Académique Documents
Professionnel Documents
Culture Documents
C U R R I C U LU M VI TAE
Personal Data
Name
ASMORO SUTONO
Address Home
asmorosutonosutono@yahoo.co.id
Nationality
Indonesian
Male / Married
Phone
Job Title
Special Knowledge
Education
:
:
Years
June 2013
February 2013
February 2012
November 2010
June 2009
March 2006
January 2006
November 2005
September 2005
/var/www/apps/conversion/tmp/scratch_7/289068528.doc
2|Page
Welding inspector as per various codes in University of Indonesia Jakarta..
Visual and liquid penetrant inspection by Pertamina debottlenec king project , Cilacap,
Central Java.
Visual welding inspector by Commonwealth Asia Pacific Const. Pte Ltd. At Berau East
Kalimantan
September 2004
August 1998
July 1996
BasicSafetyTrainings
Specialized Training
Years
Sea Survival & Offshore Emergency Procedure Training by PT. Indosafe Pratama comply
with SOLAS (Safety of Life st Sea) for Marine Standard at Balikpapan
First Aider Officer Training by Kemenakertrans RI and certified by Ministry of Manpower &
Transmigration (DEPNAKERTRANS) at Balikpapan
Fire Fighting Training (Class D) Certification by Unit Kementrans RI & certified by Ministry
of Manpower & Transmigration (DEPNAKERTRANS) at Balikpapan
Basic First Aid, Basic Fire Fighting & Sea Survival Training by PT.Indosafe Pratama comply
with British Safety Council at Balikpapan
Basic Sea Survival by Biro Klasifikasi Indonesia (BKI) for PT. Nisconi in Palm Court
Balikpapan
Safety leadership and zero accident process by Fluor Daniel Indonesia Sumbawa , West
Nusa Tenggara (NTB).
June 2014
March 2014
March 2014
March 2012
March 2006
January 1999
Competencies
Deep knowledge in various international codes & standard such as: ASME, AWS, API, ASTM for refinery,
steel structure, pressure vessel fabrication & installation, pipeline transmission for Oil / Gas Company, power
plant and petrochemical Company.
Planning, Project Supervising and Expediting in fabrication & installation for client project
Preparing of several Project Quality Inspection Procedure, Welding Mapping, NDT Plan
Preparing of Welding Procedure Qualification Testing (WPQT) until completed approved Welding Procedure
Specification (WPS) comply with Client Specification.
Experience in making execution of fabrication procedure and installation procedure using client specification.
Coordinating with other discipline Quality Team in activities related it.
Experience of Hot Tapping Specialist work for previously making in service welding procedure and joint
calculation with engineering specialist as per client specification.
Up grading welders for certification Migas & Depnaker.
Experience in welding inspection & painting inspection and witnessing of pressure testing Hand on
experience in coordinating Non Destructive Test (NDT) such as: Dye Penetrant Test (DPT); Magnetic Particle
Test (MPT); Ultrasonic Test (UT): Radiography Test (RT)
WorkExperienceSummary
Period
January 2013 Dec.2014
Summary
As QA/QC Coordinator in PT. Nippon Steel & Sumikin Construction
Indonesia (PT. NISCONI)
Client: TOTAL E&P Indonesie at Balikpapan, East Kalimantan
Main Responsibilities:
Coordination all of QC members and NDT team, monitoring in preparing
WPS/PQR qualification and provide WPS ready for use and for bidding
document.
/var/www/apps/conversion/tmp/scratch_7/289068528.doc
3|Page
Studying clients specification & standard to use in the item project.
Monitoring in preparing QC doc. QA/QC procedure, new construction
procedure of work & its implementation.
Approving QC report completion for piping & structure section comply
with clients specification such as: material verification record, fabrication,
dimension, orientation, check, fit-up check, visual welding and NDE
requirement.
Acknowledging & monitoring for QC review shop drawing, isometric,
P&ID, break down system & sub-system and preparing test package of
hydrostatic test, pneumatic & gross leak test for pre-commissioning work.
Monitoring & approving in preparation and reporting for commissioning
dossier and project QC dossier for piping & structure work and also
reviewing sub-contractors QA/QC documentation & procedure.
As construction coordinator, engage of manage project execution from
storage arrangements and placement of material, pre-fabrication till
installation such project as:
Total E&P Construction & BSP Maintenance Services 2011-2014
Total E&P Ind.Peciko Well Connection 2012-2015
Total E&P Indonesie Bekapai Phase 2A Project.
July 2005 December 2012
4|Page
5|Page
material & vendor selection (through of commercials & technical review)
December 1993 May 1994
/var/www/apps/conversion/tmp/scratch_7/289068528.doc