Académique Documents
Professionnel Documents
Culture Documents
DESIGN SOFTWARE
WTPSOFT02
Users Guide
PRACHI SERVICES
B-36, DHAKE PARK NATWAR NAGAR ROAD NO. 1,
JOGESHWARI ( EAST) MUMBAI - 400060.
TEL. : (022)-28395068
Users Guide
Contents
Chapter 1: Getting Started
Welcome to WTPSOFT02 Software .....................................................................
About WTP02 Software
.................................................................................
Users Guide
Getting Started
WELCOME TO WATER TREATMENT PLANT DESIGN SOFTWARE WTPSOFT02
INTRODUCTION:
Municipal water supply systems can be divided into 1. Collection Works, 2.
Transmission Works, 3. Purification Works and 4. Distribution Works.
software deals with purification works or water treatment plants.
This
The water
collected directly from the source may not be safe for drinking because of
physical, chemical and biological impurities.
deliver to consumer the water that is (i) hygienically safe (ii) esthetically
attractive and palatable and (iii) economically satisfactory for its intended use.
Diseases like typhoid, cholera, dysentery etc. are water borne diseases.
The
principal aim of the water treatment plant is to supply, clean and bacteria free
water. The water treatment plants can be broadly divided in two categories:
(i)
like
chlorides,
sulphates,
hardness
causing
ions
of
calcium
and
2.0 APPLICATIONS OF W.T.P. DESIGN SOFTWARE: The procedure of design of water treatment plant involved performing
repetitive calculations, which take considerable time and energy, and there are
chances of human errors.
designing the water Treatment Plant. The WTP02 Design Software can be used as
a tool in the hands of Design Engineer. It gives the dimensions of various units of
the treatment plant and their power requirement.
Users Guide
draft project report outlining the design of water treatment plant is required to be
submitted quickly. This software can be of great use for this. Agencies such as
industries, public sector organizations appoint consultants for the design of WTP.
Engineers from these consulting organizations can use this software to increase
the productivity and profitability.
software for teaching the students the approach for the design of WTP and also
for their consultancy cell.
Users Guide
Creating New Project Or Opening Earlier Project Before Designing Its Module:
1.1Creating New Project:1. Click Project New /Open Project on the Standard Menu Bar Following Screen will appeared. Click ADD NEW Button
on the form To Create New Project
To Create New
Project, Click
On ADD NEW
Button.
1.2 After Pressing Add New Button Project Code Will Be Auto Generated in the Project Code Text Box, The List Of Exiting
Client Records Will Appeared As Follows Select Clint Name By Double Clicking Or Pressing Enter.
After Pressing Add
New Button Project
Code Will Be Auto
Generated
The List Of Exiting Client
Records Will Appeared As
Follows Select Clint Name
By Double Clicking Or
Pressing Enter.
Users Guide
1.3 Enter Project Date In DD/MM/YYYY Format Or Press Button Which Is Next To Text Box For The Calendar. Select
Date By Double Clicking On It.
1.4 Select Project Type From The List And Enter Other Project Details i.e. Flow Rate,BOD5,Peak Flow Factor etc., Press
SAVE Button For Saving Record, If Record Is Saved Then SAVE DATA Massage Box Will Appear.
Enter Other
Project Details
i.e. Flow Rate,
etc..
Users Guide
1.5 After Pressing OK Button Of SAVE DATA Massage Box, SAVE Button Will Changes To OPEN Button. And Another
Massage Box Will Appeared. Which Will Help You To Open This Project For Designing Its Other Modules.
1.2 Opening Project Which Are Created Earlier:1.1 If You Want To Open Project Which Are Created Earlier Click On Project Code Text Box. The List Of Exiting Records Will
Appears As Follows Select Record Which You Want To Open By Double Clicking Or Pressing Enter
Users Guide
1.2 After Pressing OPEN Button Massage Box Will Appear. Which Will Help You To Open This Project For Designing
Its Other Modules.
Users Guide
Hydraulic Designing Of New Spray Aerator Or Modifying Which Are Designed Earlier:
2.1 Hydraulic Designing Of New Spray Aerator :2.1 Click Hydraulic Calculation Aerators Spray Aerator on the Standard Menu Bar. This option will enable only after
opening any Project .Then following Screen will appeared. Click ADD NEW Button on the form To Design New Screen
2.2 after pressing ADD NEW button Aerator No. Will be Auto Generated in the Aerator No. Textbox. Then cursor will move
in to Area Req. field, enter value for this field. If you trying to leave this field empty or if you enter high or low value then
standard value, the massage box will appear by showing acceptable values for that particular field. Press YES to load default
value, and NO to cont. This is applicable to all the fields shown on the form.
After Pressing Add New
Button Screen No. Will
Be Auto Generated
Users Guide
2.3 After Entering Appropriate Values In All Textbox Press Hydraulic Design Button For Output i.e. Hydraulic Designing
Parameters Of the Screen.
2.4 After Desired Output i.e. Hydraulic Designing Parameters Of the Screen. Press SAVE Button For Saving Record, If
Record Is Saved Then SAVE DATA Massage Box Will Appear.
Users Guide
2.5 If Record Is Saved Then SAVE Button Will Changes To UPDATE. Now You Can Add New Record, Modify Exiting Record
Or Exit From This Module.
# SAME PROCEDURE WILL APPLY FOR DESIGNING ALL NEW MODULES IN THIS ENTIRE PROGRAM.
10
Users Guide
3.2 Record of Screen Which Are Designed Earlier Is Now Displayed In To Appropriate Text Boxes. Make Necessary Changes
And Then Once Again Press Hydraulic Design Button For Fresh Output. After Desired Output i.e. Hydraulic Designing
Parameters of the Screen. Press UPDATE Button For Saving Updated Record.
11
Users Guide
3.3 The Change In Record of Spray Aerator Which Are Designed Earlier Is Saved And UPDATE DATA Message Box Will
Appear. Now You Can Add New Record, Modify Exiting Record Or Exit From This Module.
SAME PROCEDURE WILL APPLY FOR MODIFYING MODULES WHICH ARE DESINED EARLIER IN THIS ENTIRE
PROGRAM.
12
Users Guide
AERATOR : This is used to get rid of odour producing gases. Three types of aerators can
be designed.
i) WATERFALL AERATORS: This is most commonly used.
The design criteria are as follows: Area of Aerator: 0.015 to 0.045 M2 / M3 / hr.
Height of Structure: 1.2m to 3 m.
Number of Steps: 4 to 6
Output gives diameter of the cascade.
(ii)SPRAY AERATORS:
Dia. of nozzles: 2.4 to 4 cm.
Time of Exposure: 2.4 seconds
(iii) DIFFURED AIR AERATORS:
Width to depth ratio of basin 1.5
Detention time of basin: 8 to 30 min. Typical: 15 min.
Air required: 0.4 to 1.2 lit of air per lit. of water.
FLASH MIXER:
Flash Mixer is designed on the basis of detention period. The output gives the dimensions
of flash mixer as well as paddles. Power rating of the agitator is also given. The value of
velocity gradient (G) is checked for adequacy.
FLOCCULATOR:
It is assumed that the flocculator is placed at the center of circular clarifier. This is also
designed on the basis of detention period. Size of the paddles is designed so as to give
satisfactory value of velocity gradient (G) and Gtd.
CLARIFIER:
Clarifier is designed on the basis of overflow rate. The software gives dimensions of the
clarifier and checks for the detention period and weir loading.
CHEMICAL STORAGE:
The user is prompted to input the alum dose for the worst season (monsoon). The software
gives the area of the room required to store the alum for the period of three months for the
worst season.
FILTER:
Filter is one of the important units of the water treatment plant. This software designs the
rapid sand filter, which is used in most of the plants, as well as slow sand filter. The design
is based on the rate of filtration. The software gives the number of filters, area of each
filter, volume of backwash water tank and the design of wash water troughs as the output.
13
Users Guide
The details of sand bed such as depth, effective size and uniformity coefficient along with
gravel depth are given.
CHLORINE REQUIREMENT:
The software gives number of Chlorine cylinders required. It is assumed that chlorinator is
used. A 50 Kg cylinder is suggested for the actual requirement of 16 Kg.
UNDERGROUND CLEAR WATER RESERVOIR:
Output gives the volume of clear water reservoir. The detention period varies depending on
the hours of pumping. It can be as less as 30 minutes if the pumps work for 24 hours. It can
be increased up to 2.5 h if pumping is done for lesser period.
PUMPS AND PUMPING MAIN:
The software gives most economical diameter for pumping main, along with the total
capacity of pumps required and number of pumps required. User is asked to enter length of
pumping main as well as current cost of some units like pumps and cost of electricity.
14
Users Guide
4. Report Printing
4.1 If You Want To print Exiting Record of Spray Aerator Which Are Designed Earlier Then Click In To Aerator No Text Box.
The List Of Exiting Records of Screen Which Are Designed Earlier Will Appear As Follows. Select Record Which You Want
Select Design No. by
To print and then Click Print
Clicking on list box.
Record will displayed on
screen.
After Slecting
record, Click
Print Button.
4.2 After Clicking Print Button. Following screen will appeared. Select Module Name & Click on Preview Button.
Press Print
Button For
Report Printing.
Printable Report
Will Appear for
Preview.
15