■ The subfloor must be clean, dry and free from cracks. Dust ■ Floor boards and similar substrates should have a moisture
and contaminants that could prevent adhesion, such as patch- content of 8% (equivalent to 40% RH at +20°C), so that
es of paint, oil, etc., must be removed. Note that asphalt, any subsequent movements cannot cause damage.
oil spillage, impregnation agents, pen marks, etc., can ■ Extra special care must be taken with installations on sur-
cause discoloration. Where required damp-proofing must be faces where significant temperature changes can be expect-
carried out according to building standards. Where required ed, for example, floors exposed to strong sunlight, as adhe-
an effective damp proof membrane must be incorporated in sion strength and subfloor treatment may be heavily
the subfloor. Check for dampness in ground supported stressed.
floors, floors above boiler rooms, floors with underfloor
■ For installation of this product on concrete subfloors that
heating or containing high-temperature pipework, etc.
do not include damp-proofing the moisture content, mea-
■ Where pipes are laid in the floor they should be arranged so sured in terms of relative humidity, must not be higher
that the flooring material is not continuously subjected to than 85% (in UK and Ireland 75% according to BS 8203).
a temperature above 30°C, otherwise there may be discolor-
■ NOTE: These products are not approved for use in wet
ation and other alterations of the material.
areas.

Preparation
■ Dust and loose particles must be thoroughly removed. ink markers, ball-point pens etc. can cause discoloration
Highly absorbent or variably absorbent substrates should be due to migration.
sealed with diluted flooring adhesive (1:4). The sized sur- ■ If material from several rolls is used, they should have the
face must be completely dry before laying is started. same manufacturing serial numbers and be used in consecu-
■ When applying smoothing compounds, use compounds that tive order.
meet the minimum requirements in the building standards. ■ Prior to laying, allow the material, adhesive and subfloor to
NOTE: Discoloration can occur when using two-part poly- reach room temperature, i.e. a temperature of at least
ester compounds if they are mixed incorrectly and/or insuf- 18°C. The relative air humidity should be 30-60%.
ficiently. Do not mix directly on the substrate.
■ The rolls should be stored upright.
■ Where required, damp proofing must be carried out.
■ Use only a lead pencil for marking. Note that any marks
made with felt-tipped pens, permanent and non-permanent

Installation
■ If local building standards or regulations states any spe- used as it can cause discoloration. The assembly time
cial installation technique or has technical advises for depends on the type of substrate, its absorbency, the tem-
this type of products not corresponding to this instruc- perature and air humidity in the premises. See the adhesive
tion, our instructions are automatically subordinated manufacturer’s instructions regarding coverage, open time,
and should only be taken in consideration as guidelines. etc.
■ Installation should be carried out at room temperature (at Sheets must be installed so that colour differences are
least +18°C). The relative air humidity in the premises avoided.
should be 30-60%. Reverse sheets whenever possible.
Prior to laying, the sheeting should be laid out to acclima- The earth connection is achieved with copper strips and
tise. Avoid creasing or folding the material as this can pro- a conductive adhesive.
duce permanent alterations.
■ Earth connection sheets
■ Do not install on existing floor coverings such as lino,
A copper strip is placed lengthways under each sheet,
PVC sheets and tiles, rubber sheets and tiles. Non
approx. 200 mm from the edge.
absorbent substrates with D.P.M. coating, other paints
The strips under each sheet are connected with strips
and coatings, residues of old adhesives etc. has to be
across the direction of sheets at both ends of the area
covered with a 3 mm layer of levelling compound to
and connected to earth.
achieve an absorbent surface.
■ The sheets are fully adhered using a high quality conductive
adhesive with permanent conductive properties.
See manufacturer’s instruction regarding coverage, open
time etc.
Note that the adhesive is also spread on top of the copper
strips. Assembly late in the pressure sensitive stage reduces
the strength of the bond and can cause the lines of adhe-
sive to show through to the surface of the flooring, and
may effect the technical properties of the flooring.
Solvent-based chloroprene contact adhesive must not be
■ Earth connections tiles 2. When installing on access flooring systems separate
The earth connection can take place according to two main earth connection is not normally required, as this is achieved
principles: by the conductive adhesive and the metal construction.
Advise concerning conductivity should be taken from the
1. Every row of tiles is connected to earth with the system
manufacturer of the access flooring system.
of conductive adhesive and underlying copper strips. Tiles
and copper strips are bonded to the subfloor using a high ■ Most commonly, the copper strip will be connected to the
quality conductive adhesive with permanent conductive normal electrical earthing network of the building. In high-
properties. ly ESD-sensitive areas, the copper strips will be connected
The strips under each row are connected with strips across to a separate earthing system provided by the end user.
the shorter dimension of the room, every 10 m and con- In all cases the earthing must comply with local electrical
nected to earth. See figure below. and building codes and regulations.
■ Rub the face surface down thoroughly to ensure that the
floor covering makes good contact with the adhesive and
that all air is expelled. Make sure that the tool used for
rubbing down the floor covering does not scratch the sur-
face. A broom is not suitable for this purpose. If possible,
use a floor roller (min. 75 kg) and roll crosswise over the
floor.
Always be careful when cutting, making grooves etc.,
that the conductive strips are not damaged, to ensure
that all sections of the surface are connected to earth
after installation.

1. Tiles Somplan AS
2. Conductive adhesive (high quality adhesive with per-
manent conductive properties).
3. Copper strips bonded to the subfloor
4. Earth connection

Welding
■ The sheets are heat-welded. The joints are chamfered or
grooved to about 3/4 of the thickness using a hand groov-
ing tool or machine prior to welding.

Maintenance instructions
■ Please see separate instruction for the care and mainte-
nance of Somplan AS.

Inspection
■ The work must be completed with an inspection. Ensure Ensure that the flooring material is protected with a cover
that the newly laid flooring is free from adhesive residues immediately after laying.
and that the bond is consistent with no bubbles.

For the best results


■ Make sure all specifications and instructions are followed ■ Carefully clean up any adhesive residue on the surface.
carefully. Please see the Cleaning and Maintenance Instructions for
■ Check the installation afterwards. details.
■ Contact your Tarkett Sommer representative if unsure about
any part of the installation.