Federal Register / Vol. 70, No.

122 / Monday, June 27, 2005 / Notices 36933

protestants parties to the proceeding. b. Project No.: P–9185–009. average annual generation would be
Anyone filing a motion to intervene or c. Date Filed: April 1, 2005. 4,903 megawatthours.
protest must serve a copy of that d. Applicant: Flambeau Hydro, LLC. m. A copy of the application is
document on the Applicant. In reference e. Name of Project: Clam River available for review at the Commission
to filings initiating a new proceeding, Hydroelectric Project. in the Public Reference Room or may be
interventions or protests submitted on f. Location: On the Clam River in viewed on the Commission’s Web site at
or before the comment deadline need Burnett County, near Danbury, http://www.ferc.gov using the
not be served on persons other than the Wisconsin. The project does not occupy ‘‘eLibrary’’ link. Enter the docket
Applicant. federal lands. number excluding the last three digits in
The Commission encourages g. Filed Pursuant to: Federal Power the docket number field to access the
electronic submission of protests and Act 16 U.S.C. 791(a)–825(r). document. For assistance, contact FERC
interventions in lieu of paper, using the h. Applicant Contact: Scott Klabunde, Online Support at
FERC Online links at http:// North American Hydro, Inc., P.O. Box FERCOnlineSupport@ferc.gov or toll-
www.ferc.gov. To facilitate electronic 167, Neshkoro, WI 54960; 920–293– free at 1–866–208–3676, or for TTY,
service, persons with Internet access 4628 ext. 14. (202) 502–8659. A copy is also available
who will eFile a document and/or be i. FERC Contact: Patrick Murphy, for inspection and reproduction at the
listed as a contact for an intervenor (202) 502–8755 or address in item h. above.
must create and validate an patrick.murphy@ferc.gov. You may also register online at
eRegistration account using the j. Deadline for filing motions to http://www.ferc.gov/esubscribenow.htm
eRegistration link. Select the eFiling intervene and protest: 60 days from the to be notified via e-mail of new filings
link to log on and submit the issuance date of this notice. and issuances related to this or other
intervention or protests. All documents (original and eight pending projects. For assistance, contact
Persons unable to file electronically copies) should be filed with: Magalie R. FERC Online Support.
should submit an original and 14 copies Salas, Secretary, Federal Energy n. Anyone may submit a protest or a
of the intervention or protest to the Regulatory Commission, 888 First motion to intervene in accordance with
Federal Energy Regulatory Commission, Street, NE., Washington, DC 20426. the requirements of Rules of Practice
888 First St. NE., Washington, DC The Commissions Rules of Practice and Procedure, 18 CFR 385.210,
20426. and Procedure require all intervenors 385.211, and 385.214. In determining
The filings in the above proceedings filing documents with the Commission the appropriate action to take, the
are accessible in the Commission’s to serve a copy of that document on Commission will consider all protests
eLibrary system by clicking on the each person whose name appears on the filed, but only those who file a motion
appropriate link in the above list. They official service list for the project. to intervene in accordance with the
are also available for review in the Further, if an intervenor files comments Commission’s Rules may become a
Commission’s Public Reference Room in or documents with the Commission party to the proceeding. Any protests or
Washington, DC. There is an relating to the merits of an issue that motions to intervene must be received
eSubscription link on the Web site that may affect the responsibilities of a on or before the specified deadline date
enables subscribers to receive e-mail particular resource agency, they must for the particular application.
notification when a document is added also serve a copy of the document on All filings must (1) bear in all capital
to a subscribed dockets(s). For that resource agency. letters the title ‘‘PROTEST’’ or
assistance with any FERC Online Motions to intervene and protests may ‘‘MOTION TO INTERVENE’’; (2) set
service, please e-mail be filed electronically via the Internet in forth in the heading the name of the
FERCOnlineSupport@ferc.gov. or call lieu of paper. The Commission strongly applicant and the project number of the
(866) 208–3676 (toll free). For TTY, call encourages electronic filings. See CFR application to which the filing
(202) 502–8659. 385.200 (a)(1)(iii) and the instructions responds; (3) furnish the name, address,
Linda Mitry, on the Commission’s Web site (http:// and telephone number of the person
Deputy Secretary. www.ferc.gov) under the ‘‘eFiling’’ link. protesting or intervening; and (4)
[FR Doc. E5–3314 Filed 6–24–05; 8:45 am] l. This application has been accepted, otherwise comply with the requirements
but is not ready for environmental of 18 CFR 385.2001 through 385.2005.
BILLING CODE 6717–01–P
analysis at this time. The existing Clam Agencies may obtain copies of the
River Project consists of: (1) A 46-foot- application directly from the applicant.
DEPARTMENT OF ENERGY high buttress type concrete dam with a A copy of any protest or motion to
54-foot-wide spillway with four intervene must be served upon each
Federal Energy Regulatory sections, three sections equipped with representative of the applicant specified
Commission 8-inch-high stoplogs, and one section in the particular application.
equipped with a 4-foot-high slide gate; o. Procedural schedule and final
[Project No. 9185–009]
(2) an 898-foot-long and 223-foot-long amendments: The application will be
Flambeau Hydro, LLC; Notice of earthen dikes connecting the left side processed according to the following
Application Accepted for Filing and and the right side of the concrete dam, Hydro Licensing Schedule. Revisions to
Soliciting Motions To Intervene and respectively; (3) a 360-acre reservoir the schedule will be made as
Protest with a net storage capacity of 3,575 acre- appropriate. The Commission staff
feet with a water surface elevation of proposes to issue one environmental
June 20, 2005. 898.9 feet msl; (4) two powerhouses assessment rather than issue a draft and
Take notice that the following integral to the dam containing three final EA. Comments, terms and
hydroelectric application has been filed turbine generating units with a total conditions, recommendations,
with the Commission and is available installed capacity of 1,200 kW; (5) a prescriptions, and reply comments, if
for public inspection. 100-foot-long, 2.4-kilovolt transmission any, will be addressed in the EA. Staff
a. Type of Application: Subsequent line; and (6) appurtenant facilities. The intends to give at least 30 days for
License. applicant estimates that the total entities to comment on the EA before

VerDate jul<14>2003 18:11 Jun 24, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\27JNN1.SGM 27JNN1
36934 Federal Register / Vol. 70, No. 122 / Monday, June 27, 2005 / Notices

final action is taken on the license Salas, Secretary, Federal Energy ‘‘REPLY COMMENTS,’’
application. Regulatory Commission, 888 First ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
Issue Scoping Document for Street, NE., Washington, DC 20426. AND CONDITIONS,’’ or
Comments: July 2005. The Commission’s Rules of Practice ‘‘PRESCRIPTIONS’’; (2) set forth in the
Notice application ready for require all intervenors filing documents heading the name of the applicant and
environmental analysis: September with the Commission to serve a copy of the project number of the application to
2005. that document on each person on the which the filing responds; (3) furnish
Notice of the availability of the EA: official service list for the project. the name, address, and telephone
March 2006. Further, if intervenors file comments or number of the person submitting the
Ready for Commission’s decision on documents with the Commission filing; and (4) otherwise comply with
the Application: May 2006. relating to the merits of an issue that the requirements of 18 CFR 385.2001
Final amendments to the application may affect the responsibilities of a through 385.2005. All comments,
must be filed with the Commission no particular resource agency, they must recommendations, terms and
later than 30 days from the issuance also serve a copy of the document on conditions, or prescriptions must set
date of the notice of ready for that resource agency. forth their evidentiary basis and
environmental analysis. Comments, recommendations, terms otherwise comply with the requirements
and conditions, and prescriptions may of 18 CFR 4.34(b). Agencies may obtain
Magalie R. Salas,
be filed electronically via the Internet in copies of the application directly from
Secretary.
lieu of paper. The Commission strongly the applicant. Each filing must be
[FR Doc. E5–3301 Filed 6–24–05; 8:45 am] encourages electronic filings. See 18 accompanied by proof of service on all
BILLING CODE 6717–01–P CFR 385.2001(a)(1)(iii) and the persons listed on the service list
instructions on the Commission’s Web prepared by the Commission in this
site (http://www.ferc.gov) under the proceeding, in accordance with 18 CFR
DEPARTMENT OF ENERGY ‘‘eFiling’’ link. 4.34(b), and 385.2010.
k. This application has been accepted o. Procedural schedule and final
Federal Energy Regulatory
and is ready for environmental analysis amendments: The application will be
Commission at this time. processed according to the following
[Project No. 2183–035] l. Project Description: The Markham
Hydro Licensing Schedule. Revisions to
Ferry Hydroelectric Project consists of
Grand River Dam Authority; Notice of the schedule will be made as
the following existing facilities: (1) The
Application Ready for Environmental appropriate.
3,744-foot-long by 90-foot-high Robert S.
Analysis and Soliciting Comments, Notice of the availability of the EA:
Kerr dam, which includes an 824-foot-
Recommendations, Terms and September 2005.
long gated spillway, topped with 17, 40-
Conditions, and Prescriptions Ready for Commission decision on
foot-long by 27-foot-high, steel Taintor
the application: December 2005.
gates and two 80-ton capacity traveling
June 20, 2005. Final amendments to the application
gate hoists; (2) the 15-mile-long Lake
Take notice that the following must be filed with the Commission no
Hudson, which has a surface area of
hydroelectric application has been filed later than 30 days from the issuance
10,900 acres, 200,300 acre-feet of
with the Commission and is available date of the notice of ready for
operating storage, and 444,500 acre-feet
for public inspection. environmental analysis.
total of flood storage capacity; (3) the
a. Type of Application: New Major
6,200-foot-long by 45-foot-high Salina Magalie R. Salas,
License Application.
Dike; (4) a concrete powerhouse Secretary.
b. Project No.: 2183–035.
c. Date Filed: June 2, 2003. containing four Kaplan turbines with a [FR Doc. E5–3304 Filed 6–24–05; 8:45 am]
d. Applicants: Grand River Dam total maximum hydraulic capacity of BILLING CODE 6717–01–P
Authority. 28,000 cubic feet per second (cfs) and
e. Name of Project: Markham Ferry four generating units with a total
Hydroelectric Project. installed generating capacity of 108,000 DEPARTMENT OF ENERGY
f. Location: The project is located on kilowatts (kW), and producing an
the River Grand (Neosho) in Mayes average of 257,107,000 kilowatt hours Federal Energy Regulatory
County, Oklahoma. The project does not (kWh) annually; and (5) appurtenant Commission
occupy any Federal lands. facilities. The dam and existing project [Docket No. ER05–1065–000]
g. Filed Pursuant to: Federal Power facilities are owned by GRDA.
Act, 16 U.S.C. 791(a)–825(r). m. A copy of the application is Entergy Services, Inc.; Notice of
h. Applicant Contact: Mr. Robert W. available for review at the Commission Technical Conference and Extension
Sullivan, Assistant General Manager, in the Public Reference Room or may be of Time
Risk Management & Regulatory viewed on the Commission’s Web site at
Compliance, GRDA, P.O. Box 409, http://www.ferc.gov using the using the June 17, 2005.
Vinita, Oklahoma 74301 (918) 256– eLibrary link. Enter the docket number Entergy Services, Inc. (Entergy) is
5545. excluding the last three digits in the sponsoring a conference on its proposal
i. FERC Contact: John Ramer at (202) docket number field to access the to establish an Independent Coordinator
502–8969, or John.Ramer@ferc.gov. document. For assistance, contact FEFC of Transmission (ICT). Entergy recently
j. Deadline for filing comments, Online Support at filed this proposal and proposed tariff
recommendations, terms and FERCOnlineSupport@ferc.gov or toll- changes in Docket No. ER05–1065–000.
conditions, and prescriptions: 60 days free at (866) 208–3676 or for TTY, call FERC staff and intervenors will
from the issuance date of this notice; (202) 502–8659. A copy is also available participate in the conference. The
reply comments are due 105 days from for inspection and reproduction at the conference will be held on June 30 and
the date of this notice. address in item h above. July 1, 2005 in New Orleans, Louisiana.
All documents (original and eight n. All filings must (1) bear in all The times of the conference are 9 a.m.
copies) should be filed with: Magalie R. capital letters the title ‘‘COMMENTS,’’ to 4:30 p.m. (Central time) on June 30,