0.300
3.11
3.100
1.60
3.60
0.80
1.500
0.500
6
0.000
0.500
1.300
###
1.30
0.500
2.600
2
Sr.
No
1
Description
3
Unit
Nos
Length
Width
Depth
in ordinary soil
cum
1.00
2.80
2.10
Total
Plain cement concrete M 15 grade levelling
course below foundation and approach slab
complete as per Technical Specification
Sections 1700, 2100 and 2700.
Cum
1.00
2.80
0.10
1
1
1
1.00
1.00
1.00
2.60
0.80
1.30
0.50
0.000
0.000
cum
Total
Providing & Casting in situ controlled Cement
Concrete for RCC Work in Retaining Wall
Open
Foundation
including
necessary
formwork, vibrating, curing and finishing. As
per MoRT&H technical specification section
1700.
Cum
Part - 1
Part - 2
Part - 3
cum
cum
cum
Part - 4
cum
Total
Structural cement concrete for reinforced
concrete grade M-30 for sub structure
including
formwork,
machinery
and
workmanship complete as per drawing and
Technical Specification Sections 1500, 1700
and 2200.
Cum
Part - 5
Part - 6
cum
cum
Total
Providing and fixing in position TMT HYSD
reinforcement complete as per drawing and
Technical Specification Section 1600.
Cum
M.T
M.T
Total
1.00
1
1
1.00
1.00
1.30
1.24
0.50
0.300
0.200
0.00
3.100
1.550
@ 60.18 kg/cu.m
@ 83.46 kg/cu.m
Cum
No. of
Spacing bars
Dia
Length of Total
bar
length
a1
20
140
3.61
28.85
a2
3.61
28.85
c1
20
215
2.825
14.13
c2
12
300
1.000
8.00
d1
12
170
19
1.000
19.00
d2
10
1.000
10.00
e1
16
240
2.125
10.63
e2
12
300
1.000
7.00
10
1.000
4.00
s1
10
300
1.325
5.30
s2
10
300
1.000
5.00
s3
10
300
1.825
7.30
s4
10
300
1.000
0.00
s5
10
300
3.525
14.10
s6
10
300
11
1.000
11.00
c1+c2+e1+e2+f+s1+s2+s3+s4
a1+a2+d1+d2+s5+s6
Quantity
5.880
5.880
0.280
0.280
1.300
0.000
0.000
0.000
1.300
0.930
0.310
1.240
0.078
0.103
0.182
Total
Wt.kg/m wt(kg)
2.47
71.15
0.00
0.00
2.47
34.83
0.89
7.10
0.89
16.87
0.00
0.00
1.58
16.77
0.89
6.21
0.62
2.47
0.62
3.27
0.62
3.08
0.62
4.50
0.62
0.00
0.62
8.69
0.62
6.78
181.73
78.24
103.50
60.18
83.46
71.549
147.8854
kg/cu.m
kg/cu.m
RCC Retaining Wall For Group II _ 4 to 5 m Ht. for 1m length & 1 no.
0.300
4.41
4.400
2.90
4.90
1.30
6
1.500
0.600
0.000
0.500
1.900
###
3
1.90
0.500
3.800
Sr.
No
1
Description
Unit
Nos
Length
Width
Depth
in ordinary soil
cum
1.00
4.00
2.10
Total
Plain cement concrete M 15 grade levelling
course below foundation and approach slab
complete as per Technical Specification
Sections 1700, 2100 and 2700.
Cum
1.00
4.00
0.10
1
1
1
1.00
1.00
1.00
3.80
1.30
1.90
0.50
0.000
0.000
cum
Total
Providing & Casting in situ controlled Cement
Concrete for RCC Work in Retaining Wall
Open
Foundation
including
necessary
formwork, vibrating, curing and finishing. As
per MoRT&H technical specification section
1700.
Cum
Part - 1
Part - 2
Part - 3
cum
cum
cum
Part - 4
cum
Total
Structural cement concrete for reinforced
concrete grade M-30 for sub structure
including
formwork,
machinery
and
workmanship complete as per drawing and
Technical Specification Sections 1500, 1700
and 2200.
Cum
Part - 5
Part - 6
cum
cum
Total
Providing and fixing in position TMT HYSD
reinforcement complete as per drawing and
Technical Specification Section 1600.
Cum
M.T
M.T
Total
1.00
1
1
1.00
1.00
1.90
1.98
0.60
0.300
0.300
0.00
4.400
2.200
@ 52.61 kg/cu.m
@ 71.27 kg/cu.m
Cum
No. of
Spacing bars
Dia
Length of Total
bar
length
a1
20
140
4.91
39.28
a2
4.91
39.28
c1
20
215
3.525
17.63
c2
12
300
10
1.000
10.00
d1
12
170
26
1.000
26.00
d2
13
1.000
13.00
e1
16
240
2.725
13.63
e2
12
300
1.000
9.00
10
1.000
4.00
s1
10
300
1.925
7.70
s2
10
300
1.000
7.00
s3
10
300
2.425
9.70
s4
10
300
1.000
1.00
s5
10
300
4.825
19.30
s6
10
300
15
1.000
15.00
c1+c2+e1+e2+f+s1+s2+s3+s4
a1+a2+d1+d2+s5+s6
Quantity
8.400
8.400
0.400
0.400
1.900
0.000
0.000
0.000
1.900
1.320
0.660
1.980
0.100
0.141
0.241
Total
Wt.kg/m wt(kg)
2.47
96.87
0.00
0.00
2.47
43.47
0.89
8.88
0.89
23.08
0.00
0.00
1.58
21.50
0.89
7.99
0.62
2.47
0.62
4.75
0.62
4.32
0.62
5.98
0.62
0.62
0.62
11.90
0.62
9.25
241.07
99.97
141.11
52.61
71.27
62.13156
196.1697
kg/cu.m
kg/cu.m
RCC Retaining Wall For Group II _ 5 to 6 m Ht. for 1m length & 1 no.
0.300
5.43
5.400
4.10
6.10
1.71
6
1.300
0.900
0.200
0.500
2.600
###
3
2.61
0.700
5.200
Sr.
No
1
Description
Unit
Nos
Length
Width
Depth
in ordinary soil
cum
1.00
5.40
2.10
Total
Plain cement concrete M 15 grade levelling
course below foundation and approach slab
complete as per Technical Specification
Sections 1700, 2100 and 2700.
Cum
1.00
5.40
0.10
1
1
1
1.00
1.00
1.00
5.20
1.70
2.60
0.50
0.100
0.100
cum
Total
Providing & Casting in situ controlled Cement
Concrete for RCC Work in Retaining Wall
Open
Foundation
including
necessary
formwork, vibrating, curing and finishing. As
per MoRT&H technical specification section
1700.
Cum
Part - 1
Part - 2
Part - 3
cum
cum
cum
Part - 4
cum
Total
Structural cement concrete for reinforced
concrete grade M-30 for sub structure
including
formwork,
machinery
and
workmanship complete as per drawing and
Technical Specification Sections 1500, 1700
and 2200.
Cum
Part - 5
Part - 6
cum
cum
Total
Providing and fixing in position TMT HYSD
reinforcement complete as per drawing and
Technical Specification Section 1600.
Cum
M.T
M.T
Total
1.00
1
1
1.00
1.00
3.21
3.24
0.90
0.300
0.600
0.20
5.400
2.700
@ 40.25 kg/cu.m
@ 54.13 kg/cu.m
Cum
No. of
Spacing bars
Dia
Length of Total
bar
length
a1
20
140
6.13
49.07
a2
6.13
49.07
c1
20
215
4.533
22.66
c2
12
300
13
1.000
13.00
d1
12
170
32
1.000
32.00
d2
16
1.000
16.00
e1
16
240
3.425
17.13
e2
12
300
12
1.000
12.00
10
1.000
4.00
s1
10
300
2.625
10.50
s2
10
300
1.000
9.00
s3
10
300
3.137
12.55
s4
10
300
1.000
3.00
s5
10
300
6.025
24.10
s6
10
300
18
1.000
18.00
c1+c2+e1+e2+f+s1+s2+s3+s4
a1+a2+d1+d2+s5+s6
Quantity
11.340
11.340
0.540
0.540
2.600
0.170
0.260
0.180
3.210
1.620
1.620
3.240
0.129
0.175
0.305
Total
Wt.kg/m wt(kg)
2.47
121.00
0.00
0.00
2.47
55.89
0.89
11.54
0.89
28.41
0.00
0.00
1.58
27.03
0.89
10.65
0.62
2.47
0.62
6.47
0.62
5.55
0.62
7.74
0.62
1.85
0.62
14.86
0.62
11.10
304.56
129.19
175.37
40.25
54.13
47.21855
247.8337
kg/cu.m
kg/cu.m
169450
169460
169459
62.754
62.635
62.6469
62.6945
20 OF 734
7
37
Sr.No
Exi ch.
Pr Ch.
Unit
Km.
178-193
New
New
New
Km.
NO
W(m)
H(m)
Width of
crash
barrier
m
1
1
1
1
1
1
2
1
1
2
4.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
1
1
1
2.000
2.000
2.000
1
2
3
4
5
6
7
8
9
10
New
Reconstruction
Reconstruction
New
New
New
1.000
182+485
184+057
184+578
184+691
185+280
186+754
188+184
188+310
192+561
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
140-178
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
140+802
146+820
147+422
148+050
148+155
148+365
148+525
148+605
151+497
151+199
152+426
152+643
154+498
154+896
155+118
156+017
156+969
157+465
163+355
164+614
171+904
172+304
175+000
175+930
176+510
New
178+917
Width of Median
side Kerb(One
Side)
m
0.5
0
0
0
0
0
0
0
0
0
0
4
4
4
4
4
4
4
4
4
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
2.000
2.000
2.000
0
0
0
4
4
4
0.5
0.5
0.5
Median
Width
21 OF 734
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
179+275
179+418
179+725
179+842
180+005
180+425
180+765
181+775
181+870
182+440
182+745
183+120
183+332
183+558
183+757
184+312
185+164
185+501
185+817
186+121
186+479
186+638
186+874
187+248
187+447
187+656
187+937
188+050
188+739
188+898
189+168
189+398
189+940
190+208
190+597
191+007
191+307
191+802
192+028
192+259
192+734
193+525
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
81
82
83
84
150 to 178
New
New
New
New
150+875
151+675
151+704
152+000
1
1
1
1
3.000
3.000
2.000
2.000
3.000
3.000
2.000
2.000
0
0
0
0
4
4
4
4
0.5
0.5
0.5
0.5
22 OF 734
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
152+436
152+622
153+450
156+415
156+514
157+196
157+770
158+477
159+080
159+332
159+890
159+905
160+670
160+866
161+450
162+085
162+712
163+715
163+861
164+055
164+070
164+200
164+596
164+606
164+660
165+050
165+354
165+550
165+980
165+985
166+105
166+285
166+705
166+941
166+952
167+354
167+620
167+684
167+694
168+100
168+497
168+734
168+885
169+005
169+175
169+320
169+459
169+660
1
2
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
3.000
3.000
3.000
3.000
2.000
2.000
2.000
3.000
3.000
2.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
2.000
2.000
2.000
2.000
3.000
2.000
2.000
2.000
2.000
3.000
3.000
3.000
3.000
2.000
2.000
2.000
3.000
3.000
2.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
2.000
2.000
2.000
2.000
3.000
2.000
2.000
2.000
2.000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
23 OF 734
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
170+188
170+317
170+507
170+625
170+860
170+962
171+225
172+605
172+655
172+845
173+225
173+675
173+830
174+009
174+262
174+345
174+425
175+220
175+370
176+015
176+600
176+770
177+064
177+427
177+573
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
3.000
2.000
3.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
3.000
3.000
3.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
2.000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
93+215
93+900
94+300
94+600
95+096
95+520
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
95+850
96+200
96+750
97+450
97+850
98+250
98+600
98+950
99+660
99+890
100+284
100+960
101+140
101+190
101+435
101+835
24 OF 734
New
New
New
New
New
101+880
102+100
102+485
102+865
103+100
1
1
1
1
1
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
0
0
0
0
0
4
4
4
4
4
0.5
0.5
0.5
0.5
0.5
25 OF 734
Depth of
Top Slab
Clear Height of
Box( Bottom of Top
Slab to Top of
Bottom of Slab)
m
0
0
0
0
0
0
0
0
0
0
4.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
0.42
0.42
0.42
0.42
0.42
0.42
0.47
0.42
0.42
0.47
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.5
0.5
0.5
0
0
0
2.00
2.00
2.00
2.000
2.000
2.000
0.25
0.25
0.25
Railing or Crash
Barrier Width
(footpath side)
m
Footpath
width (one
side)
m
2
2
2
2
2
2
2
2
2
2
7.500
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
2
2
2
10.000
10.000
10.000
Nos of
Carriage Way
Carriageway Width ( One Side)
Clear
Span
26 OF 734
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
2
2
2
2
10.000
10.000
10.000
10.000
0.5
0.5
0.5
0.5
0
0
0
0
3.00
3.00
2.00
2.00
3.000
3.000
2.000
2.000
0.42
0.42
0.25
0.25
27 OF 734
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3.00
3.00
3.00
3.00
2.00
2.00
2.00
3.00
3.00
2.00
3.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
3.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
2.00
2.00
3.000
3.000
3.000
3.000
2.000
2.000
2.000
3.000
3.000
2.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
2.000
2.000
2.000
2.000
3.000
2.000
2.000
2.000
2.000
0.42
0.4
0.42
0.42
0.25
0.25
0.25
0.4
0.42
0.25
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.4
0.25
0.25
0.25
0.25
28 OF 734
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
3.00
3.00
2.00
3.00
3.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00
3.00
2.00
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
3.000
3.000
3.000
3.000
3.000
2.000
2.000
2.000
2.000
2.000
2.000
3.000
2.000
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.42
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
0..25
29 OF 734
2
2
2
2
2
10.000
10.000
10.000
10.000
10.000
0.5
0.5
0.5
0.5
0.5
0
0
0
0
0
2.00
2.00
2.00
2.00
2.00
2.000
2.000
2.000
2.000
2.000
0..25
0..25
0..25
0..25
0..25
30 OF 734
Depth of
Proposed
Existing
Thickness of Thickness
Bottom
Formation
Ground Level
Wearing of Side Wall
Slab
Level ( Average)
( Average)
Coat
of Box
m
m
m
m
m
0.42
0.42
0.42
0.42
0.42
0.42
0.45
0.42
0.42
0.45
103.420
52.500
51.200
48.000
48.000
45.000
100.000
35.100
33.500
32.000
100.000
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.3
0.3
0.3
Slope of
Pitching
Slope of
Embankment
48.685
47.500
44.310
44.310
41.070
96.500
31.100
29.400
28.000
0.065
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
1.5
2
2
2
2
2
2
2
2
2
1.5
2
2
2
2
2
2
2
2
2
33.705
35.000
34.803
36.874
36.76
36.166
35.678
35.434
32.2444
34.500
34.795
35.400
34.0454
33.178
33.3338
35.4864
33.5344
32.2615
36.684
42.000
49.500
45.900
35.750
41.000
38.200
31.200
31.010
32.050
33.200
33.240
33.160
33.250
33.150
31.010
30.380
31.790
31.390
31.300
30.650
30.000
32.900
30.900
30.000
34.170
37.900
45.220
41.910
31.780
37.000
34.270
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
37.634
38.643
32.710
35.722
38.410
35.700
0.075
0.075
0.075
0.25
0.25
0.25
2
2
2
2
2
2
31 OF 734
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
37.300
36.860
37.580
38.290
39.892
41.672
43.290
51.000
49.990
56.170
56.520
40.067
54.750
53.960
52.790
50.600
45.450
45.240
42.100
40.520
39.440
38.970
38.770
40.600
45.385
48.605
53.148
34.750
34.440
34.930
36.102
37.110
39.095
40.074
45.898
48.188
41.428
38.400
36.206
33.130
30.840
30.064
32.415
33.100
34.000
33.992
35.400
38.800
40.540
46.900
46.820
48.400
52.200
37.443
51.775
47.665
48.450
47.697
42.300
41.169
39.545
37.738
36.214
35.250
35.000
38.076
42.242
45.966
50.890
31.400
30.879
31.300
0.42
0.42
0.3
0.3
39
34.1
33.4
33.35
35.010
30.050
30.460
33.4
34.587
37
38
36.5
36
36.45
35.8
32.7
30.45
28.305
26.8
30.410
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
0.075
0.075
0.075
0.075
0.42
0.42
0.25
0.25
2
2
2
2
2
2
2
2
32 OF 734
0.42
0.42
0.42
0.42
0.3
0.3
0.3
0.42
0.42
0.3
0.42
0.42
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.42
0.42
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.42
0.3
0.3
0.3
0.3
0.42
0.3
0.3
0.3
0.3
36.3
35.9
32.35
31.9
39
37.5
33.2
32.8
33.5
36
37.8
35.6
35.5
36.9
35.7
34.9
35.3
36.2
37.2
37.1
37.4
38.2
38.1
41.9
41.9
41.9
43.3
45.2
46.7
51
51
52.5
54.4
57.4
55.3
55
52.2
52.3
52.8
52.7
56.45
60
62.7
64.1
62.3
62.3
62
60
57.2
35.08
34.51
30.23
29.83
29.51
31.94
34.9
31.61
31.51
33.93
32.74
31.911
32.3
33.3
34.17
34.18
34.5
35.3
35.17
38
36.8
38.9
40.39
42.3
43.75
48.1
48.1
49.6
51.45
54.433
52.4
52.1
49.3
49.388
49.9
49.74
53.52
56.7
59.74
61.186
58.31
59.356
59.3
57
54.017
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.42
0.35
0.42
0.42
0.25
0.25
0.25
0.35
0.42
0.25
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.35
0.25
0.25
0.25
0.25
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
SAI Consulting Engineers Pvt. Ltd.
33 OF 734
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.42
0.42
0.3
0.42
0.42
0.42
0.3
0.3
0.3
0.3
0.3
0.3
0.42
0.3
59.4
57
54.6
53.8
54.5
54.65
51.3
44
44
43.6
43.7
40
36.7
36.9
37.9
38.6
35.4
34.8
35.8
35.8
38.6
39.1
44.3
44.5
46.5
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
39.644
39.035
39.549
40.271
40.119
39.28
39.548
38.743
39.354
38.73
39.358
38.532
38.758
39.251
38.753
38.8102
39.146
38.589
38.435
37.853
38.566
31.78
34
34.604
31.43
32.12
32.87
32.87
35.62
36.2
41.4
40.6
43.6
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.42
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
36.214
36.975
36.489
36.953
36.15
37.018
36.836
36.495
36.234
36.381
36.004
35.75
35.882
36.19
36.2
36.206
36.1
36.046
35.65
35.67
35.583
35.398
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
56.51
54.06
51.7
50.83
51.53
51.71
48.309
40.99
40.99
40.63
40.738
35.25
33.71
34 OF 734
0.3
0.3
0.3
0.3
0.3
38.656
38.934
38.23
39.748
39.048
35.157
35.386
35.608
0.075
0.075
0.075
0.075
0.075
0.25
0.25
0.25
0.25
0.25
2
2
2
2
2
2
2
2
2
2
35 OF 734
Projection of Height of
Bottom Slab Toe Wall
Width of
Toe Wall
Width of
Thickness
Thickness of
Thickness
approach No. of cell
of
inner wall
of PCC
slab
foothpath
m
m
m
m
0.9
0.9
0.9
0.9
0.9
0.9
0.3
0.9
0.9
0.3
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
1
1
1
1
1
1
2
1
1
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.6
0.6
0.6
1.1
1.1
1.1
0.3
0.3
0.3
3.5
3.5
3.5
1
1
1
0
0
0
0
0
0
0.15
0.15
0.15
36 OF 734
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.6
0.6
0.6
0.6
1.1
1.1
1.1
1.1
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
1
1
1
1
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
37 OF 734
0.6
0.3
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
0.6
0.6
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0.25
0
0
0
0
0
0.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
38 OF 734
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
39 OF 734
0.6
0.6
0.6
0.6
0.6
1.1
1.1
1.1
1.1
1.1
0.3
0.3
0.3
0.3
0.3
3.5
3.5
3.5
3.5
3.5
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.15
40 OF 734
BACK
FORNT
Height of PCC Width Thickness
Angle of
BATTERN BATTERN
Key
of Toe Wall of Apron
Skew
1 in
1 in
m
m
m
Width of
Curtain wall
for U/S side
m
Width of
Curtain wall
for D/S side
m
Depth of
Curtain wall
for U/S side
m
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
0
0
0
0
0
0
0
0
0
0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
1.2
1.2
1.2
0.75
0.75
0.75
0.45
0.45
0.45
3
3
3
6
6
6
0
0
0
1.5
1.5
1.5
1.85
1.85
1.85
2.15
2.15
2.15
41 OF 734
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
1.2
1.2
1.2
1.2
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
3
3
3
3
6
6
6
6
0
0
0
0
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
42 OF 734
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
43 OF 734
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
44 OF 734
1.2
1.2
1.2
1.2
1.2
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
3
3
3
3
3
6
6
6
6
6
0
0
0
0
0
1.5
1.5
1.5
1.5
1.5
1.85
1.85
1.85
1.85
1.85
2.15
2.15
2.15
2.15
2.15
45 OF 734
Depth of
Area of
Area of
Length of
Curtain wall Curtain wall Curtain wall Flexible Apron
for D/S side for U/S side for D/S side for U/S side
m
SQ.m
SQ.m
m
Length of
Flexible Apron
for D/S side
m
Thickness Thicknes
of Flexible s of Floor
Apron
Apron
m
m
Camber
%
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.65
2.65
2.65
1.6925
1.6925
1.6925
2.175
2.175
2.175
3
3
3
6
6
6
0.75
0.75
0.75
0.45
0.45
0.45
2.5
2.5
2.5
46 OF 734
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
3
3
3
3
6
6
6
6
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
47 OF 734
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
48 OF 734
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
2.175
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
49 OF 734
2.65
2.65
2.65
2.65
2.65
1.6925
1.6925
1.6925
1.6925
1.6925
2.175
2.175
2.175
2.175
2.175
3
3
3
3
3
6
6
6
6
6
0.75
0.75
0.75
0.75
0.75
0.45
0.45
0.45
0.45
0.45
2.5
2.5
2.5
2.5
2.5
50 OF 734
side of
Cushion
RL of Top of Box
widening
2
2
2
2
2
2
2
2
2
2
0.300
0.695
0.580
0.570
0.570
0.810
0.330
0.880
0.980
0.830
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
-0.665
0.820
-0.417
0.504
0.350
-0.164
-0.742
-0.886
-1.936
0.950
-0.165
0.840
-0.425
-0.642
0.164
-0.584
-0.536
-0.909
-0.656
0.930
1.110
0.820
0.800
0.830
0.760
2
2
2
2.974
0.971
0.760
103.120
51.805
50.620
47.430
47.430
44.190
99.670
34.220
32.520
31.170
0.000
0.000
34.370
34.180
35.220
36.370
36.410
36.330
36.420
36.320
34.180
33.550
34.960
34.560
34.470
33.820
33.170
36.070
34.070
33.170
37.340
41.070
48.390
45.080
34.950
40.170
37.440
0.000
0.000
0.000
0.000
0.000
34.660
37.672
37.650
51 OF 734
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2.935
1.810
1.630
2.348
2.542
0.922
0.800
2.150
1.220
5.820
2.370
0.674
1.025
4.345
2.390
0.953
1.200
2.121
0.605
0.832
1.276
1.770
1.820
0.574
1.193
0.689
0.308
1.400
1.611
1.680
0.752
0.573
0.145
0.124
7.448
10.238
3.028
0.650
1.556
0.730
0.585
1.314
34.365
35.050
35.950
35.942
37.350
40.750
42.490
48.850
48.770
50.350
54.150
39.393
53.725
49.615
50.400
49.647
44.250
43.119
41.495
39.688
38.164
37.200
36.950
40.026
44.192
47.916
52.840
33.350
32.829
33.250
35.350
36.537
38.950
39.950
38.450
37.950
38.400
37.750
34.650
32.400
30.255
28.750
0.000
2
2
2
2
0.870
0.930
0.990
0.990
38.130
33.170
32.410
32.360
52 OF 734
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
0.830
0.900
-3.120
0.800
1.040
1.020
1.020
0.890
0.940
0.950
0.870
0.870
1.020
1.010
1.039
1.050
0.950
1.080
0.970
0.950
0.950
0.980
0.780
1.980
1.050
0.960
0.950
1.000
0.950
0.950
0.950
1.000
1.017
0.950
0.950
0.950
0.962
0.950
-0.160
0.980
1.350
1.010
0.964
0.890
0.994
0.750
1.050
1.233
35.470
35.000
3.120
38.200
36.460
32.180
31.780
32.610
35.060
36.850
34.730
34.630
35.880
34.690
33.861
34.250
35.250
36.120
36.130
36.450
37.250
37.120
41.120
39.920
40.850
42.340
44.250
45.700
50.050
50.050
51.550
53.400
56.383
54.350
54.050
51.250
51.338
51.850
52.860
55.470
58.650
61.690
63.136
61.410
61.306
61.250
58.950
55.967
53 OF 734
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
0.940
0.990
0.950
1.020
1.020
0.990
1.041
#REF!
1.060
0.660
1.120
-3.858
-1.670
0.240
0.780
0.876
0.850
0.730
0.980
0.980
1.030
0.950
0.950
0.780
0.950
58.460
56.010
53.650
52.780
53.480
53.660
50.259
#REF!
42.940
42.940
42.580
43.858
38.370
36.660
37.120
37.724
34.550
34.070
34.820
34.820
37.570
38.150
43.350
43.720
45.550
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
DPR for Rehabilitation and Upgrading
Munger-Bhagalpur-Mirzachauki NH-80 Bihar (Package-1)
54 OF 734
2
2
2
2
2
Box Data
Sr. NO.
Proposed
chainage (KM)
1
2
3
4
5
6
7
8
140-150
140+802
146+820
147+422
148+050
148+155
148+365
148+525
148+605
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
150-178
150+875
151+199
151+497
151+675
151+704
152+000
152+426
152+436
152+622
152+643
153+450
154+498
154+896
155+118
156+017
156+415
156+514
156+969
157+196
157+465
157+770
158+477
159+080
159+332
159+890
159+905
Existing Chainagae
(KM)
No. of
Cell
Clear
Span
Clear
Height
Depth
Of Top
Slab
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
1
2
2
1
1
1
2
1
2
2
1
2
2
2
2
1
1
2
1
2
1
2
1
1
1
1
3
3
3
3
2
2
3
3
3
3
3
3
3
3
3
3
2
3
2
3
2
3
3
2
3
3
3
3
3
3
2
2
3
3
3
3
3
3
3
3
3
3
2
3
2
3
2
3
3
2
3
3
0.42
0.47
0.47
0.42
0.25
0.25
0.47
0.42
0.4
0.47
0.42
0.47
0.47
0.47
0.47
0.42
0.25
0.47
0.25
0.47
0.25
0.4
0.42
0.25
0.42
0.42
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
160+670
160+866
161+450
162+085
162+712
163+355
163+715
163+861
164+055
164+070
164+200
164+596
164+606
164+614
164+660
165+050
165+354
165+550
165+980
165+985
166+105
166+285
166+705
166+941
166+952
167+354
167+620
167+684
167+694
168+100
168+497
168+734
168+885
169+005
169+175
169+320
169+459
169+660
170+188
170+317
170+507
170+625
170+860
170+962
171+225
1
1
1
1
1
2
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
3
2
2
2
2
2
3
3
3
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
2
2
2
2
3
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
2
2
2
2
2
3
3
3
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
2
2
2
2
3
2
2
2
2
2
2
2
2
2
2
2
0.25
0.25
0.25
0.25
0.25
0.47
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.47
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.4
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
171+904
172+304
172+605
172+655
172+845
173+225
173+675
173+830
174+009
174+262
174+345
174+425
175+000
175+220
175+370
175+930
176+015
176+510
176+600
176+770
177+064
177+427
177+573
2
2
1
1
1
1
1
1
1
1
1
1
2
1
1
2
1
2
1
1
1
1
1
3
3
2
2
2
2
3
3
2
3
3
3
3
2
2
3
2
3
2
2
2
3
2
3
3
2
2
2
2
3
3
3
3
3
3
3
2
2
3
2
3
2
2
2
3
2
0.47
0.47
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.42
0.42
0.42
0.47
0.25
0.25
0.47
0.25
0.47
0.25
0.25
0.25
0.42
0.25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
178-193
178+440
178+840
178+917
1
179+275
179+418
179+725
179+842
180+005
180+425
180+765
181+775
181+870
182+440
182+485
182+745
183+120
183+332
183+558
183+757
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
4
2
2
2
2
2
2
2
2
2
2
3
2
2
2
2
2
2
2
2
3
2
2
2
2
2
2
2
2
2
2
3
2
2
2
2
2
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.25
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
184+057
184+312
184+578
184+691
185+164
185+280
185+501
185+817
186+121
186+479
186+638
186+754
186+874
187+248
187+447
187+656
187+937
188+050
188+184
188+310
188+739
188+898
189+168
189+398
189+940
190+208
190+597
191+007
191+307
191+802
192+028
192+259
192+561
192+734
193+525
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
3
2
3
3
2
3
2
2
2
2
2
3
2
2
2
2
2
2
3
3
2
2
2
2
2
2
2
2
2
2
2
2
3
2
2
3
2
3
3
2
3
2
2
2
2
2
3
2
2
2
2
2
2
3
3
2
2
2
2
2
2
2
2
2
2
2
2
3
2
2
0.42
0.25
0.42
0.42
0.25
0.42
0.25
0.25
0.25
0.25
0.25
0.47
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.47
0.25
0.25
Box Data
Proposed
Width of
Proposed
Depth of Thick.of Thick.of
No.of
Formatio
carriage Existing
Formatio
Bottom
Side
Inner Projection Carriage
n
way on G.L(D.S)
n Level
slab
wall
wall
way
Level(Ce
one side
(Edge)
ntre)
e
f
g
c
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
2
2
2
2
2
2
2
2
10
10
10
10
10
10
10
10
31.2
31.01
32.05
33.2
33.24
33.16
33.25
33.15
33.705
35
34.803
36.874
36.76
36.166
35.678
35.434
33.705
35
34.803
36.874
36.76
36.166
35.678
35.434
0.42
0.45
0.45
0.42
0.3
0.3
0.45
0.42
0.42
0.45
0.42
0.45
0.45
0.45
0.45
0.42
0.3
0.45
0.3
0.45
0.3
0.42
0.42
0.3
0.42
0.42
0.42
0.42
0.42
0.42
0.25
0.25
0.42
0.42
0.35
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.25
0.42
0.25
0.42
0.25
0.35
0.42
0.25
0.42
0.42
0
0.35
0.35
0
0
0
0.35
0
0.25
0.35
0
0.35
0.35
0.35
0.35
0
0
0.35
0
0.35
0
0.25
0
0
0
0
0.6
0.3
0.3
0.6
0.6
0.6
0.3
0.6
0.3
0.3
0.6
0.3
0.3
0.3
0.3
0.6
0.6
0.3
0.6
0.3
0.6
0.3
0.6
0.6
0.6
0.6
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
35.01
30.38
31.01
30.05
30.46
30.41
31.79
32.35
31.9
31.39
0
31.3
30.65
30
32.9
35.08
34.51
30.9
30.23
30
29.83
29.51
31.94
34.9
31.61
31.51
39
34.5
32.2444
34.1
33.4
33.35
34.795
36.3
35.9
35.4
0
34.0454
33.178
33.3338
35.4864
39
37.5
33.5344
33.2
32.2615
32.8
33.5
36
37.8
35.6
35.5
39
34.5
32.2444
34.1
33.4
33.35
34.795
36.3
35.9
35.4
0
34.0454
33.178
33.3338
35.4864
39
37.5
33.5344
33.2
32.2615
32.8
33.5
36
37.8
35.6
35.5
0.3
0.3
0.3
0.3
0.3
0.45
0.3
0.3
0.3
0.3
0.3
0.42
0.42
0.45
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.42
0.3
0.3
0.3
0.3
0.42
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.35
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0
0
0
0
0
0.35
0
0
0
0
0
0
0
0.35
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.25
0
0
0
0
0
0
0
0
0
0
0
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
33.93
32.74
31.911
32.3
33.3
34.17
34.17
34.18
34.5
35.3
35.17
38
36.8
37.9
38.9
40.39
42.3
43.75
48.1
48.1
49.6
51.45
54.433
52.4
52.1
49.3
49.388
49.9
49.74
53.52
56.7
59.74
61.186
58.31
59.356
59.3
57
54.017
56.51
54.06
51.7
50.83
51.53
51.71
48.309
36.9
35.7
34.9
35.3
36.2
36.684
37.2
37.1
37.4
38.2
38.1
41.9
41.9
42
41.9
43.3
45.2
46.7
51
51
52.5
54.4
57.4
55.3
55
52.2
52.3
52.8
52.7
56.45
60
62.7
64.1
62.3
62.3
62
60
57.2
59.4
57
54.6
53.8
54.5
54.65
51.3
36.9
35.7
34.9
35.3
36.2
36.684
37.2
37.1
37.4
38.2
38.1
41.9
41.9
42
41.9
43.3
45.2
46.7
51
51
52.5
54.4
57.4
55.3
55
52.2
52.3
52.8
52.7
56.45
60
62.7
64.1
62.3
62.3
62
60
57.2
59.4
57
54.6
53.8
54.5
54.65
51.3
0.45
0.45
0.3
0.3
0.3
0.3
0.42
0.42
0.3
0.42
0.42
0.42
0.45
0.3
0.3
0.45
0.3
0.45
0.3
0.3
0.3
0.42
0.3
0.42
0.42
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.42
0.42
0.42
0.42
0.25
0.25
0.42
0.25
0.42
0.25
0.25
0.25
0.42
0.25
0.35
0.35
0
0
0
0
0
0
0
0
0
0
0.35
0
0
0.35
0
0.35
0
0
0
0
0
0.3
0.3
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
0.3
0.6
0.3
0.6
0.6
0.6
0.6
0.6
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
45.22
41.91
40.99
40.99
40.63
40.738
35.25
33.71
31.78
34
34.604
31.43
31.78
32.12
32.87
37
32.87
34.27
35.62
36.2
41.4
40.6
43.6
49.5
45.9
44
44
43.6
43.7
40
36.7
36.9
37.9
38.6
35.4
35.75
34.8
35.8
41
35.8
38.2
38.6
39.1
44.3
44.5
46.5
49.5
45.9
44
44
43.6
43.7
40
36.7
36.9
37.9
38.6
35.4
35.75
34.8
35.8
41
35.8
38.2
38.6
39.1
44.3
44.5
46.5
0.3
0.3
0.3
0.42
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.42
0.3
0.3
0.3
0.3
0.3
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.6
0.6
0.6
0.9
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.9
0.6
0.6
0.6
0.6
0.6
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10
10
10
7.5
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
32.71
35.722
35.7
100
32.415
33.1
34
33.992
35.4
38.8
40.54
46.9
46.82
48.4
48.685
52.2
37.443
51.775
47.665
48.45
37.634
38.643
38.41
103.42
37.3
36.86
37.58
38.29
39.892
41.672
43.29
51
49.99
56.17
52.5
56.52
40.067
54.75
53.96
52.79
37.634
38.643
38.41
103.42
37.3
36.86
37.58
38.29
39.892
41.672
43.29
51
49.99
56.17
52.5
56.52
40.067
54.75
53.96
52.79
0.42
0.3
0.42
0.42
0.3
0.42
0.3
0.3
0.3
0.3
0.3
0.45
0.3
0.3
0.3
0.3
0.3
0.3
0.42
0.42
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.45
0.3
0.3
0.42
0.25
0.42
0.42
0.25
0.42
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.42
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.42
0.25
0.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.9
0.6
0.9
0.9
0.6
0.9
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
0.6
0.6
0.6
0.6
0.9
0.9
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.3
0.6
0.6
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
47.5
51.2
51.2
47.697
50.6
50.6
44.31
48
48
44.31
48
48
42.3
45.45
45.45
41.07
45
45
41.169
45.24
45.24
39.545
42.1
42.1
37.738
40.52
40.52
36.214
39.44
39.44
35.25
38.97
38.97
96.5
100
100
35
38.77
38.77
38.076
40.6
40.6
42.242 45.3854 45.3854
45.966 48.6052 48.6052
50.89 53.1478 53.1478
31.4
34.75
34.75
31.1
35.1
35.1
29.4
33.5
33.5
30.879
34.44
34.44
31.3
34.93
34.93
33.4
36.102
36.102
34.587
37.11
37.11
37
39.095
39.095
38
40.074
40.074
36.5
45.898
45.898
36
48.188
48.188
36.45
41.428
41.428
35.8
38.4
38.4
32.7
36.206
36.206
30.45
33.13
33.13
28
32
32
28.305
30.84
30.84
26.8
30.064
30.064
Camber
LHS
RHS
Directio
LHS
RHS
(Main
(Main
n Of
(Service
(Service
Carriage
Carriage
flow
Road)
Road)
way)
way)
RL of
Top of
Box
Earth
cushion
Skew
Angle
34.37
34.18
35.22
36.37
36.41
36.33
36.42
36.32
-0.665
0.82
-0.417
0.504
0.35
-0.164
-0.742
-0.886
0
0
0
0
0
0
0
0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
New
New
New
New
New
New
New
New
38.13
33.55
34.18
33.17
32.41
32.36
34.96
35.47
35
34.56
3.12
34.47
33.82
33.17
36.07
38.2
36.46
34.07
32.18
33.17
31.78
32.61
35.06
36.85
34.73
34.63
0.87
0.95
-1.9356
0.93
0.99
0.99
-0.165
0.83
0.9
0.84
-3.12
-0.4246
-0.642
0.1638
-0.5836
0.8
1.04
-0.5356
1.02
-0.9085
1.02
0.89
0.94
0.95
0.87
0.87
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
Remarks
35.88
34.69
33.861
34.25
35.25
37.34
36.12
36.13
36.45
37.25
37.12
41.12
39.92
41.07
40.85
42.34
44.25
45.7
50.05
50.05
51.55
53.4
56.383
54.35
54.05
51.25
51.338
51.85
52.86
55.47
58.65
61.69
63.136
61.41
61.306
61.25
58.95
55.967
58.46
56.01
53.65
52.78
53.48
53.66
50.259
1.02
1.01
1.039
1.05
0.95
-0.656
1.08
0.97
0.95
0.95
0.98
0.78
1.98
0.93
1.05
0.96
0.95
1
0.95
0.95
0.95
1
1.017
0.95
0.95
0.95
0.962
0.95
-0.16
0.98
1.35
1.01
0.964
0.89
0.994
0.75
1.05
1.233
0.94
0.99
0.95
1.02
1.02
0.99
1.041
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
48.39
45.08
#REF!
42.94
42.94
42.58
43.858
38.37
36.66
37.12
37.724
34.55
34.95
34.07
34.82
40.17
34.82
37.44
37.57
38.15
43.35
43.72
45.55
1.11
0.82
#REF!
1.06
0.66
1.12
-3.858
-1.67
0.24
0.78
0.876
0.85
0.8
0.73
0.98
0.83
0.98
0.76
1.03
0.95
0.95
0.78
0.95
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
34.66
37.672
37.65
103.12
34.365
35.05
35.95
35.942
37.35
40.75
42.49
48.85
48.77
50.35
51.805
54.15
39.393
53.725
49.615
50.4
2.974
0.971
0.76
0.3
2.935
1.81
1.63
2.348
2.542
0.922
0.8
2.15
1.22
5.82
0.695
2.37
0.674
1.025
4.345
2.39
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
50.62
49.647
47.43
47.43
44.25
44.19
43.119
41.495
39.688
38.164
37.2
99.67
36.95
40.026
44.192
47.916
52.84
33.35
34.22
32.52
32.829
33.25
35.35
36.537
38.95
39.95
38.45
37.95
38.4
37.75
34.65
32.4
31.17
30.255
28.75
0.58
0.953
0.57
0.57
1.2
0.81
2.121
0.605
0.832
1.276
1.77
0.33
1.82
0.574
1.1934
0.6892
0.3078
1.4
0.88
0.98
1.611
1.68
0.752
0.573
0.145
0.124
7.448
10.238
3.028
0.65
1.556
0.73
0.83
0.585
1.314
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
New
New
New
New
New
Reconstructio
n
New
New
New
New
New
Reconstructio
n
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
67 of 734
Box Culvert
Description
Sr.
No
1
excavation
Unit
m.
Pro.Ch
Length Width
1.000
Depth
1 x 4.0
Nos
cum
cum
cum
cum
1
2
4
18.30
1.18
5.19
6.94
6.94
5.40
0.87
0.93
2.10
cum
cum
cum
cum
cum
cum
1
2
2
4
2
18.30
1.10
0.40
5.19
18.00
6.94
6.94
6.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
Part - 2
cum
cum
4
4
5.19
5.19
5.20
1.70
0.50
0.10
Part - 3
cum
5.19
2.60
0.10
Part - 4
cum
5.19
0.90
0.20
Part - 5
Part - 6
cum
cum
4
4
5.19
5.19
0.30
0.60
4.41
2.20
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
18.00
18.00
1.08
18.00
18.00
0.50
4.84
4.84
18.00
18.00
6.64
0.42
6.64
4.84
0.01125
15.22
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
PCC
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
3
RCC
Return
wall
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
RCC Box
cum
cum
0.5
0.3
3.00
68 of 734
Box Culvert
Description
Sr.
No
5
HYSD
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
50mm Bc
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
12mm MA
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
Approch sl
DS
Total
Providing and fixing drainage spouts for
bridges as per Drawing and Technical
Specifications Clause 2705.
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
Unit
1 x 4.0
Nos
m.
Pro.Ch
Length Width
1.000
Depth
Cum
Kg
Kg
Kg
Kg
T
65
70
120
2
152.58
121.54
1.21
0.00
Cum
Cum
1
2
15.00
15.00
4.84
3.50
Sqm
15.00
4.84
cum
18.00
3.50
No
No
6.64
Rmt
18.0
0.05
0.05
0.3
69 of 734
Sr.
No
10
Earthwork
in
excavation
11
PCC in toe
wall &
Curtain
wall &
appron
Filter
below
Stone
pitching
12
13
14
15
Box Culvert
Description
Unit
m.
Pro.Ch
Length Width
1.000
Depth
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
8.05
15.10
15.10
40.68
15.10
15.10
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
8.05
8.05
15.10
15.10
40.68
0.75
0.30
0.20
1.10
1.693
2.175
0.15
cum
cum
cum
cum
4
2
4
5.19
18.00
31.80
0.6
0.6
3.108
3.840
cum
cum
41.08
cum
cum
cum
cum
2
1
1
40.68
15.10
15.10
cum
cum
40.68
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
16
1 x 4.0
Nos
RM
3.00
6.00
1.30
2.15
2.65
0.45
0.75
0.75
0.3
3.00
6.00
0.30
0.75
0.75
0.80
4.84
70 of 734
Box Culvert
Description
Sr.
No
17
Unit
Weep Holes
Return wall
Side wall of box
1 x 4.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch
Length Width
5.19
18.0
1.000
Depth
3.91
3.00
Total
18
19
17
5.19
3.420
71 of 734
km.
Quantity
110.49
15.23
235.42
361.14
19.05
2.30
0.83
16.82
19.71
58.71
53.98
3.53
5.40
3.74
66.64
27.45
27.45
54.90
50.20
45.36
7.15
36.59
0.81
7.61
1.21
0.00
0.00
4.86
DPR for Rehabilitation and Upgrading
Munger-Bhagalpur-Mirzachauki NH-80 Bihar (Package-3)
72 of 734
km.
Quantity
152.58
9917.45
8507.76
145.20
0.00
18.57
3.63
5.25
8.88
177.60
37.80
37.80
4
4
36.00
73 of 734
km.
Quantity
31.41
48.70
74.03
36.61
33.98
67.95
292.67
4.83
10.63
25.56
32.84
12.20
86.07
38.71
82.94
127.22
127.22
49.29
49.29
24.41
33.98
67.95
126.33
65.08
65.08
0
74 of 734
km.
Quantity
82
108
190
603.49
75 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.69
5.94
5.94
5.40
0.87
0.93
2.10
135.91
13.04
348.82
497.77
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
7.69
22.00
5.94
5.94
5.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
23.43
1.97
0.71
24.92
24.09
75.12
Part - 2
cum
cum
4
4
7.69
7.69
5.20
1.70
0.50
0.10
79.98
5.23
Part - 3
cum
7.69
2.60
0.10
8.00
Part - 4
cum
7.69
0.90
0.20
5.54
Part - 5
Part - 6
cum
cum
4
4
7.69
7.69
0.30
0.60
4.80
2.40
98.74
44.32
44.32
88.63
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.64
0.42
5.64
3.84
0.01125
19.22
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 182+485
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
61.59
65.52
6.07
41.93
1.17
9.61
0.96
0.00
0.00
7.02
76 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 182+485
Length Width Depth
Cum
km.
Quantity
192.91
Kg
Kg
Kg
Kg
T
75
75
120
2
192.91
187.37
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.64
4
4
Rmt
22.0
44.00
14468.44
14053.09
115.20
0.00
28.64
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
77 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 182+485
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
7.69
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
3.503
3.840
64.64
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
78 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 182+485
Length Width Depth
7.69
26.0
4.31
3.00
Total
9
10
km.
Quantity
134
156
290
26
7.69
3.215
1285.61
79 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.46
5.94
5.94
5.40
0.87
0.93
2.10
135.91
13.04
338.39
487.34
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
7.46
22.00
5.94
5.94
5.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
23.43
1.97
0.71
24.17
24.09
74.37
Part - 2
cum
cum
4
4
7.46
7.46
5.20
1.70
0.50
0.10
77.58
5.07
Part - 3
cum
7.46
2.60
0.10
7.76
Part - 4
cum
7.46
0.90
0.20
5.37
Part - 5
Part - 6
cum
cum
4
4
7.46
7.46
0.30
0.60
4.69
2.34
95.79
41.96
41.96
83.93
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.64
0.42
5.64
3.84
0.01125
18.76
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 184+057
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
61.59
65.52
6.07
41.93
1.17
9.38
0.96
0.00
0.00
7.02
80 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 184+057
Length Width Depth
Cum
km.
Quantity
192.68
Kg
Kg
Kg
Kg
T
75
75
120
2
192.68
179.71
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.64
4
4
Rmt
22.0
44.00
14451.19
13478.36
115.20
0.00
28.04
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
81 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 184+057
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
7.46
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
3.388
3.840
60.65
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
82 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 184+057
Length Width Depth
7.46
26.0
4.19
3.00
Total
9
10
km.
Quantity
126
156
282
26
7.46
3.700
1435.30
83 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.44
5.94
5.94
5.40
0.87
0.93
2.10
135.91
13.04
337.48
486.43
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
7.44
22.00
5.94
5.94
5.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
23.43
1.97
0.71
24.11
24.09
74.31
Part - 2
cum
cum
4
4
7.44
7.44
5.20
1.70
0.50
0.10
77.38
5.06
Part - 3
cum
7.44
2.60
0.10
7.74
Part - 4
cum
7.44
0.90
0.20
5.36
Part - 5
Part - 6
cum
cum
4
4
7.44
7.44
0.30
0.60
4.68
2.34
95.53
41.76
41.76
83.52
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.64
0.42
5.64
3.84
0.01125
18.72
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 184+578
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
61.59
65.52
6.07
41.93
1.17
9.36
0.96
0.00
0.00
7.02
84 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 184+578
Length Width Depth
Cum
km.
Quantity
192.66
Kg
Kg
Kg
Kg
T
75
75
120
2
192.66
179.05
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.64
4
4
Rmt
22.0
44.00
14449.69
13428.83
115.20
0.00
27.99
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
85 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 184+578
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
7.44
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
3.378
3.840
60.31
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
86 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 184+578
Length Width Depth
7.44
26.0
4.18
3.00
Total
9
10
km.
Quantity
126
156
282
26
7.44
3.690
1427.59
87 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.44
5.94
5.94
5.40
0.87
0.93
2.10
135.91
13.04
337.48
486.43
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
7.44
22.00
5.94
5.94
5.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
23.43
1.97
0.71
24.11
24.09
74.31
Part - 2
cum
cum
4
4
7.44
7.44
5.20
1.70
0.50
0.10
77.38
5.06
Part - 3
cum
7.44
2.60
0.10
7.74
Part - 4
cum
7.44
0.90
0.20
5.36
Part - 5
Part - 6
cum
cum
4
4
7.44
7.44
0.30
0.60
4.68
2.34
95.53
41.76
41.76
83.52
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.64
0.42
5.64
3.84
0.01125
18.72
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 184+691
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
61.59
65.52
6.07
41.93
1.17
9.36
0.96
0.00
0.00
7.02
88 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 184+691
Length Width Depth
Cum
km.
Quantity
192.66
Kg
Kg
Kg
Kg
T
75
75
120
2
192.66
179.05
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.64
4
4
Rmt
22.0
44.00
14449.69
13428.83
115.20
0.00
27.99
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
89 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 184+691
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
7.44
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
3.378
3.840
60.31
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
90 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 184+691
Length Width Depth
7.44
26.0
4.18
3.00
Total
9
10
km.
Quantity
126
156
282
26
7.44
3.690
1427.59
91 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.94
5.94
5.40
0.87
0.93
2.10
135.91
13.04
285.77
434.72
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.94
5.94
5.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
23.43
1.97
0.71
20.41
24.09
70.61
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.64
0.42
5.64
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 185+280
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
61.59
65.52
6.07
41.93
1.17
8.22
0.96
0.00
0.00
7.02
92 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 185+280
Length Width Depth
Cum
km.
Quantity
191.52
Kg
Kg
Kg
Kg
T
75
75
120
2
191.52
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.64
4
4
Rmt
22.0
44.00
14364.19
10724.81
115.20
0.00
25.20
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
93 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 185+280
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
94 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 185+280
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
95 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.06
7.74
7.74
5.40
0.90
0.90
2.10
183.21
16.44
320.24
519.89
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
7.06
22.00
7.74
7.74
7.74
5.40
3.65
0.15
0.15
0.15
0.15
0.15
30.53
2.46
0.93
22.87
24.09
80.89
Part - 2
cum
cum
4
4
7.06
7.06
5.20
1.70
0.50
0.10
73.42
4.80
Part - 3
cum
7.06
2.60
0.10
7.34
Part - 4
cum
7.06
0.90
0.20
5.08
Part - 5
Part - 6
cum
cum
4
4
7.06
7.06
0.30
0.60
4.49
2.24
90.65
38.02
38.02
76.04
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
6.84
6.84
26.00
26.00
7.44
0.42
7.44
6.84
0.01125
17.96
0.125
0.75
0.00
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 186+754
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
87.05
65.52
7.53
83.58
2.34
8.98
1.71
0.00
0.00
7.02
96 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 186+754
Length Width Depth
Cum
km.
Quantity
262.03
Kg
Kg
Kg
Kg
T
75
75
120
2
262.03
166.69
1.71
0.00
Cum
Cum
1
2
20.00
20.00
6.84
3.50
Sqm
20.00
6.84
cum
22.00
3.50
No
No
7.44
4
4
Rmt
22.0
44.00
19651.94
12501.50
205.20
0.00
32.36
0.05
0.05
6.84
7.00
13.84
276.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
97 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 186+754
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
20.72
20.72
74.40
20.72
20.72
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
20.72
20.72
74.40
cum
cum
cum
cum
4
2
4
7.06
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
74.40
20.72
20.72
cum
cum
74.40
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
42.49
66.82
101.58
66.96
46.62
93.24
417.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.54
14.38
35.07
45.07
22.32
123.37
0.6
0.6
3.188
3.920
54.01
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
44.64
46.62
93.24
184.50
0.80
119.03
119.03
3.00
6.00
3.00
6.00
6.84
98 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 186+754
Length Width Depth
7.06
26.0
3.99
3.00
Total
9
10
km.
Quantity
114
156
270
26
7.06
3.500
1284.92
99 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.94
5.94
5.40
0.87
0.93
2.10
135.91
13.04
285.77
434.72
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.94
5.94
5.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
23.43
1.97
0.71
20.41
24.09
70.61
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.64
0.42
5.64
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 188+184
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
61.59
65.52
6.07
41.93
1.17
8.22
0.96
0.00
0.00
7.02
100 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 188+184
Length Width Depth
Cum
km.
Quantity
191.52
Kg
Kg
Kg
Kg
T
75
75
120
2
191.52
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.64
4
4
Rmt
22.0
44.00
14364.19
10724.81
115.20
0.00
25.20
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
101 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 188+184
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
102 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 188+184
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
103 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.94
5.94
5.40
0.87
0.93
2.10
135.91
13.04
285.77
434.72
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.94
5.94
5.94
5.40
3.65
0.15
0.15
0.15
0.15
0.15
23.43
1.97
0.71
20.41
24.09
70.61
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.64
0.42
5.64
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 188+310
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
61.59
65.52
6.07
41.93
1.17
8.22
0.96
0.00
0.00
7.02
104 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 188+310
Length Width Depth
Cum
km.
Quantity
191.52
Kg
Kg
Kg
Kg
T
75
75
120
2
191.52
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.64
4
4
Rmt
22.0
44.00
14364.19
10724.81
115.20
0.00
25.20
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
105 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 188+310
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
106 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 188+310
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
107 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
7.74
7.74
5.40
0.90
0.90
2.10
183.21
16.44
290.30
489.95
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
7.74
7.74
7.74
5.40
3.65
0.15
0.15
0.15
0.15
0.15
30.53
2.46
0.93
20.74
24.09
78.75
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
6.84
6.84
26.00
26.00
7.44
0.42
7.44
6.84
0.01125
16.64
0.125
0.75
0.00
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 192+561
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
87.05
65.52
7.53
83.58
2.34
8.32
1.71
0.00
0.00
7.02
108 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 192+561
Length Width Depth
Cum
km.
Quantity
261.37
Kg
Kg
Kg
Kg
T
75
75
120
2
261.37
146.04
1.71
0.00
Cum
Cum
1
2
20.00
20.00
6.84
3.50
Sqm
20.00
6.84
cum
22.00
3.50
No
No
7.44
4
4
Rmt
22.0
44.00
19602.44
10952.64
205.20
0.00
30.76
0.05
0.05
6.84
7.00
13.84
276.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
109 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 192+561
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
20.72
20.72
74.40
20.72
20.72
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
20.72
20.72
74.40
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
74.40
20.72
20.72
cum
cum
74.40
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
42.49
66.82
101.58
66.96
46.62
93.24
417.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.54
14.38
35.07
45.07
22.32
123.37
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
44.64
46.62
93.24
184.50
0.80
119.03
119.03
3.00
6.00
3.00
6.00
6.84
110 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 192+561
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
111 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.07
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
229.98
438.65
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
5.07
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
16.43
24.09
75.98
Part - 2
cum
cum
4
4
5.07
5.07
5.20
1.70
0.50
0.10
52.73
3.45
Part - 3
cum
5.07
2.60
0.10
5.27
Part - 4
cum
5.07
0.90
0.20
3.65
Part - 5
Part - 6
cum
cum
4
4
5.07
5.07
0.30
0.60
3.49
1.75
65.10
21.25
21.25
42.50
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
14.33
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 140+802
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.17
1.80
0.00
27.30
7.02
112 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 140+802
Length Width Depth
Cum
km.
Quantity
296.24
Kg
Kg
Kg
Kg
T
75
75
120
2
296.24
107.60
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22217.79
8069.67
215.70
0.00
30.50
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
113 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 140+802
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
5.07
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.193
3.920
26.68
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
114 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 140+802
Length Width Depth
5.07
26.0
3.00
3.00
Total
9
10
km.
Quantity
62
156
218
26
5.07
2.505
660.42
115 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 146+820
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
116 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 146+820
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
117 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 146+820
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
118 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 146+820
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
119 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.57
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
252.47
461.15
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
5.57
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
18.03
24.09
77.58
Part - 2
cum
cum
4
4
5.57
5.57
5.20
1.70
0.50
0.10
57.89
3.78
Part - 3
cum
5.57
2.60
0.10
5.79
Part - 4
cum
5.57
0.90
0.20
4.01
Part - 5
Part - 6
cum
cum
4
4
5.57
5.57
0.30
0.60
3.74
1.87
71.47
24.98
24.98
49.97
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
15.32
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 147+422
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.66
1.80
0.00
27.30
7.02
120 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 147+422
Length Width Depth
Cum
km.
Quantity
296.73
Kg
Kg
Kg
Kg
T
75
75
120
2
296.73
121.43
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22254.99
9107.59
215.70
0.00
31.58
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
121 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 147+422
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
5.57
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.441
3.920
32.60
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
122 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 147+422
Length Width Depth
5.57
26.0
3.25
3.00
Total
9
10
km.
Quantity
74
156
230
26
5.57
2.753
796.81
123 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.41
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
336.03
544.70
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
7.41
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
24.00
24.09
83.55
Part - 2
cum
cum
4
4
7.41
7.41
5.20
1.70
0.50
0.10
77.04
5.04
Part - 3
cum
7.41
2.60
0.10
7.70
Part - 4
cum
7.41
0.90
0.20
5.33
Part - 5
Part - 6
cum
cum
4
4
7.41
7.41
0.30
0.60
4.66
2.33
95.12
41.44
41.44
82.88
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
19.01
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 148+050
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
9.50
1.80
0.00
27.30
7.02
124 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 148+050
Length Width Depth
Cum
km.
Quantity
298.58
Kg
Kg
Kg
Kg
T
75
75
120
2
298.58
178.00
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22393.14
13349.73
215.70
0.00
35.96
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
125 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 148+050
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
7.41
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
3.362
3.920
59.76
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
126 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 148+050
Length Width Depth
7.41
26.0
4.17
3.00
Total
9
10
km.
Quantity
124
156
280
26
7.41
3.674
1415.28
127 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.10
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
322.06
530.73
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
7.10
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
23.00
24.09
82.55
Part - 2
cum
cum
4
4
7.10
7.10
5.20
1.70
0.50
0.10
73.84
4.83
Part - 3
cum
7.10
2.60
0.10
7.38
Part - 4
cum
7.10
0.90
0.20
5.11
Part - 5
Part - 6
cum
cum
4
4
7.10
7.10
0.30
0.60
4.51
2.25
91.16
38.40
38.40
76.81
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
18.39
0.4
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 148+155
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
1.075
0.3
3.00
91.14
65.52
7.89
87.86
2.34
19.77
5.75
0.00
27.30
7.02
128 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 148+155
Length Width Depth
Cum
km.
Quantity
308.84
Kg
Kg
Kg
Kg
T
75
75
120
2
308.84
167.97
5.75
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
23163.11
12597.89
690.24
0.00
36.45
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
129 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 148+155
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
7.10
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
3.208
3.920
54.66
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
130 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 148+155
Length Width Depth
7.10
26.0
4.01
3.00
Total
9
10
km.
Quantity
114
156
270
26
7.10
3.520
1299.58
131 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.07
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
275.43
484.10
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.07
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
19.67
24.09
79.22
Part - 2
cum
cum
4
4
6.07
6.07
5.20
1.70
0.50
0.10
63.15
4.13
Part - 3
cum
6.07
2.60
0.10
6.31
Part - 4
cum
6.07
0.90
0.20
4.37
Part - 5
Part - 6
cum
cum
4
4
6.07
6.07
0.30
0.60
3.99
2.00
77.96
29.10
29.10
58.20
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.33
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 148+365
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.17
1.80
0.00
27.30
7.02
132 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 148+365
Length Width Depth
Cum
km.
Quantity
297.24
Kg
Kg
Kg
Kg
T
75
75
120
2
297.24
136.16
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22292.94
10212.07
215.70
0.00
32.72
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
133 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 148+365
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.07
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.694
3.920
39.25
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
134 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 148+365
Length Width Depth
6.07
26.0
3.50
3.00
Total
9
10
km.
Quantity
86
156
242
26
6.07
3.006
949.13
135 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
4.92
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
222.99
431.66
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
4.92
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
15.93
24.09
75.48
Part - 2
cum
cum
4
4
4.92
4.92
5.20
1.70
0.50
0.10
51.13
3.34
Part - 3
cum
4.92
2.60
0.10
5.11
Part - 4
cum
4.92
0.90
0.20
3.54
Part - 5
Part - 6
cum
cum
4
4
4.92
4.92
0.30
0.60
3.42
1.71
63.12
20.15
20.15
40.30
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
14.02
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 148+525
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.01
1.80
0.00
27.30
7.02
136 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 148+525
Length Width Depth
Cum
km.
Quantity
296.08
Kg
Kg
Kg
Kg
T
75
75
120
2
296.08
103.42
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22206.24
7756.42
215.70
0.00
30.18
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
137 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 148+525
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
4.92
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.116
3.920
24.96
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
138 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 148+525
Length Width Depth
4.92
26.0
2.92
3.00
Total
9
10
km.
Quantity
58
156
214
26
4.92
2.428
620.67
139 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
4.63
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
209.93
418.60
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
4.63
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
14.99
24.09
74.54
Part - 2
cum
cum
4
4
4.63
4.63
5.20
1.70
0.50
0.10
48.13
3.15
Part - 3
cum
4.63
2.60
0.10
4.81
Part - 4
cum
4.63
0.90
0.20
3.33
Part - 5
Part - 6
cum
cum
4
4
4.63
4.63
0.30
0.60
3.27
1.64
59.42
18.17
18.17
36.34
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
13.45
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 148+605
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
6.72
1.80
0.00
27.30
7.02
140 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 148+605
Length Width Depth
Cum
km.
Quantity
295.80
Kg
Kg
Kg
Kg
T
75
75
120
2
295.80
95.76
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22184.64
7182.05
215.70
0.00
29.58
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
141 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 148+605
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
4.63
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
1.972
3.920
21.90
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
142 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 148+605
Length Width Depth
4.63
26.0
2.78
3.00
Total
9
10
km.
Quantity
52
156
208
26
4.63
2.284
549.66
143 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
2.53
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
114.71
323.38
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
2.53
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
8.19
24.09
67.74
Part - 2
cum
cum
4
4
2.53
2.53
5.20
1.70
0.50
0.10
26.30
1.72
Part - 3
cum
2.53
2.60
0.10
2.63
Part - 4
cum
2.53
0.90
0.20
1.82
Part - 5
Part - 6
cum
cum
4
4
2.53
2.53
0.30
0.60
2.22
1.11
32.47
6.74
6.74
13.48
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
9.25
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 151+497
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
4.62
1.80
0.00
27.30
7.02
144 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 151+497
Length Width Depth
Cum
km.
Quantity
293.70
Kg
Kg
Kg
Kg
T
75
75
120
2
293.70
45.95
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22027.20
3446.61
215.70
0.00
25.69
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
145 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 151+497
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
2.53
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
0.922
3.920
5.60
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
146 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 151+497
Length Width Depth
2.53
26.0
1.73
3.00
Total
9
10
km.
Quantity
18
156
174
26
2.53
1.234
162.32
147 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 151+199
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
148 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 151+199
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
149 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 151+199
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
150 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 151+199
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
151 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.07
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
275.34
484.01
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.07
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
19.67
24.09
79.22
Part - 2
cum
cum
4
4
6.07
6.07
5.20
1.70
0.50
0.10
63.13
4.13
Part - 3
cum
6.07
2.60
0.10
6.31
Part - 4
cum
6.07
0.90
0.20
4.37
Part - 5
Part - 6
cum
cum
4
4
6.07
6.07
0.30
0.60
3.99
2.00
77.94
29.08
29.08
58.16
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.33
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 152+426
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.17
1.80
0.00
27.30
7.02
152 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 152+426
Length Width Depth
Cum
km.
Quantity
297.24
Kg
Kg
Kg
Kg
T
75
75
120
2
297.24
136.10
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22292.79
10207.62
215.70
0.00
32.72
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
153 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 152+426
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.07
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.693
3.920
39.22
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
154 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 152+426
Length Width Depth
6.07
26.0
3.50
3.00
Total
9
10
km.
Quantity
86
156
242
26
6.07
3.005
948.50
155 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 152+643
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
156 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 152+643
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
157 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 152+643
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
158 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 152+643
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
159 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.55
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
251.78
460.46
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
5.55
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
17.98
24.09
77.53
Part - 2
cum
cum
4
4
5.55
5.55
5.20
1.70
0.50
0.10
57.73
3.77
Part - 3
cum
5.55
2.60
0.10
5.77
Part - 4
cum
5.55
0.90
0.20
4.00
Part - 5
Part - 6
cum
cum
4
4
5.55
5.55
0.30
0.60
3.73
1.87
71.27
24.86
24.86
49.73
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
15.29
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 154+498
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.65
1.80
0.00
27.30
7.02
160 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 154+498
Length Width Depth
Cum
km.
Quantity
296.72
Kg
Kg
Kg
Kg
T
75
75
120
2
296.72
121.00
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22253.85
9075.13
215.70
0.00
31.54
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
161 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 154+498
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
5.55
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.433
3.920
32.41
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
162 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 154+498
Length Width Depth
5.55
26.0
3.24
3.00
Total
9
10
km.
Quantity
72
156
228
26
5.55
2.745
792.44
163 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.12
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
232.06
440.74
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
5.12
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
16.58
24.09
76.13
Part - 2
cum
cum
4
4
5.12
5.12
5.20
1.70
0.50
0.10
53.21
3.48
Part - 3
cum
5.12
2.60
0.10
5.32
Part - 4
cum
5.12
0.90
0.20
3.68
Part - 5
Part - 6
cum
cum
4
4
5.12
5.12
0.30
0.60
3.52
1.76
65.69
21.58
21.58
43.16
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
14.42
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 154+896
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.21
1.80
0.00
27.30
7.02
164 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 154+896
Length Width Depth
Cum
km.
Quantity
296.28
Kg
Kg
Kg
Kg
T
75
75
120
2
296.28
108.85
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22221.24
8164.06
215.70
0.00
30.60
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
165 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 154+896
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
5.12
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.216
3.920
27.20
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
166 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 154+896
Length Width Depth
5.12
26.0
3.02
3.00
Total
9
10
km.
Quantity
62
156
218
26
5.12
2.528
672.53
167 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.73
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
305.16
513.84
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.73
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
21.80
24.09
81.35
Part - 2
cum
cum
4
4
6.73
6.73
5.20
1.70
0.50
0.10
69.97
4.57
Part - 3
cum
6.73
2.60
0.10
7.00
Part - 4
cum
6.73
0.90
0.20
4.84
Part - 5
Part - 6
cum
cum
4
4
6.73
6.73
0.30
0.60
4.32
2.16
86.38
34.89
34.89
69.77
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
17.65
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 155+118
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.82
1.80
0.00
27.30
7.02
168 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 155+118
Length Width Depth
Cum
km.
Quantity
297.89
Kg
Kg
Kg
Kg
T
75
75
120
2
297.89
156.16
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22342.11
11711.63
215.70
0.00
34.27
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
169 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 155+118
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.73
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
3.021
3.920
48.78
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
170 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 155+118
Length Width Depth
6.73
26.0
3.83
3.00
Total
9
10
km.
Quantity
104
156
260
26
6.73
3.334
1166.28
171 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.23
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
237.36
446.03
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
5.23
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
16.95
24.09
76.50
Part - 2
cum
cum
4
4
5.23
5.23
5.20
1.70
0.50
0.10
54.42
3.56
Part - 3
cum
5.23
2.60
0.10
5.44
Part - 4
cum
5.23
0.90
0.20
3.77
Part - 5
Part - 6
cum
cum
4
4
5.23
5.23
0.30
0.60
3.57
1.79
67.19
22.44
22.44
44.88
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
14.66
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 156+017
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.33
1.80
0.00
27.30
7.02
172 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 156+017
Length Width Depth
Cum
km.
Quantity
296.40
Kg
Kg
Kg
Kg
T
75
75
120
2
296.40
112.07
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22230.00
8405.46
215.70
0.00
30.85
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
173 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 156+017
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
5.23
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.274
3.920
28.56
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
174 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 156+017
Length Width Depth
5.23
26.0
3.08
3.00
Total
9
10
km.
Quantity
66
156
222
26
5.23
2.586
703.77
175 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.33
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
241.71
450.39
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
5.33
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
17.27
24.09
76.82
Part - 2
cum
cum
4
4
5.33
5.33
5.20
1.70
0.50
0.10
55.42
3.62
Part - 3
cum
5.33
2.60
0.10
5.54
Part - 4
cum
5.33
0.90
0.20
3.84
Part - 5
Part - 6
cum
cum
4
4
5.33
5.33
0.30
0.60
3.62
1.81
68.42
23.16
23.16
46.32
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
14.85
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 156+969
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.42
1.80
0.00
27.30
7.02
176 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 156+969
Length Width Depth
Cum
km.
Quantity
296.50
Kg
Kg
Kg
Kg
T
75
75
120
2
296.50
114.74
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22237.20
8605.70
215.70
0.00
31.06
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
177 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 156+969
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
5.33
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.322
3.920
29.70
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
178 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 156+969
Length Width Depth
5.33
26.0
3.13
3.00
Total
9
10
km.
Quantity
68
156
224
26
5.33
2.634
729.99
179 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
4.58
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
207.88
416.56
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
4.58
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
14.85
24.09
74.40
Part - 2
cum
cum
4
4
4.58
4.58
5.20
1.70
0.50
0.10
47.66
3.12
Part - 3
cum
4.58
2.60
0.10
4.77
Part - 4
cum
4.58
0.90
0.20
3.30
Part - 5
Part - 6
cum
cum
4
4
4.58
4.58
0.30
0.60
3.25
1.62
58.85
17.87
17.87
35.74
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
13.36
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 157+465
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
6.68
1.80
0.00
27.30
7.02
180 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 157+465
Length Width Depth
Cum
km.
Quantity
295.75
Kg
Kg
Kg
Kg
T
75
75
120
2
295.75
94.58
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22181.26
7093.66
215.70
0.00
29.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
181 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 157+465
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
4.58
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
1.949
3.920
21.44
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
182 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 157+465
Length Width Depth
4.58
26.0
2.75
3.00
Total
9
10
km.
Quantity
52
156
208
26
4.58
2.262
538.95
183 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.09
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
230.79
439.47
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
5.09
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
16.49
24.09
76.04
Part - 2
cum
cum
4
4
5.09
5.09
5.20
1.70
0.50
0.10
52.92
3.46
Part - 3
cum
5.09
2.60
0.10
5.29
Part - 4
cum
5.09
0.90
0.20
3.66
Part - 5
Part - 6
cum
cum
4
4
5.09
5.09
0.30
0.60
3.50
1.75
65.33
21.38
21.38
42.76
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
14.37
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 163+355
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
7.18
1.80
0.00
27.30
7.02
184 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 163+355
Length Width Depth
Cum
km.
Quantity
296.26
Kg
Kg
Kg
Kg
T
75
75
120
2
296.26
108.09
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22219.14
8106.56
215.70
0.00
30.54
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
185 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 163+355
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
5.09
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.202
3.920
26.88
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
186 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 163+355
Length Width Depth
5.09
26.0
3.01
3.00
Total
9
10
km.
Quantity
62
156
218
26
5.09
2.514
665.14
187 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 164+614
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
188 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 164+614
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
189 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 164+614
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
190 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 164+614
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
191 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 171+904
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
192 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 171+904
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
193 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 171+904
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
194 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 171+904
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
195 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 172+304
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
196 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 172+304
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
197 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 172+304
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
198 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 172+304
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
199 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 175+000
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
200 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 175+000
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
201 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 175+000
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
202 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 175+000
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
203 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.40
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
290.30
498.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
6.40
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
20.74
24.09
80.29
Part - 2
cum
cum
4
4
6.40
6.40
5.20
1.70
0.50
0.10
66.56
4.35
Part - 3
cum
6.40
2.60
0.10
6.66
Part - 4
cum
6.40
0.90
0.20
4.61
Part - 5
Part - 6
cum
cum
4
4
6.40
6.40
0.30
0.60
4.16
2.08
82.18
31.93
31.93
63.86
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
16.99
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 175+930
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
8.50
1.80
0.00
27.30
7.02
204 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 175+930
Length Width Depth
Cum
km.
Quantity
297.57
Kg
Kg
Kg
Kg
T
75
75
120
2
297.57
146.04
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22317.54
10952.64
215.70
0.00
33.49
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
205 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 175+930
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
6.40
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
2.858
3.920
43.89
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
206 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 175+930
Length Width Depth
6.40
26.0
3.66
3.00
Total
9
10
km.
Quantity
94
156
250
26
6.40
3.170
1054.98
207 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
7.92
8.09
8.09
5.40
0.90
0.90
2.10
191.49
17.18
359.25
567.92
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.06
0.40
7.92
22.00
8.09
8.09
8.09
5.40
3.65
0.15
0.15
0.15
0.15
0.15
31.92
2.57
0.97
25.66
24.09
85.21
Part - 2
cum
cum
4
4
7.92
7.92
5.20
1.70
0.50
0.10
82.37
5.39
Part - 3
cum
7.92
2.60
0.10
8.24
Part - 4
cum
7.92
0.90
0.20
5.70
Part - 5
Part - 6
cum
cum
4
4
7.92
7.92
0.30
0.60
4.92
2.46
101.69
46.74
46.74
93.47
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
8
2
2
0
1
2
26.00
26.00
1.05
26.00
26.00
0.50
7.19
7.19
26.00
26.00
7.79
0.42
7.79
7.19
0.01125
20.03
0.125
0.75
0.35
0.14
0.45
3.00
0.75
0.47
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 176+510
Length Width Depth
2 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
91.14
65.52
7.89
87.86
2.34
10.02
1.80
0.00
27.30
7.02
208 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
2 x 3.0
Nos
m.
Pro.Ch 176+510
Length Width Depth
Cum
km.
Quantity
299.09
Kg
Kg
Kg
Kg
T
75
75
120
2
299.09
195.16
1.80
0.00
Cum
Cum
1
2
20.00
20.00
7.19
3.50
Sqm
20.00
7.19
cum
22.00
3.50
No
No
7.79
4
4
Rmt
22.0
44.00
22431.54
14637.35
215.70
0.00
37.28
0.05
0.05
7.19
7.00
14.19
283.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
209 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 176+510
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.90
21.07
21.07
76.93
21.07
21.07
0.70
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.90
10.90
21.07
21.07
76.93
cum
cum
cum
cum
4
2
4
7.92
26.00
33.36
cum
cum
42.29
cum
cum
cum
cum
2
1
1
76.93
21.07
21.07
cum
cum
76.93
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
2 x 3.0
Nos
RM
1.10
2.15
2.65
0.45
0.75
0.75
33.56
67.95
103.30
69.24
47.41
94.82
416.26
0.70
0.30
0.20
0.90
1.693
2.175
0.15
6.10
11.77
35.66
45.83
23.08
122.44
0.6
0.6
3.618
3.920
68.76
122.30
133.43
133.43
0.3
50.75
50.75
0.30
0.75
0.75
46.16
47.41
94.82
188.38
0.60
92.32
92.32
3.00
6.00
3.00
6.00
7.19
210 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
2 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 176+510
Length Width Depth
7.92
26.0
4.42
3.00
Total
9
10
km.
Quantity
142
156
298
26
7.92
3.930
1618.53
211 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
32.25
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
96.74
11.34
187.34
295.42
cum
cum
cum
cum
cum
cum
1
2
2
4
2
32.25
1.27
0.40
4.13
27.95
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
19.35
1.53
0.48
13.38
30.60
65.34
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
31.95
31.95
1.20
31.95
31.95
0.50
2.50
2.50
31.95
31.95
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 178+440
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
35.46
31.95
5.00
19.97
1.44
5.38
0.63
0.00
0.00
8.63
212 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 178+440
Length Width Depth
Cum
km.
Quantity
107.82
Kg
Kg
Kg
Kg
T
75
75
120
2
107.82
82.15
0.63
0.00
Cum
Cum
1
2
20.00
25.95
2.5
3.50
Sqm
20.00
2.5
cum
27.95
3.50
No
No
3.70
2
2
Rmt
27.9
55.90
8086.23
6160.93
75.00
0.00
14.32
0.05
0.05
2.50
9.08
11.58
231.64
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
58.69
58.69
213 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 178+440
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
31.95
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
97.76
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
214 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 178+440
Length Width Depth
4.13
31.9
2.44
2.00
Total
9
10
km.
Quantity
42
128
170
31.948
4.13
1.950
514.59
215 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 178+840
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
216 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 178+840
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
217 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 178+840
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
218 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 178+840
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
219 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.65
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
256.28
346.52
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.65
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
18.31
24.09
60.18
Part - 2
cum
cum
4
4
5.65
5.65
5.20
1.70
0.50
0.10
58.76
3.84
Part - 3
cum
5.65
2.60
0.10
5.88
Part - 4
cum
5.65
0.90
0.20
4.07
Part - 5
Part - 6
cum
cum
4
4
5.65
5.65
0.30
0.60
3.70
1.85
72.55
25.07
25.07
50.14
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.80
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 178+917
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.90
0.63
0.00
0.00
7.02
220 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 178+917
Length Width Depth
Cum
km.
Quantity
91.20
Kg
Kg
Kg
Kg
T
75
75
120
2
91.20
122.68
0.63
0.00
Cum
Cum
1
2
20.00
24.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6839.63
9201.31
75.00
0.00
16.12
0.05
0.05
2.50
8.40
10.90
218.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
221 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 178+917
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.65
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.398
2.550
32.51
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
222 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 178+917
Length Width Depth
5.65
26.0
3.20
2.00
Total
9
10
km.
Quantity
74
104
178
26
5.65
2.710
796.20
223 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
32.17
1.35
4.13
4.00
4.00
5.40
-10.09
1.05
2.10
cum
cum
cum
cum
cum
cum
1
2
2
4
2
32.17
1.27
0.40
4.13
27.87
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
19.30
1.53
0.48
13.38
30.52
65.21
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
31.87
31.87
1.20
31.87
31.87
0.50
2.50
2.50
31.87
31.87
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 179+275
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
-1298.00
11.34
187.34
-1099.32
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
35.38
31.87
5.00
19.92
1.43
5.38
0.63
0.00
0.00
8.60
224 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 179+275
Length Width Depth
Cum
km.
Quantity
107.58
Kg
Kg
Kg
Kg
T
75
75
120
2
107.58
82.15
0.63
0.00
Cum
Cum
1
2
20.00
29.87
2.5
3.50
Sqm
20.00
2.5
cum
27.87
3.50
No
No
3.70
2
2
Rmt
27.9
55.74
8068.39
6160.93
75.00
0.00
14.30
0.05
0.05
2.50
10.45
12.95
259.09
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
58.53
58.53
225 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 179+275
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
31.87
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
97.52
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
226 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 179+275
Length Width Depth
4.13
31.9
2.44
2.00
Total
9
10
km.
Quantity
42
128
170
31.87
4.13
1.950
513.33
227 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
3.11
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
9.33
11.34
187.34
208.00
cum
cum
cum
cum
cum
cum
1
2
2
4
2
3.11
1.27
0.40
4.13
-1.19
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
1.87
1.53
0.48
13.38
-1.30
15.95
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
2.81
2.81
1.20
2.81
2.81
0.50
2.50
2.50
2.81
2.81
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 179+418
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
3.12
2.81
5.00
1.76
0.13
5.38
0.63
0.00
0.00
0.76
228 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 179+418
Length Width Depth
Cum
km.
Quantity
18.94
Kg
Kg
Kg
Kg
T
75
75
120
2
18.94
82.15
0.63
0.00
Cum
Cum
1
2
20.00
-3.19
2.5
3.50
Sqm
20.00
2.5
cum
-1.19
3.50
No
No
3.70
2
2
Rmt
-1.2
-2.38
1420.55
6160.93
75.00
0.00
7.66
0.05
0.05
2.50
-1.12
1.38
27.66
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
-2.50
-2.50
229 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 179+418
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
2.81
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
8.59
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
230 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 179+418
Length Width Depth
4.13
2.8
2.44
2.00
Total
9
10
km.
Quantity
42
12
54
29.62
4.13
1.950
477.09
231 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.56
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
88.68
11.34
187.34
287.36
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.56
1.27
0.40
4.13
25.26
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.74
1.53
0.48
13.38
27.66
60.78
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.26
29.26
1.20
29.26
29.26
0.50
2.50
2.50
29.26
29.26
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 179+725
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.48
29.26
5.00
18.29
1.32
5.38
0.63
0.00
0.00
7.90
232 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 179+725
Length Width Depth
Cum
km.
Quantity
99.62
Kg
Kg
Kg
Kg
T
75
75
120
2
99.62
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.26
2.5
3.50
Sqm
20.00
2.5
cum
25.26
3.50
No
No
3.70
2
2
Rmt
25.3
50.52
7471.35
6160.93
75.00
0.00
13.71
0.05
0.05
2.50
8.14
10.64
212.82
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
53.05
53.05
233 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 179+725
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.26
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
89.54
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
234 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 179+725
Length Width Depth
4.13
29.3
2.44
2.00
Total
9
10
km.
Quantity
42
118
160
29.26
4.13
1.950
471.29
235 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.00
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
92.99
11.34
187.34
291.66
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.00
1.27
0.40
4.13
26.70
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.60
1.53
0.48
13.38
29.23
63.22
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.70
30.70
1.20
30.70
30.70
0.50
2.50
2.50
30.70
30.70
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 179+842
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
34.07
30.70
5.00
19.19
1.38
5.38
0.63
0.00
0.00
8.29
236 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 179+842
Length Width Depth
Cum
km.
Quantity
104.00
Kg
Kg
Kg
Kg
T
75
75
120
2
104.00
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.70
2.5
3.50
Sqm
20.00
2.5
cum
26.70
3.50
No
No
3.70
2
2
Rmt
26.7
53.39
7799.84
6160.93
75.00
0.00
14.04
0.05
0.05
2.50
8.64
11.14
222.87
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.06
56.06
237 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 179+842
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.70
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
93.93
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
238 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 179+842
Length Width Depth
4.13
30.7
2.44
2.00
Total
9
10
km.
Quantity
42
124
166
30.696
4.13
1.950
494.42
239 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.38
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
94.15
11.34
187.34
292.83
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.38
1.27
0.40
4.13
27.08
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.83
1.53
0.48
13.38
29.66
63.88
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
31.08
31.08
1.20
31.08
31.08
0.50
2.50
2.50
31.08
31.08
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 180+005
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
34.50
31.08
5.00
19.43
1.40
5.38
0.63
0.00
0.00
8.39
240 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 180+005
Length Width Depth
Cum
km.
Quantity
105.18
Kg
Kg
Kg
Kg
T
75
75
120
2
105.18
82.15
0.63
0.00
Cum
Cum
1
2
20.00
25.08
2.5
3.50
Sqm
20.00
2.5
cum
27.08
3.50
No
No
3.70
2
2
Rmt
27.1
54.17
7888.59
6160.93
75.00
0.00
14.12
0.05
0.05
2.50
8.78
11.28
225.59
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.88
56.88
241 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 180+005
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
31.08
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
95.12
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
242 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 180+005
Length Width Depth
4.13
31.1
2.44
2.00
Total
9
10
km.
Quantity
42
126
168
31.084
4.13
1.950
500.67
243 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 180+425
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
244 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 180+425
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
245 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 180+425
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
246 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 180+425
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
247 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 180+765
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
248 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 180+765
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
249 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 180+765
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
14.56
14.56
23.41
14.56
14.56
0.75
0.00
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
14.56
14.56
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
14.56
14.56
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
0.00
71.37
21.07
32.76
65.51
218.26
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
24.64
31.66
7.02
76.89
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
32.76
65.51
112.31
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
250 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 180+765
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
251 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
30.60
1.35
4.13
4.00
4.00
5.40
0.45
1.35
2.10
55.08
14.58
187.34
257.00
cum
cum
cum
cum
cum
cum
1
2
2
4
2
30.60
1.70
0.40
4.13
26.30
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.36
2.04
0.48
13.38
28.80
63.06
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.30
30.30
1.50
30.30
30.30
0.50
2.50
2.50
30.30
30.30
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.00
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 181+775
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
1.20
0.25
0.5
0.3
0.00
0.00
0.00
7.99
18.94
1.36
5.38
0.63
0.00
0.00
8.18
252 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 181+775
Length Width Depth
Cum
km.
Quantity
41.85
Kg
Kg
Kg
Kg
T
75
75
120
2
41.85
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.30
2.5
3.50
Sqm
20.00
2.5
cum
26.30
3.50
No
No
3.70
2
2
Rmt
26.3
52.60
3139.05
6160.93
75.00
0.00
9.37
0.05
0.05
2.50
8.51
11.01
220.10
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
55.23
55.23
253 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 181+775
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
58.23
11.50
11.50
23.41
11.50
11.50
0.75
1.50
0.00
cum
cum
cum
cum
cum
cum
4
4
1
1
2
58.23
58.23
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.30
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
0.00
0.45
0.75
0.75
227.11
37.09
0.00
21.07
25.88
51.75
362.89
0.75
0.30
0.20
1.10
1.693
2.175
0.15
34.94
76.87
19.46
25.01
7.02
163.31
0.6
0.6
1.638
0.250
16.23
9.09
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
254 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 181+775
Length Width Depth
4.13
30.3
2.44
2.00
Total
9
10
km.
Quantity
42
122
164
30.3
4.13
1.950
488.04
255 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 181+870
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
256 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 181+870
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
257 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 181+870
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
258 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 181+870
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
259 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
37.94
1.35
4.13
4.00
4.00
5.40
###
1.05
2.10
113.82
11.34
187.34
187.34
cum
cum
cum
cum
cum
cum
1
2
2
4
2
37.94
1.27
0.40
4.13
33.64
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
22.76
1.53
0.48
13.38
36.84
74.99
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
37.64
37.64
1.20
37.64
37.64
0.50
2.50
2.50
37.64
37.64
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 182+440
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
41.78
37.64
5.00
23.53
1.69
5.38
0.63
0.00
0.00
10.16
260 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 182+440
Length Width Depth
Cum
km.
Quantity
125.18
Kg
Kg
Kg
Kg
T
75
75
120
2
125.18
82.15
0.63
0.00
Cum
Cum
1
2
20.00
31.64
2.5
3.50
Sqm
20.00
2.5
cum
33.64
3.50
No
No
3.70
2
2
Rmt
33.6
67.28
9388.28
6160.93
75.00
0.00
15.62
0.05
0.05
2.50
11.07
13.57
271.48
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
70.64
70.64
261 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 182+440
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
37.64
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
115.18
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
262 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 182+440
Length Width Depth
4.13
37.6
2.44
2.00
Total
9
10
km.
Quantity
42
152
194
37.64
4.13
1.950
606.27
263 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.04
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
93.12
11.34
187.34
291.80
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.04
1.27
0.40
4.13
26.74
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.62
1.53
0.48
13.38
29.28
63.29
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.74
30.74
1.20
30.74
30.74
0.50
2.50
2.50
30.74
30.74
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 182+745
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
34.12
30.74
5.00
19.21
1.38
5.38
0.63
0.00
0.00
8.30
264 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 182+745
Length Width Depth
Cum
km.
Quantity
104.13
Kg
Kg
Kg
Kg
T
75
75
120
2
104.13
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.74
2.5
3.50
Sqm
20.00
2.5
cum
26.74
3.50
No
No
3.70
2
2
Rmt
26.7
53.48
7809.90
6160.93
75.00
0.00
14.05
0.05
0.05
2.50
8.66
11.16
223.18
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.15
56.15
265 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 182+745
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.74
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
94.06
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
266 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 182+745
Length Width Depth
4.13
30.7
2.44
2.00
Total
9
10
km.
Quantity
42
124
166
30.74
4.13
1.950
495.13
267 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.48
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
248.48
338.72
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.48
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
17.75
24.09
59.63
Part - 2
cum
cum
4
4
5.48
5.48
5.20
1.70
0.50
0.10
56.97
3.73
Part - 3
cum
5.48
2.60
0.10
5.70
Part - 4
cum
5.48
0.90
0.20
3.94
Part - 5
Part - 6
cum
cum
4
4
5.48
5.48
0.30
0.60
3.61
1.81
70.34
23.74
23.74
47.48
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.46
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 183+120
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.73
0.63
0.00
0.00
7.02
268 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 183+120
Length Width Depth
Cum
km.
Quantity
91.02
Kg
Kg
Kg
Kg
T
75
75
120
2
91.02
117.82
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6826.73
8836.40
75.00
0.00
15.74
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
269 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 183+120
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.48
26.00
7.76
cum
cum
5.00
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.312
2.550
30.39
79.56
31.06
31.06
0.3
5.99
5.99
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
270 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 183+120
Length Width Depth
5.48
26.0
3.12
2.00
Total
9
10
km.
Quantity
70
104
174
26
5.48
2.624
747.46
271 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
16.25
16.25
5.40
0.75
1.05
2.10
320.53
46.07
187.34
553.94
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
16.25
16.25
16.25
5.40
3.65
0.15
0.15
0.15
0.15
0.15
64.11
6.20
1.95
13.38
24.09
109.73
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 183+332
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
272 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 183+332
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
273 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 183+332
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
0.00
51.75
193.84
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
0.00
51.75
65.79
0.80
37.45
37.45
0.00
6.00
0.00
6.00
2.50
274 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 183+332
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
275 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
34.99
1.35
4.13
4.00
4.00
5.40
2.16
2.46
2.10
302.46
26.58
187.34
516.38
cum
cum
cum
cum
cum
cum
1
2
2
4
2
34.99
1.27
0.40
4.13
30.69
4.00
4.00
4.00
5.40
3.65
1.56
1.56
0.15
1.56
1.56
218.48
15.90
0.48
139.26
349.73
723.85
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
34.69
34.69
1.20
34.69
34.69
0.50
2.50
2.50
34.69
34.69
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 183+558
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
38.51
34.69
5.00
21.68
1.56
5.38
0.63
0.00
0.00
9.37
276 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 183+558
Length Width Depth
Cum
km.
Quantity
116.18
Kg
Kg
Kg
Kg
T
75
75
120
2
116.18
82.15
0.63
0.00
Cum
Cum
1
2
20.00
28.69
2.5
3.50
Sqm
20.00
2.5
cum
30.69
3.50
No
No
3.70
2
2
Rmt
30.7
61.38
8713.46
6160.93
75.00
0.00
14.95
0.05
0.05
2.50
10.04
12.54
250.83
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
64.45
64.45
277 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 183+558
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
34.69
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
0.00
167.96
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
106.15
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
0.00
39.92
2.21
103.51
103.51
3.00
0.00
3.00
0.00
2.50
278 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 183+558
Length Width Depth
4.13
34.7
2.44
2.00
Total
9
10
km.
Quantity
42
140
182
34.69
4.13
1.950
558.75
279 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.08
1.35
4.13
4.00
4.00
5.40
0.75
5.23
2.10
93.24
56.48
187.34
337.06
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.08
7.18
0.40
4.13
26.78
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.65
8.62
0.48
13.38
29.32
70.45
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.78
30.78
5.38
30.78
30.78
0.50
2.50
2.50
30.78
30.78
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
5.08
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 183+757
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
34.17
30.78
106.76
19.24
1.39
5.38
0.63
0.00
0.00
8.31
280 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 183+757
Length Width Depth
Cum
km.
Quantity
206.02
Kg
Kg
Kg
Kg
T
75
75
120
2
206.02
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.78
2.5
3.50
Sqm
20.00
2.5
cum
26.78
3.50
No
No
3.70
2
2
Rmt
26.8
53.56
15451.52
6160.93
75.00
0.00
21.69
0.05
0.05
2.50
8.67
11.17
223.46
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.24
56.24
281 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 183+757
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.78
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.00
0.00
27.55
37.09
56.38
21.07
0.00
0.00
142.09
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
94.19
31.06
31.06
0.3
21.34
21.34
0.30
0.00
0.00
14.04
0.00
0.00
14.04
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
282 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 183+757
Length Width Depth
4.13
30.8
2.44
2.00
Total
9
10
km.
Quantity
42
124
166
30.78
4.13
1.950
495.77
283 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 184+312
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
284 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 184+312
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
285 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 184+312
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.00
0.75
0.75
27.55
37.09
56.38
0.00
25.88
51.75
198.64
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
286 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 184+312
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
287 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 185+164
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
288 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 185+164
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
289 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 185+164
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
0.20
2.15
2.65
0.45
0.75
0.75
4.24
37.09
56.38
21.07
25.88
51.75
196.40
0.75
0.30
0.20
0.00
1.693
2.175
0.15
4.24
0.00
19.46
25.01
7.02
55.74
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
-0.30
-14.04
-14.04
3.00
6.00
3.00
6.00
2.50
290 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 185+164
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
291 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
30.54
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
91.63
11.34
187.34
290.30
cum
cum
cum
cum
cum
cum
1
2
2
4
2
30.54
1.27
0.40
4.13
26.24
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.33
1.53
0.48
13.38
28.73
62.45
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.24
30.24
1.20
30.24
30.24
0.50
2.50
2.50
30.24
30.24
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 185+501
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
33.57
30.24
5.00
18.90
1.36
5.38
0.63
0.00
0.00
8.17
292 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 185+501
Length Width Depth
Cum
km.
Quantity
102.61
Kg
Kg
Kg
Kg
T
75
75
120
2
102.61
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.24
2.5
3.50
Sqm
20.00
2.5
cum
26.24
3.50
No
No
3.70
2
2
Rmt
26.2
52.48
7695.98
6160.93
75.00
0.00
13.93
0.05
0.05
2.50
8.48
10.98
219.69
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
55.11
55.11
293 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 185+501
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.00
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.24
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
0.00
37.09
56.38
21.07
25.88
51.75
192.16
0.00
0.30
0.20
1.10
1.693
2.175
0.15
0.00
9.33
19.46
25.01
7.02
60.82
0.6
0.6
1.638
2.550
16.23
92.54
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
294 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 185+501
Length Width Depth
4.13
30.2
2.44
2.00
Total
9
10
km.
Quantity
42
122
164
30.242
4.13
1.950
487.11
295 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.34
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
242.22
332.46
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.34
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
17.30
24.09
59.18
Part - 2
cum
cum
4
4
5.34
5.34
5.20
1.70
0.50
0.10
55.54
3.63
Part - 3
cum
5.34
2.60
0.10
5.55
Part - 4
cum
5.34
0.90
0.20
3.84
Part - 5
Part - 6
cum
cum
4
4
5.34
5.34
0.30
0.60
3.54
1.77
68.57
22.70
22.70
45.40
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.18
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 185+817
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.59
0.63
0.00
0.00
7.02
296 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 185+817
Length Width Depth
Cum
km.
Quantity
90.89
Kg
Kg
Kg
Kg
T
75
75
120
2
90.89
113.97
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6816.38
8547.47
75.00
0.00
15.44
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
297 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 185+817
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
7.02
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
7.02
cum
cum
cum
cum
4
2
4
5.34
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
7.02
11.50
11.50
cum
cum
7.02
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
6.32
25.88
51.75
204.96
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
2.11
60.15
0.6
0.6
2.243
2.550
28.74
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
4.21
25.88
51.75
81.84
0.80
11.23
11.23
3.00
6.00
3.00
6.00
2.50
298 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 185+817
Length Width Depth
5.34
26.0
3.05
2.00
Total
9
10
km.
Quantity
66
104
170
26
5.34
2.555
709.47
299 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 186+121
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
300 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 186+121
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
301 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 186+121
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
302 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 186+121
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
303 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
28.85
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
86.56
11.34
187.34
285.23
cum
cum
cum
cum
cum
cum
1
2
2
4
2
28.85
1.27
0.40
4.13
24.55
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.31
1.53
0.48
13.38
26.88
59.58
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
28.55
28.55
1.20
28.55
28.55
0.50
2.50
2.50
28.55
28.55
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 186+479
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
31.69
28.55
5.00
17.85
1.28
5.38
0.63
0.00
0.00
7.71
304 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 186+479
Length Width Depth
Cum
km.
Quantity
97.46
Kg
Kg
Kg
Kg
T
75
75
120
2
97.46
82.15
0.63
0.00
Cum
Cum
1
2
20.00
22.55
2.5
3.50
Sqm
20.00
2.5
cum
24.55
3.50
No
No
3.70
2
2
Rmt
24.6
49.10
7309.40
6160.93
75.00
0.00
13.55
0.05
0.05
2.50
7.89
10.39
207.86
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
51.56
51.56
305 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 186+479
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
28.55
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
87.37
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
306 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 186+479
Length Width Depth
4.13
28.6
2.44
2.00
Total
9
10
km.
Quantity
42
116
158
28.552
4.13
1.950
459.89
307 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.84
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
89.52
11.34
187.34
288.20
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.84
1.27
0.40
4.13
25.54
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.90
1.53
0.48
13.38
27.97
61.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.54
29.54
1.20
29.54
29.54
0.50
2.50
2.50
29.54
29.54
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 186+638
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.79
29.54
5.00
18.46
1.33
5.38
0.63
0.00
0.00
7.98
308 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 186+638
Length Width Depth
Cum
km.
Quantity
100.47
Kg
Kg
Kg
Kg
T
75
75
120
2
100.47
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.54
2.5
3.50
Sqm
20.00
2.5
cum
25.54
3.50
No
No
3.70
2
2
Rmt
25.5
51.08
7535.40
6160.93
75.00
0.00
13.77
0.05
0.05
2.50
8.24
10.74
214.78
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
53.63
53.63
309 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 186+638
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.54
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
90.39
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
310 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 186+638
Length Width Depth
4.13
29.5
2.44
2.00
Total
9
10
km.
Quantity
42
120
162
29.54
4.13
1.950
475.80
311 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.94
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
89.82
11.34
187.34
288.50
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.94
1.27
0.40
4.13
25.64
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.96
1.53
0.48
13.38
28.08
61.43
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.64
29.64
1.20
29.64
29.64
0.50
2.50
2.50
29.64
29.64
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 186+874
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.90
29.64
5.00
18.53
1.33
5.38
0.63
0.00
0.00
8.00
312 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 186+874
Length Width Depth
Cum
km.
Quantity
100.78
Kg
Kg
Kg
Kg
T
75
75
120
2
100.78
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.64
2.5
3.50
Sqm
20.00
2.5
cum
25.64
3.50
No
No
3.70
2
2
Rmt
25.6
51.28
7558.28
6160.93
75.00
0.00
13.79
0.05
0.05
2.50
8.27
10.77
215.48
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
53.84
53.84
313 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 186+874
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.64
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
90.70
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
314 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 186+874
Length Width Depth
4.13
29.6
2.44
2.00
Total
9
10
km.
Quantity
42
120
162
29.64
4.13
1.950
477.41
315 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.28
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
239.41
329.65
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.28
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
17.10
24.09
58.98
Part - 2
cum
cum
4
4
5.28
5.28
5.20
1.70
0.50
0.10
54.89
3.59
Part - 3
cum
5.28
2.60
0.10
5.49
Part - 4
cum
5.28
0.90
0.20
3.80
Part - 5
Part - 6
cum
cum
4
4
5.28
5.28
0.30
0.60
3.51
1.76
67.77
22.24
22.24
44.48
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.06
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 187+248
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.53
0.63
0.00
0.00
7.02
316 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 187+248
Length Width Depth
Cum
km.
Quantity
90.82
Kg
Kg
Kg
Kg
T
75
75
120
2
90.82
112.25
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6811.73
8418.78
75.00
0.00
15.31
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
317 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 187+248
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.28
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.212
2.550
28.01
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
318 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 187+248
Length Width Depth
5.28
26.0
3.02
2.00
Total
9
10
km.
Quantity
64
104
168
26
5.28
2.524
692.73
319 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 187+447
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
320 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 187+447
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
321 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 187+447
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
322 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 187+447
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
323 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.51
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
249.86
340.10
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.51
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
17.85
24.09
59.72
Part - 2
cum
cum
4
4
5.51
5.51
5.20
1.70
0.50
0.10
57.29
3.75
Part - 3
cum
5.51
2.60
0.10
5.73
Part - 4
cum
5.51
0.90
0.20
3.97
Part - 5
Part - 6
cum
cum
4
4
5.51
5.51
0.30
0.60
3.63
1.81
70.73
23.97
23.97
47.95
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.52
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 187+656
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.76
0.63
0.00
0.00
7.02
324 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 187+656
Length Width Depth
Cum
km.
Quantity
91.05
Kg
Kg
Kg
Kg
T
75
75
120
2
91.05
118.67
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6829.01
8900.51
75.00
0.00
15.80
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
325 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 187+656
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.51
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.327
2.550
30.76
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
326 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 187+656
Length Width Depth
5.51
26.0
3.13
2.00
Total
9
10
km.
Quantity
70
104
174
26
5.51
2.639
755.96
327 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.75
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
215.26
305.50
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.75
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
15.38
24.09
57.25
Part - 2
cum
cum
4
4
4.75
4.75
5.20
1.70
0.50
0.10
49.35
3.23
Part - 3
cum
4.75
2.60
0.10
4.94
Part - 4
cum
4.75
0.90
0.20
3.42
Part - 5
Part - 6
cum
cum
4
4
4.75
4.75
0.30
0.60
3.25
1.62
60.93
18.48
18.48
36.96
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
11.99
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 187+937
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.00
0.63
0.00
0.00
7.02
328 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 187+937
Length Width Depth
Cum
km.
Quantity
90.29
Kg
Kg
Kg
Kg
T
75
75
120
2
90.29
97.90
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6771.80
7342.17
75.00
0.00
14.19
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
329 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 187+937
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.75
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.945
2.550
22.16
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
330 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 187+937
Length Width Depth
4.75
26.0
2.75
2.00
Total
9
10
km.
Quantity
54
104
158
26
4.75
2.258
557.16
331 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.10
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
87.30
11.34
187.34
285.98
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.10
1.27
0.40
4.13
24.80
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.46
1.53
0.48
13.38
27.16
60.00
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
28.80
28.80
1.20
28.80
28.80
0.50
2.50
2.50
28.80
28.80
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 188+050
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
31.97
28.80
5.00
18.00
1.30
5.38
0.63
0.00
0.00
7.78
332 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 188+050
Length Width Depth
Cum
km.
Quantity
98.22
Kg
Kg
Kg
Kg
T
75
75
120
2
98.22
82.15
0.63
0.00
Cum
Cum
1
2
20.00
22.80
2.5
3.50
Sqm
20.00
2.5
cum
24.80
3.50
No
No
3.70
2
2
Rmt
24.8
49.60
7366.13
6160.93
75.00
0.00
13.60
0.05
0.05
2.50
7.98
10.48
209.60
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
52.08
52.08
333 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 188+050
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
28.80
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
88.13
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
334 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 188+050
Length Width Depth
4.13
28.8
2.44
2.00
Total
9
10
km.
Quantity
42
116
158
28.8
4.13
1.950
463.88
335 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.52
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
88.57
11.34
187.34
287.24
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.52
1.27
0.40
4.13
25.22
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.71
1.53
0.48
13.38
27.62
60.72
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.22
29.22
1.20
29.22
29.22
0.50
2.50
2.50
29.22
29.22
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 188+739
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.44
29.22
5.00
18.26
1.31
5.38
0.63
0.00
0.00
7.89
336 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 188+739
Length Width Depth
Cum
km.
Quantity
99.50
Kg
Kg
Kg
Kg
T
75
75
120
2
99.50
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.22
2.5
3.50
Sqm
20.00
2.5
cum
25.22
3.50
No
No
3.70
2
2
Rmt
25.2
50.44
7462.66
6160.93
75.00
0.00
13.70
0.05
0.05
2.50
8.13
10.63
212.55
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
52.97
52.97
337 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 188+739
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.22
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
89.42
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
338 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 188+739
Length Width Depth
4.13
29.2
2.44
2.00
Total
9
10
km.
Quantity
42
118
160
29.222
4.13
1.950
470.68
339 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.66
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
88.98
11.34
187.34
287.66
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.66
1.27
0.40
4.13
25.36
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.80
1.53
0.48
13.38
27.77
60.95
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.36
29.36
1.20
29.36
29.36
0.50
2.50
2.50
29.36
29.36
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 188+898
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.59
29.36
5.00
18.35
1.32
5.38
0.63
0.00
0.00
7.93
340 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 188+898
Length Width Depth
Cum
km.
Quantity
99.92
Kg
Kg
Kg
Kg
T
75
75
120
2
99.92
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.36
2.5
3.50
Sqm
20.00
2.5
cum
25.36
3.50
No
No
3.70
2
2
Rmt
25.4
50.72
7494.23
6160.93
75.00
0.00
13.73
0.05
0.05
2.50
8.18
10.68
213.52
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
53.26
53.26
341 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 188+898
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.36
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
89.84
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
342 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 188+898
Length Width Depth
4.13
29.4
2.44
2.00
Total
9
10
km.
Quantity
42
118
160
29.36
4.13
1.950
472.90
343 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.63
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
255.56
345.80
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.63
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
18.25
24.09
60.13
Part - 2
cum
cum
4
4
5.63
5.63
5.20
1.70
0.50
0.10
58.59
3.83
Part - 3
cum
5.63
2.60
0.10
5.86
Part - 4
cum
5.63
0.90
0.20
4.06
Part - 5
Part - 6
cum
cum
4
4
5.63
5.63
0.30
0.60
3.69
1.84
72.34
24.94
24.94
49.89
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.77
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 189+168
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.88
0.63
0.00
0.00
7.02
344 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 189+168
Length Width Depth
Cum
km.
Quantity
91.18
Kg
Kg
Kg
Kg
T
75
75
120
2
91.18
122.23
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6838.43
9167.14
75.00
0.00
16.08
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
345 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 189+168
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.63
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.390
2.550
32.31
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
346 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 189+168
Length Width Depth
5.63
26.0
3.19
2.00
Total
9
10
km.
Quantity
72
104
176
26
5.63
2.702
791.60
347 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.28
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
239.32
329.56
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.28
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
17.09
24.09
58.97
Part - 2
cum
cum
4
4
5.28
5.28
5.20
1.70
0.50
0.10
54.87
3.59
Part - 3
cum
5.28
2.60
0.10
5.49
Part - 4
cum
5.28
0.90
0.20
3.80
Part - 5
Part - 6
cum
cum
4
4
5.28
5.28
0.30
0.60
3.51
1.76
67.74
22.23
22.23
44.45
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.05
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 189+398
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.53
0.63
0.00
0.00
7.02
348 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 189+398
Length Width Depth
Cum
km.
Quantity
90.82
Kg
Kg
Kg
Kg
T
75
75
120
2
90.82
112.20
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6811.58
8414.64
75.00
0.00
15.30
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
349 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 189+398
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.28
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.211
2.550
27.99
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
350 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 189+398
Length Width Depth
5.28
26.0
3.02
2.00
Total
9
10
km.
Quantity
64
104
168
26
5.28
2.523
692.19
351 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.42
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
200.49
290.73
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.42
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
14.32
24.09
56.20
Part - 2
cum
cum
4
4
4.42
4.42
5.20
1.70
0.50
0.10
45.97
3.01
Part - 3
cum
4.42
2.60
0.10
4.60
Part - 4
cum
4.42
0.90
0.20
3.18
Part - 5
Part - 6
cum
cum
4
4
4.42
4.42
0.30
0.60
3.08
1.54
56.75
16.35
16.35
32.70
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
11.34
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 189+940
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.67
0.63
0.00
0.00
7.02
352 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 189+940
Length Width Depth
Cum
km.
Quantity
89.97
Kg
Kg
Kg
Kg
T
75
75
120
2
89.97
89.45
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6747.38
6708.90
75.00
0.00
13.53
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
353 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 189+940
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.42
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.783
2.550
18.91
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
354 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 189+940
Length Width Depth
4.42
26.0
2.59
2.00
Total
9
10
km.
Quantity
46
104
150
26
4.42
2.095
481.51
355 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.38
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
198.59
288.83
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.38
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
14.18
24.09
56.06
Part - 2
cum
cum
4
4
4.38
4.38
5.20
1.70
0.50
0.10
45.53
2.98
Part - 3
cum
4.38
2.60
0.10
4.55
Part - 4
cum
4.38
0.90
0.20
3.15
Part - 5
Part - 6
cum
cum
4
4
4.38
4.38
0.30
0.60
3.06
1.53
56.21
16.08
16.08
32.17
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
11.26
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 190+208
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.63
0.63
0.00
0.00
7.02
356 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 190+208
Length Width Depth
Cum
km.
Quantity
89.92
Kg
Kg
Kg
Kg
T
75
75
120
2
89.92
88.38
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6744.23
6628.60
75.00
0.00
13.45
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
357 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 190+208
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.38
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.762
2.550
18.51
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
358 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 190+208
Length Width Depth
4.38
26.0
2.57
2.00
Total
9
10
km.
Quantity
46
104
150
26
4.38
2.074
472.16
359 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
41.20
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
123.59
11.34
187.34
322.26
cum
cum
cum
cum
cum
cum
1
2
2
4
2
41.20
1.27
0.40
4.13
36.90
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
24.72
1.53
0.48
13.38
40.40
80.51
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
40.90
40.90
1.20
40.90
40.90
0.50
2.50
2.50
40.90
40.90
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 190+597
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
45.39
40.90
5.00
25.56
1.84
5.38
0.63
0.00
0.00
11.04
360 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 190+597
Length Width Depth
Cum
km.
Quantity
135.11
Kg
Kg
Kg
Kg
T
75
75
120
2
135.11
82.15
0.63
0.00
Cum
Cum
1
2
20.00
34.90
2.5
3.50
Sqm
20.00
2.5
cum
36.90
3.50
No
No
3.70
2
2
Rmt
36.9
73.79
10133.09
6160.93
75.00
0.00
16.37
0.05
0.05
2.50
12.21
14.71
294.27
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
77.48
77.48
361 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 190+597
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
40.90
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
125.14
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
362 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 190+597
Length Width Depth
4.13
40.9
2.44
2.00
Total
9
10
km.
Quantity
42
164
206
40.896
4.13
1.950
658.71
363 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
46.78
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
140.33
11.34
187.34
339.00
cum
cum
cum
cum
cum
cum
1
2
2
4
2
46.78
1.27
0.40
4.13
42.48
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
28.07
1.53
0.48
13.38
46.51
89.97
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
46.48
46.48
1.20
46.48
46.48
0.50
2.50
2.50
46.48
46.48
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 191+007
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
51.59
46.48
5.00
29.05
2.09
5.38
0.63
0.00
0.00
12.55
364 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 191+007
Length Width Depth
Cum
km.
Quantity
152.13
Kg
Kg
Kg
Kg
T
75
75
120
2
152.13
82.15
0.63
0.00
Cum
Cum
1
2
20.00
40.48
2.5
3.50
Sqm
20.00
2.5
cum
42.48
3.50
No
No
3.70
2
2
Rmt
42.5
84.95
11409.51
6160.93
75.00
0.00
17.65
0.05
0.05
2.50
14.17
16.67
333.33
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
89.20
89.20
365 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 191+007
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
46.48
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
142.22
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
366 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 191+007
Length Width Depth
4.13
46.5
2.44
2.00
Total
9
10
km.
Quantity
42
186
228
46.476
4.13
1.950
748.59
367 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
32.36
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
97.07
11.34
187.34
295.74
cum
cum
cum
cum
cum
cum
1
2
2
4
2
32.36
1.27
0.40
4.13
28.06
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
19.41
1.53
0.48
13.38
30.72
65.52
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
32.06
32.06
1.20
32.06
32.06
0.50
2.50
2.50
32.06
32.06
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 191+307
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
35.58
32.06
5.00
20.04
1.44
5.38
0.63
0.00
0.00
8.66
368 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 191+307
Length Width Depth
Cum
km.
Quantity
108.15
Kg
Kg
Kg
Kg
T
75
75
120
2
108.15
82.15
0.63
0.00
Cum
Cum
1
2
20.00
26.06
2.5
3.50
Sqm
20.00
2.5
cum
28.06
3.50
No
No
3.70
2
2
Rmt
28.1
56.11
8110.94
6160.93
75.00
0.00
14.35
0.05
0.05
2.50
9.12
11.62
232.39
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
58.92
58.92
369 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 191+307
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
32.06
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
98.09
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
370 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 191+307
Length Width Depth
4.13
32.1
2.44
2.00
Total
9
10
km.
Quantity
42
130
172
32.056
4.13
1.950
516.33
371 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.43
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
246.30
336.54
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.43
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
17.59
24.09
59.47
Part - 2
cum
cum
4
4
5.43
5.43
5.20
1.70
0.50
0.10
56.47
3.69
Part - 3
cum
5.43
2.60
0.10
5.65
Part - 4
cum
5.43
0.90
0.20
3.91
Part - 5
Part - 6
cum
cum
4
4
5.43
5.43
0.30
0.60
3.59
1.79
69.72
23.38
23.38
46.75
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.36
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 191+802
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.68
0.63
0.00
0.00
7.02
372 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 191+802
Length Width Depth
Cum
km.
Quantity
90.98
Kg
Kg
Kg
Kg
T
75
75
120
2
90.98
116.47
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6823.13
8735.51
75.00
0.00
15.63
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
373 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 191+802
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.43
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.288
2.550
29.81
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
374 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 191+802
Length Width Depth
5.43
26.0
3.09
2.00
Total
9
10
km.
Quantity
68
104
172
26
5.43
2.600
734.14
375 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.41
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
88.24
11.34
187.34
286.91
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.41
1.27
0.40
4.13
25.11
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.65
1.53
0.48
13.38
27.50
60.53
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.11
29.11
1.20
29.11
29.11
0.50
2.50
2.50
29.11
29.11
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 192+028
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.31
29.11
5.00
18.20
1.31
5.38
0.63
0.00
0.00
7.86
376 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 192+028
Length Width Depth
Cum
km.
Quantity
99.17
Kg
Kg
Kg
Kg
T
75
75
120
2
99.17
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.11
2.5
3.50
Sqm
20.00
2.5
cum
25.11
3.50
No
No
3.70
2
2
Rmt
25.1
50.22
7437.50
6160.93
75.00
0.00
13.67
0.05
0.05
2.50
8.09
10.59
211.78
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
52.74
52.74
377 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 192+028
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.11
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
89.08
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
378 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 192+028
Length Width Depth
4.13
29.1
2.44
2.00
Total
9
10
km.
Quantity
42
118
160
29.112
4.13
1.950
468.91
379 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.59
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
253.56
343.80
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.59
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
18.11
24.09
59.99
Part - 2
cum
cum
4
4
5.59
5.59
5.20
1.70
0.50
0.10
58.14
3.80
Part - 3
cum
5.59
2.60
0.10
5.81
Part - 4
cum
5.59
0.90
0.20
4.02
Part - 5
Part - 6
cum
cum
4
4
5.59
5.59
0.30
0.60
3.67
1.83
71.78
24.60
24.60
49.20
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.68
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 192+259
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.84
0.63
0.00
0.00
7.02
380 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 192+259
Length Width Depth
Cum
km.
Quantity
91.14
Kg
Kg
Kg
Kg
T
75
75
120
2
91.14
120.98
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6835.13
9073.41
75.00
0.00
15.98
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
381 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 192+259
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.59
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.368
2.550
31.76
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
382 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 192+259
Length Width Depth
5.59
26.0
3.17
2.00
Total
9
10
km.
Quantity
72
104
176
26
5.59
2.680
779.02
383 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.30
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
240.41
330.65
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.30
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
17.17
24.09
59.05
Part - 2
cum
cum
4
4
5.30
5.30
5.20
1.70
0.50
0.10
55.12
3.60
Part - 3
cum
5.30
2.60
0.10
5.51
Part - 4
cum
5.30
0.90
0.20
3.82
Part - 5
Part - 6
cum
cum
4
4
5.30
5.30
0.30
0.60
3.52
1.76
68.05
22.40
22.40
44.81
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.10
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 192+734
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.55
0.63
0.00
0.00
7.02
384 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 192+734
Length Width Depth
Cum
km.
Quantity
90.85
Kg
Kg
Kg
Kg
T
75
75
120
2
90.85
112.86
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6813.38
8464.37
75.00
0.00
15.35
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
385 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 192+734
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.30
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.223
2.550
28.27
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
386 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 192+734
Length Width Depth
5.30
26.0
3.03
2.00
Total
9
10
km.
Quantity
66
104
170
26
5.30
2.535
698.65
387 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
28.93
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
86.78
11.34
187.34
285.46
cum
cum
cum
cum
cum
cum
1
2
2
4
2
28.93
1.27
0.40
4.13
24.63
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.36
1.53
0.48
13.38
26.97
59.71
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
28.63
28.63
1.20
28.63
28.63
0.50
2.50
2.50
28.63
28.63
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 193+525
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
31.78
28.63
5.00
17.89
1.29
5.38
0.63
0.00
0.00
7.73
388 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
Providing & laying Tar paper on
abutments/piers as bearing for receiving
RCC work in superstructure as per drawing
and Technical Specifications.
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 193+525
Length Width Depth
Cum
km.
Quantity
97.69
Kg
Kg
Kg
Kg
T
75
75
120
2
97.69
82.15
0.63
0.00
Sqm
28.63
7326.78
6160.93
75.00
0.00
13.56
0.3
0.00
Sqm
0.00
Cum
Cum
1
2
20.00
22.63
2.5
3.50
0.05
0.05
2.50
7.92
10.42
Sqm
20.00
2.5
cum
24.63
3.50
No
No
3.70
2
2
Rmt
24.6
49.26
208.40
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
51.72
51.72
389 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 193+525
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
28.63
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
87.60
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
390 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 193+525
Length Width Depth
4.13
28.6
2.44
2.00
Total
9
10
km.
Quantity
42
116
158
28.628
4.13
1.950
461.11
391 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
35.58
0.93
2.10
4996.93
11.72
285.77
5294.41
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
2.04
0.42
2.04
0.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
0.00
0.78
0
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 150+875
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
0.00
22.28
0.00
2.20
0.00
1.17
8.22
0.96
0.00
0.00
7.02
392 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
Providing & laying Tar paper on
abutments/piers as bearing for receiving
RCC work in superstructure as per drawing
and Technical Specifications.
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 150+875
Length Width Depth
Cum
km.
Quantity
40.88
Kg
Kg
Kg
Kg
T
75
75
120
2
40.88
143.00
0.96
0.00
Sqm
26.00
3066.20
10724.81
115.20
0.00
13.91
0.00
Sqm
0.00
Cum
Cum
1
2
20.00
20.00
0.84
3.50
0.05
0.05
0.84
7.00
7.84
Sqm
20.00
0.84
cum
22.00
3.50
No
No
2.04
2
2
Rmt
22.0
44.00
156.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
393 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 150+875
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
0.00
0.00
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
0.00
2.65
0.45
0.75
0.75
41.88
0.00
0.00
46.48
39.42
78.84
206.62
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
0.420
42.45
13.10
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
394 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 150+875
Length Width Depth
6.30
0.0
3.61
3.00
Total
9
10
km.
Quantity
92
0
92
26
6.30
3.120
1022.11
395 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 151+675
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
8.22
0.96
0.00
0.00
7.02
396 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
Providing & laying Tar paper on
abutments/piers as bearing for receiving
RCC work in superstructure as per drawing
and Technical Specifications.
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 151+675
Length Width Depth
Cum
km.
Quantity
184.32
Kg
Kg
Kg
Kg
T
75
75
120
2
184.32
143.00
0.96
0.00
Sqm
26.00
13824.35
10724.81
115.20
0.00
24.66
0.3
0.00
Sqm
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
0.05
0.05
3.84
7.00
10.84
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
397 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 151+675
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
398 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 151+675
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
399 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 151+704
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
400 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 151+704
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
401 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 151+704
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
402 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 151+704
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
403 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 152+000
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
404 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 152+000
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
405 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 152+000
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
406 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 152+000
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
407 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
46.78
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
217.31
11.72
285.77
514.80
cum
cum
cum
cum
cum
cum
1
2
2
4
2
46.78
1.10
0.40
6.30
42.48
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
37.47
1.77
0.64
20.41
46.51
106.80
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
46.48
46.48
1.08
46.48
46.48
0.50
3.84
3.84
46.48
46.48
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 152+436
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
98.38
117.12
5.43
74.96
2.09
8.22
0.96
0.00
0.00
12.55
408 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 152+436
Length Width Depth
Cum
km.
Quantity
318.74
Kg
Kg
Kg
Kg
T
75
75
120
2
318.74
143.00
0.96
0.00
Cum
Cum
1
2
20.00
40.48
3.84
3.50
Sqm
20.00
3.84
cum
42.48
3.50
No
No
5.04
4
4
Rmt
42.5
84.95
23905.34
10724.81
115.20
0.00
34.75
0.05
0.05
3.84
14.17
18.01
360.13
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
89.20
89.20
409 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 152+436
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
46.48
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
214.16
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
410 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 152+436
Length Width Depth
6.30
46.5
3.61
3.00
Total
9
10
km.
Quantity
92
280
372
26
6.30
3.120
1022.11
411 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.25
6.33
4.60
4.60
5.40
0.87
0.93
2.10
105.25
10.70
287.13
403.08
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.33
22.00
4.60
4.60
4.60
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.15
1.52
0.55
20.51
24.09
64.82
Part - 2
cum
cum
4
4
6.33
6.33
5.20
1.70
0.50
0.10
65.83
4.30
Part - 3
cum
6.33
2.60
0.10
6.58
Part - 4
cum
6.33
0.90
0.20
4.56
Part - 5
Part - 6
cum
cum
4
4
6.33
6.33
0.30
0.60
4.09
2.04
81.28
31.05
31.05
62.10
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.70
3.70
26.00
26.00
4.30
0.35
4.30
3.7
0.01125
16.61
0.125
0.75
0.25
0.14
0.42
3.00
0.78
0.4
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 152+622
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
46.96
54.60
4.63
38.48
1.17
8.31
0.93
0.00
0.00
7.02
412 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 152+622
Length Width Depth
Cum
km.
Quantity
161.16
Kg
Kg
Kg
Kg
T
75
75
120
2
161.16
143.37
0.93
0.00
Cum
Cum
1
2
20.00
20.00
3.7
3.50
Sqm
20.00
3.7
cum
22.00
3.50
No
No
4.30
2
2
Rmt
22.0
44.00
12086.96
10753.09
111.00
0.00
22.95
0.05
0.05
3.70
7.00
10.70
214.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
413 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 152+622
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.68
17.30
17.30
50.23
17.30
17.30
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.68
10.68
17.30
17.30
50.23
cum
cum
cum
cum
4
2
4
6.33
26.00
31.20
cum
cum
40.60
cum
cum
cum
cum
2
1
1
50.23
17.30
17.30
cum
cum
50.23
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.64
55.79
84.81
45.21
38.93
77.85
344.23
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.41
14.09
29.28
37.63
15.07
102.48
0.6
0.6
2.788
3.820
42.35
119.18
124.79
124.79
0.3
48.72
48.72
0.30
0.75
0.75
30.14
38.93
77.85
146.91
0.80
80.37
80.37
3.00
6.00
3.00
6.00
3.70
414 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 152+622
Length Width Depth
6.33
26.0
3.59
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.33
3.100
1020.40
415 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
0.06
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
2.72
136.63
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
0.06
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
0.19
24.09
47.76
Part - 2
cum
cum
4
4
0.06
0.06
5.20
1.70
0.50
0.10
0.62
0.04
Part - 3
cum
0.06
2.60
0.10
0.06
Part - 4
cum
0.06
0.90
0.20
0.04
Part - 5
Part - 6
cum
cum
4
4
0.06
0.06
0.30
0.60
0.99
0.49
0.77
0.07
0.07
0.14
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
3.96
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 153+450
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
1.98
0.96
0.00
0.00
7.02
416 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 153+450
Length Width Depth
Cum
km.
Quantity
178.08
Kg
Kg
Kg
Kg
T
75
75
120
2
178.08
0.91
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13356.35
68.45
115.20
0.00
13.54
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
417 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 153+450
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
0.06
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
-0.313
3.840
-0.05
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
418 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 153+450
Length Width Depth
0.06
26.0
0.49
3.00
Total
9
10
km.
Quantity
2
156
158
26
0.06
0.000
0.00
419 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87000
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 156+415
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
8.22
0.96
0.00
0.00
7.02
420 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 156+415
Length Width Depth
Cum
km.
Quantity
184.32
Kg
Kg
Kg
Kg
T
75
75
120
2
184.32
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13824.35
10724.81
115.20
0.00
24.66
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
421 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 156+415
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
422 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 156+415
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
423 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 156+514
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
424 of 734
Box Culvert
Description
Sr.
No
5
Unit
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
m.
Pro.Ch 156+514
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Sqm
26.00
6725.63
6160.93
75.00
0.00
12.96
0.3
0.00
Sqm
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
0.05
0.05
2.50
7.00
9.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
190.00
1 x 2.0
Nos
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
425 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 156+514
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
426 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 156+514
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
427 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 157+196
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
428 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 157+196
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
429 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 157+196
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
430 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 157+196
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
431 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 157+770
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
432 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 157+770
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
433 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 157+770
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
9.33
9.33
23.41
9.33
9.33
0.75
0.00
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
9.33
9.33
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
9.33
9.33
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
0.00
45.72
21.07
20.98
41.97
157.29
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
15.78
20.28
7.02
56.65
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
20.98
41.97
76.99
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
434 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 157+770
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
435 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.25
6.33
4.60
4.60
5.40
0.8700
0.93
2.10
105.25
10.70
287.13
403.08
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.33
22.00
4.60
4.60
4.60
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.15
1.52
0.55
20.51
24.09
64.82
Part - 2
cum
cum
4
4
6.33
6.33
5.20
1.70
0.50
0.10
65.83
4.30
Part - 3
cum
6.33
2.60
0.10
6.58
Part - 4
cum
6.33
0.90
0.20
4.56
Part - 5
Part - 6
cum
cum
4
4
6.33
6.33
0.30
0.60
4.09
2.04
81.28
31.05
31.05
62.10
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.70
3.70
26.00
26.00
4.30
0.35
4.30
3.7
0.01125
16.61
0.125
0.75
0.25
0.14
0.42
3.00
0.78
0.4
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 158+477
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
46.96
54.60
4.63
38.48
1.17
8.31
0.93
0.00
0.00
7.02
436 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 158+477
Length Width Depth
Cum
km.
Quantity
161.16
Kg
Kg
Kg
Kg
T
75
75
120
2
161.16
143.37
0.93
0.00
Cum
Cum
1
2
20.00
20.00
3.7
3.50
Sqm
20.00
3.7
cum
22.00
3.50
No
No
4.30
2
2
Rmt
22.0
44.00
12086.96
10753.09
111.00
0.00
22.95
0.05
0.05
3.70
7.00
10.70
214.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
437 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 158+477
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.68
17.30
17.30
50.23
17.30
17.30
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.68
10.68
17.30
17.30
50.23
cum
cum
cum
cum
4
2
4
6.33
26.00
31.20
cum
cum
40.60
cum
cum
cum
cum
2
1
1
50.23
17.30
17.30
cum
cum
50.23
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.64
55.79
84.81
45.21
38.93
77.85
344.23
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.41
14.09
29.28
37.63
15.07
102.48
0.6
0.6
2.788
3.820
42.35
119.18
124.79
124.79
0.3
48.72
48.72
0.30
0.75
0.75
30.14
38.93
77.85
146.91
0.80
80.37
80.37
3.00
6.00
3.00
6.00
3.70
438 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 158+477
Length Width Depth
6.33
26.0
3.59
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.33
3.100
1020.40
439 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 159+080
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
8.22
0.96
0.00
0.00
7.02
440 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
Providing & laying Tar paper on
abutments/piers as bearing for receiving
RCC work in superstructure as per drawing
and Technical Specifications.
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 159+080
Length Width Depth
Cum
km.
Quantity
184.32
Kg
Kg
Kg
Kg
T
75
75
120
2
184.32
143.00
0.96
0.00
Sqm
26.00
13824.35
10724.81
115.20
0.00
24.66
0.3
0.00
Sqm
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
0.05
0.05
3.84
7.00
10.84
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
441 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 159+080
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
442 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 159+080
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
443 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 159+332
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
444 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 159+332
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
445 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 159+332
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
446 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 159+332
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
447 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 159+890
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
1.075
0.3
3.00
55.04
65.52
5.43
41.93
1.17
17.67
0.96
0.00
0.00
7.02
448 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 159+890
Length Width Depth
Cum
km.
Quantity
193.78
Kg
Kg
Kg
Kg
T
75
75
120
2
193.78
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
14533.32
10724.81
115.20
0.00
25.37
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
449 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 159+890
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
103.87
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
124.64
124.64
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
450 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 159+890
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
451 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
0.00
0.00
5.40
0.87
0.93
2.10
0.00
0.00
285.77
285.77
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
0.00
0.00
0.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
0.00
0.00
0.00
20.41
24.09
44.50
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
4.20
0.00
4.20
3
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 159+905
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
45.86
0.00
4.52
32.76
1.17
8.22
0.96
0.00
0.00
7.02
452 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 159+905
Length Width Depth
Cum
km.
Quantity
99.55
Kg
Kg
Kg
Kg
T
75
75
120
2
99.55
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3
3.50
Sqm
20.00
cum
22.00
3.50
No
No
4.20
2
2
Rmt
22.0
44.00
7466.62
10724.81
115.20
0.00
18.31
0.05
0.05
3.00
7.00
10.00
200.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
453 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 159+905
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
0.00
78.84
309.59
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
0.00
78.84
109.82
0.80
82.62
82.62
0.00
6.00
0.00
6.00
3.84
454 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 159+905
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
455 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 160+670
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
456 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 160+670
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
457 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 160+670
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
458 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 160+670
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
459 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 160+866
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
460 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 160+866
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
461 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 160+866
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
462 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 160+866
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
463 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 161+450
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
464 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 161+450
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
465 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 161+450
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
466 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 161+450
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
467 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
1.69
1.05
2.10
177.86
11.34
187.34
376.53
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 162+085
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
468 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 162+085
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
469 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 162+085
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
470 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 162+085
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
471 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
0.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
0.90
11.34
187.34
199.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
0.30
1.27
0.40
4.13
-4.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
0.18
1.53
0.48
13.38
-4.38
11.19
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
0.00
0.00
1.20
0.00
0.00
0.50
2.50
2.50
0.00
0.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 162+712
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
0.00
0.00
5.00
0.00
0.00
5.38
0.63
0.00
0.00
0.00
472 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 162+712
Length Width Depth
Cum
km.
Quantity
10.38
Kg
Kg
Kg
Kg
T
75
75
120
2
10.38
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
778.13
6160.93
75.00
0.00
7.01
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
473 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 162+712
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
0.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
0.00
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
474 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 162+712
Length Width Depth
4.13
0.0
2.44
2.00
Total
9
10
km.
Quantity
42
0
42
26
4.13
1.950
418.78
475 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 163+715
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
476 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 163+715
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
477 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 163+715
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
478 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 163+715
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
479 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 163+861
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
480 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 163+861
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
481 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 163+861
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
482 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 163+861
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
483 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 164+055
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
484 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 164+055
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
485 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 164+055
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
486 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 164+055
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
487 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 164+070
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
488 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 164+070
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
489 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 164+070
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
490 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 164+070
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
491 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 164+200
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
492 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
Providing & laying Tar paper on
abutments/piers as bearing for receiving
RCC work in superstructure as per drawing
and Technical Specifications.
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 164+200
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Sqm
26.00
6725.63
6160.93
75.00
0.00
12.96
0.3
0.00
Sqm
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
0.05
0.05
2.50
7.00
9.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
493 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 164+200
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
25.88
25.88
23.41
25.88
25.88
0.75
0.00
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
25.88
25.88
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
0.00
126.85
21.07
58.22
116.44
350.13
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
43.79
56.28
7.02
120.66
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
494 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 164+200
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
495 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 164+596
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
8.22
0.96
0.00
0.00
7.02
496 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 164+596
Length Width Depth
Cum
km.
Quantity
184.32
Kg
Kg
Kg
Kg
T
75
75
120
2
184.32
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13824.35
10724.81
115.20
0.00
24.66
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
497 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 164+596
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
78.84
78.84
51.64
78.84
78.84
0.75
0.00
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
78.84
78.84
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
0.00
386.51
46.48
177.39
354.78
1007.04
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
133.44
171.48
15.49
341.02
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
498 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 164+596
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
499 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 164+606
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
8.22
0.96
0.00
0.00
7.02
500 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 164+606
Length Width Depth
Cum
km.
Quantity
184.32
Kg
Kg
Kg
Kg
T
75
75
120
2
184.32
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13824.35
10724.81
115.20
0.00
24.66
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
501 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 164+606
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
502 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 164+606
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
503 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 164+660
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
504 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 164+660
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
505 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 164+660
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
506 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 164+660
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
507 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 165+050
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
508 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 165+050
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
509 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 165+050
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
510 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 165+050
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
511 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 165+550
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
1.075
0.3
2.00
28.86
26.00
5.00
16.25
1.17
11.57
0.63
0.00
0.00
7.02
512 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 165+550
Length Width Depth
Cum
km.
Quantity
95.86
Kg
Kg
Kg
Kg
T
75
75
120
2
95.86
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
7189.65
6160.93
75.00
0.00
13.43
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
513 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 165+550
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
0.00
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
0.00
0.00
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
514 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 165+550
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
515 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 165+354
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
1.075
0.3
2.00
28.86
26.00
5.00
16.25
1.17
11.57
0.63
0.00
0.00
7.02
516 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 165+354
Length Width Depth
Cum
km.
Quantity
95.86
Kg
Kg
Kg
Kg
T
75
75
120
2
95.86
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
7189.65
6160.93
75.00
0.00
13.43
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
517 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 165+354
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
37.45
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
44.94
44.94
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
518 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 165+354
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
519 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.60
0.90
2.10
63.12
9.72
187.34
260.18
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.00
0.00
0.15
0.00
0.00
0.00
0.00
0.48
0.00
0.00
0.48
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 165+980
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
520 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 165+980
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
521 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 165+980
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
0.00
167.96
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
0.00
39.92
0.65
30.43
30.43
3.00
0.00
3.00
0.00
2.50
522 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 165+980
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
523 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
41.85
2.10
78.90
451.98
187.34
718.22
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
58.97
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
70.77
0.48
13.38
24.09
124.50
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
42.00
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 165+985
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
276.72
16.25
1.17
5.38
0.63
0.00
0.00
7.02
524 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 165+985
Length Width Depth
Cum
km.
Quantity
361.40
Kg
Kg
Kg
Kg
T
75
75
120
2
361.40
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
27105.23
6160.93
75.00
0.00
33.34
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
525 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 165+985
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.00
0.00
27.55
37.09
56.38
21.07
0.00
0.00
142.09
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.00
0.00
14.04
0.00
0.00
14.04
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
526 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 165+985
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
527 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
103.85
2.10
78.90
1121.58
187.34
1387.82
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
146.65
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
175.98
0.48
13.38
24.09
229.72
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 166+105
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
528 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 166+105
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
529 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 166+105
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.00
0.00
27.55
37.09
56.38
21.07
0.00
0.00
142.09
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.00
0.00
14.04
0.00
0.00
14.04
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
530 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 166+105
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
531 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 166+285
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
532 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 166+285
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
533 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 166+285
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
0.20
2.15
2.65
0.45
0.75
0.75
4.24
37.09
56.38
21.07
25.88
51.75
196.40
0.75
0.30
0.20
0.00
1.693
2.175
0.15
4.24
0.00
19.46
25.01
7.02
55.74
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
534 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 166+285
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
535 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 166+705
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
536 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 166+705
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
537 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 166+705
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
2.00
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
73.48
37.09
56.38
21.07
25.88
51.75
265.63
2.00
0.30
0.20
1.10
1.693
2.175
0.15
11.30
9.33
19.46
25.01
7.02
72.13
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
538 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 166+705
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
539 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
-0.15
2.10
78.90
-1.62
187.34
264.62
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 166+941
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
540 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 166+941
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
541 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 166+941
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.00
0.00
27.55
37.09
56.38
21.07
0.00
0.00
142.09
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.00
0.00
14.04
0.00
0.00
14.04
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
542 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 166+941
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
543 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 166+952
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
544 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 166+952
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
545 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 166+952
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
546 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 166+952
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
547 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 167+354
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
548 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 167+354
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
549 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 167+354
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
550 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 167+354
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
551 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 167+620
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
552 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 167+620
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
553 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 167+620
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
-0.15
0.75
0.75
-7.02
25.88
51.75
70.60
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
554 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 167+620
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
555 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 167+684
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
556 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 167+684
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
557 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 167+684
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
558 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 167+684
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
559 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
5.98
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
271.25
405.16
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
5.98
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
19.38
24.09
66.94
Part - 2
cum
cum
4
4
5.98
5.98
5.20
1.70
0.50
0.10
62.19
4.07
Part - 3
cum
5.98
2.60
0.10
6.22
Part - 4
cum
5.98
0.90
0.20
4.31
Part - 5
Part - 6
cum
cum
4
4
5.98
5.98
0.30
0.60
3.95
1.97
76.78
28.33
28.33
56.65
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
15.80
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 167+694
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
7.90
0.96
0.00
0.00
7.02
560 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 167+694
Length Width Depth
Cum
km.
Quantity
184.00
Kg
Kg
Kg
Kg
T
75
75
120
2
184.00
133.44
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13800.35
10007.83
115.20
0.00
23.92
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
561 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 167+694
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
5.98
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.648
3.840
38.00
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
562 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 167+694
Length Width Depth
5.98
26.0
3.45
3.00
Total
9
10
km.
Quantity
84
156
240
26
5.98
2.960
920.44
563 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 168+100
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
564 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 168+100
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
565 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 168+100
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
566 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 168+100
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
567 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 168+497
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
568 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 168+497
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
569 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 168+497
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
570 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 168+497
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
571 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 168+734
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
572 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 168+734
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
573 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 168+734
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
574 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 168+734
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
575 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 168+885
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
576 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 168+885
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
577 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 168+885
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
578 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 168+885
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
579 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.25
6.33
4.60
4.60
5.40
0.87
0.93
2.10
105.25
10.70
287.13
403.08
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.33
22.00
4.60
4.60
4.60
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.15
1.52
0.55
20.51
24.09
64.82
Part - 2
cum
cum
4
4
6.33
6.33
5.20
1.70
0.50
0.10
65.83
4.30
Part - 3
cum
6.33
2.60
0.10
6.58
Part - 4
cum
6.33
0.90
0.20
4.56
Part - 5
Part - 6
cum
cum
4
4
6.33
6.33
0.30
0.60
4.09
2.04
81.28
31.05
31.05
62.10
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.70
3.70
26.00
26.00
4.30
0.35
4.30
3.7
0.01125
16.61
0.125
0.75
0.25
0.14
0.42
3.00
0.78
0.4
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 169+005
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
46.96
54.60
4.63
38.48
1.17
8.31
0.93
0.00
0.00
7.02
580 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 169+005
Length Width Depth
Cum
km.
Quantity
161.16
Kg
Kg
Kg
Kg
T
75
75
120
2
161.16
143.37
0.93
0.00
Cum
Cum
1
2
20.00
20.00
3.7
3.50
Sqm
20.00
3.7
cum
22.00
3.50
No
No
4.30
2
2
Rmt
22.0
44.00
12086.96
10753.09
111.00
0.00
22.95
0.05
0.05
3.70
7.00
10.70
214.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
581 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 169+005
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.68
17.30
17.30
50.23
17.30
17.30
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.68
10.68
17.30
17.30
50.23
cum
cum
cum
cum
4
2
4
6.33
26.00
31.20
cum
cum
40.60
cum
cum
cum
cum
2
1
1
50.23
17.30
17.30
cum
cum
50.23
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.64
55.79
84.81
45.21
38.93
77.85
344.23
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.41
14.09
29.28
37.63
15.07
102.48
0.6
0.6
2.788
3.820
42.35
119.18
124.79
124.79
0.3
48.72
48.72
0.30
0.75
0.75
30.14
38.93
77.85
146.91
0.80
80.37
80.37
3.00
6.00
3.00
6.00
3.70
582 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 169+005
Length Width Depth
6.33
26.0
3.59
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.33
3.100
1020.40
583 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 169+175
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
584 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 169+175
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
585 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 169+175
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
586 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 169+175
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
587 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.63
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
255.38
345.62
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.63
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
18.24
24.09
60.12
Part - 2
cum
cum
4
4
5.63
5.63
5.20
1.70
0.50
0.10
58.55
3.83
Part - 3
cum
5.63
2.60
0.10
5.86
Part - 4
cum
5.63
0.90
0.20
4.05
Part - 5
Part - 6
cum
cum
4
4
5.63
5.63
0.30
0.60
3.69
1.84
72.29
24.91
24.91
49.83
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 169+320
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.88
0.63
0.00
0.00
7.02
588 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 169+320
Length Width Depth
Cum
km.
Quantity
91.18
Kg
Kg
Kg
Kg
T
75
75
120
2
91.18
122.11
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6838.13
9158.60
75.00
0.00
16.07
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
589 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 169+320
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.63
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
2.388
2.550
32.26
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
590 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 169+320
Length Width Depth
5.63
26.0
3.19
2.00
Total
9
10
km.
Quantity
72
104
176
26
5.63
2.700
790.45
591 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 169+459
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
592 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 169+459
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
593 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 169+459
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
594 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 169+459
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
595 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
32.25
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
96.74
11.34
187.34
295.42
cum
cum
cum
cum
cum
cum
1
2
2
4
2
32.25
1.27
0.40
4.13
27.95
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
19.35
1.53
0.48
13.38
30.60
65.34
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
31.95
31.95
1.20
31.95
31.95
0.50
2.50
2.50
31.95
31.95
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 169+660
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
35.46
31.95
5.00
19.97
1.44
5.38
0.63
0.00
0.00
8.63
596 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 169+660
Length Width Depth
Cum
km.
Quantity
107.82
Kg
Kg
Kg
Kg
T
75
75
120
2
107.82
82.15
0.63
0.00
Cum
Cum
1
2
20.00
25.95
2.5
3.50
Sqm
20.00
2.5
cum
27.95
3.50
No
No
3.70
2
2
Rmt
27.9
55.90
8086.23
6160.93
75.00
0.00
14.32
0.05
0.05
2.50
9.08
11.58
231.64
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
58.69
58.69
597 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 169+660
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
31.95
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
97.76
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
598 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 169+660
Length Width Depth
4.13
31.9
2.44
2.00
Total
9
10
km.
Quantity
42
128
170
31.948
4.13
1.950
514.59
599 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 170+188
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
600 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 170+188
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
601 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 170+188
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
602 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 170+188
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
603 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 170+317
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
604 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 170+317
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
8.40
10.90
218.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
605 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 170+317
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
606 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 170+317
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
607 of 734
Box Culvert
Description
Sr.
No
1
Unit
170+507
Depth
cum
cum
cum
cum
1
2
4
32.17
1.35
4.13
4.00
4.00
5.40
0.75000
1.05
2.10
cum
cum
cum
cum
cum
cum
1
2
2
4
2
32.17
1.27
0.40
4.13
27.87
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
Part - 3
cum
4.13
2.60
0.10
Part - 4
cum
4.13
0.90
0.20
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
31.87
31.87
1.20
31.87
31.87
0.50
2.50
2.50
31.87
31.87
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch
Length Width
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
608 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch
Length Width
170+507
Depth
Cum
Kg
Kg
Kg
Kg
T
75
75
120
2
107.58
82.15
0.63
0.00
Cum
Cum
1
2
20.00
29.87
2.5
3.50
Sqm
20.00
2.5
cum
27.87
3.50
No
No
3.70
Rmt
27.9
0.05
0.05
Total
Providing and fixing drainage spouts for
bridges as per Drawing and Technical
Specifications Clause 2705.
1 no. per 5.0m
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
609 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch
Length Width
170+507
Depth
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
0.75
0.30
0.20
1.10
1.693
2.175
0.15
cum
cum
cum
cum
4
2
4
4.13
31.87
7.76
0.6
0.6
1.638
2.550
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
3.00
6.00
1.30
2.15
2.65
0.45
0.75
0.75
0.3
3.00
6.00
0.30
0.75
0.75
0.80
2.50
610 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch
Length Width
4.13
31.9
170+507
Depth
2.44
2.00
Total
9
10
31.87
4.13
1.950
611 of 734
km.
Quantity
96.51
11.34
187.34
295.19
19.30
1.53
0.48
13.38
30.52
65.21
42.95
2.81
4.30
2.97
53.03
14.56
14.56
29.12
35.38
31.87
5.00
19.92
1.43
5.38
0.63
0.00
0.00
8.60
DPR for Rehabilitation and Upgrading
Munger-Bhagalpur-Mirzachauki NH-80 Bihar (Package-3)
612 of 734
km.
Quantity
107.58
8068.39
6160.93
75.00
0.00
14.30
2.50
10.45
12.95
259.09
58.53
58.53
2
2
55.74
613 of 734
km.
Quantity
27.55
37.09
56.38
21.07
25.88
51.75
219.71
4.24
9.33
19.46
25.01
7.02
65.06
16.23
97.52
31.06
31.06
21.34
21.34
14.04
25.88
51.75
91.67
37.45
37.45
0
614 of 734
km.
Quantity
42
128
170
513.33
615 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.92
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
89.76
11.34
187.34
288.44
cum
cum
cum
cum
cum
cum
1
2
2
4
2
0.30
1.27
0.40
4.13
25.62
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
0.18
1.53
0.48
13.38
28.05
43.62
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.62
29.62
1.20
29.62
29.62
0.50
2.50
2.50
0.00
0.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 170+625
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.88
29.62
5.00
18.51
1.33
5.38
0.63
0.00
0.00
0.00
616 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 170+625
Length Width Depth
Cum
km.
Quantity
92.72
Kg
Kg
Kg
Kg
T
75
75
120
2
92.72
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.62
2.5
3.50
Sqm
20.00
2.5
cum
25.62
3.50
No
No
3.70
2
2
Rmt
25.6
51.24
6953.90
6160.93
75.00
0.00
13.19
0.05
0.05
2.50
8.27
10.77
215.34
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
53.80
53.80
617 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 170+625
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.62
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
90.64
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
618 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 170+625
Length Width Depth
4.13
0.0
2.44
2.00
Total
9
10
km.
Quantity
42
0
42
29.62
4.13
1.950
477.09
619 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
29.56
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
88.68
11.34
187.34
287.36
cum
cum
cum
cum
cum
cum
1
2
2
4
2
29.56
1.27
0.40
4.13
25.26
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.74
1.53
0.48
13.38
27.66
60.78
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
29.26
29.26
1.20
29.26
29.26
0.50
2.50
2.50
29.26
29.26
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 170+860
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
32.48
29.26
5.00
18.29
1.32
5.38
0.63
0.00
0.00
7.90
620 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 170+860
Length Width Depth
Cum
km.
Quantity
99.62
Kg
Kg
Kg
Kg
T
75
75
120
2
99.62
82.15
0.63
0.00
Cum
Cum
1
2
20.00
23.26
2.5
3.50
Sqm
20.00
2.5
cum
25.26
3.50
No
No
3.70
2
2
Rmt
25.3
50.52
7471.35
6160.93
75.00
0.00
13.71
0.05
0.05
2.50
8.14
10.64
212.82
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
53.05
53.05
621 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 170+860
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
29.26
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
89.54
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
622 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 170+860
Length Width Depth
4.13
29.3
2.44
2.00
Total
9
10
km.
Quantity
42
118
160
29.26
4.13
1.950
471.29
623 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.00
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
92.99
11.34
187.34
291.66
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.00
1.27
0.40
4.13
26.70
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.60
1.53
0.48
13.38
29.23
63.22
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.70
30.70
1.20
30.70
30.70
0.50
2.50
2.50
30.70
30.70
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 170+962
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
34.07
30.70
5.00
19.19
1.38
5.38
0.63
0.00
0.00
8.29
624 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 170+962
Length Width Depth
Cum
km.
Quantity
104.00
Kg
Kg
Kg
Kg
T
75
75
120
2
104.00
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.70
2.5
3.50
Sqm
20.00
2.5
cum
26.70
3.50
No
No
3.70
2
2
Rmt
26.7
53.39
7799.84
6160.93
75.00
0.00
14.04
0.05
0.05
2.50
8.64
11.14
222.87
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.06
56.06
625 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 170+962
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.70
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
93.93
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
626 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 170+962
Length Width Depth
4.13
30.7
2.44
2.00
Total
9
10
km.
Quantity
42
124
166
30.696
4.13
1.950
494.42
627 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.38
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
94.15
11.34
187.34
292.83
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.38
1.27
0.40
4.13
27.08
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.83
1.53
0.48
13.38
29.66
63.88
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
31.08
31.08
1.20
31.08
31.08
0.50
2.50
2.50
31.08
31.08
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 171+225
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
34.50
31.08
5.00
19.43
1.40
5.38
0.63
0.00
0.00
8.39
628 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 171+225
Length Width Depth
Cum
km.
Quantity
105.18
Kg
Kg
Kg
Kg
T
75
75
120
2
105.18
82.15
0.63
0.00
Cum
Cum
1
2
20.00
25.08
2.5
3.50
Sqm
20.00
2.5
cum
27.08
3.50
No
No
3.70
2
2
Rmt
27.1
54.17
7888.59
6160.93
75.00
0.00
14.12
0.05
0.05
2.50
8.78
11.28
225.59
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.88
56.88
629 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 171+225
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
31.08
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
95.12
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
630 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 171+225
Length Width Depth
4.13
31.1
2.44
2.00
Total
9
10
km.
Quantity
42
126
168
31.084
4.13
1.950
500.67
631 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 172+605
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
632 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 172+605
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
633 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 172+605
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
0.00
0.00
23.41
0.00
0.00
0.75
0.00
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
0.00
0.00
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
0.00
0.00
21.07
0.00
0.00
48.62
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
0.00
0.00
7.02
20.59
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
634 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 172+605
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
635 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
30.60
1.35
4.13
4.00
4.00
5.40
0.45
1.35
2.10
55.08
14.58
187.34
257.00
cum
cum
cum
cum
cum
cum
1
2
2
4
2
30.60
1.70
0.40
4.13
26.30
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.36
2.04
0.48
13.38
28.80
63.06
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.30
30.30
1.50
30.30
30.30
0.50
2.50
2.50
30.30
30.30
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
1.20
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 172+655
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
0.00
33.63
30.30
7.99
18.94
1.36
5.38
0.63
0.00
0.00
8.18
636 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 172+655
Length Width Depth
Cum
km.
Quantity
105.79
Kg
Kg
Kg
Kg
T
75
75
120
2
105.79
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.30
2.5
3.50
Sqm
20.00
2.5
cum
26.30
3.50
No
No
3.70
2
2
Rmt
26.3
52.60
7934.03
6160.93
75.00
0.00
14.17
0.05
0.05
2.50
8.51
11.01
220.10
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
55.23
55.23
637 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 172+655
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
0.00
11.50
11.50
23.41
11.50
11.50
0.75
1.50
0.00
cum
cum
cum
cum
cum
cum
4
4
1
1
2
0.00
0.00
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.30
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
0.00
0.45
0.75
0.75
0.00
37.09
0.00
21.07
25.88
51.75
135.78
0.75
0.30
0.20
1.10
1.693
2.175
0.15
0.00
0.00
19.46
25.01
7.02
51.50
0.6
0.6
1.638
2.550
16.23
92.72
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
638 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 172+655
Length Width Depth
4.13
30.3
2.44
2.00
Total
9
10
km.
Quantity
42
122
164
30.3
4.13
1.950
488.04
639 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 172+845
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
640 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 172+845
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
641 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 172+845
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
642 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 172+845
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
643 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
37.94
1.35
4.13
4.00
4.00
5.40
0.75000
1.05
2.10
113.82
11.34
187.34
187.34
cum
cum
cum
cum
cum
cum
1
2
2
4
2
37.94
1.27
0.40
4.13
33.64
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
22.76
1.53
0.48
13.38
36.84
74.99
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
37.64
37.64
1.20
37.64
37.64
0.50
2.50
2.50
37.64
37.64
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 173+225
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
41.78
37.64
5.00
23.53
1.69
5.38
0.63
0.00
0.00
10.16
644 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 173+225
Length Width Depth
Cum
km.
Quantity
125.18
Kg
Kg
Kg
Kg
T
75
75
120
2
125.18
82.15
0.63
0.00
Cum
Cum
1
2
20.00
31.64
2.5
3.50
Sqm
20.00
2.5
cum
33.64
3.50
No
No
3.70
2
2
Rmt
33.6
67.28
9388.28
6160.93
75.00
0.00
15.62
0.05
0.05
2.50
11.07
13.57
271.48
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
70.64
70.64
645 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 173+225
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
37.64
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
115.18
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
646 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 173+225
Length Width Depth
4.13
37.6
2.44
2.00
Total
9
10
km.
Quantity
42
152
194
37.64
4.13
1.950
606.27
647 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.04
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
144.21
11.72
285.77
441.69
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.04
1.10
0.40
6.30
26.74
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
24.86
1.77
0.64
20.41
29.28
76.96
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.74
30.74
1.08
30.74
30.74
0.50
3.84
3.84
30.74
30.74
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 173+675
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
65.07
77.46
5.43
49.58
1.38
8.22
0.96
0.00
0.00
8.30
648 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 173+675
Length Width Depth
Cum
km.
Quantity
215.44
Kg
Kg
Kg
Kg
T
75
75
120
2
215.44
143.00
0.96
0.00
Cum
Cum
1
2
20.00
24.74
3.84
3.50
Sqm
20.00
3.84
cum
26.74
3.50
No
No
5.04
4
4
Rmt
26.7
53.48
16158.06
10724.81
115.20
0.00
27.00
0.05
0.05
3.84
8.66
12.50
249.98
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.15
56.15
649 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 173+675
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
30.74
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
141.65
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
650 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 173+675
Length Width Depth
6.30
30.7
3.61
3.00
Total
9
10
km.
Quantity
92
186
278
30.74
6.30
3.120
1208.45
651 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.04
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
273.97
407.88
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.04
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
19.57
24.09
67.13
Part - 2
cum
cum
4
4
6.04
6.04
5.20
1.70
0.50
0.10
62.82
4.11
Part - 3
cum
6.04
2.60
0.10
6.28
Part - 4
cum
6.04
0.90
0.20
4.35
Part - 5
Part - 6
cum
cum
4
4
6.04
6.04
0.30
0.60
3.98
1.99
77.55
28.83
28.83
57.66
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
15.92
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 173+830
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
7.96
0.96
0.00
0.00
7.02
652 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 173+830
Length Width Depth
Cum
km.
Quantity
184.06
Kg
Kg
Kg
Kg
T
75
75
120
2
184.06
135.21
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13804.85
10140.86
115.20
0.00
24.06
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
653 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 173+830
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.04
26.00
31.80
cum
cum
0.00
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.678
3.840
38.81
119.81
127.22
127.22
3.00
6.00
3.00
6.00
3.84
0.3
0.00
0.00
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
0
654 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 173+830
Length Width Depth
6.04
26.0
3.48
3.00
Total
9
10
km.
Quantity
86
156
242
26
6.04
2.990
939.10
655 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
6.13
0.00
0.00
5.40
0.75
1.05
2.10
0.00
0.00
278.06
278.06
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
6.13
22.00
0.00
0.00
0.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
0.00
0.00
0.00
19.86
24.09
43.95
Part - 2
cum
cum
4
4
6.13
6.13
5.20
1.70
0.50
0.10
63.75
4.17
Part - 3
cum
6.13
2.60
0.10
6.38
Part - 4
cum
6.13
0.90
0.20
4.41
Part - 5
Part - 6
cum
cum
4
4
6.13
6.13
0.30
0.60
3.94
1.97
78.71
28.96
28.96
57.93
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
14.76
0.125
0.75
0.00
0.14
0.30
3.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 174+009
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
28.86
39.00
5.00
16.25
1.17
7.38
0.63
0.00
0.00
7.02
656 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 174+009
Length Width Depth
Cum
km.
Quantity
104.68
Kg
Kg
Kg
Kg
T
75
75
120
2
104.68
136.64
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
7850.63
10247.83
75.00
0.00
18.17
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
657 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 174+009
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.21
15.50
15.50
39.07
15.50
15.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.21
10.21
15.50
15.50
39.07
cum
cum
cum
cum
4
2
4
6.13
26.00
26.88
cum
cum
37.10
cum
cum
cum
cum
2
1
1
39.07
15.50
15.50
cum
cum
39.07
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
39.80
49.99
75.99
35.16
0.00
69.75
270.69
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.12
13.47
26.23
33.71
11.72
91.26
0.6
0.6
2.638
3.550
38.80
110.76
107.54
107.54
0.3
44.51
44.51
0.30
0.75
0.75
23.44
0.00
69.75
93.19
0.80
62.51
62.51
0.00
6.00
0.00
6.00
2.50
658 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 174+009
Length Width Depth
6.13
26.0
3.44
3.00
Total
9
10
km.
Quantity
86
156
242
26
6.13
2.950
940.34
659 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
34.99
1.18
6.30
5.34
5.34
5.40
0.72
0.78
2.10
134.53
9.83
285.77
430.13
cum
cum
cum
cum
cum
cum
1
2
2
4
2
34.99
1.10
0.40
6.30
30.69
5.34
5.34
5.34
5.40
3.65
0.00
0.00
0.15
0.00
0.00
0.00
0.00
0.64
0.00
0.00
0.64
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
34.69
34.69
1.08
34.69
34.69
0.50
3.84
3.84
34.69
34.69
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 174+262
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
73.43
87.42
5.43
55.95
1.56
8.22
0.96
0.00
0.00
9.37
660 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 174+262
Length Width Depth
Cum
km.
Quantity
241.37
Kg
Kg
Kg
Kg
T
75
75
120
2
241.37
143.00
0.96
0.00
Cum
Cum
1
2
20.00
28.69
3.84
3.50
Sqm
20.00
3.84
cum
30.69
3.50
No
No
5.04
4
4
Rmt
30.7
61.38
18102.83
10724.81
115.20
0.00
28.94
0.05
0.05
3.84
10.04
13.88
277.63
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
64.45
64.45
661 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 174+262
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
34.69
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
0.00
270.17
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
159.85
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
0.00
70.40
0.65
67.13
67.13
3.00
0.00
3.00
0.00
3.84
662 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 174+262
Length Width Depth
6.30
34.7
3.61
3.00
Total
9
10
km.
Quantity
92
210
302
34.69
6.30
3.120
1363.73
663 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
31.08
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
144.39
11.72
285.77
441.88
cum
cum
cum
cum
cum
cum
1
2
2
4
2
31.08
1.10
0.40
6.30
26.78
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
24.90
1.77
0.64
20.41
29.32
77.04
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.78
30.78
1.08
30.78
30.78
0.50
3.84
3.84
30.78
30.78
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 174+345
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
65.16
77.57
5.43
49.64
1.39
8.22
0.96
0.00
0.00
8.31
664 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 174+345
Length Width Depth
Cum
km.
Quantity
215.70
Kg
Kg
Kg
Kg
T
75
75
120
2
215.70
143.00
0.96
0.00
Cum
Cum
1
2
20.00
24.78
3.84
3.50
Sqm
20.00
3.84
cum
26.78
3.50
No
No
5.04
4
4
Rmt
26.8
53.56
16177.76
10724.81
115.20
0.00
27.02
0.05
0.05
3.84
8.67
12.51
250.26
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
56.24
56.24
665 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 174+345
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
30.78
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.00
0.00
41.88
56.50
85.89
46.48
0.00
0.00
230.75
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
141.83
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
666 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 174+345
Length Width Depth
6.30
30.8
3.61
3.00
Total
9
10
km.
Quantity
92
186
278
30.78
6.30
3.120
1210.02
667 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 174+425
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
8.22
0.96
0.00
0.00
7.02
668 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 174+425
Length Width Depth
Cum
km.
Quantity
184.32
Kg
Kg
Kg
Kg
T
75
75
120
2
184.32
143.00
0.00
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13824.35
10724.81
0.00
0.00
24.55
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
669 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 174+425
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.00
0.75
0.75
41.88
56.50
85.89
0.00
39.42
78.84
302.54
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
0.00
670 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 174+425
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
671 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
5.59
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
253.56
343.80
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
5.59
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
18.11
24.09
59.99
Part - 2
cum
cum
4
4
5.59
5.59
5.20
1.70
0.50
0.10
58.14
3.80
Part - 3
cum
5.59
2.60
0.10
5.81
Part - 4
cum
5.59
0.90
0.20
4.02
Part - 5
Part - 6
cum
cum
4
4
5.59
5.59
0.30
0.60
3.67
1.83
71.78
24.60
24.60
49.20
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
13.68
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 175+220
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
6.84
0.63
0.00
0.00
7.02
672 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 175+220
Length Width Depth
Cum
km.
Quantity
91.14
Kg
Kg
Kg
Kg
T
75
75
120
2
91.14
120.98
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6835.13
9073.41
75.00
0.00
15.98
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
673 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 175+220
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
5.59
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
0.20
2.15
2.65
0.45
0.75
0.75
4.24
37.09
56.38
21.07
25.88
51.75
196.40
0.75
0.30
0.20
0.00
1.693
2.175
0.15
4.24
0.00
19.46
25.01
7.02
55.74
0.6
0.6
2.368
2.550
31.76
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
674 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 175+220
Length Width Depth
5.59
26.0
3.17
2.00
Total
9
10
km.
Quantity
72
104
176
26
5.59
2.680
779.02
675 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
30.54
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
91.63
11.34
187.34
290.30
cum
cum
cum
cum
cum
cum
1
2
2
4
2
30.54
1.27
0.40
4.13
26.24
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
18.33
1.53
0.48
13.38
28.73
62.45
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
30.24
30.24
1.20
30.24
30.24
0.50
2.50
2.50
30.24
30.24
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 175+370
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
33.57
30.24
5.00
18.90
1.36
5.38
0.63
0.00
0.00
8.17
676 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 175+370
Length Width Depth
Cum
km.
Quantity
102.61
Kg
Kg
Kg
Kg
T
75
75
120
2
102.61
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.24
2.5
3.50
Sqm
20.00
2.5
cum
26.24
3.50
No
No
3.70
2
2
Rmt
26.2
52.48
7695.98
6160.93
75.00
0.00
13.93
0.05
0.05
2.50
8.48
10.98
219.69
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
55.11
55.11
677 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 175+370
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.00
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
30.24
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
0.00
37.09
56.38
21.07
25.88
51.75
192.16
0.00
0.30
0.20
1.10
1.693
2.175
0.15
0.00
9.33
19.46
25.01
7.02
60.82
0.6
0.6
1.638
2.550
16.23
92.54
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
678 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 175+370
Length Width Depth
4.13
30.2
2.44
2.00
Total
9
10
km.
Quantity
42
122
164
30.242
4.13
1.950
487.11
679 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 176+015
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
680 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 176+015
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
681 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 176+015
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
0.00
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
0.00
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
0.00
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
0.00
25.88
51.75
198.64
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
0.00
58.04
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
0.00
25.88
51.75
77.63
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
682 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 176+015
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
683 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 176+600
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
684 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 176+600
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
685 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 176+600
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
686 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 176+600
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
687 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
28.85
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
86.56
11.34
187.34
285.23
cum
cum
cum
cum
cum
cum
1
2
2
4
2
28.85
1.27
0.40
4.13
24.55
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
17.31
1.53
0.48
13.38
26.88
59.58
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
28.55
28.55
1.20
28.55
28.55
0.50
2.50
2.50
28.55
28.55
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 176+770
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
31.69
28.55
5.00
17.85
1.28
5.38
0.63
0.00
0.00
7.71
688 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 176+770
Length Width Depth
Cum
km.
Quantity
97.46
Kg
Kg
Kg
Kg
T
75
75
120
2
97.46
82.15
0.63
0.00
Cum
Cum
1
2
20.00
22.55
2.5
3.50
Sqm
20.00
2.5
cum
24.55
3.50
No
No
3.70
2
2
Rmt
24.6
49.10
7309.40
6160.93
75.00
0.00
13.55
0.05
0.05
2.50
7.89
10.39
207.86
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
51.56
51.56
689 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 176+770
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
28.55
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
87.37
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
690 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 176+770
Length Width Depth
4.13
28.6
2.44
2.00
Total
9
10
km.
Quantity
42
116
158
28.552
4.13
1.950
459.89
691 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 177+064
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
692 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 177+064
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
20.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
7.00
9.50
190.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
693 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 177+064
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
694 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 177+064
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
695 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.18
6.30
5.34
5.34
5.40
0.87
0.93
2.10
122.18
11.72
285.77
419.67
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.10
0.40
6.30
22.00
5.34
5.34
5.34
5.40
3.65
0.15
0.15
0.15
0.15
0.15
21.07
1.77
0.64
20.41
24.09
67.98
Part - 2
cum
cum
4
4
6.30
6.30
5.20
1.70
0.50
0.10
65.52
4.28
Part - 3
cum
6.30
2.60
0.10
6.55
Part - 4
cum
6.30
0.90
0.20
4.54
Part - 5
Part - 6
cum
cum
4
4
6.30
6.30
0.30
0.60
4.11
2.05
80.89
31.05
31.05
62.11
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.08
26.00
26.00
0.50
3.84
3.84
26.00
26.00
5.04
0.42
5.04
3.84
0.01125
16.44
0.125
0.75
0.00
0.14
0.42
3.00
0.78
0.42
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 177+427
Length Width Depth
1 x 3.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
3.00
55.04
65.52
5.43
41.93
1.17
8.22
0.96
0.00
0.00
7.02
696 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 3.0
Nos
m.
Pro.Ch 177+427
Length Width Depth
Cum
km.
Quantity
184.32
Kg
Kg
Kg
Kg
T
75
75
120
2
184.32
143.00
0.96
0.00
Cum
Cum
1
2
20.00
20.00
3.84
3.50
Sqm
20.00
3.84
cum
22.00
3.50
No
No
5.04
4
4
Rmt
22.0
44.00
13824.35
10724.81
115.20
0.00
24.66
0.05
0.05
3.84
7.00
10.84
216.80
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
697 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 177+427
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
10.74
17.52
17.52
51.64
17.52
17.52
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
10.74
10.74
17.52
17.52
51.64
cum
cum
cum
cum
4
2
4
6.30
26.00
31.80
cum
cum
41.08
cum
cum
cum
cum
2
1
1
51.64
17.52
17.52
cum
cum
51.64
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 3.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
41.88
56.50
85.89
46.48
39.42
78.84
349.01
0.75
0.30
0.20
1.10
1.693
2.175
0.15
6.44
14.18
29.65
38.11
15.49
103.87
0.6
0.6
2.808
3.840
42.45
119.81
127.22
127.22
0.3
49.29
49.29
0.30
0.75
0.75
30.98
39.42
78.84
149.24
0.80
82.62
82.62
3.00
6.00
3.00
6.00
3.84
698 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 3.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 177+427
Length Width Depth
6.30
26.0
3.61
3.00
Total
9
10
km.
Quantity
92
156
248
26
6.30
3.120
1022.11
699 of 734
Box Culvert
Description
Sr.
No
1
Unit
km.
Quantity
cum
cum
cum
cum
1
2
4
26.30
1.35
4.13
4.00
4.00
5.40
0.75
1.05
2.10
78.90
11.34
187.34
277.58
cum
cum
cum
cum
cum
cum
1
2
2
4
2
26.30
1.27
0.40
4.13
22.00
4.00
4.00
4.00
5.40
3.65
0.15
0.15
0.15
0.15
0.15
15.78
1.53
0.48
13.38
24.09
55.26
Part - 2
cum
cum
4
4
4.13
4.13
5.20
1.70
0.50
0.10
42.95
2.81
Part - 3
cum
4.13
2.60
0.10
4.30
Part - 4
cum
4.13
0.90
0.20
2.97
Part - 5
Part - 6
cum
cum
4
4
4.13
4.13
0.30
0.60
2.94
1.47
53.03
14.56
14.56
29.12
cum
cum
cum
cum
cum
cum
cum
1
2
2
1
4
2
2
0
0
2
26.00
26.00
1.20
26.00
26.00
0.50
2.50
2.50
26.00
26.00
3.70
0.25
3.70
2.5
0.01125
10.76
0.125
0.75
0.00
0.14
0.30
2.00
0.90
0.25
Total
Cement concrete M-25 grade in foundation/
levelling course in bridge/pipe culvert and
levelling course below approach slab etc.
including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1500 & 1700.
Box Portion
Key Portion
Retaining Wall
PCC For Approach slab
m.
Pro.Ch 177+573
Length Width Depth
1 x 2.0
Nos
Total
Cement concrete M-25 grade in RCC return
wall including centering and shuttering all
complete as per drawing and Technical
Specifications Sections 1700, 2100 and
2900.
A. Foundation
Part - 1
B. Substructure
cum
cum
0.5
0.3
2.00
28.86
26.00
5.00
16.25
1.17
5.38
0.63
0.00
0.00
7.02
700 of 734
Box Culvert
Description
Sr.
No
5
Total
HYSD/TMT bar reinforcement for culverts,
underpass, retaining walls etc. complete as
per drawings and Technical Specifications
Section 1600.
Box (75 kg/cmt)
Retaining Wall
Parapet wall (120 kg/cmt)
Safety kerb (120 kg/cmt)
Total
6 A Providing and laying 50mm thick bituminous
concrete wearing coat in two layers over the
top of deck slab complete as per drawings
and Technical Specification Section 500 and
2700.
Road
Approach Slab
Total
6 B Providing and laying a layer of 12mm thick
Mastic Asphalt as per drawing and
Tech./spn.
7
1 x 2.0
Nos
m.
Pro.Ch 177+573
Length Width Depth
Cum
km.
Quantity
89.68
Kg
Kg
Kg
Kg
T
75
75
120
2
89.68
82.15
0.63
0.00
Cum
Cum
1
2
20.00
24.00
2.5
3.50
Sqm
20.00
2.5
cum
22.00
3.50
No
No
3.70
2
2
Rmt
22.0
44.00
6725.63
6160.93
75.00
0.00
12.96
0.05
0.05
2.50
8.40
10.90
218.00
Unit
Total
Providing and laying Filler Type expansion
joints complete as per drawing & Technical
Specification Section 2605.
0.3
46.20
46.20
701 of 734
Sr.
No
1
Box Culvert
Description
Unit
m.
Pro.Ch 177+573
Length Width Depth
km.
Quantity
cum
cum
cum
cum
cum
cum
cum
4
1
1
2
1
1
7.07
11.50
11.50
23.41
11.50
11.50
0.75
1.50
1.85
cum
cum
cum
cum
cum
cum
4
4
1
1
2
7.07
7.07
11.50
11.50
23.41
cum
cum
cum
cum
4
2
4
4.13
26.00
7.76
cum
cum
17.78
cum
cum
cum
cum
2
1
1
23.41
11.50
11.50
cum
cum
23.41
Total
Stone Pitching 300 mm thick on slopes
as
per
drawings
and
Technical
Specifications Section 2500.
Cone Shape
Total
Stone boulder apron 300 mm thick
complete as per drawings and Technical
Specifications Clause 2503
Floor Apron
Flexible Apron for U/S side
Flexible Apron for D/S side
Total
Providing and laying compacted earth
filling
as per Section 2500 of MOST
specification for Road & Bridge work.
Total
1 x 2.0
Nos
RM
1.30
2.15
2.65
0.45
0.75
0.75
27.55
37.09
56.38
21.07
25.88
51.75
219.71
0.75
0.30
0.20
1.10
1.693
2.175
0.15
4.24
9.33
19.46
25.01
7.02
65.06
0.6
0.6
1.638
2.550
16.23
79.56
31.06
31.06
0.3
21.34
21.34
0.30
0.75
0.75
14.04
25.88
51.75
91.67
0.80
37.45
37.45
3.00
6.00
3.00
6.00
2.50
702 of 734
Box Culvert
Description
Sr.
No
8
Unit
Weep Holes
Return wall
Side wall of box
1 x 2.0
Nos
No
No
4
2
No.
cum
m.
Pro.Ch 177+573
Length Width Depth
4.13
26.0
2.44
2.00
Total
9
10
km.
Quantity
42
104
146
26
4.13
1.950
418.78
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
0-3 depth
3-6 depth
(ii) in rock (blasting not requred)
6D.02 Cement concrete for plain/ reinforced concrete in
foundation (leveling course) below head wall complete
as per drawing and Technical Specification Sections
1700, 2100 and 2900.
Cu.m.
M-15
M-20
6D.03 Structural cement concrete for plain / reinforced
concrete for foundation including formwork, machinery
and workmanship complete as per drawing and
Technical Specification Sections 1500, 1700 and 2100.
Cu.m.
Cu.m.
(a) In foundation
(i) PCC M-20
(ii) RCC M-25
(iii) RCC M-30
(iv) M-35
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-15
(ii) a PCC M-20
(ii) b RCC M-20
(iii) RCC M-25
(iv) RCC M-30
(v) RCC M-35
(v) RCC M-40
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-20
(ii) M-25
Cu.m.
Cu.m.
(b) Substructure
(c) Super-structure
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
Cu.m.
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
MT
b) Sub structure
MT
b) Super structure
MT
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
MT
sq.m.
ton
ton
ton
RM
RM
Cu.m.
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Description
Unit
Proposed Chainage km
#REF!
Additional in rock
1200 dia
1000 dia
750 dia
M-35 conc.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
m
m
m
Cu.m.
M.T
M.T
M.T
Cu.m.
MT
6D.30 Sinking of wells through all type of soils and rock to be
measured from low water level (other then pneumatic
method of sinking) complete as per drawing and
Techncial Specifications Clause 1200.
(a) for 8 M dia well
(i) Depth 0-3 m.
(ii) Depth 3-10m
(iii) Depth 10-20 m.
(iv) 20-30m.
(v) 30-40m.
(xiv)40-50 m.
(xv) 50-60 m.
(b) for 7 M dia well
(i) Depth 0-3 m.
DPR for Rehabilitation and Upgrading
Munger-Bhagalpur-Mirzachauki NH-80 Bihar
m
m
m
m
m
m
m
m
SAI Consulting Engineers Pvt. Ltd.
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m
m
m
m
m
m
6D.31 Providing and laying cutting edge of mild steel for well
foundation for bridges as per drawings and Technical
Specifications clause 1200 and 1900.
MT.
Cu.m.
Cu m.
Cu m.
Cu m.
Cu m.
Cu m.
a) Chequered tiles
6D.35 Providing ,fixing,erecting and painting 65 NB GI pipe on
concrete crash barrier as per approved drawing and
Technical Specification Section 2700.
sq.m.
RM
No.
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
No.
c.
cum
Sqmt
kg
d.
Replacement of the damaged concrte railing.
e.
Replacement of the crash barrier
6D.41 Laying 300mm thick stone apron complete as per
drawings and Technical Specification Clause 2503.
6D.42 Providing and laying Compacted Earth Filling as per
Section 2500 of MOST specification for Road & Bridge
work.
6D.43 Structural Steelwork in superstructure including painting
as per technical specification Section 1900 (painting
shall conform to System (v) , Table 1900-3)
cum
cum
MT
Total
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
0-3 depth
3-6 depth
(ii) in rock (blasting not requred)
6D.02 Cement concrete for plain/ reinforced concrete in
foundation (leveling course) below head wall complete
as per drawing and Technical Specification Sections
1700, 2100 and 2900.
Cu.m.
M-15
M-20
6D.03 Structural cement concrete for plain / reinforced
concrete for foundation including formwork, machinery
and workmanship complete as per drawing and
Technical Specification Sections 1500, 1700 and 2100.
Cu.m.
Cu.m.
(a) In foundation
(i) PCC M-20
(ii) RCC M-25
(iii) RCC M-30
(iv) M-35
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-15
(ii) a PCC M-20
(ii) b RCC M-20
(iii) RCC M-25
(iv) RCC M-30
(v) RCC M-35
(v) RCC M-40
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-20
(ii) M-25
Cu.m.
Cu.m.
(b) Substructure
(c) Super-structure
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
Cu.m.
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
MT
b) Sub structure
MT
b) Super structure
MT
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
MT
sq.m.
ton
ton
ton
RM
RM
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Additional in rock
1200 dia
1000 dia
750 dia
M-35 conc.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
m
m
m
Cu.m.
M.T
M.T
M.T
Cu.m.
MT
6D.30 Sinking of wells through all type of soils and rock to be
measured from low water level (other then pneumatic
method of sinking) complete as per drawing and
Techncial Specifications Clause 1200.
(a) for 8 M dia well
(i) Depth 0-3 m.
(ii) Depth 3-10m
(iii) Depth 10-20 m.
(iv) 20-30m.
(v) 30-40m.
(xiv)40-50 m.
(xv) 50-60 m.
(b) for 7 M dia well
(i) Depth 0-3 m.
DPR for Rehabilitation and Upgrading
Munger-Bhagalpur-Mirzachauki NH-80 Bihar
m
m
m
m
m
m
m
m
SAI Consulting Engineers Pvt. Ltd.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m
m
m
m
m
m
6D.31 Providing and laying cutting edge of mild steel for well
foundation for bridges as per drawings and Technical
Specifications clause 1200 and 1900.
MT.
Cu.m.
Cu m.
Cu m.
Cu m.
Cu m.
Cu m.
a) Chequered tiles
6D.35 Providing ,fixing,erecting and painting 65 NB GI pipe on
concrete crash barrier as per approved drawing and
Technical Specification Section 2700.
sq.m.
RM
No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
No.
c.
cum
Sqmt
kg
d.
Replacement of the damaged concrte railing.
e.
Replacement of the crash barrier
6D.41 Laying 300mm thick stone apron complete as per
drawings and Technical Specification Clause 2503.
6D.42 Providing and laying Compacted Earth Filling as per
Section 2500 of MOST specification for Road & Bridge
work.
6D.43 Structural Steelwork in superstructure including painting
as per technical specification Section 1900 (painting
shall conform to System (v) , Table 1900-3)
cum
cum
MT
Total
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cu.m.
0-3 depth
3-6 depth
(ii) in rock (blasting not requred)
6D.02 Cement concrete for plain/ reinforced concrete in
foundation (leveling course) below head wall complete
as per drawing and Technical Specification Sections
1700, 2100 and 2900.
Cu.m.
M-15
M-20
6D.03 Structural cement concrete for plain / reinforced
concrete for foundation including formwork, machinery
and workmanship complete as per drawing and
Technical Specification Sections 1500, 1700 and 2100.
Cu.m.
Cu.m.
(a) In foundation
(i) PCC M-20
(ii) RCC M-25
(iii) RCC M-30
(iv) M-35
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-15
(ii) a PCC M-20
(ii) b RCC M-20
(iii) RCC M-25
(iv) RCC M-30
(v) RCC M-35
(v) RCC M-40
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-20
(ii) M-25
Cu.m.
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
(b) Substructure
(c) Super-structure
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total
Qty.
Rate
(in Rs.)
0
#REF!
0
0
63
81
90
0
#REF!
0
3325
3525
0
0
0
#REF!
0
0
0
0
0
0
#REF!
0
0
0
0
0
3525
3920
3859
4020
3518
3728
4058
4761
4467
3500
4000
4463
4961
Description
Unit
Proposed Chainage km
#REF!
(iii) M-30 (Solid Slab)
M-30 (T-Beam)
(iv) M-35
(v) M-40 and above
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total
Qty.
Rate
(in Rs.)
0
0
0
0
0
0
5233
5135
5193
5787
#REF!
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
0
0
4500
#REF!
7020
0
0
#REF!
0
1547
5787
5233
RM
Cu.m.
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
a) Foundation
MT
b) Sub structure
MT
b) Super structure
MT
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
62121
#REF!
62196
62840
Description
Unit
Proposed Chainage km
Total
Qty.
Rate
(in Rs.)
MT
0
0
100000
sq.m.
133
cu.cm.
ton
0
0
ton
ton
0
0
666
RM
8524
#REF!
4420
Cu.m.
8542
sq.m.
313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
666
Description
Unit
Proposed Chainage km
Total
Qty.
Rate
(in Rs.)
No.
690
No.
101
Cu.m.
166
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Description
Unit
Proposed Chainage km
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total
Qty.
Rate
(in Rs.)
938
#REF!
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
386
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
677
Cu.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
767
Cu.m.
618
RM
Description
Unit
Proposed Chainage km
Total
Qty.
Rate
(in Rs.)
RM
m
0
0
9381
7451
4568
Cu.m.
M.T
M.T
M.T
0
0
0
648
648
10795
Cu.m.
0
0
0
3978
4113
MT
65027
m
m
m
m
m
m
m
0
0
0
0
0
0
0
0
0
0
0
#REF!
Additional in rock
1200 dia
1000 dia
750 dia
M-35 conc.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
9680
13414
17714
33229
78948
7915
Description
Unit
Proposed Chainage km
Total
Qty.
Rate
(in Rs.)
m
m
m
m
m
m
0
0
0
0
0
0
0
13015
17187
32236
76588
6D.31 Providing and laying cutting edge of mild steel for well
foundation for bridges as per drawings and Technical
Specifications clause 1200 and 1900.
MT.
70818
Cu.m.
203
Cu m.
Cu m.
Cu m.
Cu m.
Cu m.
0
0
0
0
0
0
3325
4850
4020
4063
3732
4102
a) Chequered tiles
6D.35 Providing ,fixing,erecting and painting 65 NB GI pipe on
concrete crash barrier as per approved drawing and
Technical Specification Section 2700.
sq.m.
0
0
#REF!
(ii) Depth 3-10m
(iii) Depth 10-20 m.
(iv) 20-30m.
(v) 30-40m.
(xiv)40-50 m.
(xv) 50-60 m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
276
Description
Unit
Proposed Chainage km
Total
Qty.
Rate
(in Rs.)
SQMT
62
RM
200
#REF!
297
cum
Sqmt
0
0
522
kg
620
0
0
0
1927
135
228
#REF!
618
cum
609
MT
0
0
62840
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
c.
d.
Replacement of the damaged concrte railing.
e.
Replacement of the crash barrier
6D.41 Laying 300mm thick stone apron complete as per
drawings and Technical Specification Clause 2503.
6D.42 Providing and laying Compacted Earth Filling as per
Section 2500 of MOST specification for Road & Bridge
work.
6D.43 Structural Steelwork in superstructure including painting
as per technical specification Section 1900 (painting
shall conform to System (v) , Table 1900-3)
Total
cum
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Description
Unit
Amount
Reference of
SOR
(in Rs.)
6D.01 Earthwork in Excavation of foundation for structure
complete as per drawing and Technical Specification
Clause 304.
(i) in all types of soil)
Cu.m.
12.1(I)A(i)
Cu.m.
0
0
12.1.B(ii)
M-15
M-20
6D.03 Structural cement concrete for plain / reinforced
concrete for foundation including formwork, machinery
and workmanship complete as per drawing and
Technical Specification Sections 1500, 1700 and 2100.
Cu.m.
Cu.m.
0
#REF!
0
12.4
0-3 depth
3-6 depth
(a) In foundation
(i) PCC M-20
(ii) RCC M-25
(iii) RCC M-30
(iv) M-35
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-15
(ii) a PCC M-20
(ii) b RCC M-20
(iii) RCC M-25
(iv) RCC M-30
(v) RCC M-35
(v) RCC M-40
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
(i) M-20
(ii) M-25
Cu.m.
Cu.m.
(b) Substructure
(c) Super-structure
0
0
0
#REF!
0
0
0
0
0
0
#REF!
0
0
0
0
0
0
12.8 B
12.8 E case II
12.8 G case II
12.8 H case II
13.5 A (p)
13.5 B (p)
13.5 E (r) case II
13.5 F (r) case II
13.5 G (r) case II
13.17
Description
Unit
Cu.m.
Cu.m.
Cu.m.
Cu.m.
Amount
(in Rs.)
0
0
0
0
0
0
Reference of
SOR
Cu.m.
Cu.m.
0
0
0
Cu.m.
#REF!
14.11
RM
Cu.m.
Cu.m.
0
0
#REF!
0
14.6
14.1.E case II (ii)
14.1 C case II (i) r
a) Foundation
MT
12.40
b) Sub structure
MT
#REF!
13.6
b) Super structure
MT
14.2
Description
Unit
Amount
Reference of
SOR
(in Rs.)
6D.08 Low relaxation HT strands in post tensioned box
girder/T-beam girder including sheathing, anchorages,
prestressing and grouting complete as per drawing and
Technical Specification Section 1800.
Strands
6D.09 Providing and fixing tar paper bearing complete as per
Technical Specification Section 2000.
MT
0
0
14.3
sq.m.
Market rate
cu.cm.
13.14
ton
0
0
13.16
ton
ton
0
0
13.16
13.13
RM
14.22
RM
#REF!
14.18
Cu.m.
14.4
sq.m.
Description
Unit
Amount
Reference of
SOR
(in Rs.)
6D.16 Drainage spouts of 100 mm diameter complete as per
drawing and Technical Specification Clause 2705.
No.
14.9
No.
13.8
Cu.m.
8.1b
Description
Unit
Amount
Reference of
SOR
(in Rs.)
6D.21 Providing and laying of asphaltic plug joint to provide for
horizontal movement of 25 mm and vertical movement
of 2 mm, depth of joint varying from 75 mm to 100 mm,
width varying from 500 mm to 750 mm (in traffic
direction), covered with a closure plate of 200mm x
6mm of wieldable structural steel conforming to IS:
2062, asphaltic plug to consist of polymer modified
bitumen binder,
carefully selected single size
aggregate of 12.5 mm nominal size and a heat resistant
foam caulking/backer rod,
all as per approved
drawings and specifications and as per relevant clauses
of Section 2600.
m
14.19
Cu.m.
#REF!
13.9 A
Cu.m.
#REF!
13.10
Cu.m.
#REF!
15.5
Cu.m.
15.4 (A)
RM
Description
Additional in rock
1200 dia
1000 dia
750 dia
M-35 conc.
Unit
Amount
Reference of
SOR
RM
m
(in Rs.)
0
0
12.25A
12.24A
12.23A
Cu.m.
M.T
M.T
M.T
0
0
0
12.37
12.37
12.37
Cu.m.
0
0
0
12.38C (ii)
12.38D(II)
MT
12.22
m
m
m
m
m
m
m
0
0
0
0
0
0
0
0
0
0
0
12.14 B (i)
12.14 B (ii)
12.14 B (iii)
12.14 B (iv)
12.13 B (i)
SAI Consulting Engineers Pvt. Ltd.
Description
Unit
Amount
m
m
m
m
m
m
(in Rs.)
0
0
0
0
0
0
0
6D.31 Providing and laying cutting edge of mild steel for well
foundation for bridges as per drawings and Technical
Specifications clause 1200 and 1900.
MT.
12.10
Cu.m.
12.21
Cu m.
Cu m.
Cu m.
Cu m.
Cu m.
0
0
0
0
0
0
12.8 A
12.11 A (iii) case II
12.11 F (iii) case II
12.11 C (i) case II
12.11 D (i) case II
12.11 B (vi) case II
a) Chequered tiles
6D.35 Providing ,fixing,erecting and painting 65 NB GI pipe on
concrete crash barrier as per approved drawing and
Technical Specification Section 2700.
sq.m.
0
0
Market rate
RM
#REF!
14.26
No.
8.28
Reference of
SOR
12.13 B (ii)
12.13 B (iii)
12.13 B (iv)
Description
Unit
Amount
Reference of
SOR
(in Rs.)
6D.37 Providing and applying 2 coats of water based cement
paint to unplastered concrete surface after cleaning the
surface of dirt,dust,oil grease, efflorescence and
applying paint @ 1 litre for 2 sq.m as per Technical
Specification Secion 800.
6D.38 PVC Downtake pipe for drainage
6D.39 Painting of structure number, span arrangement and
flow direction complete as per drawings and Technical
Specification Section 800.
SQMT
14.16
RM
Market rate
No.
#REF!
Market rate
cum
Sqmt
0
0
16.10
kg
16.7
0
0
0
16.18
16.19
cum
#REF!
15.1
cum
4.2 (iii)
MT
0
#REF!
14.2
c.
d.
Replacement of the damaged concrte railing.
e.
Replacement of the crash barrier
6D.41 Laying 300mm thick stone apron complete as per
drawings and Technical Specification Clause 2503.
6D.42 Providing and laying Compacted Earth Filling as per
Section 2500 of MOST specification for Road & Bridge
work.
6D.43 Structural Steelwork in superstructure including painting
as per technical specification Section 1900 (painting
shall conform to System (v) , Table 1900-3)
Total