Brazil
Landmark: Worlds First Early Production Drill Pipe Riser Rated for
2,000 m (6,600 ft)
Project Overview
Project Characteristics
Project Ownership
No. Trees:
Water Depth:
Tree Type:
Tree Pressure:
Tree Bore size:
Hydrocarbon:
Petrobras
2 (Pilot Project)
11 (Mod I, Ph A)
8 (by FMC CBV)
1,500 - 2,000 m
(4,900 - 6,600 ft)
Vertical, Horizontal
5,000 psi
4x2, 5x1
Oil and Gas
100%
Comments
Worldwide Headquarters:
FMC Technologies
1803 Gears Road
Houston, TX 77067, USA
Phone: +1 (281) 591 4000
Fax: +1 (281) 591 4291
www.fmctechnologies.com
The first phase of this full-scale project was put onstream in May
2000 when the semi and FSO P-47 began operation. An accident
caused P-36 to sink in March 2001, when six (6) wells were in
production. After the accident, Petrobras chartered a production
unit called FPSO Brazil to temporarily substitute the P-36
platform. For a period of 5-1/2 years, eight (8) production and
three (3) injection wells will be connected to the chartered FPSO.
In 2006, the second phase of Module IA will start operating
twenty (20) production wells and ten (10) injection wells,
including those that had been connected to FPSO Brazil. These
wells will be tied to P-52, a brand new semi-submersible with
capacity to produce 180,000 bopd. This unit will be one of the
largest in the world, with a total displacement of 80,000 metric
tons. The feasibility studies for the other three (3) modules of
Roncador are currently under way.
BRAZIL
Scope of Work