Vous êtes sur la page 1sur 1

Federal Register / Vol. 70, No.

148 / Wednesday, August 3, 2005 / Notices 44623

intervene in accordance with the f. Filed Pursuant to: Federal Power comments, a protest, or a motion to
requirements of Rules of Practice and Act, 16 U.S.C. 791a–825r intervene in accordance with the
Procedure, 18 CFR 385.210, .211, .214. g. Applicant Contacts: For the requirements of Rules of Practice and
In determining the appropriate action to transferor: Sharon Townsend, Director Procedure, 18 CFR 385.210, .211, .214.
take, the Commission will consider all of Electric Utilities, City of Denton, 901– In determining the appropriate action to
protests or other comments filed, but A Texas Street, Denton, Texas 76201, take, the Commission will consider all
only those who file a motion to (940) 349–8487. protests or other comments filed, but
intervene in accordance with the For the transferee: Lambeth only those who file a motion to
Commission’s Rules may become a Townsend, Attorney for the City of intervene in accordance with the
party to the proceeding. Any comments, Garland, Lloyd Gosselink Blevins Commission’s Rules may become a
protests, or motions to intervene must Rochelle & Townsend P.C., 111 party to the proceeding. Any comments,
be received on or before the specified Congress Ave., Suite 1800, Austin, protests, or motions to intervene must
comment date for the particular Texas 78701, (512) 322–5830. be received on or before the specified
application. h. FERC Contact: James Hunter at comment date for the particular
o. Filing and Service of Responsive (202) 502–6086. application.
Documents—Any filings must bear in i. Deadline for filing comments, n. Filing and Service of Responsive
all capital letters the title protests, and motions to intervene: Documents—Any filings must bear in
‘‘COMMENTS’’, ‘‘PROTEST’’, OR August 29, 2005. all capital letters the title
‘‘MOTION TO INTERVENE’’, as All documents (original and eight ‘‘COMMENTS’’, ‘‘PROTEST’’, or
applicable, and the Project Number of copies) should be filed with: Magalie R. ‘‘MOTION TO INTERVENE’’, as
the particular application to which the Salas, Secretary, Federal Energy applicable, and the Project Number of
filing refers. A copy of any motion to Regulatory Commission, 888 First the particular application to which the
intervene must be served upon each Street, NE., Washington, DC 20426. filing refers. Any of the above-named
representative of the Applicant Comments, protests, and interventions documents must be filed by providing
specified in the particular application. may be filed electronically via the the original and eight copies to: The
p. Agency Comments—Federal, state, Internet in lieu of paper; see 18 CFR Secretary, Federal Energy Regulatory
and local agencies are invited to file 385.2001(a)(1)(iii) and the instructions Commission, 888 First Street, NE.,
comments on the described application. on the Commission’s Web site under the Washington, DC 20426. A copy of any
A copy of the application may be ‘‘e-Filing’’ link. The Commission motion to intervene must also be served
obtained by agencies directly from the strongly encourages electronic filings. upon each representative of the
Applicant. If any agency does not file Please include the Project Number on Applicants specified in the particular
comments within the time specified for any comments or motions filed. application.
filing comments, it will be presumed to The Commission’s Rules of Practice o. Agency Comments—Federal, state,
have no comments. One copy of an and Procedure require all interveners and local agencies are invited to file
agency’s comments must also be sent to filing a document with the Commission comments on the described application.
the Applicant’s representatives. to serve a copy of that document on A copy of the application may be
each person in the official service list obtained by agencies directly from the
Magalie R. Salas, for the project. Further, if an intervener Applicants. If an agency does not file
Secretary. files comments or documents with the comments within the time specified for
[FR Doc. E5–4166 Filed 8–2–05; 8:45 am] Commission relating to the merits of an filing comments, it will be presumed to
BILLING CODE 6717–01–P issue that may affect the responsibilities have no comments. One copy of an
of a particular resource agency, they agency’s comments must also be sent to
must also serve a copy of the documents the Applicants’ representatives.
DEPARTMENT OF ENERGY on that resource agency.
j. Description of Application: The Magalie R. Salas,
Federal Energy Regulatory Applicants seek Commission approval Secretary.
Commission to transfer the license for the Lewisville [FR Doc. E5–4168 Filed 8–2–05; 8:45 am]
Dam Project from the City of Denton to BILLING CODE 6717–01–P
Notice of Application for Transfer of the City of Garland.
License, and Soliciting Comments, k. This filing is available for review at
Motions To Intervene, and Protests the Commission in the Public Reference DEPARTMENT OF ENERGY
July 25, 2005. Room or may be viewed on the
Take notice that the following Commission’s Web site at http:// Federal Energy Regulatory
hydroelectric application has been filed www.ferc.gov using the ‘‘FERRIS’’ link. Commission
with the Commission and is available Enter the docket number (P–3940) in the [Project No. 199–205]
for public inspection: docket number field to access the
a. Application Type: Transfer of document. For assistance, call toll-free South Carolina Public Service
License. 1–866–208–3676 or e-mail Authority; Notice of Application
b. Project No.: 3940–015. FERCOnlineSupport@ferc.gov. For TTY, Accepted for filing and soliciting
c. Date Filed: July 11, 2005. call (202) 502–8659. A copy is also Motions To Intervene and Protests
d. Applicants: City of Denton, Texas available for inspection and
(transferor), City of Garland, Texas reproduction at the addresses in item g. July 26, 2005.
(transferee). above. Take notice that the following
e. Name and Location of Project: The l. Individuals desiring to be included hydroelectric application has been filed
Lewisville Dam Hydroelectric Project is on the Commission’s mailing list should with the Commission and is available
located at the U.S. Army Corps of so indicate by writing to the Secretary for public inspection.
Engineers’ Lewisville Dam on the Elm of the Commission. a. Type of Application: New major
Fork of the Trinity River in Denton m. Comments, Protests, or Motions to license.
County, Texas. Intervene—Anyone may submit b. Project No.: 199–205.

VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\03AUN1.SGM 03AUN1

Vous aimerez peut-être aussi