Vous êtes sur la page 1sur 1

13026 Federal Register / Vol. 70, No.

51 / Thursday, March 17, 2005 / Notices

Affected Entities: Entities potentially Burden Statement. The estimated FOR FURTHER INFORMATION CONTACT: The
affected by this action are airport burden for this survey is 24 hours per finding is available at EPA’s conformity
owners/operators. air carrier site (i.e. an air carrier’s Web site: http://www.epa.gov/otaq/
Title: Survey of Airport Deicing operational facility at a specific airport). transp.htm, (once there, click on the
Operations (Airline Questionnaire). The total number of air carrier sites is ‘‘Transportation Conformity’’ button,
Abstract: EPA is developing 300, producing an approximate total then look for ‘‘Adequacy Review of SIP
wastewater discharge standards, called burden of 7,200 hours. Burden means Submissions’’). You may also contact
‘‘effluent guidelines,’’ for airports the total time, effort, or financial Wayne Elson, U.S. EPA, Region 10,
pursuant to the Agency’s 2004 Effluent resources expended by persons to
Guidelines Plan (69 FR 53719, Office of Air, Waste, and Toxics (AWT–
generate, maintain, retain, or disclose or 107), 1200 Sixth Ave, Seattle WA 98101;
September 2, 2004). The focus of the provide information to or for a Federal
rulemaking is on wastewater discharges (206) 553–1463 or
agency. This includes the time needed elson.wayne@epa.gov.
from aircraft and runway deicing to review instructions; develop, acquire,
operations. EPA will send survey install, and utilize technology and SUPPLEMENTARY INFORMATION:
questionnaires to a sample of air carriers systems for the purposes of collecting,
to help the Agency compile a national validating, and verifying information, Background
assessment of deicing operations. The processing and maintaining
survey will include questions on the Today’s notice is simply an
information, and disclosing and
deicing technologies employed, amount announcement of a finding that we have
providing information; adjust the
of deicing chemicals used, pollution already made. EPA Region 10 sent a
existing ways to comply with any
prevention techniques, and economic previously applicable instructions and letter to the Oregon Department of
and financial information. Each air requirements; train personnel to be able Environmental Quality on March 8,
carrier receiving a questionnaire to respond to a collection of 2005, stating that the SIP is adequate for
package would be asked to provide information; search data sources; transportation conformity purposes.
responses for a specified sample of complete and review the collection of Transportation conformity is required
locations at which the airline operates. information; and transmit or otherwise by section 176(c) of the Clean Air Act.
Completion of this one-time survey will disclose the information. EPA’s conformity rule requires that
be mandatory pursuant to sec. 308 of the transportation plans, programs, and
Dated: March 10, 2005.
Clean Water Act. projects conform to SIPs. Conformity to
EPA has prepared a separate draft Mary T. Smith,
Acting Director, Office of Science and a SIP means that transportation
questionnaire for airports. This
questionnaire was announced at 70 FR Technology. activities will not produce new air
4117, January 28, 2005, with a comment [FR Doc. 05–5324 Filed 3–16–05; 8:45 am] quality violations, worsen existing
deadline of March 29, 2005. EPA is BILLING CODE 6560–50–P violations, or delay timely attainment of
hereby extending the comment deadline the national ambient air quality
for the Airport Questionnaire to match standards.
the deadline for the Airline ENVIRONMENTAL PROTECTION The criteria by which we determine
Questionnaire, namely May 16, 2005. AGENCY whether a SIP is adequate for
An agency may not conduct or [Docket No. R10–OAR–2005–OR–0003; conformity purposes are outlined in 40
sponsor, and a person is not required to FRL–7885–1] CFR 93.118(e)(4). Please note that an
respond to, a collection of information adequacy review is separate from EPA’s
unless it displays a currently valid OMB Adequacy Status of the Medford- completeness review and it also should
control number. The OMB control Ashland PM10 Attainment and not be used to prejudge our ultimate
numbers for EPA’s regulations in 40 Maintenance Plan for Transportation
approval of the SIP. Even if we find a
CFR are listed in 40 CFR part 9. Conformity Purposes
SIP adequate for conformity, the SIP
EPA would like to solicit comments
to: AGENCY: Environmental Protection could later be disapproved. For the
(i) Evaluate whether the proposed Agency (EPA). reader’s ease, the motor vehicle
collection of information is necessary ACTION: Notice of adequacy. emissions budget is 3,754 tons per year.
for the proper performance of the This was the only budget included in
SUMMARY: In this notice, EPA is the Plan.
functions of the Agency, including
whether the information will have notifying the public that we have found
the Medford-Ashland PM10 Attainment We have described our process for
practical utility; determining the adequacy in SIPs in
(ii) evaluate the accuracy of the and Maintenance Plan adequate for
transportation conformity purposes. On guidance dated May 14, 1999. This
Agency’s estimate of the burden of the guidance in now is reflected in the
proposed collection of information, March 2, 1999, the D.C. Circuit Court
ruled that submitted State amended transportation conformity
including the validity of the rule, July 1, 2004 (69 FR 40004). We
methodology and assumptions used; Implementation Plans (SIPs) cannot be
used for conformity determinations followed this process in making our
(iii) enhance the quality, utility, and
clarity of the information to be until EPA has found them adequate. adequacy determination.
collected; and This affects future transportation Authority: 42 U.S.C. 7401–7671q.
(iv) minimize the burden of the conformity determinations prepared,
reviewed and approved by the Rogue Dated: March 9, 2005.
collection of information on those who
are to respond, including through the Valley Council of Governments, Oregon Ronald A. Kreizenbeck,
use of appropriate automated electronic, Department of Transportation, Federal Acting Regional Administrator, Region 10.
mechanical, or other technological Highway Administration and the [FR Doc. 05–5325 Filed 3–16–05; 8:45 am]
collection techniques or other forms of Federal Transit Administration. BILLING CODE 6560–50–P
information technology, e.g., permitting DATES: This finding is effective April 1,
electronic submission of responses. 2005.

VerDate jul<14>2003 14:51 Mar 16, 2005 Jkt 205001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\17MRN1.SGM 17MRN1

Vous aimerez peut-être aussi