Federal Register / Vol. 70, No.

150 / Friday, August 5, 2005 / Notices 45387

agencies with jurisdiction and/or http://www.ferc.gov using the with Commission and is available for
special expertise with respect to ‘‘eLibrary’’ link. Enter the docket public inspection:
environmental issues to cooperate with number excluding the last three digits in a. Type of Application: New major
us in the preparation of the the docket number field to access the license.
environmental document. Agencies who document. For assistance, contact FERC b. Project No: 2170–029.
would like to request cooperating status Online Support at c. Date filed: April 22, 2005.
should follow the instructions for filing FERCOnlineSupport@ferc.gov or toll- d. Applicant: Chugach Electric
comments described in item l below. free at 1–866–208–3676, or for TTY, Association.
k. Pursuant to section 4.32(b)(7) of 18 (202) 502–8659. A copy is also available e. Name of Project: Cooper Lake
CFR of the Commission’s regulations, if for inspection and reproduction at the Hydroelectric Project.
any resource agency, Indian Tribe, or address in item h above. f. Location: On Cooper Lake,
person believes that an additional You may also register online at http:/ approximately 4.8 river miles from the
scientific study should be conducted in /www.ferc.gov/docs-filing/ mouth of Cooper Creek in south central
order to form an adequate factual basis esubscription.asp to be notified via e- Alaska on the Kenai Peninsula, 55 air
for a complete analysis of the mail of new filings and issuances miles south of Anchorage.
application on its merit, the resource related to this or other pending projects. g. Filed Pursuant to: Federal Power
agency, Indian Tribe, or person must file For assistance, contact FERC Online Act, 16 U.S.C. 791(a)–825(r).
a request for a study with the Support. h. Applicant Contact: Burke Wick,
Commission not later than 60 days from p. With this notice, we are initiating Chugach Electric Association, 5601
the date of filing of the application, and consultation with the California State Minnesota Drive, Anchorage, Alaska
serve a copy of the request on the Historic Preservation Officer (SHPO), as 99519. (907) 762–4779.
applicant. required by (106, National Historic i. FERC Contact: David Turner (202)
l. Deadline for Filing Additional Preservation Act, and the regulations of 502–6091 or david.turner@ferc.gov.
Study Requests and Requests for j. Deadline for filing scoping
the Advisory Council on Historic
Cooperating Agency Status: September comments: October 10, 2005.
Preservation, 36 CFR 800.4.
15, 2005. All documents (original and eight
q. Procedural Schedule and Final
All Documents (Original and Eight copies) should be filed with: Magalie R.
Amendments: The application will be
Copies) Should be Filed With: Magalie Salas, Secretary, Federal Energy
processed according to the following
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
Hydro Licensing Schedule. Revisions to
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
the schedule will be made as The Commission’s Rules of Practice
Street, NE., Washington, DC 20426. appropriate.
The Commission’s Rules of Practice and Procedure require all intervenors
require all intervenors filing documents Issue Acceptance/Deficiency Letter and filing documents with the Commission
with the Commission to serve a copy of request additional information, if needed, to serve a copy of that document on
November 2005. each person on the official service list
that document on each person on the
Issue Scoping Document for comments,
official service list for the project. for the project. Further, if an intervenor
December 2005.
Further, if an intervenor files comments Notice of application is ready for files comments or documents with the
or documents with the Commission environmental analysis, April 2006. Commission relating to the merits of an
relating to the merits of an issue that Notice of the availability of the draft EIS, issue that may affect the responsibilities
may affect the responsibilities of a December 2006. of a particular resource agency, they
particular resource agency, they must Notice of the availability of the final FEIS, must also serve a copy of the document
also serve a copy of the document on June 2007. on that resource agency.
that resource agency. Ready for Commission’s decision on the Scoping comments may be filed
Additional study requests and application, August 2007. electronically via the Internet in lieu of
requests for cooperating agency status Final amendments to the application paper. The Commission strongly
may be filed electronically via the must be filed with the Commission no encourages electronic filings. See 18
Internet in lieu of paper. The later than 30 days from the issuance CFR 385.2001(a)(1)(iii) and the
Commission strongly encourages date of the notice of ready for instructions on the Commission’s Web
electronic filings. See 18 CFR environmental analysis. site (http://www.ferc.gov) under the ‘‘e-
385.2001(a)(1)(iii) and the instructions Filing’’ link.
Linda Mitry, k. This application is not ready for
on the Commission’s Web site (http://
www.ferc.gov) under the ‘‘e-Filing’’ link. Deputy Secretary. environmental analysis at this time.
m. This application is not ready for [FR Doc. E5–4199 Filed 8–4–05; 8:45 am] l. The existing project consists of: (1)
environmental analysis at this time. BILLING CODE 6717–01–P The Cooper Lake Dam, a 52-foot-high
n. The existing Chili Bar Project earth-and-rockfilled structure; (2) the
consists of: (1) A 120-foot-high concrete 2,910-acre, 5-mile-long Cooper Lake
gravity dam; (2) a 110-acre reservoir DEPARTMENT OF ENERGY Reservoir; (3) two vertical-shaft Francis
with a useable storage of 1,339 acre-feet; turbines with a total capacity of 19.38
(3) a powerhouse with one 7-MW unit Federal Energy Regulatory megawatts; (4) an intake structure
and (4) appurtenant facilities. The Commission located on Cooper Lake; (5) a tunnel and
applicant estimates that the total [Project No. 2170–029–AK]
penstock extending 10,686 feet east
average annual generation would be from the intake to the powerhouse; (6)
33,500 megawatt hours. All generated Chugach Electric Association; Notice a 6.3-mile-long, 69-kV transmission line
power is utilized within the applicant’s of Scoping Meetings and Site Visit and from the powerhouse to Quartz Creek
electric utility system. Soliciting Scoping Comments Substation; and 90.4-mile-long, 115-kV
o. A copy of the application is transmission line from the Quartz Creek
available for review at the Commission July 28, 2005. Substation to Anchorage.
in the Public Reference Room or may be Take notice that the following m. A copy of the application is
viewed on the Commission’s Web site at hydroelectric application has been filed available for review at the Commission

VerDate jul<14>2003 15:34 Aug 04, 2005 Jkt 205001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\05AUN1.SGM 05AUN1
45388 Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices

in the Public Reference Room or may be crossing over the Kenai River Bridge, with the Commission and is available
viewed on the Commission’s Web site at turn south (left) on Snug Harbor Road for public inspection:
http://www.ferc.gov using the and travel eleven miles to the Power a. Application Type: Partial transfer of
‘‘eLibrary’’ link. Enter the docket House. license.
number P–2170, excluding the last three b. Project No.: 2309–013.
Anchorage Scoping Meeting c. Date Filed: July 15, 2005.
digits in the docket number field to
access the document. For assistance, Date and Time: Thursday, September d. Applicants: PSEG Fossil LLC (PSEG
contact FERC Online Support at 8, 2005, 1 p.m. to 3 p.m. (AKT). Fossil); Jersey Central Power & Light
FERCOnlineSupport@ferc.gov or toll- Location: Hawthorn Suites, 1110 West Company (JCP&L); Exelon Generation
free at 1–866–208–3676, or for TTY, 8th Ave, Anchorage, Alaska. 907–222– Company, LLC (Exelon Generation).
(202) 502–8659. A copy is also available 5005. e. Name and Location of Project: The
for inspection and reproduction at the Copies of the Scoping Document Yards Creek Hydroelectric Project is a
address in item h above. (SD1) outlining the subject areas to be pumped storage project located on
You may also register online at http: addressed in the EA were distributed to Yards Creek in Warren County, New
//www.ferc.gov/docs-filing/ the parties on the Commission’s mailing Jersey.
esubscription.asp to be notified via e- list. Copies of the SD1 will be available f. Filed Pursuant to: Federal Power
mail of new filings and issuances at the scoping meeting or may be Act, 16 U.S.C. 791a–825r.
related to this or other pending projects. viewed on the Web at http:// g. Applicants’ Contact: Gary A.
For assistance, contact FERC Online www.ferc.gov using the ‘‘eLibrary’’ link Morgans, Steptoe & Johnson, LLP, 1330
Support. (see item m above). Connecticut Avenue, NW., Washington,
n. Scoping Process: The Commission DC 20036, (202) 429–6234.
Objectives h. FERC Contact: James Hunter at
intends to prepare an Environmental
assessment (EA) on the project in At the scoping meetings, the staff will: (202) 502–6086.
(1) Summarize the environmental issues i. Deadline for filing comments,
accordance with the National
tentatively identified for analysis in the protests, and motions to intervene:
Environmental Policy Act. The EA will
EA; (2) solicit from the meeting August 29, 2005.
consider both site-specific and
participants all available information, All documents (original and eight
cumulative environmental impacts and
especially quantifiable data, on the copies) should be filed with: Magalie R.
reasonable alternatives to the proposed
resources at issue; (3) encourage Salas, Secretary, Federal Energy
action.
statements from experts and the public Regulatory Commission, 888 First
Scoping Meetings on issues that should be analyzed in the Street, NE., Washington, DC 20426.
FERC staff will conduct two scoping EA, including viewpoints in opposition Comments, protests, and interventions
meetings and one site visit. All to, or in support of, the staff’s may be filed electronically via the
Interested agencies, Indian tribes, NGOs, preliminary views; (4) determine the Internet in lieu of paper; see 18 CFR
and individuals are invited to attend resource issues to be addressed in the 385.2001(a)(1)(iii) and the instructions
one or both of the Scoping meetings and EA; and (5) identify those issues that on the Commission’s Web site under the
to assist the staff in identifying the require a detailed analysis, as well as ‘‘e-Filing’’ link. The Commission
scope of environmental issues to be those issues that do not require a strongly encourages electronic filings.
analyzed in an Environmental detailed analysis. Please include the Project Number on
Assessment. Those who plan to attend any comments or motions filed.
Procedures The Commission’s Rules of Practice
the Site Visit must notify Chugach
Electric of their planned attendance. The meetings are recorded by a and Procedure require all intervenors
stenographer and become part of the filing a document with the Commission
Cooper Landing Scoping Meeting formal record of the Commission to serve a copy of that document on
Date and Time: Tuesday, September proceeding on the project. each person in the official service list
6, 2005, 7 p.m. to 9 p.m. (AKT). Individuals, organizations, and for the project. Further, if an intervenor
Location: Cooper Landing Community agencies with environmental expertise files comments or documents with the
Club, 18511 Bean Creek Road, Cooper and concerns are encouraged to attend Commission relating to the merits of an
Landing, Alaska 99575. (907) 595–1712. the meeting and to assist the staff in issue that may affect the responsibilities
The Community Club is located defining and clarifying the issues to be of a particular resource agency, they
approximately 2 hours south of addressed in the EA. must also serve a copy of the documents
Anchorage off the Sterling Highway at on that resource agency.
Linda Mitry,
milepost 47.7 (Cooper Landing). Turn j. Description of Application: The
Deputy Secretary. Applicants seek Commission approval
north on Bean Creek Road.
[FR Doc. E5–4200 Filed 8–4–05; 8:45 am] of a partial transfer the license from
Site Visit of Project BILLING CODE 6717–01–P PSEG Fossil to Exelon Generation.
Date and Time: Wednesday, JCP&L would remain as co-licensee.
September 7, 2005, 1 p.m. to 4 p.m. k. This filing is available for review at
(AKT). DEPARTMENT OF ENERGY the Commission in the Public Reference
Location: Cooper Lake Power House, Room or may be viewed on the
Federal Energy Regulatory Commission’s Web site at http://
Cooper Landing, Alaska.
Commission www.ferc.gov using the ‘‘eLibrary’’ link.
RSVP: By August 22, 2005, Ms. May
Clark, Relicensing Secretary, Chugach Notice of Application for Transfer of Enter the docket number (P–2309) in the
Electric, 907–762–4547 or License, and Soliciting Comments, docket number field to access the
may_clark@chugachelectric.com. Motions To Intervene, and Protests document. For assistance, call toll-free
The Power House is located 1–866–208–3676 or e-mail
approximately 2 hours south of July 28, 2005. FERCOnlineSupport@ferc.gov. For TTY,
Anchorage off the Sterling Highway at Take notice that the following call (202) 502–8659. A copy is also
milepost 48.0 (Cooper Landing). After hydroelectric application has been filed available for inspection and

VerDate jul<14>2003 15:34 Aug 04, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\05AUN1.SGM 05AUN1

Vous aimerez peut-être aussi