Introduction
Safety and Business Benefits
Making Process Safety Risks Visible
Agenda
February 2012
of coal,
gas & and
hydro
44GW6GW
of installed
capacity
a world
leading
11 GW of renewables
generation
across the UK
SP
onshore
SP
is Renewables
one of the biglargest
six energy
suppliers
in the UKin UK (1200 MW)
wind operator
area
of over and
35,000
SPDistribution
has 5.2 million
customers
6GW
of generation
capacity
across the UK
square
kilometres
Scottish
Power
Transmission &
Distribution
Longannet
Cockenzie
Blackburn
Pearsons
Galloway
Ravenhead
& Pilkington
Scottish Power
Manweb
(Distribution)
1st private
producer in Mexico
1st distributor in
Brazil
Rye House
Main energy
company
Brighton
Damhead
Creek
NHHT
Basingstoke
February 2012
HSE Case
Study
Judith Hackitt CBE
February 2012
Working in together
February 2012
The Benefits
Incidents and severity now starting to fall...
February 2012
The Benefits
Significant benefits have been realised to date.....
2008
2009
2010
2011
Plant Availability
64.5%
77.0%
83.9%
86.9%
EFOR1
10.1%
7.5%
6.4%
5.5%
2008
February 2012
2009
2010
2011
29% reduction in
Operations and
Maintenance costs
22% increase in plant
availability
50% reduction in plant
forced outage rates
10% Reduction in
Insurance costs and
deductable period
Generation Strategy
Driving light into the future
February 2012
Our Strategy...
The electricity generation industry is facing significant challenges...
Governance &
Audit
PAS 55 is used as a
framework for Asset
Management
Process Safety is fully
embedded in culture and
process
Integrated audit
programme (ISRS 8) in
place that independently
checks processes and
procedures against best
practice.
Integrated
Operations and
Maintenance
Leadership, Staff
Competence and
Human Factors
Audit observations
proactively addressed
through continual
improvements
Implementation of a solid
governance framework
using visible metrics to
regularly review and
improve performance from
Board to Plant Level
Common Operational
Standards established
Plant operated with in its
design parameters against
agreed procedures
Plant put back in to
operation safely following
outages
Emergency
Arrangements and
Business
Continuity
Staff and contractors have
the required knowledge
and skills to deal with all
emergency situations
Communication strategy
designed to deliver regular
updates on performance,
risks, issues and
improvement opportunities
All incidents and near
misses are reviewed and
lessons learned shared
with all staff at all sites
Engineering
Governance
Technical Risk
Management through
robust change processes,
underpinned by
Engineering Standards and
a Governance framework
Management of Change
processes are established
and rigorously followed
Criticality is assigned to all
assets using a common
risk based framework.
Life plans developed using
reliability engineering
methods appropriate to
asset criticality and
condition
ALARP principles
embedded and used to
asses technical risks
Alarm, Controls
and Instrument
Management
Alarms are prioritises and
actively managed to
resolution
No long term
standing/Shevled alarms
Alarm performance is in
line with best practice
Standard approach to
instrument calibration
Benchmarking
Benchmarking is carried
out with and without sector
to establish and maintain
industry leading position
Continual review of Best
Practice
Implementation of
improvement RoadMaps
to deliver a sustained
process
Integration with Iberdrola to
establish common
processes and practices
February 2012
Establish
Leadership
Design Asset
Management &
Process Safety
Management
System
Implement
Foundation
Dashboard
Integration
&Automation Of
Dashboard
Review &
Governance
Benchmarking &
Continuous
Improvement
Road Map
Asset Management & Process Safety Integrated RoadMap
Establish
Leadership
Design Asset
Management &
Process Safety
Management
System
Implement
Foundation
Dashboard
Integration
&Automation Of
Dashboard
Review &
Governance
Benchmarking &
Continuous
Improvement
Establish
integrated
approach.
Develop
business case.
February 2012
Ensure
business buy in
at CEO and
Senior
Leadership
level.
Common level
of awareness
and
understanding
established.
Follow HSG254
six step
approach.
Structured
approach
delivers
comprehensive
and rigorous
analysis of
hazards, risk
control
systems.
Quick win
implementation
of dashboard
based on
manual KPIs.
Provides initial
assessment of
Process Safety
performance
and kicks off
cultural change.
Move to daily
tracking of KPIs
based on
automated
feeds.
Exploit drill
down and
trending to
drive
performance to
next level.
Establish
framework for
delivery of
sustained
performance
and
improvements.
Embed core
decision
making tool.
Maintain sense
of vulnerability
through
learning from
others and
challenging
business as
usual.
June
2009
July
2008
2006 to 2008
Maximo established at
all sites
Pilot Ivara EXP
Ivara Contract Award
2007
Project Management
System Established
February 2012
Operational
Transformation
Programme
Established
Integrated Approach
Developed
Ivara EXP established
Application of MTA
Introduction of Hand
Held Technology
MSPe and QMS for
Project Management
ISO 9001
Process Safety
Management System
Developed
KPI Dashboard
Introduced
ORG Governance
Established
P2Pr Process
Established
PAS-55 Accreditation
Achieved
Reliability Engineering
Established At Key Sites
Leadership Training
ISRS8 Pilot
Cintellate - Incident
Reporting & Investigation
Establish
Leadership
Design Asset
Management and
Process Safety
Management
System
Implement
Foundation
Dashboard
Integration
&Automation Of
Dashboard
Review &
Governance
Benchmarking &
Continuous
Improvement
February 2012
Control Systems
Operations
Management
Start-up /Shutdown
Procedures
Work Prioritisation
Fire Systems
The
full asset management
Engineering
Standards
lifecycle:
Critical
Instrumentation
Technical Knowledge
Management
HV Electrical
Systems
Construction
Design /
Design
Operations
Review
Maintenance
Asset
Investment
Engineering
Main Protection
Systems
New
Routine Testing
Staff
Competence
People
Protective Systems
/ Devices
Environment
Assets
10
Emergency
Preparedness
PS17.
10
0.1
0.1
PS 2
10
0.1
0.1
PS5.
10
0.1
0.1
Pipe rupture and catastrophic weld failure from a major low temperature steam line
PS7.
0.1
0.1
EWG5
0.1
CSW3
0.1
PS3.
0.1
0.03
Rupture of boiler integral furnace circulating and saturated steam pipework, fabricated in C steel
materials with an internal diameter > 65mm
PS10.
10
0.1
0.01
PS8.
10
0.1
0.01
10
PS4.
0.01
0.01
11
PS25.
0.01
0.01
Communications
Hazard
12
PS11.
PFS2
0.01
0.01
13
EWG6
0.01
14
CSW11
0.001
0.01
15
CSW12
0.01
16
CSW17
0.001
0.01
90Leadership
Hazards
Training Needs
Analysis
Emergency
Planning
Work Planning,
Scheduling
Incident
Process Safety
Civil Inspections
Reporting
Alarm Systems
Separation
ManagementOilProcess
Pressure System
Systems
Regulations
Safety
Understand
Hazards
Identify Risk Control
Systems (Barriers)
1 Develop
Operation
&
External Audit
Leading
and
Compliance
Audit
Lagging Indicators
February 2012
Routine Plant
Checks
Work Identification,
Routine Plant
Inspections
Product
Maintenance
Management
Probability
Consequence
Disciplines Involved
Strategic Spares
Frequency
Emergency
Supplies
Recovery
Electrical
Mechanical
Event Frequency
Fatalities
Probability
Fire0.001
/ Explosion
Remote risk with current mitigations
1
0.001
Possibility but no expectation Loss
0.01
3
0.01
of Containment
Expectation in the UK in 10 years
0.1
10
0.1
rd
Party
Hazards
Expectation in the UK in a Year3
1
7
8 1
Reference
Leading
The collective name for the
2 systems, procedures
4Indicators
measures,
3
and
policies which prevent
Technical
Alarm and
Of
incidents and / or protectCritical
people 3 Classifications
Risk
Instrument
Lagging
and the environment from
the
Systems Lagging Indicators
Management
Indicators
Management
effects of major accidents.
Keeping the process inside the
equipment.
Plant Modification
Procedure
People
Ranking
Definition
of Process
Plant
Safety
Business
Continuity Planning
Shift Handover
Work Execution
Personal Risk
Assessment
Training Plan
Process Safety
Management
Environmental
System
Containment
Company Safety
Rules Management
Competency
Assurance
Plant Limiting
Conditions
Staff Knowledge
Management
Systems
13th January 2009
Version 0.8 [Working Draft]
Action Tracking
88 Leading Indicators
Process Safety KPIs
Controlled Documents
(Policies, Procedures,
Standards)
ScottishPower 2008
Commercial in Confidence this document contains information which is confidential and of value to ScottishPower. It may
be used only for the purpose for which it has been provided. Prior written consent is required before any part is reproduced or
distributed to 3rd parties.
Classification Of Incidents
3 tier approach based on API guidance...
Major
Process
Safety
Incident
Significant
Process
Safety
Incident
Minor
Process
Safety
Incident
February 2012
Data Recording
Guidelines
Formal sign off by
senior managers
February 2012
February 2012
KPI Ranking
Operational Indictors are the key to avoiding incidents...
February 2012
February 2012
Process Safety
Hazards
February 2012
Leading Indicators
Performing
Significantly
Below
Requirement
Performing
Below
Requirement
Performing
At Or Above
Requirement
Best Practice
Performance
Minor
Process Safety
Incident
No
Process Safety
Incidents
Lagging Indicators
Major Process
Safety Incident
February 2012
Significant
Process Safety
Incident
Plant Checks
Key Operational Indicators...
February 2012
Plant Checks
Visibility Of All Routine Operations Plant Checks...
February 2012
Shift Handover
Key Communication Tool...
February 2012
Shift Handover
Linked to Operational & Competence Standards...
February 2012
Establish
Leadership
Design Asset
Management &
Process Safety
Management
System
Implement
Foundation
Dashboard
Integration
&Automation Of
Dashboard
Review &
Governance
Benchmarking &
Continuous
Improvement
Alarm
Management
Staff
Competence
Works
Management
Process
Safety
Reliability
Engineering
Risk
Management
Shift
Logging
February 2012
Alarm
Management
Staff
Competence
Alarm Management
Works
Management
Process
Safety
Reliability
Engineering
Works Management
Risk
Management
Shift
Logging
February 2012
Alarm
Management
Staff
Competence
Risk Management
Works
Management
Process
Safety
Reliability
Engineering
Shift Logging
Risk
Management
Shift
Logging
February 2012
Alarm
Management
Staff
Competence
Reliability
Engineering
Works
Management
Process
Safety
Reliability
Engineering
Staff Competence
Risk
Management
Shift
Logging
February 2012
Operations standards
introduced
Start up and shutdown /
shift handover
competencies in place
and monitored
Alarm
Management
Staff
Competence
Works
Management
Process
Safety
Reliability
Engineering
Risk
Management
Shift
Logging
February 2012
Alarm
Management
Staff
Competence
Works
Management
Process
Safety
Reliability
Engineering
Risk
Management
Shift
Logging
February 2012
Source
Systems
Reporting and
Analysis
Data Processing
Reliability
Engineering
(PAS)
February 2012
KPI Data
Mart
Alarm Management
ETL
(Cintellate)
Integrated
Transactional
Data Mart
Technical Risks
ETL
(Cintellate)
ETL
Staging Area
(Ivara EXP)
Dashboard
Scheduling
Establish
Leadership
Design Asset
Management &
Process Safety
Management
System
Implement
Foundation
Dashboard
Integration
&Automation Of
Dashboard
Review &
Governance
February 2012
Benchmarking &
Continuous
Improvement
Energy
Wholesale
Generation
Governance Body
Review
Guidance
Frequency
Consolidated
Indicators
Major or Key
Incidents
Monthly
Business Wide
Indicators
Significant
Incidents
Trends
Monthly
Monthly
Daily
Generation
Groups
Coal PRM
Gas PRM
Hydro PRM
Group Indicators
Significant &
Moderate
Incidents
Close-out rates
Power
Stations
LN, CK, DD
RH , DC, SH,
BB, HT
CN, GW, LK
Local Indicators
All Incidents
February 2012
39
February 2012
Leading Indicators
Performance
(KPI Dashboard)
Incident Reviews
(Cintellate)
Technical Risks
Benchmarking
Legislation Update
February 2012
Learning Points
Key learning points from ScottishPowers journey to date...
For the first time, senior management is given near time visibility of core
processes
Introduction of Process Safety KPIs has driven improvement across the
business
Maintenance improvements backlog, preventative maintenance, planning
Technical Risk visibility and mitigation
Business benefits also now being realised e.g. insurance, plant availability
increasing, opex and capex reductions
In Summary
Business Benefits...
February 2012
Question Time
February 2012