Federal Register / Vol. 70, No.

171 / Tuesday, September 6, 2005 / Rules and Regulations 52917

that is replaced by another bond, being available in the docket, are part of change to the temporary regulation the
whether it be a trust fund or other docket (CGD01–05–081) and are bridge owner again changed their
financial instrument used as a collateral available for inspection or copying at request. The bridge owner advised the
bond, that will cover the area and cost the First Coast Guard District, Bridge Coast Guard that the night closure plan
of treatment facilities. Therefore, to the Branch Office, 408 Atlantic Avenue, would not work due to known adverse
extent that the reference in section Boston, Massachusetts, 02110, between public response to nighttime operations.
4(g)(3) to release of the ‘‘whole’’ bond 7 a.m. and 3 p.m., Monday through As a result of the late notice from the
means the original bond that is replaced Friday, except Federal holidays. bridge owner and the necessity to
by the new bond in the form of another FOR FURTHER INFORMATION CONTACT: Mr. complete vital repairs, the Coast Guard
financial assurance mechanism, that John W. McDonald, Project Officer, First is now revising the current rules to
reference is approved. Coast Guard District, (617) 223–8364. allow the bridge to open less frequently
Section 4(g)(3) was also amended by during the daytime.
SUPPLEMENTARY INFORMATION:
deleting bond release language Background and Purpose
applicable to noncoal surface mining Regulatory Information
operations. Since SMCRA contains no The SR 27 Bridge has a vertical
We did not publish a notice of clearance of 10 feet at mean high water,
counterpart to this language, the proposed rulemaking (NPRM) for this
deletion of the language does not render and 19 feet at mean low water in the
regulation. Under 5 U.S.C. 553(b)(3), the closed position. The permanent
the Pennsylvania program inconsistent Coast Guard finds that good cause exists
with SMCRA or the implementing drawbridge operating regulations at 33
for not publishing an NPRM. CFR 117.5, which were suspended from
Federal regulations. Additionally, under 5 U.S.C. 553(b)(B),
For the above noted reasons, we are March 14, 2005 through November 30,
the Coast Guard finds that good cause 2005, require the bridge to open on
approving the amendments to Section exists for making this temporary final signal at all times.
4(g)(3). rule effective less than 30 days after On January 5, 2005, we published a
Dated: July 14, 2005. publication in the Federal Register. The notice of proposed rulemaking (NPRM)
Brent Wahlquist, Coast Guard believes that not publishing entitled Drawbridge Operation
Regional Director, Appalachian Region. an NPRM and making this final rule Regulations, Townsend Gut, Maine, in
[FR Doc. 05–17613 Filed 9–2–05; 8:45 am] effective less than 30 days after the Federal Register (70 FR 773). We
publication is necessary for the reasons received no comments in response to
BILLING CODE 4310–05–M
discussed below, coupled with the fact the notice of proposed rulemaking. No
that the bridge rehabilitation is public hearing was requested and none
necessary, vital work that must be was held.
DEPARTMENT OF HOMELAND performed in order to assure the
SECURITY On March 16, 2005, we published a
continued, safe, and reliable operation temporary final rule (TFR) entitled
Coast Guard of the bridge. Any delay in the Drawbridge Operation Regulations,
implementation of this regulation would Townsend Gut, Maine, in the Federal
33 CFR Part 117 not be in the best interest of the public Register (70 FR 12805).
and public safety. On July 23, 2005, the bridge owner
[CGD01–05–081] On January 5, 2005, we published a requested additional regulatory action to
RIN 1625–AA09 notice of proposed rulemaking (NPRM) help facilitate the timely completion of
entitled Drawbridge Operation the bridge painting portion of this
Drawbridge Operation Regulations, Townsend Gut, Maine, in project. The contractor’s progress would
Regulations:Townsend Gut, ME the Federal Register (70 FR 773). We not allow completion of the project
received no comments in response to before the winter months when painting
AGENCY: Coast Guard, DHS. the notice of proposed rulemaking. No operations are not possible due to cold
ACTION: Temporary final rule. public hearing was requested and none temperatures. As a result, the Coast
was held. Then, on March 16, 2005, we Guard is revising the current temporary
SUMMARY: The Coast Guard is
published a temporary final rule (TFR) rules to allow the bridge to open less
temporarily changing the drawbridge entitled Drawbridge Operation frequently during the daytime. A half-
operation regulations for the operation Regulations, Townsend Gut, Maine, in hour advance notice will be required to
of the SR 27 Bridge, at mile 0.7, across the Federal Register (70 FR 12805) allow the construction workers
Townsend Gut, between Boothbay which suspended the existing sufficient time to clear the bridge before
Harbor and Southport, Maine. This regulations and put in place temporary each bridge opening. Under this
temporary rule allows the bridge to rules effective until November 30, 2005. temporary rule the bridge will open
open at specific times between 6 a.m. On July 23, 2005, the bridge owner during the daytime at 6 a.m., 12 p.m.,
and 8 p.m., after a half-hour advance requested additional regulatory action to 6 p.m. and 8 p.m., after a half-hour
notice is given. Additionally, this help facilitate the timely completion of notice is given by calling the number
temporary rule allows the bridge to the bridge painting aspect of this posted at the bridge. At all other times
remain closed for nine days, September project. The contractor’s progress would from 8 p.m. until 6 a.m., the bridge will
19, 2005 through September 27, 2005. not allow completion of the project on open on signal.
This action is necessary to help time before the winter months, which In order to facilitate necessary repairs,
facilitate rehabilitation construction and require painting operations to stop due the bridge owner requested a nine-day
painting at the bridge. to cold temperatures. As a result, the bridge closure from September 19, 2005
DATES: This rule is effective from bridge owner requested that the bridge through September 27, 2005. Therefore,
September 6, 2005 through November remain closed at night from 8 p.m. in addition to the 4 closure periods
30, 2005. through 6 a.m. to allow the contractor identified in the March 16, 2005
ADDRESSES: Comments and material uninterrupted time to complete the temporary final rule, which have
received from the public, as well as bridge repairs and painting. However, already occurred, the bridge will be
documents indicated in this preamble as before we could publish the requested closed from September 19, 2005 through

VerDate Aug<18>2005 17:00 Sep 02, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4700 Sfmt 4700 E:\FR\FM\06SER1.SGM 06SER1
52918 Federal Register / Vol. 70, No. 171 / Tuesday, September 6, 2005 / Rules and Regulations

September 27, 2005 under this use an alternate route should they need Interference with Constitutionally
regulation. to transit at other times. Protected Property Rights.
Discussion of Changes Assistance for Small Entities Civil Justice Reform
The Coast Guard is changing Under section 213(a) of the Small This rule meets applicable standards
temporary final rule 117.T536, which Business Regulatory Enforcement in sections 3(a) and 3(b)(2) of Executive
authorized the bridge to open at 6 a.m., Fairness Act of 1996 (Pub. L. 104–121), Order 12988, Civil Justice Reform, to
8 a.m., 10 a.m., 12 p.m., 2 p.m., 4 p.m., we offered to assist small entities in minimize litigation, eliminate
and 6 p.m., after a half-hour notice is understanding the rule so that they ambiguity, and reduce burden.
given. This temporary final rule changes could better evaluate its effects on them
Protection of Children
that schedule to allow the bridge to and participate in the rulemaking
open at 6 a.m., 12 p.m., 6 p.m., and 8 process. We have analyzed this rule under
p.m. after a half-hour notice is given by During the course of rulemaking upon Executive Order 13045, Protection of
calling the number posted at the bridge. this bridge, beginning on January 5, Children from Environmental Health
At all other times from 8 p.m. to 6 a.m., 2005, no small entities requested Coast Risks and Safety Risks. This rule is not
the bridge will open on signal. In Guard assistance and none was given. an economically significant rule and
addition, a nine-day closure is in effect Small businesses may send comments does not concern an environmental risk
from September 19, 2005 through on the actions of Federal employees to health or risk to safety that may
September 27, 2005. who enforce, or otherwise determine disproportionately affect children.
compliance with, Federal regulations to Indian Tribal Governments
Regulatory Evaluation the Small Business and Agriculture
Regulatory Enforcement Ombudsman This final rule does not have tribal
This rule is not a ‘‘significant
and the Regional Small Business implications under Executive Order
regulatory action’’ under section 3(f) of
Regulatory Fairness Boards. The 13175, Consultation and Coordination
Executive Order 12866,
Ombudsman evaluates these actions with Indian Tribal Governments,
RegulatoryPlanning and Review, and
annually and rates each agency’s because it does not have substantial
does not require an assessment of
responsiveness to small business. If you direct effect on one or more Indian
potential costs and benefits under
wish to comment on actions by tribes, on the relationship between the
section 6(a)(3), of that Order. The Office
employees of the Coast Guard, call 1– Federal Government and Indian tribes,
of Management and Budget has not
888–REG–FAIR (1–888–734–3247). or on the distribution of power and
reviewed it under that Order. It is not
responsibilities between the Federal
‘‘significant’’ under the regulatory Collection of Information Government and Indian tribes.
policies and procedures of the
Department of Homeland Security This rule calls for no new collection Energy Effects
(DHS). of information under the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501– We have analyzed this rule under
This conclusion is based on the fact Executive Order 13211, Actions
that vessel traffic will still be able to 3520).
Concerning Regulations That
transit through the SR 27 Bridge under Federalism Significantly Affect Energy Supply,
a fixed opening schedule. Vessel A rule has implications for federalism Distribution, or Use. We have
operators may adjust their schedules to under Executive Order 13132, determined that it is not a ‘‘significant
correspond with the opening schedule Federalism, if it has a substantial direct energy action’’ under that order because
at the bridge. Vessel operators may also effect on State or local governments and it is not a ‘‘significant regulatory action’’
use the alternate route should they need would either preempt State law or under Executive Order 12866 and is not
to transit at other times. impose a substantial direct cost of likely to have a significant adverse effect
Small Entities compliance on them. We have analyzed on the supply, distribution, or use of
this rule under that Order and have energy. The Administrator of the Office
Under the Regulatory Flexibility Act determined that it does not have of Information and Regulatory Affairs
(5 U.S.C. 601–612), we considered implications for federalism. has not designated it as a significant
whether this rule would have a energy action. Therefore, it does not
significant economic impact on a Unfunded Mandates Reform Act require a Statement of Energy Effects
substantial number of small entities. The Unfunded Mandates Reform Act under Executive Order 13211.
The term ‘‘small entities’’ comprises of 1995 (2 U.S.C. 1531–1538) requires
small businesses, not-for profit Technical Standards
Federal agencies to assess the effects of
organizations that are independently their discretionary regulatory actions. In The National Technology Transfer
owned and operated and are not particular, the Act addresses actions and Advancement Act (NTTAA) (15
dominant in their fields, and that may result in the expenditure by U.S.C. 272 note) directs agencies to use
governmental jurisdictions with State, local, or tribal government, in the voluntary consensus standards in their
populations less than 50,000. aggregate, or by the private sector of regulatory activities unless the agency
The Coast Guard certifies under 5 $100,000,000 or more in any one year. provides Congress, through the Office of
U.S.C. 605(b), that this rule will not Though this rule will not result in such Management and Budget, with an
have a significant economic impact on an expenditure, we do discuss the explanation of why using these
a substantial number of small entities. effects of this rule elsewhere in this standards would be inconsistent with
This conclusion is based on the fact preamble. applicable law or otherwise impractical.
that vessel traffic will still be able to Voluntary consensus standards are
transit through the SR 27 Bridge under Taking of Private Property technical standards (e.g., specifications
a fixed opening schedule. Vessel This rule will not affect a taking of of materials, performance, design, or
operators may adjust their schedules to private property or otherwise have operation; test methods; sampling
correspond with the opening schedule taking implications under Executive procedures; and related management
at the bridge. Vessels operators may also Order 12630, Governmental Actions and systems practices) that are developed or

VerDate Aug<18>2005 11:56 Sep 02, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4700 Sfmt 4700 E:\FR\FM\06SER1.SGM 06SER1
Federal Register / Vol. 70, No. 171 / Tuesday, September 6, 2005 / Rules and Regulations 52919

adopted by voluntary consensus ENVIRONMENTAL PROTECTION of the Federal Register (OFR). The
standards bodies. AGENCY description of the revised SIP
This proposed rule does not use document, IBR procedures and
technical standards. Therefore, we did 40 CFR Part 52 ‘‘Identification of plan’’ format are
not consider the use of voluntary [DC102–2050; FRL–7953–9] discussed in further detail in the May
consensus standards. 22, 1997 Federal Register document.
Approval and Promulgation of Air On December 7, 1998, (63 FR 67407)
Environment Quality Implementation Plans; District EPA published a document in the
of Columbia; Update to Materials Federal Register beginning the new IBR
We have analyzed this final rule
Incorporated by Reference procedure for the District of Columbia.
under Commandant Instruction
On August 6, 2004 (69 FR 47773), EPA
M16475.1D, which guides the Coast AGENCY: Environmental Protection published an update to the IBR material
Guard in complying with the National Agency (EPA). for the District of Columbia. In this
Environmental Policy Act of 1969 ACTION: Final rule; Notice of action, EPA is doing the following:
(NEPA) (42 U.S.C. 4321–4370f), and administrative change. 1. Announcing the second update to
have concluded that there are no factors
the material being IBR’ed.
in this case that would limit the use of SUMMARY: EPA is updating the materials 2. Making corrections to the chart
a categorical exclusion under section submitted by the District of Columbia listed in § 52.470(c), as described below:
2.B.2 of the Instruction. Therefore, this that are incorporated by reference (IBR) a. Chapter 1 (General), Section 199
rule is categorically excluded, under into the State implementation plan (Definitions and Abbreviations)—
figure 2–1, paragraph (32)(e), of the (SIP). The regulations affected by this Entries for Section 199 which were
Instruction, from further environmental update have been previously submitted inadvertently removed by a December
documentation. It has been determined by the State agency and approved by 28, 2004 rulemaking action are being
that this final rule does not significantly EPA. This update affects the SIP restored to the table.
impact the environment. materials that are available for public b. Chapter 3 (Operating Permits),
List of Subjects in 33 CFR Part 117 inspection at the National Archives and Section 307, the State effective date is
Records Administration (NARA), the revised to read ‘‘4/16/04.’’
Bridges. Air and Radiation Docket and c. Chapter 6 (Particulates), Section
Information Center located at EPA 600.1—In the ‘‘Additional explanation’’
Regulations Headquarters in Washington, DC, and column, a brief description of the
For the reasons set out in the the EPA Regional Office. revision is added.
preamble, the Coast Guard amends 33 EFFECTIVE DATE: This action is effective d. Chapter 7 (Volatile Organic
CFR part 117 as follows: September 6, 2005. Compounds), Section 715—the State
ADDRESSES: SIP materials which are effective date is revised to read ‘‘4/16/
PART 117—[AMENDED] incorporated by reference into 40 CFR 04.’’
part 52 are available for inspection at e. Chapter 7, Sections 749 through
■ 1. The authority citation for part 117 the following locations: Air Protection 754—an entry is added to the
continues to read as follows: Division, U.S. Environmental Protection ‘‘Additional explanation’’ column to
Authority: 33 U.S.C. 499; 33 CFR 1.05–1(g); Agency, Region III, 1650 Arch Street, reference a related correction final
Department of Homeland Security Delegation Philadelphia, Pennsylvania 19103; the rulemaking action.
No. 170.1; section 117.255 also issued under Air and Radiation Docket and f. Chapter 7, Section 799—An entry
the authority of Pub. L. 102–587, 106 Stat. Information Center, U.S. Environmental for Section 799 which was inadvertently
5039. Protection Agency, 1301 Constitution deleted by a December 23, 2004
Avenue NW., Room B108, Washington, rulemaking action is being restored.
■ 2. Revise § 117.T536 to read as g. Chapter 7, Section 799—The entry
follows: DC 20460; or the National Archives and
Records Administration (NARA). For in the ‘‘Title/subject’’ column is revised
§ 117.T536 Townsend Gut. information on the availability of this to read ‘‘Definitions and Abbreviations.’’
h. Chapter 7, Section 799—Language
The draw of the SR 27 Bridge, mile material at NARA, call 202–741–6030,
is added to the ‘‘Additional
0.7, across Townsend Gut shall operate or go to: http://www.archives.gov/
explanation’’ column to provide a brief
as follows: federal_register/
explanation of the entries for this
code_of_federal_regulations/
(a) From September 6, 2005 through section.
ibr_locations.html.
November 30, 2005, the SR 27 Bridge i. Chapter 8 (Asbestos, Sulfur, and
shall open on signal at 6 a.m., 12 p.m., FOR FURTHER INFORMATION CONTACT: Nitrogen Oxides), Section 805—In the
6 p.m., and 8 p.m., after at least a half- Harold A. Frankford, (215) 814–2108 or ‘‘EPA approval date’’ column, the
hour advance notice is given by calling by e-mail at frankford.harold@epa.gov. Federal Register page citation is
the number posted at the bridge. At all SUPPLEMENTARY INFORMATION: revised, and the language in the
other times from 8 p.m. to 6 a.m. the The SIP is a living document which ‘‘Additional explanation’’ section is
draw shall open on signal. the state can revise as necessary to revised to include citations for all of the
(b) From September 19, 2005 through address the unique air pollution revised paragraphs.
September 27, 2005, the bridge need not problems in the State. Therefore, EPA EPA has determined that today’s falls
open for the passage of vessel traffic. from time to time must take action on under the ‘‘good cause’’ exemption in
SIP revisions containing new and/or section 553(b)(3)(B) of the
Dated: August 25, 2005. revised regulations as being part of the Administrative Procedures Act (APA)
Mark J. Campbell, SIP. On May 22, 1997 (62 FR 27968), which, upon finding ‘‘good cause,’’
Captain, U.S. Coast Guard, Acting First EPA revised the procedures for authorizes agencies to dispense with
District Commander. incorporating by reference Federally- public participation and section
[FR Doc. 05–17714 Filed 9–1–05; 2:26 pm] approved SIPs, as a result of 553(d)(3) which allows an agency to
BILLING CODE 4910–15–P consultations between EPA and Office make a rule effective immediately

VerDate Aug<18>2005 11:56 Sep 02, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4700 Sfmt 4700 E:\FR\FM\06SER1.SGM 06SER1

Vous aimerez peut-être aussi