Vous êtes sur la page 1sur 3

38662 Federal Register / Vol. 70, No.

127 / Tuesday, July 5, 2005 / Notices

DOD Clearance Officer: Ms. Patricia the information collection proposal Army Creek Watershed in the City of
Toppings. Written requests for copies of should be sent to Ms. Toppings, WHS/ New Castle, New Castle County,
the information collection proposal ESD/Information Management Division, Delaware.
should be sent to Ms. Toppings, WHS/ 1225 South Clark Street, Suite 504, 2. Wells Farms, Inc. D–99–67. An
ESD/Information Management Division, Arlington, VA 22202–4326. application for approval of a ground
1225 South Clark Street, Suite 504, Dated: June 27, 2005.
water withdrawal project to supply up
Arlington, VA 22202–4326. to 80 mg/30 days of water from Wells
Patricia L. Toppings,
Dated: June 27, 2005.
Nos. Wells Farm No. 1, Wells Farm No.
Alternate OSD Federal Register Liaison 2, Parold Davis and Shepard Prettyman,
Patricia L. Toppings, Officer, Department of Defense.
for irrigation of the applicant’s farm
Alternate OSD Federal Register Liaison [FR Doc. 05–13103 Filed 7–1–05; 8:45 am] crops near the Town of Milton, Sussex
Officer, Department of Defense. BILLING CODE 5001–06–M County, Delaware. The water will be
[FR Doc. 05–13102 Filed 7–1–05; 8:45 am] used to irrigate approximately 370 acres
BILLING CODE 5001–06–M of grains and vegetables.
DELAWARE RIVER BASIN 3. Lazy Boy Farm, Inc. D–2000–50. An
COMMISSION application for approval of a ground
DEPARTMENT OF DEFENSE water withdrawal project to supply up
Notice of Commission Meeting and to 45.240 mg/30 days of water to the
Office of the Secretary Public Hearing applicant’s agricultural irrigation system
Submission for OMB Review; from existing Wells Nos. 1 and 2 in the
Notice is hereby given that the
Comment Request Rancocas Aquifer, and up to 43.4464
Delaware River Basin Commission will mg/30 days from Pond No. 1, and to
hold an informal conference followed limit the withdrawal from all sources to
ACTION: Notice. by a public hearing on Wednesday, July 86.8928 mg/30 days. The project is
The Department of Defense has 20, 2005. The hearing will be part of the located near the Town of Middletown,
submitted to OMB for clearance, the Commission’s regular business meeting. New Castle County, Delaware.
following proposal for collection of Both the conference session and 4. Richard M. Morgan D–2000–62. A
information under the provisions of the business meeting are open to the public combined surface water and ground
Paperwork Reduction Act (44 U.S.C. and will be held at the Commission’s water withdrawal project to supply a
Chapter 35). office building, 25 State Police Drive, maximum of 137.562164 mg/30 days of
DATES: Consideration will be given to all
West Trenton, New Jersey. water to irrigate approximately 585
comments received by August 4, 2005. The conference among the acres of the applicant’s farm crops.
Title and OMB Number: Department commissioners and staff will begin at 10 Approximately 74.293344 mg/30 days
of Defense Education Activity (DoDEA) a.m. Topics of discussion will include: will be provided by the applicant’s five
Customer Satisfaction Surveys; OMB a status report on implementation of the existing and wells and approximately
Number 0704–0421. pollutant minimization plan (PMP) 63.268820 mg/30 days of surface water
Type of Request: Revision. regulation approved by the Commission will be withdrawn from a Hudson Pond
Number of Respondents: 7,283. on May 18, 2005, and formation of a tributary and Three Bridge Branch. The
Responses Per Respondent: 1. peer review advisory committee to project is located near the Town of
Annual Responses: 7,283. evaluate the PMP effort; a report and Lincoln, Sussex County, Delaware.
Average Burden Per Response: 16.7 discussion on post-flood activities; a 5. Howard A. Webb D–2005–11–1. An
minutes (average). proposal to rename the Flow application for approval of a ground and
Annual Burden Hours: 2,025. Management Technical Advisory surface water withdrawal project to
Needs and Uses: The DoDEA Committee and modify its membership; supply up to 19 mg/30 days of water to
Customer Satisfaction Surveys are a proposed amendment to the Basin the applicant’s agricultural irrigation
needed to measure the satisfaction level Regulations—Water Supply Charges, system from new Wells Nos. 1, 2, 3 and
with the programs and services relating to entitlements; a status report 4 in the Columbia Formation and up to
provided by DoDEA, as required by the on re-evaluation of administrative 54 mg/30 days from Intakes Nos. 1 and
DoDEA Community Strategic Plan. agreements and project review 2 in the farm pond and to limit the
Some of the topics included are procedures; an update on the withdrawal from all sources to 73 mg/
curriculum, communication, and Pennsylvania Act 220 State water 30 days. The project is located in the
technology. The information derived planning process, including regional Mispillion River and Cedar Creek
from these surveys will be used to priorities; and a presentation on DRBC’s watersheds in the Town of Milford,
improve planning efforts at all levels water monitoring and assessment Sussex County, Delaware.
throughout DoDEA. program, an EPA ‘‘Ten Elements Plan’’. 6. Theodore Bobola D–2005–15–1. A
Affected Public: Individuals or The subjects of the public hearing to ground water withdrawal project to
households. be held during the 1:30 p.m. business supply a maximum of 35 mg/30 days of
Frequency: Biennially. meeting include the dockets listed water from Wells Nos. 1, 2, 3 and 4 to
Respondent’s Obligation: Voluntary. below: irrigate the applicant’s farm crops in the
OMB Desk Officer: Mr. Lewis 1. City of New Castle, Municipal City of Dover, Kent County, Delaware.
Oleinick. Written comments and Services Commission D–78–71 CP–3. An The water will be used to irrigate
recommendations on the proposed application for renewal of a ground approximately 217 acres in the St. Jones
information collection should be sent to water withdrawal project to continue to River Watershed.
Mr. Oleinick at the Office of supply up to 48.0 million gallons per 7. Borough of Haddonfield D–75–84
Management and Budget, Desk Officer thirty days (mg/30 days) to the CP–2. An application for the renewal of
for DoD, Room 10236, New Executive applicant’s public water supply a ground water withdrawal project and
Office Building, Washington, DC 20503. distribution system from existing Wells decrease in withdrawal from 97.5 mg/30
DOD Clearance Officer: Ms. Patricia Nos. 1 through 4, in the Potomac days to 61.9 mg/30 days to supply the
Toppings. Written requests for copies of Formation. The project is located in the applicant’s public supply distribution

VerDate jul<14>2003 18:41 Jul 01, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\05JYN1.SGM 05JYN1
Federal Register / Vol. 70, No. 127 / Tuesday, July 5, 2005 / Notices 38663

system from existing Wells Nos. 1A, 5, continue to supply up to 46.8 mg/30 Nos. 1, 2, 3 and 4 in the Stockton
6 and 7. The project is located in the days to the applicant’s public water Formation. The allocation from all wells
Cooper River Watershed in Haddonfield supply distribution system from existing will be limited to 5.98 mg/30 days. The
Borough, Camden County, New Jersey. Wells Nos. 4A, 5 and 6, located in the project is located in the Assunpink
8. Borough of Pennington D–84–33 Potomac-Raritan-Magothy Formation Creek Watershed in Lawrence
CP–3. An application for a renewal of a within the Delaware River Watershed in Township, Mercer County, New Jersey.
ground water withdrawal project to Greenwich Township, Gloucester 18. United Mobile Homes D–2005–3–
continue to supply up to 6.48 mg/30 County, New Jersey. 1. An application to expand an existing
days of water to the applicant’s public 13. Estaugh Corporation T/A Medford sewage treatment plant (STP) from
water supply distribution system from Leas D–94–56 CP–2. An application for 54,000 gallons per day (gpd) to 79,500
existing Well No. 7 in the Brunswick a renewal of a surface water and ground gpd to serve 48 additional units in the
Formation, without a change in water withdrawal project to continue to Kinnebrook Mobile Home Park. The
allocation. The applicant’s distribution supply up to 4.9 mg/30 days of water to project is located just south of Route
system is also supplied by four wells the applicant’s public water supply 17B, near its intersection with Hamilton
located outside of the Delaware River distribution system from existing Road in the Town of Thompson,
Basin. The project is located in the surface water Intake No. 1 on the Sullivan County, New York, within the
Jacobs Creek Watershed in Pennington Southwest Branch Rancocas Creek and drainage area of the Special Protection
Borough, Mercer County, New Jersey. existing Wells Nos. 1 and 2 in the Waters. Following tertiary treatment, the
9. Sunoco, Inc. (R&M) D–86–15–3. An Potomac-Raritan-Magothy Formation, effluent will be discharged to an
application for approval of a surface without a change in allocation. The unnamed tributary of the Kinne Brook.
water and ground water withdrawal project is located in the Sharps Run 19. Myerstown Water Authority D–81–
project to revise and consolidate the Watershed in Medford Township, 67 CP–3. An application for a renewal
allocations included in Dockets D–86–5 Burlington County, New Jersey. of a ground water withdrawal project to
and D–86–15 REN. The applicant 14. Washington Township Municipal continue to supply up to 33.0 mg/30
requests an increase in its surface water Utilities Authority D–99–43 CP. An days of water to the applicant’s public
withdrawal from the Delaware River application for approval of a ground water supply distribution system from
from 175.104 mg/30 days to 265.0 mg/ water withdrawal project to supply up existing Wells Nos. 3, 5, 6 and 8 in the
30 days. The draft docket proposes a to 24.81 mg/30 days of water to the Hamburg and Ontelaunee Formations,
corresponding decrease in the existing applicant’s distribution system from without a change in allocation. The
ground water allocation from 232 mg/30 new ASR Well No. ASR 20, and to project is located in the Tulpehocken
days to 142 mg/30 days from Wells Nos. increase the total withdrawal from all Creek Watershed in Jackson Township
1, 3, 5 and 6A in the Potomac-Raritan- wells to 273.01 mg/30 days. The project and the Borough of Myerstown,
Magothy Aquifer. Surface water is located in Washington Township, Lebanon County, Pennsylvania.
withdrawals provide industrial cooling Gloucester County, New Jersey. 20. PennEngineering D–86–31 PA–3.
and process water. Ground water 15. South Jersey Water Supply An application for the renewal of a
withdrawals are used to provide Company D–99–57 CP. An application ground water withdrawal project to
industrial cooling, process water, and for approval of a ground water continue withdrawal of 1.3 mg/30 days
potable water as well as to maintain withdrawal project to supply up to 42 from existing Well G to supply the
hydraulic control and meet ground mg/30 days of water to the applicant’s applicant’s manufacturing facility. The
water remediation goals. The project is distribution system from new Wells primary purposes of the withdrawal are
located in the Delaware River Nos. 5 and 7 and existing Wells Nos. 2, domestic use and air conditioning
Watershed in West Deptford Township, 3 and 6, and to retain the withdrawal during the summer months.
Gloucester County, New Jersey. limit from all wells of 42 mg/30 days. Approximately 2% of the withdrawal is
10. Polyone Corporation D–89–74–2. Wells Nos. 2, 3 and 6 are located in the used for industrial processes. The
An application for the renewal of a NJDEP’s Water Supply Critical Area No. project is located in the Lockatong
ground water withdrawal project to 2. The project withdrawal is from the Formation in Plumstead Township,
continue withdrawal of 44.64 mg/30 Potomac-Raritan-Magothy Aquifer and Bucks County, Pennsylvania, within the
days of water to supply the applicant’s is located in Harrison Township, Southeastern Pennsylvania Ground
industrial manufacturing facility from Gloucester County, New Jersey. Water Protected Area.
existing Wells Nos. 4, 6 and 10 and new 16. Salem City Water Department D– 21. Grand Central Sanitary Landfill,
replacement Well No. 9A in the 2002–46 CP. An application for Inc. D–88–52–2. An application to
Potomac-Raritan-Magothy Aquifer. The approval of a ground water withdrawal upgrade a 0.1 million gallon per day
project is located in Oldmans project to supply up to 36 mg/30 days leachate treatment plant (LTP) located
Township, Salem County, New Jersey. of water to the applicant’s public water on a 537.9-acre tract, just east of State
(This was NAR’d as D–89–74 Renewal.) supply from new Wells Nos. 6 and 7 Route 512 in Plainfield Township,
11. Pennsgrove Water Supply and existing Well No. 2 in the Northampton County, Pennsylvania.
Company—Bridgeport Division D–93–28 Wenonah-Mt. Laurel Formation and up The LTP serves the Grand Central
CP–2. An application for the renewal of to 93 mg/30 days from the Laurel Lake Sanitary Landfill, which receives
a ground water withdrawal project to and Elkinton Pond intakes, and to limit interstate, non-hazardous refuse. The
continue withdrawal of 4.7 mg/30 days the total system withdrawal to 93 mg/ existing activated sludge treatment
to supply the applicant’s public water 30 days. The project is located in the process will be upgraded with a
supply distribution system from existing Salem River watershed in the City of sequencing batch reactor system that
Wells Nos. 2 and 3. The project is Salem, Salem County, New Jersey. includes powdered activated carbon and
located in the Raccoon Creek Watershed 17. The Lawrenceville School D– polymer addition. The existing reverse
in Logan Township, Gloucester County, 2005–13–1. An application for approval osmosis (RO) system will be replaced
New Jersey. of a ground water withdrawal project to with an improved model that includes
12. Township of Greenwich D–94–51 supply up to 5.98 mg/30 days for the microfiltration. This advanced treatment
CP–2. An application for renewal of a applicant’s potable water supply and for is designed to meet an effluent Total
ground water withdrawal project to irrigation of athletic fields from Wells Dissolved Solids (TDS) limit of 1,000

VerDate jul<14>2003 18:41 Jul 01, 2005 Jkt 205001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\05JYN1.SGM 05JYN1
38664 Federal Register / Vol. 70, No. 127 / Tuesday, July 5, 2005 / Notices

milligrams per liter (mg/l). Thus, the Formation. The project is located in of water for supplemental irrigation of
DRBC’s TDS effluent limit of 2,400 Lehman Township, Pike County, the applicant’s golf course from new
mg/l will be reduced to 1,000 mg/l. Pennsylvania. (This was NAR’d under Well No. PW–3 in the Stockton
Additional process and operational the name of Tamiment Water Company Formation, and to retain the maximum
improvements will be made. No as D–89–33 CP Renewal.) withdrawal from existing Wells Nos.
expansion of the LTP is proposed. The 24. Pilgrims Pride Corporation D–89– PW–1 and PW–2 and new Well PW–3
primary method of leachate disposal for 65–2. An application to modify an of 8.64 mg/30 days. The project is
the landfill is to discharge to the Pen industrial wastewater treatment plant located in the Delaware River
Argyl Sewage Treatment Plant (STP) (IWTP) discharge to an unnamed,
Watershed in Lower Makefield
following partial treatment, and the intermittent tributary of Indian Creek in
Township, Bucks County, Pennsylvania.
secondary alternative is to discharge the Perkiomen Creek Watershed. The
fully treated effluent to Little Bush Kill project, formerly owned by Wampler- In addition to the public hearing on
in the drainage area of the Lower Longacre, Inc. is located at the the dockets listed above, the
Delaware River Management Plan Area. intersection of Allentown Road and Commission’s 1:30 p.m. business
22. Delaware County Solid Waste Route 113 in Franconia Township, meeting will include possible action on
Authority D–89–18 CP–3. An Montgomery County, Pennsylvania. The a resolution to rename the Flow
application to modify the Rolling Hills facility formerly processed tuna and Management Technical Advisory
Sanitary Landfill (RHSL) (formerly poultry but currently processes only Committee and modify its membership;
Colebrookdale Landfill) leachate poultry products. Because the project is a resolution authorizing the Executive
treatment plant (LTP) discharge to located in the Southeastern Director to engage a contractor to
Manatawny Creek via Outfall 001 in the Pennsylvania Ground Water Protected support the Commission in the
Schuylkill River Watershed. The landfill Area, the applicant has implemented collection and assessment of
and LTP are located off Schenkel Road mandatory water conservation information for the ‘‘State of the Basin
in Earl Township, Berks County, measures. As a result, total dissolved
Report 2006’’; and resolutions regarding
Pennsylvania. Following advanced solids (TDS) are present at an elevated
health insurance benefits for
treatment of 0.08 million gallons per concentration in the IWTP effluent. The
day (mgd), LTP effluent is discharged applicant’s current draft NPDES Permit Commission retirees.
via diffuser to a point on the limits the effluent TDS concentration to The meeting will also include:
Manatawny Creek in Oley Township, 1,000 milligrams per liter (mg/l). The adoption of the Minutes of the May 18,
Berks County, Pennsylvania applicant requests a limit of 4,700 2005 business meeting; announcements;
approximately one mile downstream mg/l, which is consistent with the a report on basin hydrologic conditions;
from RHSL. The docket holder has Pennsylvania Department of a report by the executive director; a
requested an increase in the average Environmental Protection’s draft permit report by the Commission’s general
discharge concentration of total limit for osmotic pressure of 100 counsel; and an opportunity for public
dissolved solids (TDS) to 30,000 milliosmos per kilogram. The applicant dialogue. Draft dockets and the
milligrams per liter (mg/l) from the has submitted with its requested resolutions scheduled for public hearing
existing 15,000 mg/l. In support of its modification an analysis that addresses or action on July 20, 2005 will be posted
requested modification, the docket environmental impact. The project is on the Commission’s Web site, http://
holder has submitted an analysis located in the drainage area of the
www.drbc.net, where they can be
concluding that the proposed Schuylkill River, which is conditionally
accessed through the Notice of
modification will cause no adverse designated as Modified-Recreational in
effect on the downstream aquatic the Delaware River Basin Commission Commission Meeting and Public
community, nor will it threaten potable Comprehensive Plan. Hearing. Additional documents relating
water supply intakes located over 20 25. Blue Mountain Water Cooperative to the dockets and other items may be
river miles downstream. In further D–93–27–2. An application for the examined at the Commission’s offices.
support to this determination, the renewal of a ground water withdrawal Please contact William Muszynski at
docket holder will demonstrate via in- project to reduce withdrawal from 10.8 609–883–9500, extension 221 with any
stream monitoring and assessment of mg/30 days to 5 mg/30 days to supply docket-related questions.
analytical data to be collected in at least the applicant’s Tilden Industrial Park Individuals in need of an
a one-year period, that the project will from existing Wells Nos. 1, 2 and 5. The accommodation as provided for in the
not have an adverse impact. An project is located in the Schuylkill River Americans with Disabilities Act who
alternatives analysis was completed by Watershed in Tilden Township, Berks wish to attend the informational
the docket holder. The LTP uses the County, Pennsylvania. meeting, conference session or hearings
Best Practicable Treatment (BCT) 26. Filomina, Inc. D–93–47–2. An
application for renewal of a ground should contact the commission
technology. A wetlands treatment
water withdrawal project to continue to secretary directly at 609–883–9500 ext.
system is used to remove iron from up
to 0.087 mgd of on-site groundwater. No supply up to 9.1 mg/30 days of water for 203 or through the Telecommunications
expansion of the LTP or the wetlands supplemental irrigation of the Relay Services (TRS) at 711, to discuss
treatment system is proposed. PADEP applicant’s golf course from existing how the Commission may accommodate
has approved the discharge from the Wells Nos. 1, 6 and 8, all in the Catskill your needs.
wetlands treatment system via Outfall Formation. No change in the existing Dated: June 27, 2005.
006 to adjacent Furnace Run. allocation is proposed. The project is Pamela M. Bush,
23. Pennsylvania Utility Company D– located in the Pohopoco Creek
Commission Secretary.
89–33 CP–2. An application for the Watershed in Polk Township, Monroe
renewal of a ground water withdrawal County, Pennsylvania. [FR Doc. 05–13119 Filed 7–1–05; 8:45 am]
project to continue to supply up to 6.4 27. Lower Makefield Township D– BILLING CODE 6360–01–P
mg/30 days of water to the applicant’s 2002–48 CP–2. An application for
public water distribution system from approval of a ground water withdrawal
Wells Nos. 1, 2 and 3 in the Catskill project to supply up to 1.73 mg/30 days

VerDate jul<14>2003 18:41 Jul 01, 2005 Jkt 205001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\05JYN1.SGM 05JYN1

Vous aimerez peut-être aussi