work. Distance of Hauling, Average age In-Service & Equipment useful age. Mass Diagram CUMMULATIVE METRIC VOLUME END AREAS ‘ALGEBRIC a VOLUME (CUM) sums STATION cur | FILL | cur FILL See CUMULATIVE 0 186 |0 | 0.000 0.000 0.000 1 6 [0 ‘| 17836594 | 0.000 17836.594 2 44 [0 [7748370 | 0.000 25584.964 3 2 [0 | 4679.708 | 0.000 30264.672 35 0 0 | 767.165 [0.000 31031.837 4 0 22 | 0.000 ~529.276 | 30502.562 5 0 44 | 0.000 “3228581 | 27273.981 6 0 65 | 0.000 ~5345,683 | 21928.298 7 0 166 | 0.000 -12305,657 | 9622.641 8 0 T19-_| 0.000 =14899.107 | -5276.466 9 35/46 | 2493.287 | -R071.452 | -10854.631 9.08 0 0 191791 | -185.246 | -10848.086 10 0 22 | 0.000 “979.160 | -11827.245 105 0 0 | 0.000 “29.276 | 12356521 ii 2 0 | 767.165 | 0.000 “11389.356 R 4a )0 [4679708 | 0.000 ~6909.647 13 87 |0 | 9282.70 | 0.000 2373.053 14 218/43 | 21595704 | -2117.102 | 21851.655 5 64/22 —-| 19984.657 | -3175.653 | 38660.658 1507 -‘[0 0 (345204 [-238174 | 38767.709 16 32/0 | 2109.705 | 0.000 40877.413, 165 0 0 1150.748 | 0.000 “42028.161 7 0 32 | 0.000 “793.913 | 41234.248 18 0 61 | 0.000 “4551.770 | 36682.478 19 0 157 | 0.000 “10717.830 | 25964.648 20 9095 | 6367.472 | -12332.120 | 20000.000 Cost Analysi Cost of equipment operation per hour and cost of each item of work. Calculation of Per day work. ‘Total Quantity of Earth= 1,00,000 Cum. No. of Days= 60 Days. Volume of Earth to be moved per day per hour= 100000/60/10 Hence Hourly production required=166.66 Cum per Hour. 1, Determine of the material type and bucket fill factor. Average Soil = 85 to 90% 2. Estimate the Cycle Time Referring to the supplier's equipment eyele time estimating chart Average = 0.43 to 0.52 minute 3. Calculation of Effective Cycles per Hour Divide the 60 minute hour by eycle time and adjust for availability and efficiencies. Cycle Time 0.48 Cycles/60 minute hour 60/ 0.4 Operator SkilVEfficiency 0.9 (90 Machine Availability 0.95 (95%) Gen Operational 0.83 (50 min/hr) Efficiency Effective Cycles per 128 x9 x 95 x.83=89 Hour 4, Calculate the Required Bucket Capacity Divide hourly production requirement by effective cycles per hour, adjust for material density and fill factor, Hourly Production 166 Cum / hour Required Effective eyeles /hour 89 =Required Payload 166/89 = 87 Cum Material Density / Loose 1.6 Ton / m3 = Bucket Payload Volume 1.87 / 1.6 = 1.17 m3 Fill Factor 0.85 (85%) = Nominal Bucket Size 1.17/.85~= 1.38 m3 Hence Considering TATA EX350 LCH - V Super BUCKET CAPACITY 30 - 1.90 m3 The cost breakdown structure for owning and operating cost of all the fleet equipment has to be paid larger importance as this is the vital statistic which can make the project into Profit and if not considered may lead to financial loss to the project. Equipment operation cost accounts for the three main categories of cost. 1, Owing cost 2. Operation cost. Its the cumulative sum of expenses an owner experiences by working @ machine on the project. It is sum of expenses like fuel, lube oil expenses, grease, repair & maintenance of ‘machinery, Fuel expenses are determined by measurement of the job. This can be determined by records of consumption of fuel in liters per hour knowing job conditions, viz. if the soil is loose machine can do more volume of work in comparisons to the work where the strata of soil is harder. Average hourly consumption of fuel can be calculated directly knowing the soil properties of the project from previous recorded statistics. Similarly, the cost of lube oil and replacement of tier required can be worked out by knowing the machine characteristics and abrasion, life of tier. 3. Wages of Equipment Operators. Operator wages may be included in Operation cost, but due to the variance of projects it is generally practiced to keep the Wages of Equipment Operator is a separate category. ‘The justification behind this is, since every project may have different scheme, sometimes the operator may be paid on hourly basis sometimes may be in Percentage and sometimes in the volume or work done. The cost should include all benefits paid by the company as per its policy. Cost of Owing ean be determined by knowing 1. Estimated Ownership Period in years, 2. Estimated Usage (Hours/year) 3. Ownership usage (Total Hours) Operating Costs: 1, Fuel Cost & Consumption rate (Unitshours) 2. Lube Oils, Filters, Grease. 3. Tyres 4, Repair reserve (Extended use & Basie repair) Fuel cost can be calculated on the theoretical basis. ‘The resulting theoretical values must be adjusted by time and load factor that account for working conditions. Time factor-Actual working time of machine. Load factor- Percentage of rated horsepower. NAME OF EQUIPMENTS; 1, FOR EQUIPMENT USED DEPARTMENTALLY | (1) Ownership charges: (a) Total investment at site of work (this includes A/T cost, Sales tax, excise, custom and other duties, transport expenses consisting of freight (by ‘ocean & rail) insurance loading/unloading charges and erection and commissioning on receipt). Rs, 50,00,000,00 (b) Deduct salvage value@15 percent of A Rs, 7,50,000.00 (©) Total investment to be depre sesoeRS, 42,50,000.00 (@) Economic life of the machine in hours as per appendix 7.11 {as per Ministry norms, itis 9000 Hrs.) Hts. (c) Depreciation per hour (oD) ‘Rs, 472.22 (8) Storage charges per hour (1 percent of “e” spread over the economic life) = 0.01x (C) ro) 4m ‘Total ownership charges = (E)+ (F) Rs.476.94...() 11 Operational Charges Repair charges per hour including maintenance and replacement of tyres (150 percent of “C” spread over ‘economic life = 1.5xC/D..... Rs.708.33...(11) IIL Overhead Charges: @S percent of ownership and operational charges = S(E+I)/100 Over tnead charges pet hOur.......sesssseee : Rs, 59.23...(11D) TV Running Charges: Operating stafflabour & wages: No, Wagesimonth, Designation () Operatior @ 584.21 per day (Gi) Helper @ 428.00 per day (iii) Cleaners @ 89.36 per day (iv) Mise. Expenses (Welder) @5% (W) TA. Ete.@ 15% (H) Wages Per hour Total Operating Cost per Hour... o-oR8.165.23 ...() (D) Servicing Chages: Fuel Lubricants, ete. ‘Consumption/hr. Rate/Litre Cost. (i) Fuel @Tliters per Hour ......cost per hour = 14Liters X Rs41.29 per Liter Rs.578.06 (i) Lubricants , Grease, Hyd.Oil, gear oil, Cotton Waste, ete, @ Rs.52.73per Hour. Total Service Charge per Hour. Rs 630.79...(K) K Cost of Lub. Oil, Fuel ete. hr. Total Running charges per hour (J+K) ' Overhead charges @ 5 percent of the total charges perhour=5x 1/100 = R539.80....0 Surnming up: ‘Ownership charges <1 = R8476.94...(0 Operational Charges - Rs.708.33...(0), Overhead of I and It = IIT= Rs. $9.23...(1D) Running charges (as in 5) = Rs, 796.02...(1V) ‘Overhead charges on IV Rs.39.80 (V) Cost of Equipment Operation per hour= (I#IF+II+IV+V)= Rs.2080.32 Calculation for Dumper: Earth haulage or transportation. It is to determine not only the most suitable method of hhauling material, but also to determine most effective and economical means or equipment to use for operation of shifting earth. The rear dumpers & tractors with hydraulic dump are mostly used in transportation of earth. These units have the body that is mounted on a frame of a truck. Dumping is carried out by raising the box with a hydraulic system. There are common types of trucks that are capable of handling all types of earth material. Physical site conditions and economic considerations may operate as controlling factors in selecting the equipment based on its size. optimum assignment of dumpers to the excavators and minimize the idle time of the excavator. The excavation- loading seeks to combine two basic equipments in view of achieving efficiency and productivity. If the excavation rate of a machine remains constant, and if the loads and cycle times of the dumpers to remain constant, it would be fairly simple to determine the ‘most economical number of dumpers to employ on a specified project. However, it is well known that dumper cycle times do not remain constant even though the haul road profiles and the number of dumpers operating remain constant, There may be times when dumpers are waiting in a queue to be loaded; then later, for no apparent reason, the excavator may have to wait for a dumper. This results in a loss in production. If more dumpers are employed, there will be an excess of dumper capacity. But often there is not enough benefit to compensate for an increased cost of extra dumper(s). This loss of productivity occurs because of a mismatch which causes bunching of the hauling units ‘The improvement can be done by minimizing both the idle time of equipment and handling cost per cubic meter of earth, The number of dumpers required for the earthwork is determined by comparing various fleet production capabilities and costs. Requirement of selecting the lowest cost fleet with adequate production capability. In other words, dumper fleet requirements are affected by many factors; site conditions, ‘output requirements, loading equipment, equipment performance and cycle time, operating methods and practices, matching of loading equipment and dumpers, and equipment availability and utilization. The suitability of a loading equipment to a hauling ‘dumper and the selection process of a dumper fleet consist of 1. The maximum capacity of a dumper depends upon the site conditions and quantum of ‘work. This differs from project to project, but generally, it is about eight times the bucket capacity. 2. The minimum capacity of the dumper should be approximately four times larger than the excavator bucket capacity. Mateh Facto number of haulers x loader cycle time/ number of loaders x hauler eyele time, The perfect match point from the theoretical standpoint is 100 percent, the dumper-shovel fleet efficiency, which occurs when the match factor equals tol. CYCLE : VOLUME CALCULATION Measured parameters Calculated parameters Excavator Dumper Avg. Number Bucket Avg. Cycle Match | Total loading of cycle time factor | efficieney(%) time dumper time(see) (min) (min) 1 023 | 22.63 2 04s | 45.27 3 0.68 | 67.90 288 275 12s 4 091 | 90.53 45 102 | 101.85 3 13 [13.17 6 136 | 135.80 7 138 | 15844 ‘Truck considered of 9MT capacity & 5.5 Cum in loading volume. Cost of Dumper per day @ Rs 2100.00 X. Snos X 60 days= Rs.6,30,000.00 (Additional One Truck is required for transportation of sand & Removal of Overburden) Total Cost of Work: Excavation; Total Earthwork to be done= 100000.00 Cum No.of days = 60 Days. 60 days X 10 Hours X 2081= Rs. 12,48,600.00 Motor Grader for leveling the site @ RE@MSOWOpENHOUT Cost of Sand. Sand Quarry Lead 20Kms, Cost at quarry Rs. 79.00 Carriage charge @ Rs.6.08 per Kms~ 121.60 Sacking charge@ Rs.3.05 per Cum. (Including labour, Loading & Unloading Charges) Cost of sand spreading & leveling at Site@ 55.00 per Cum Cost of sand = Rs.79% Rs.121.604Rs.3.05+ Rs.55.00 =Rs.258.65 Total Cost of Sand = 3000 Cum. X Rs.258.65 = RSW75(950000 Cost of Bitumen, Cost of Bitumen at Bongaion Plant.Rs. 38170.00 Cost of transportation= Rs.568.10 per Truck. Additional Rs.8.34per Kms Consider site 1000kms from Plant Hence cost of transportation= Rs568.10+Rs.8340.00= Rs.8964,91 Consider Stacking, loading unloading cost @ 2%= Rs, 167.93 Per MT Cost of Bitumen= Rs.38,170.00 + Rs, 163.93 + Rs 896 49 Rs.39,230.42 Per MT Cost of 1,50,000.00 Lit-2403 Kg per cum, = 360.45 MT Total Cost of Bitumen= 360.45 MT X Rs.39230.42 =Rs.1,41,40,604.89 say RsTTO(OSI0 TOTAL COST OF WORK=Rs. _17,52,600.00 Rs, 7,75,950.00 Rs. 1,41,40,605,00 MATERIAL MANAGEMENT: Material management plays a vital role in achieving the target completion date. Material management is planning & controlling of the functions supporting the complete cycle of materials, and the associated flow of information. These can be achieved by Identification of Critical & Most Critical materials required, Standardizing by formulation & Implementation of Guidelines to achieve harmony within the activities. Determining the period, start & end of the project preparing schedules, procure materials as per schedule, storage, inventory control, distribution as per requirement & dispose. It confirms that the material reaches the site before the time of its requirement at the same time it also ensures that the fund is not blocked by purchase of material too before they are required at site, EQO ~ economic order calculation As we are procuring Bitumen from Indian Oil Corp. Bangaigaon, Assam, how many ‘would we order “at a time?” If we order a large quantity each time we order, we'll end up holding some bitumen in inventory for a longer time & than if we had ordered a smaller ‘quantity. With a higher quantity, inventory cost goes high. If we order a small quantity, we'll end up paying any setup and/or fixed costs more frequently. For example, the driver of the truck delivering the bitumen is paid the same, ‘whether the truck is loaded with 10MT bitumen or 2MT bitumen. If we order only 2MT bitumen at a time, we'll have to pay transportation 5 times more ... than if we had ordered 200MTbitumen at a time, With a smaller quantity, setup and/or fixed cost goes high. Since a higher quantity is not best ... and a lower quantity is not best .. there must be some “middle” quantity where the total cost (inventory cost PLUS setup and/or fixed cost) is least expensive. Below is a chart that illustrates the relationship: Total Cost Inventory Cost nwoo Setup Cost ‘The point of lowest total cost can be seen to be at the “very bottom” of the Total Cost curve. The quantity associated with that point just also happens to be the same quantity at which the two other lines intersect. To calculate the quantity at that point, use the formula below: EQ = V[2 (Demand) (Setup Cost)] / (Inventory Cost) ‘That formula results from using calculus to take the derivative of the Total Cost function at zero, When this formula is used to calculate how many to MAKE at a time (instead of how many to BUY at a time), it is sometimes called the Economic Manufacturing Quantity ... oF EMQ. Calculation of EOQ. IR PF. DCR R = Forecasted monthly usage. 1,50,000.00 Lit=2403 Kg per cum, = 360.45 MT. C= Cost per order event (mot per unit)... cesssesssosseeesaiRS. 3,53,073.60 (OMT in One Truck) P = Purchase cost per unit... .Rs. 38170.00 (Cost at plant) H= Holding cost factor... seonnaRS, 41,987.00 (P=1.1XP) Recorder level (ROL} Receiving and issuing of inventories are the common and recurring phenomena in a ‘manufacturing organization, When the inventories fall below a particular level, they are replenished by the fresh purchases. The prescription of re-order level (ROL) is an important technique of inventory control. It fundamentally deals with ‘when to order’ to replenish the inventories. Re-order level is predetermined point, and when the existing stock of inventories reaches this point of falls below it, the purchase action is initiated to replenish them. The ROL is mentioned in the bin-card of each inventory item, What should be the quantity of replenishment order is also @ matter of policy. Generally, size of the order is determined on the basis of the economic ordering quantity (EOQ) which is also an important technique of inventory control. Detailed treatment is given to this technique separately. ‘The re-order level is decided for each important item of inventory on the basis of following considerations: 1) Lead time 2) Average periodic consumption (daily consumption) 3) Safety stock Re-order level is decided as under: ROL= (Lead time x average daily consumption) + safety stock Here, Lead Time=4 days. Average periodie consumption per day = $000 Liters Safety Stock 5000 Liters. ROL= (4x5000)+5000 = 25000 Liters Ordering schedule, for Bitumen. As per the given criterion, the site has a storage capacity of only $0,000 liters of bitumen at a time. Hence the schedule for procurement of bitumen can be decided as follows to ensure timely consumption of bitumen and also timely procurement. It is given that the lead time for bitument from a refinery in Bongaigaon in Assam is 45 days. Hence: Order for bitumen to be placed in lots of 50,000 liters each as follows: Lotnumber | Day of indent from 1st day | Day of reciept | Days for consumption 4 415th day 60th day 40 days 2 25th day Toth day 40 days 3 35th day 80th day 10 days BIBLIOGRAPHY: ‘+ A Statistical Analysis Of Construction Equipment Repair Costs Using Field Data & The ‘Cumulative Cost Model by Zane W. Mitchell, Jr. ‘+ Managing Construction equipment S. W. Nunnally ‘+ Construction Planning Equipment & Methods- Peurifoy/Schexnayder/ Shapira ‘+ Optimizing Economic Order Quantity (EOQ)- By Dave Piasecki © GOVERNMENT OF INDIA CENTRAL PUBLIC WORKS DEPARTMENT 2012 DELHI SCHEDULE OF RATES ‘+ Construction equipments & methods By Dr.Ibrahem Assakkaf ‘+ Client Packet, Beonomic Order Quantity (EOQ) Caleulation

Vous aimerez peut-être aussi