Vous êtes sur la page 1sur 1

20116 Federal Register / Vol. 70, No.

73 / Monday, April 18, 2005 / Notices

contains the names and registration Dated: April 12, 2005. Transmission Company, Joint Owners of
information for all legally registered Gracia Hillman, the Highgate Project, Long Sault, Inc.,
voters in the State and that local Chair, Election Assistance Commission. Maine Electric Power Company, Maine
election officials throughout the State [FR Doc. 05–7713 Filed 4–15–05; 8:45 am] Public Service Company, Minnesota
have immediate electronic access to BILLING CODE 6820–YN–M
Power Inc., Minnkota Power
such information, as appropriate. Cooperative, New York Power
Authority, Niagara Mohawk Power
10. How should the statewide voter Corporation, Northern States Power/
registration list be coordinated with DEPARTMENT OF ENERGY
Excel, Vermont Electric Power Company
other agency databases? [Docket No. EA–302] and Vermont Electric Transmission
Company.
HAVA makes accurate voter Application To Export Electric Energy; The construction, operation,
registration lists a priority. States should Duke Energy Marketing America, L.L.C. maintenance, and connection of each of
coordinate the statewide voter
AGENCY: Office of Fossil Energy, DOE. the international transmission facilities
registration list with other state agency to be utilized by DEMA, as more fully
databases (e.g., voter registration ACTION: Notice of application.
described in the application, has
agencies as defined by NVRA) that may previously been authorized by a
SUMMARY: Duke Energy Marketing
contain information relevant to the Presidential permit issued pursuant to
America, L.L.C. (DEMA) has applied for
statewide voter registration list. Executive Order 10485, as amended.
authority to transmit electric energy
Additionally, coordination between from the United States to Canada Procedural Matters: Any person
the statewide voter registration list and pursuant to section 202(e) of the Federal desiring to become a party to this
other government sources of Power Act. proceeding or to be heard by filing
information (e.g., death and felony DATES: Comments, protests or requests comments or protests to this application
records) is equally critical. States should to intervene must be submitted on or should file a petition to intervene,
take steps to provide for regular before May 18, 2005. comment or protest at the address
coordination of their statewide voter provided above in accordance with
ADDRESSES: Comments, protests or
registration lists with death and felony §§ 385.211 or 385.214 of the FERC’s
requests to intervene should be
records so as to assure that the statewide Rules of Practice and Procedures (18
addressed as follows: Office of Coal &
voter registration list is current. CFR 385.211, 385.214). Fifteen copies of
Power Systems (FE–27), Office of Fossil
each petition and protest should be filed
Moreover, section 303(a) of HAVA Energy, U.S. Department of Energy,
with DOE on or before the date listed
requires States to match information 1000 Independence Avenue, SW.,
above.
received on voter registration forms Washington, DC 20585–0350 (FAX 202–
287–5736). Comments on the DEMA application
against drivers license and social to export electric energy to Canada
security databases for the purpose of FOR FURTHER INFORMATION CONTACT:
should be clearly marked with Docket
verifying the accuracy of the Xavier Puslowski (Program Office) 202– EA–302. Additional copies are to be
information received from all new voter 586–4708 or Michael Skinker (Program filed directly with Gordon J. Smith, John
registrants. Under Section 303(b), such Attorney) 202–586–2793. & Hengerer, 1200 17th Street, NW.,
validation provides an exemption to the SUPPLEMENTARY INFORMATION: Exports of Suite 600, Washington, DC 20036–3013
voter identification requirements for electricity from the United States to a and David W. Wright, Duke Energy
first-time registrants by mail if the foreign country are regulated and Marketing America, L.L.C., 5400
information matches. require authorization under section Westheimer Ct., Houston, Texas 77056.
202(e) of the Federal Power Act (FPA) A final decision will be made on this
11. Who should have immediate (16 U.S.C. 824a(e)).
electronic access to the statewide voter application after the environmental
On March 23, 2005, the Office of impacts have been evaluated pursuant
registration list? Fossil Energy (FE) of the Department of to the National Environmental Policy
At a minimum, local election officials Energy (DOE) received an application Act of 1969, and a determination is
must have immediate electronic access from DEMA to transmit electric energy made by the DOE that the proposed
from the United States to Canada. action will not adversely impact on the
to the statewide voter registration list.
DEMA is wholly owned by Duke Energy reliability of the U.S. electric power
This means that the local official must
North America, LLC (a subsidiary of supply system.
have access through some electronic
Duke Energy Corporation). DEMA does
connection to the official statewide Copies of this application will be
not own, operate or control any electric
voter registration list when needed to made available, upon request, for public
power generation, transmission or
process voter registrations, assist voters, inspection and copying at the address
distribution facilities. DEMA has
input or change data, or determine provided above or by accessing the
requested an electricity export
eligibility of an individual to vote. The Fossil Energy Home page at http://
authorization with a 5-year term. The
level of access given to each user should www.fe.de.gov. Upon reaching the Fossil
electric energy which DEMA proposes
be appropriate to the function of the Energy home page, select ‘‘Electricity
to export to Canada would be purchased
user and should be established Regulation,’’ and then ‘‘Pending
from electric utilities and Federal power
collaboratively by the State and local Procedures’’ from the options menus.
marketing agencies within the U.S.
election officials. However, all voter DEMA proposes to arrange for the Issued in Washington, DC, on April 12,
registration information obtained by any delivery of electric energy to Canada 2005.
local election official must be over the existing international Anthony J. Como,
electronically entered into the statewide transmission facilities owned by Basin Deputy Director, Electric Power Regulation,
voter registration list on an expedited Electric Power Cooperative, Bonneville Office of Fossil Energy.
basis at the time the information is Power Administration, Eastern Maine [FR Doc. 05–7693 Filed 4–15–05; 8:45 am]
provided to the local official. Electric Cooperative, International BILLING CODE 6450–01–P

VerDate jul<14>2003 16:08 Apr 15, 2005 Jkt 205001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\18APN1.SGM 18APN1

Vous aimerez peut-être aussi