bp Trinidad & Tobago CoW/ISSoW Handbook


1.0
2.0
3.0
4.0

Stopping all Unsafe Work ....................................................................4


Purpose..................................................................................................4
Objectives ..............................................................................................5
Work Control Accountabilities ............................................................7

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.13
4.14
4.15
4.16
4.17

5.0

Site Controller (SC) ......................................................................................... 7


Area Authority (AA) ......................................................................................... 7
Affected Area Authority (AAA)......................................................................... 8
Isolating Authority Process (IAP) .................................................................... 8
Isolating Authority Electrical (IAE)................................................................... 8
Isolating Authority Control (IAC)...................................................................... 9
Performing Authority (PA) ............................................................................... 9
Technical Authority (TA)................................................................................ 10
Authorised Gas Tester .................................................................................. 11
Work Party Members..................................................................................... 11
Installation Administrator ............................................................................... 11
Node Administrator........................................................................................ 11
Guest Role .................................................................................................... 12

Handover of Responsibilities ............................................................12

5.1
5.2

Shift Change.................................................................................................. 12
Crew Change ................................................................................................ 12

5.2.1
5.2.2
5.2.3

6.0

Performing Authority............................................................................................. 12
Area Authority....................................................................................................... 12
Site Controller / Site Manager .............................................................................. 13

ISSoW Process....................................................................................14

6.1

WCC Permits.............................................................................................. 14

6.1.1
6.1.2
6.1.3

6.2
6.3
6.4
6.5
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8

8.0

Hot Work WCC.................................................................................................. 14


Cold Work WCC ................................................................................................ 15
Cold Work Breaking Containment - WCC ............................................................ 16

Confined Space Entry (CSE) WCC............................................................ 16


WCC Routines............................................................................................... 17
Work that does not require WCC Authorisation ............................................ 17
Lifecycle of Work Control Certificates ........................................................... 18
Documentation of Isolations .......................................................................... 19
Electrical Isolations........................................................................................ 19
Process Isolations ......................................................................................... 19
Personal Isolations ........................................................................................ 19
Lifecycle of an ICC ........................................................................................ 19
Sanction to Test (STT) .................................................................................. 20
Long Term Isolations (LTI) ............................................................................ 20
Boundary Isolations ....................................................................................... 20

Supporting Processes........................................................................21

8.1
8.2
8.3

9.0

Paper Based Back up system ....................................................................... 21


Additional Paper Certification........................................................................ 21
Operations within the 500m Zone ................................................................. 21

Risk Assessment Process .................................................................23

9.1
9.2
9.2.1
9.2.2

9.3
9.3.1
9.3.2

9.4

Glossary of Terms ......................................................................................... 23


Risk Assessment Process............................................................................. 23
Level 1 (L1RA) ..................................................................................................... 24
Level 2 (L2RA) ..................................................................................................... 24

Other Types of Risk Assessment Conducted in ISSoW ............................... 24


Standalone Risk Assessment (SARA) - WCC...................................................... 25
Operational Risk Assessment (ORA) - WCC ....................................................... 25

Planning ........................................................................................................ 25

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 1 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


9.4.1
9.4.2
9.4.3
9.4.4

9.5

10.0
11.0
12.0
12.1
12.2
12.3

13.0
14.0

Collating Information ............................................................................................ 25


The Risk Assessment Team (Level 2 RA) ........................................................... 25
Level 2 Risk Assessment ..................................................................................... 25
Work Co-ordination .............................................................................................. 26

Risk Assessment Matrix................................................................................ 26

Control of Work Standard ..................................................................34


Golden Rules of Safety.......................................................................35
Site Standards .....................................................................................39
Beachfield Site Standards ............................................................................. 39
Galeota Terminal Site Standards .................................................................. 42
Offshore Site Standards ................................................................................ 45

HSSE Policy Statement ......................................................................48


Supplementary Certificates ...............................................................49

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 2 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


LIST OF ABBREVIATIONS
AA
AAA
AGT
ALARP
AM
COSHH
CSE
ELV
HV
IAC
IAE
IAP
ICC
Inst Admin
CoW/ISSoW
L1RA
L2RA
LSA
LTI
Node Admin
NORM
LV
ORA
PA
PTW
RPE
SARA
SC
SCC
STT
TBT
TA
WCC

Area Authority
Affected Area Authority
Authorised Gas Tester
As Low as Reasonably Practicable
Asset Manager
Control of Substances Hazardous to Health
Confined Space Entry
Extra Low Voltage
High Voltage
Isolating Authority Control
Isolating Authority Electrical
Isolating Authority Process
Isolation Confirmation Certificate
Installation Administrator
Control of Work/Integrated Safe System of Work
Level One Risk Assessment
Level Two Risk Assessment
Low Specific Activity
Long Term Isolation
Node Administrator
Naturally Occurring Radioactive Material
Low Voltage
Operational Risk Assessment
Performing Authority
Permit to Work
Responsible Person Electrical
Stand Alone Risk Assessment
Site Controller
Supplementary Control Certificate
Sanction to Test
Toolbox Talk
Technical Authority
Work Control Certificate

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 3 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


1.0

Stopping all Unsafe Work

Intent

To stop the continuation of potentially unsafe work at the earliest stage


possible by making every member of the workforce responsible for its
prevention.

Mandatory
Requirement

a) All personnel must be made aware of their obligation to stop work that
they consider to be unsafe.
Requirements:

Mandatory
Requirement

The CoW process must make it unambiguously clear that all personnel are
obliged and have the authority to stop work that they consider to be unsafe.
All personnel must be made aware of the actions they must take, including
reporting, when stopping unsafe work.

b) All indications from personnel that the work is unsafe must be


properly investigated.
Requirements:
In order to comply with this Mandatory Requirement:

2.0

All instances of work being stopped for reasons of safety must be


recorded.
All reports of unsafe work, from any member of the work force, must be
properly investigated and the results recorded.

Purpose

This document describes the bp Trinidad & Tobago Control of Work / Integrated Safe System of
Work (CoW/ISSoW) process, the responsibilities of the people involved in the authorisation,
preparation and execution of work and the process of task risk assessment that underpins
CoW/ISSoW.
This process is implemented through a software system that is an integrated electronic work
control system covering the areas of work control, task risk assessment and isolations
management.
Notes:
The use of the software system is described in the electronic Resource Centre that is an
integral part of the software.
All task risk assessments shall be carried out in accordance with the standards set out in
bpTT Policy and Guidance on Management of Risk STP-IM-009
All associated Process Isolation activities shall be carried out in accordance with the
bpTT SIRPS Manual TRD 2143
All associated Electrical Isolation activities shall be carried out in accordance with the
bpTT Energy Isolation Electrical Standard TRD 2163
Title of Document: bpTT CoW / ISSoW Handbook
Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 4 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


3.0

Objectives

The prime objective of CoW/ISSoW is to ensure that work is properly controlled, co-ordinated
and communicated. It is the means of providing written instructions and authorisation to people
carrying out potentially hazardous work. The system allows individuals, with individual
passwords, certain privileges to perform certain tasks designated to their responsibilities. This
forms part of the training process with privileges being entered into the CoW/ISSoW system
once confirmation of training level has been established. This is performed by the site focal
point.
The CoW/ISSoW process provides the following key elements:

Authorisation
Approval, both before work starts, and at change of shift, to confirm the worksite remains safe.

Co-ordination
Area Authority on an asset to ensure that tasks that may clash with each other are not
authorised to be carried out at the same time.

Communication
Through face to face contact at permit issue to ensure that all personnel who need to know
that the task is being carried out are made aware of it.

Planning
Ensuring that the tasks to be done are fully considered, the sequence of working decided and
all personnel and equipment prepared for the tasks.
Note:

A daily planning meeting must be held.

Discipline
The system can only operate effectively if all personnel associated with a task, understand and
comply with the WCC requirements and the CoW/ISSoW rules and procedures.

Toolbox Talk
A comprehensive worksite briefing carried out by the Performing Authority where the Risk
Assessment, WCC precautions and conditions associated with carrying out the work are
communicated to the work party.

Supervision
An appointed Performing Authority, responsible for ensuring compliance with all requirements
specified on the WCC.

Task Risk Assessment


To ensure that the nature, content and location of a task are clearly defined, hazards are
identified and controls defined to reduce the risks to as low as reasonably practicable (tick box

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 5 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


stating ALARP). Task Risk Assessment is a key element of the Work Control Certificate in that
it records and communicates all identified hazards and controls necessary to ensure the safety
of personnel, however it relies on everyone involved to make it work.

Recording Lessons Learned


Information about what has been learned whilst performing a task is recorded in order that
others can benefit from earlier experiences.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 6 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


4.0

Work Control Accountabilities

The key accountabilities within the CoW/ISSoW are described in this section. No one may be
assigned a role within CoW/ISSoW unless they have successfully completed the appropriate
training and been formally appointed.
There are two types of roles within CoW/ISSoW:

Persons who sign Certificates as gate keepers, e.g. Site Controller / Area Authority /
Performing Authority. CoW/ISSoW will check that a person with the correct electronic
authorisation role has carried out the necessary actions.

Persons who counter-sign Certificates are defined in the bpTT business process as being
required to carry out particular checks or actions, but CoW/ISSoW does not check that
these actions have been carried out.

4.1

Site Controller (SC)

This will normally be the Offshore Installation Manager or Onshore Site Manager.
The principle accountabilities of the SC are:

The SC/OSM is the Single Point of Accountability for CoW/ISSoW on his or her facility /
site.

Control and coordinate all work on the site or within the sites zone of authority

Ensuring persons appointed to roles within CoW/ISSoW have undergone the required
training and are assessed competent for those positions and these details are recorded.

As a Gate Keeper, authorisation of all categories of WCC.

Ensuring that the requirements for an audit of CoW/ISSoW are complied with and that
corrective actions resulting from audit findings are carried out.

Sets expectations for all personnel via issuing of the site standards

Approval of all risk assessments

STOPPING ALL UNSAFE WORK

4.2

Area Authority (AA)

The Area Authority (AA) is the central figure in the day-to-day management of the CoW/ISSoW
within their area of responsibility. Depending upon the size of the installation there may be more
than one AA.
The principle accountabilities of the Area Authority are:

Responsible to the SC/OSM for the safe control of work activities within their area of
accountability in accordance with these procedures.

Conducting a site visit with the PA for each task.

Liaising closely with the Performing Authority (PA) when planning WCCs to ensure the
appropriate Level 1 or 2 Risk Assessment has been carried out for the task.

Liaising with PA to ensure scope of work is fully understood and that work part is briefed.

Determining the ability of the PA to supervise more than one job.

Ensuring appropriate control measures have been put in place.

Verification of all WCCs in their area of accountability.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 7 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

Verification of Isolation design for work on allocated system and equipment and control of
isolation implementation and removal.

Prior to issuing a WCC, ensuring that all appropriate control measures have been put in
place. Furthermore, confirming that the PA fully understands the scope of the task and the
other members of the work party have been fully briefed, via the Toolbox Talk.

Manage the paper based back-up system in the unlikely event of a system failure.

Ensuring suitable handovers are carried out at shift/crew change.

STOPPING ALL UNSAFE WORK

4.3

Affected Area Authority (AAA)

This applies where there is more than one AA on a site. Where activities carried out in one
area impact or impinge on activities in another area, then the AA must inform the Affected AA.
The Affected AA must:

Countersign the WCC from the adjoining area to confirm that he is aware of the activity
taking place and that the hazards can be effectively managed with the specified controls.

Communicate with personnel working within his area who may be affected by the adjacent
activity to ensure that they understand the potential impact on their activities.

STOPPING ALL UNSAFE WORK

4.4

Isolating Authority Process (IAP)

Only persons assessed as competent isolators and who have completed the appropriate
ISSoW training may be assigned to the role of Isolating Authority Process (IAP) in CoW/ISSoW.
The principle accountabilities of the IAP are:

Ensuring isolations are adequately identified, applied, tested and secured, and that
Isolation Standards are compliant with to bpTT SIRPS Manual TRD 2143

Demonstrating integrity of isolation to PA

Periodic monitoring of all isolations whilst in force

On approval from the AA de-isolates and reinstates the plant consistent with SIRP
standards

Supervising others who may assist in applying/removing the isolation

Communicating effectively with other work parties involved in the work when requested.

STOPPING ALL UNSAFE WORK

4.5

Isolating Authority Electrical (IAE)

The Isolating Authority Electrical is responsible for design of an electrical isolation when
requested by the Area Authority. He/she is then responsible for safely isolating a specific
section of plant or items of equipment to the highest quality and security of isolation, which is
reasonably practicable. The IAE is also responsible for demonstrating the integrity of the
isolation to the Performing Authority. The IAE will be authorised to the maximum voltage level
required for the isolation.
The principle responsibilities of the Isolating Authority Electrical are:

Participation in Risk Assessments for work with an electrical content and perform all
electrical work and testing on electrical equipment in accordance with the bpTT Energy

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 8 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Isolation Electrical Standard TRD 2163. Identify effective electrical isolations and deisolations as required on all electrical equipment

Demonstrating integrity of isolation to PA

Periodic monitoring of all electrical isolations whilst in force

On approval from the AA de-isolates and reinstates the equipment consistent with bpTT
Energy Isolation Electrical Standard TRD 2163.

Communicating effectively with other work parties involved in the work when requested.

Countersigning all Isolation Confirmation Certificates with an electrical content is


mandatory.

STOPPING ALL UNSAFE WORK

4.6

Isolating Authority Control (IAC)

Instrument personnel who have been formally assessed by the site RPE and authorized by the
Site Controller/Site Manager to switch, isolate and test control, instrument and telecom
equipment with voltage levels less than 50V, can act as an isolating authority under
CoW/ISSoW for control, instrument and telecom systems with voltage levels less than 50V
phase to earth.

Participation in Risk Assessments for work with instrument content.

Identify effective control isolations and de-isolations as required on all instrumentation


equipment

Demonstrating integrity of isolation to PA

Periodic monitoring of all control isolations whilst in force

On approval from the AA de-isolates and reinstates the equipment consistent with bpTT
Energy Isolation Electrical Standard TRD 2163.

Communicating effectively with other work parties involved in the work when requested.

Countersigning all Isolation Confirmation Certificates with instrument content is mandatory.

STOPPING ALL UNSAFE WORK

4.7

Performing Authority (PA)

The Performing Authority (PA) is the responsible person for the activity being carried out under
the WCC. The PA may be the person carrying out the task or supervising a group of people
carrying out a task. The PA can be responsible for more than one task at any one time,
providing the tasks can be safely managed concurrently.
The principle accountabilities of the Performing Authorities are:

Create the WCC for the task being planned and take an active role as a team member in
the Level 1 and 2 Risk Assessment Process.

Ensuring the worksite is ready for work to commence, and confirming controls in place
prior to a WCC being issued by the AA.

Ensuring competent people are in place to carry out the task.

Lead the Toolbox Talk and ensures it is completed and that all members of the work party
fully understand the scope of work and agree with the hazards and controls identified for
the task by signing the declaration.

Requesting demonstration of Isolation Integrity.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 9 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

Accepting the WCC from the AA.

Ensures that only the work covered within the scope of the WCC takes place.

Ensures that the worksite is kept in a safe and tidy condition, both during and upon
completion of the task

Ensures that a detailed handover is carried out with oncoming PA at shift/crew change.

STOPPING ALL UNSAFE WORK

4.8

Technical Authority (TA)

The Operations Technical Authority is not authorised to sanction Hot Work Naked Flame on
a live Production site or facility.

The purpose of submitting a risk assessment to this person is to enable advice and
guidance on the integrity of the risk assessment process to be given to the accountable
Asset Manager and to provide assurance to the Performance Unit Leader that HOT Work
Naked Flame instances remain controlled occurrences.

STOP ALL UNSAFE WORK

4.9

Asset Manager (AM)

The Asset Manager prior to work being undertaken must sanction any Hot Work Naked
Flame on a live Production site or installation, including activities within the five hundred
(500) metre exclusion zones.

Prior to the Asset Manager sanctioning Hot Work Naked Flame on a live Production site or
facility, the On-Site Manager is required to submit a written risk assessment to both the
Asset Manager and the Operations Technical Authority for review.

STOP ALL UNSAFE WORK

4.10

Responsible Person Electrical (RPE)

This is a role under CoW/ISSoW to clearly identify which authorised person has the
responsibility for the electrical system; the RPE is nominated by the Site Controller/Site
Manager from those persons having the highest level of authorisation required for that site.
The RPE is not a Gate Keeper in CoW/ISSoW, but countersigns the WCC for the purpose of
ensuring electrical safety where there is work with an electrical content, or work carried out in
the immediate vicinity of electrical switchgear.
The RPE will:
Approve any switching programs
Countersign permits with electrical content where the Area Authority isnt electrically
competent, ensuring that the isolation has been correctly designed and the Isolating
Authority Electrical has the appropriate authorisation level for the work
Assess and recommend site personnel for authorization to IAE and IAC

STOP ALL UNSAFE WORK

At any one time there can be only one RPE on site. The RPE may also be the isolating
authority electrical.

4.11

Department Head (DH)

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 10 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


The Department Head role does not exist on all sites, but where applicable the principal
accountabilities of the DH are:

Responsible and accountable to the Site Controller/Site Manager for the integrity and safe
condition of the structure, system and equipment allocated to him or her

Operation of the ISSoW within their area of responsibility

Countersignature of all categories of WCC within their area of responsibility and ensuring
that the appropriate hazard and controls have been identified for the planned task.

STOP ALL UNSAFE WORK

4.12

HSE

The HSE responsible person ensures the appropriate level of management attention to health
and safety. He/She is accountable for providing expert health, safety and specialist advice and
guidance to management on their social and legal responsibilities for minimising loss to
personnel, equipment, environment and the public for all departments and also confirming the
requirements for health and safety expectations in the facility and STOPPING ALL UNSAFE
WORK.

4.13

Authorised Gas Tester

A Competent Person, authorised and appointed by the Site Controller


This Person:

Tests for the presence of flammable or toxic gases and oxygen levels.

Records results within CoW/ISSoW as required.

STOPS ALL UNSAFE WORK

4.14

Work Party Members

The work party members do not have any specific role in using the electronic system, but have
a crucial part to play in the safety of work by:

Actively participating in the Toolbox Talk Process following bpTT Permit To Work (PTW)
Guidance Manual TRD 2145, to ensure they understand the hazards and control measures
associated with the task, including the identification of any additional hazards and control
measures required at the worksite

Demonstrating knowledge of and compliance with the site standards

Actively monitoring their worksites and surroundings for changes

Ensuring worksite is kept clean and safe during and on completion of task

STOPPING ALL UNSAFE WORK

4.15

Installation Administrator

Each Installation will have an Installation Administrator (Inst Admin) who is responsible for
managing roles and privileges in the CoW/ISSoW software for the Installation

4.16

Node Administrator

The Node Administrator is responsible for administering the core Hazard and Control data
within the system, subject to the bpTT Management of Change process. In addition, the Node
Administrator has access to all users records for the installations within the node, and
therefore, can assign roles for all users within the node.
Title of Document: bpTT CoW / ISSoW Handbook
Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 11 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


This role is undertaken by the bpTT Operations Technical Authority.

4.17

Guest Role

There is also a Guest role, which enables any person with access to the company network to
login into CoW/ISSoW with read only privilege. They can search, view and print WCCs, ICCs
etc, but as they have read only privilege they cannot create, edit or conduct state change
actions.

5.0

Handover of Responsibilities

Effective handover between oncoming and off going personnel at shift and crew change is
critical to ensure continuity is maintained and that there is no adverse impact on safety.

5.1

Shift Change

WCCs are valid until the end of the shift in which they were issued at which point they must
normally be suspended by the off-going PA.
If work is required to continue in the new shift, the following must happen

A shift handover will take place between the off going AA/PA and the oncoming AA/PA to
ensure the current state of the plant is fully understood by the oncoming AA/PA. This will
normally involve a worksite visit so that checks can be made prior to any WCC being issued
for work in the area of accountability. The PA will then confirm, Controls in Place.

There may not be normally both a Dayshift and Nightshift Area Authority for most areas.
Where the same person acts as both Day and Night shift AA, they will issue WCCs for work
in their area, and they remain responsible, even if they are not on shift.

The oncoming PA then logs in and Accepts the WCC and thereby accepts responsibility
of the work.

Note: Where the WCC requires a continuous presence of the PA, it may be necessary for the
responsibility to be transferred between PAs during a shift/period. In this case the
oncoming PA is to countersign for the current shift to signify acceptance of responsibility.

5.2

Crew Change

5.2.1

Performing Authority

If the PA who accepted the WCC is required to crew change, the WCC should be suspended.
The only exception to this rule is where work is necessarily continuous, where another PA takes
responsibility for the work by Countersigning the WCC.
Note:

Work cannot continue on a WCC unless the PA named on the WCC is actually in
charge of the work.

5.2.2

Area Authority

The on-coming Area Authorities shall in the first instance review all Live WCCs in their Area of
Accountability. The AA shall assess whether a worksite visit is necessary for any particular
WCC in order to verify the adequacy of the control measures. If it is deemed that a worksite
visit is required then the WCC-Permit shall be suspended until the inspection is carried out.
Only when the AA is satisfied with the adequacy of the control measures shall he then
Countersign the WCC.
Title of Document: bpTT CoW / ISSoW Handbook
Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 12 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Note:

The worksite inspection may be delegated to a nominated competent person.

5.2.3

Site Controller / Site Manager

The off going and oncoming Site Controller / Site Manager follow a similar process as the AA,
as described above.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 13 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


6.0

ISSoW Process

This section describes the Control of Work/Integrated Safe System of Work (CoW/ISSoW)
business process and the rules and the guidelines, which underpin the software.

6.1

WCC Permits

There are four categories of Permits, namely:

Hot Work Naked Flame (Valid for 1 day)

Hot Work Spark Potential (Valid for 7 days)

Cold Work (Valid for 7 days)

Cold Work Breaking Containment (Valid for 7days)


Examples of activities covered by each category (but not limited to) are detailed below.
6.1.1

Hot Work WCC

General Definition
Hot work refers to any task that uses (or could create) a flame, spark or other energy discharge
that might in turn ignite a fire or explosion.
It is normal practice to consider two types of hot work:

High Energy - Primary Source of Ignition (PSI). Identification and control of PSI hot work
is required at all premises.

Lower Energy - Secondary Source of Ignition (SSI). Identification and control of SSI hot
work is required only at premises where highly flammable liquids and gases are routinely
present and processed, loaded/ discharged, stored in tanks, etc.

Primary source of ignition (PSI) - Hot Work Naked Flame


PSI hot work is any work with equipment and tools that, when used in a normal manner, are
likely to ignite a flammable or explosive atmosphere, solid materials and liquids. High energy is
present in the form of a flame, electric-arc, incandescant sparks or the equipment has a surface
temperature that exceeds 200C.
Typical PSIs are:

welding and burning

use of grinding/cutting discs

preheating or annealing welded fabrications, where the surface temperature may exceed
200C

stud welding

use of explosives

exposure of pyrophoric scale to air.

Secondary source of ignition (SSI) - Hot Work Spark Potential


SSI hot work is work with equipment and tools that when used in a normal manner, or due to
errors or malfunctions, may create lower-energy sparks and ignite a flammable or explosive
atmosphere.

Typical SSIs include:


Title of Document: bpTT CoW / ISSoW Handbook
Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 14 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

heat shrinking with an electrical heat gun

sandblasting, needle-gunning (possible static spark)

rotating steel brush

electrical isolation testing (megger testing)

maintenance of Ex electrical equipment (e.g. opening flameproof enclosures).

soldering equipment

friction spark, typically from a rusty surface

camera with battery/flash/motor

internal combustion engines

Note: Petrol engines have non-Ex ignition systems. Diesel engines can overspeed and fail
mechanically, resulting in friction sparks. Vehicles with either type of engine will typically
have other SSI electrical accessories, such as alternators, direction indicators, etc

mains or battery-powered electrical/electronic equipment not Ex-protected (see Glossary)


according to the classification of the Hazardous Area in which they are used

6.1.2

Cold Work WCC

Cold Work is a catch all category for tasks not included in other categories. Cold Work can
involve a wide range of hazards, including:

non-routine lifting operations (at some premises a higher-than-normal authorisation may be


required for heavy or very unusual lifts, in which case a separate Heavy/Unusual Lift
Certificate may be used)

use of portable power tools and equipment (electric, air or hydraulic powered)

in-situ pressure testing

high pressure or ultra high pressure (UHP) water jetting, wet grit blasting or water cutting

work with radioactive sources fixed and mobile

stripping or disturbance of asbestos and other mineral fibres

temporary use of hazardous substances in areas not designed for this, e.g. cleaning and
dosing tasks

work on vessels/equipment contaminated with Low Specific Activity (LSA) scale/Naturally


Occurring Radioactive Materials (NORM)

painting, especially spray painting

civil and ground preparation works - a mandatory Permit is required (except for greenfield
sites, see Section 4.3 Work Categories)

work near overhead electrical cables, or other unprotected live electrical equipment, e.g. in
HV switching compounds or rooms

removal of handrails, gratings, hatches and fixed ladders

scaffolding erection/dismantling, or use of powered access

diving

use of Class 3(b) or open beam path laser equipment (e.g. lab applications)

temporary transfer of Area Authority responsibility for specific equipment or a location to


another party (e.g. for construction work or well intervention)

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 15 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

work affecting the availability of fire and gas detection, alarm and emergency shutdown
systems

work affecting key security systems, designed to protect the premises and/or personnel

work affecting the availability of fire/explosion and other emergency control or protection
arrangements e.g. fixed fire fighting, fire/ballast pumps, fire main, emergency generator,
external communications, etc.

work affecting main escape routes and/or systems (e.g. lifeboats)

6.1.3

Cold Work Breaking Containment - WCC

A Cold Work (Breaking Containment) WCC is intended to highlight the higher hazards of tasks
which breach the designed containment envelope for hazardous process fluids these will
typically be flammable fluids, but similar considerations apply for toxic and corrosive fluids, and
those at high pressure. Highlighting such tasks assists in avoiding clashes with other work in
the immediate vicinity. Cold Work (Breaking Containment) tasks include:

construction, maintenance, overhauls and repair work in operational areas involving


breaking containment of hydrocarbon or other hazardous systems

spading and de-spading of systems normally under pressure

sampling of process fluids by any means other than a suitably designed and approved
sample point.

6.2

Confined Space Entry (CSE) WCC

WCC Confined Space Entry (CSE) Certificates are used to define the conditions that are
required for entry, and to certify that those conditions have been achieved. CSE Certificates do
not allow any specific work to take place within a confined space.
The Confined Space Entry permit differs from the other permits in that:

a Level 2 RA is mandatory

provision is made for gas tests, including a continuation sheet

it does not permit any form of work, only visual inspection and gas testing

it requires to be authorised by the Site Controller / Site Manager

permit for Confined Space Entry involves declaring that the confined space is positively
isolated so that the Authorised Gas Tester can enter, subject to any special conditions:
o
o
o
o
o

authorising entry by the Authorised Gas Tester


recording the gas test and re-test results
declaring the confined space safe for entry
Specifying whether or not Breathing Apparatus is required
Written communication between the Authorised Gas Tester and Area Authority

Examples of confined spaces include closed tanks, vessels, vats, pits, and inadequately
ventilated rooms.
The bpTT procedure for Confined Space and Vessel Entry (Safe Work Practices Manual TRD
2147) describes the criteria for deciding if a space should be defined as a confined Space, and
the procedure to be followed. A CSE is valid for 7 days.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 16 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


6.3

WCC Routines

WCC Routines are similar in nature to WCC Permits, and have the same 4 categories of work
(Hot Work Naked Flame; Hot Work Spark Potential; Cold Work; Cold Work Breaking
Containment).
Routines can be used for the more regularly occurring and lower risk tasks. When first created
a Routine undergoes a Level 1 or Level 2 Risk Assessment in the same way as a Permit, but
then when the Routine is required for work, it does not have to go through the full WCC
approval process on every issue.
The primary purpose of a Routine is to reduce the burden of lower risk activities on the
CoW/ISSoW process enabling personnel to focus on potentially hazardous activities.
Below is a list of typical Routine activities, although it should be noted that the list is not
intended to be exhaustive and it will be up to each worksite to identify which tasks are
acceptable to carry out under a routine.
A WCC - Routine is normally required in the following circumstances:

Following minor repair and maintenance work on safety and emergency systems: i.e.
o

Routine checks and tests which do not require isolating or inhibiting any part of the
system.

Minor work and checks that do not affect the integrity of the system.

Non-intrusive work on equipment that is already shut down.

Visual inspection of areas except in confined spaces.

Opening live electrical junction boxes in non-hazardous areas to carry out switching, testing
to prove dead.

Opening, but not working on live electrical junction boxes in hazardous areas which contain
only IS circuits.

Hand painting except where the paint or the area to be painted requires the use of an air
fed mask.

Routine maintenance work, not requiring a Work Permit and covered by a written
procedure.

Work on communication systems within telecommunications safe areas.

Work on computer controlled systems.

Re-lamping in non-hazardous areas.

Maintenance work on office equipment.

Use of non-certified portable electrical equipment, cameras etc and non-IS test equipment
in hazardous areas (constant gas monitoring is mandatory).

6.4

Work that does not require WCC Authorisation

The following activities do not normally require to be authorised by a WCC (Permit or Routine)
within the ISSoW process. However competent persons using approved procedures must carry
out these tasks.

Routine production operations using approved operating procedures.

Routine drilling operations using approved procedures.

Routine Helideck operations using approved procedures.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 17 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

Routine crane operations using approved procedures.

Routine hotel activities.

Routine office work in approved offices using approved procedures..

General cold work carried out in approved workshops by authorised personnel using drills,
lathes, grinders etc.

Processes involving naked flames/hazardous substances in laboratories using approved


procedures.

Routine maintenance of non-hazardous equipment in accommodation areas.

Operation of safety equipment for training purposes

6.5

Lifecycle of Work Control Certificates

The lifecycle of WCCs, including the authorisation states, levels and validity periods are described below:

The primary states of a WCC are:

Requested

Pending

Authorised

Issued

Live

Job Complete

WCC Complete

Archived.

Refer to Addendum A Permit Lifecycle and Addendum B Routine Lifecycle

The different states of a WCC are represented by the Icon shapes as shown in Figure 1.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 18 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


7.0

Isolations

7.1

Documentation of Isolations

The need for isolations shall be identified during the CoW/ISSoW planning process, and shall
normally be carried out under the control of an Isolation Confirmation Certificate (ICC). The
ICC should include a clear description of the reason for the isolation scheme and a detailed list
of all isolation points (e.g. valves, blinds, vents and drains opened, breakers racked out, etc). A
marked up P&ID or suitable drawing will be used to plan the isolation, and will be presented as
part of the Authorisation process of the ICC, and accompany the ICC to the worksite.
The Isolation Confirmation Certificate (ICC) is used to control:

Process isolations and de-isolations

Electrical isolations and de-isolations

Control isolations and de-isolations

Sanction To Test (STT)

Retained Isolation (RI)

7.2

Electrical Isolations

All electrical isolations of plant shall be carried out in accordance with the bpTT Energy
Isolation Electrical Standard TRD 2163 under the control of an ICC by an Authorised /
Responsible Person Electrical (IAE within CoW/ISSoW)
A Responsible Person Electrical must countersign the isolation scheme to verify when the work
involves:

7.3

On high voltage electrical equipment

On low voltage multi-point feed equipment

Where a circuit main earth is to be applied to any part of the electrical system

Process Isolations

Process Isolation standards and methods are described in the bpTT SIRPS Manual TRD 2143.
If the isolation cannot meet the defined minimum standard, then an isolation Risk Assessment
must be conducted to justify working to a lower level. This must clearly identify what additional
control measures are being applied to reduce the risk to an acceptable level. This risk
assessment will be carried out using the Risk Assessment Process that is integral to the CoW/
ISSoW software, and must be approved by the Site Controller.

7.4

Personal Isolations

Within CoW/ISSoW there is the facility for Personal Isolations, subject to the requirements of
the bpTT SIRPS Manual TRD 2143 being met. A WCC that references Personal isolations
must be Verified and Authorised in the normal way.

7.5

Lifecycle of an ICC

The ICC contains a listing of all isolation points that the Area Authority (AA) must Verify, before
giving permission to the relevant Isolating Authority (IA) to Perform the isolation. The relevant
IA then signs off against each isolation point to confirm that the isolation has been applied and
that the isolations are in place. Only then can the AA issue the referenced WCC.
Title of Document: bpTT CoW / ISSoW Handbook
Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 19 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


The ICC remains in force until all WCCs associated with the ICC have been taken to Complete
State.
Refer to Addendum C - ICC Lifecycle for detail

7.6

Sanction to Test (STT)

A Sanction to Test (STT) is to be used when there is a requirement to de-isolate all or part of an
isolation boundary covered by an Isolation Confirmation Certificate (ICC) in order to conduct an
operation/integrity test, without the need to cancel the referenced WCC.
Note: As this process requires the removal or partial removal of the isolations before the
total scope of work is completed, it must be tightly controlled. All STT isolations
must be approved by the AA
The isolation points required to be temporarily de-isolated must be reviewed with the AA and
the IA, then the referenced WCC shall be Suspended for STT (and any other associated WCCs
affected by the STT).
Once the AA has given approval for the STT, the relevant IA can de-isolate the relevant
isolation points. After the initial de-isolation has taken place the referenced WCC can be then
Issued for STT.
On successful completion of the test, the isolation points can be re-isolated to allow continued
work under the original WCC. This approval, de-isolation and subsequent re-isolation are
recorded on the ICC.
However, if a successful STT marks the end of the scope of work of the WCC, then these
isolation points do not need to be re-isolated, but can be moved to final de-isolation.
Note:

A step-by-step guide on how to conduct a STT can be seen in the Resource Centre.

7.7

Long Term Isolations (LTI)

In circumstances where it is not possible to continue the work under a WCC (e.g. waiting for
spare parts), the ICC has to be retained. The AA will ensure that the WCC assigned for this
work will be either complete or not complete. The AA will then move the ICC to LTI where it will
remain in the LTI Register until such time that it has to be re-activated. The ICC will undergo a
Review every 7 days and an Audit every 90 days.

7.8

Boundary Isolations

Where Multiple WCCs are carried out against a common isolation, this is designated a
boundary isolation, this is in accordance with bpTT SIRPS Manual TRD 2143.
Where boundary isolation is used then each WCC must be referenced to the ICC. All of the
referenced WCCs must be cancelled before the isolation can be removed.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 20 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

8.0

Supporting Processes

8.1

Paper Based Back up system

A paper based back up system exists which provides an interim control should there, in the
unlikely event, be a failure of the software system. This should be kept in the permit office and
comes in pre printed pads.

8.2

Additional Paper Certification

Where additional paper certification / documentation are used in support of a Work Control
Certificate (WCC), then they should be referenced on the WCC and attached in paper form.
The following are some examples of supporting certification/documentation:

8.3

COSHH Assessment

Safety System Inhibits

P&IDs

LO/LC valve status log.

Leak pressure test certificate

Ground disturbance certificate

Operations within the 500m Zone

Activities within any Installations 500m zone, e.g. diving or pipe laying operations, are
controlled under CoW/ISSoW and will be carried out under an appropriate WCC.
Any vessel carrying out these activities must maintain close communication with the Installation
at all times and must not carry out any work until approval by the SC, excluding routine supply
vessel operations.
A WCC will be generated and administered for work within the 500m zone as follows:
1. The company representative on the vessel will contact the Installation and discuss the
proposed operation with the designated AA.
2. The AA or his designate will create the WCC identifying the correct hazards and
controls for the operation.
3. The WCC will go through the normal approval process on the Installation.
4. When the Company Representative is ready to commence operations they will contact
the AA who will issue the WCC to a designated person, normally the Control Room
Operator, who will accept to take the WCC live. A copy will then be sent to the vessel
where the Company Representative will sign the copy and send it back by way of
acceptance (this can be done via fax or e-mail).
5. On suspension of work the Company Representative will inform the AA who will have
the WCC suspended. A copy of the status should then be sent to the Company
Representative on the vessel who will append their signature in confirmation and send
it back to the AA/Performing Authority (PA).

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 21 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


6. On completion of the task and communication from the Company Representative that
operations have been completed, the WCC will be moved to job complete.
7. A copy showing the signature of the PA will be sent to the Company Representative on
the vessel who will append their signature and send it back to the AA/PA,
acknowledging the completion of the task.
Any work being undertaken on subsea templates out with the 500m zone would still have the
same principle as above applied.
This is reflected within bpTT Sub-Sea Operating Practice (Diving Operations) TRD 2167.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 22 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


9.0

Risk Assessment Process

9.1

Glossary of Terms

Competent Person
A person who by reason of his/her training, knowledge, experience and judgement is
considered by management to be capable of adequately assessing health and safety risks for
the activity in question.
Control Measures
Actions necessary to prevent hazards from causing harm
Hazard
The potential to cause harm
Hazard Effect
The severity of the likely consequence if an incident occurs.
Probability
The possibility of an event happening should controls fail expressed as unlikely, low, medium,
or high.
Reasonably Practicable
This term implies that an estimation of the risk must be made. If the cost or difficulty of a
precaution is grossly out of proportion to the reduction in risk likely to be achieved by
implementing it, the precaution can be considered not reasonably practicable.
Any additional risks which may arise while implementing or removing the precaution must
also be taken into consideration in determining what is reasonably practicable.
Risk
The product of hazard effect and likelihood

Initial Risk before control measures have been identified


Residual Risk after control measures have been identified

Risk Assessment
The process of hazard identification assessment and reduction of risk to an acceptable level
for any activity that is to be carried out.
CoW/ISSoW has two levels of risk assessment - L1RA and L2RA.
Risk Assessment Matrix
A pictorial method of indicating the results of a risk assessment.

9.2

Risk Assessment Process

Almost any person employed at a bpTT site can be requested to participate in Risk
Assessments. The company is responsible for the provision of training to a level that permits
risk assessment participants to contribute effectively to the process.
The Major Accident Hazard Management Team (MAHAMS) shall be responsible for the
custody and maintenance of the Policy and Guidance on Management of Risk STP-IM-009
with the provision for a risk assessment and advisory service as required.
The Risk Assessment Process is an integral part of all WCCs and is categorised into two
levels.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 23 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


9.2.1

Level 1 (L1RA)

A single person may carry out this type of assessment (with input from others as required) in
accordance with the guidelines set out within the bpTT Policy and Guidance on Management
of Risk STP-IM-009.
If it is deemed that the L1RA is not sufficient to control the identified hazards then a L2RA
must be conducted. The software will prompt the user to this effect.
Examples of Work that may be undertaken using a L1RA are listed below:

Following minor repair and maintenance work on safety and emergency systems: i.e.
o

Routine checks and tests which do not require isolating or inhibiting any part of
the system.

Minor work and checks, which do not affect the integrity of the system.

Non-intrusive work on equipment, which is already shut down.

Visual inspection of areas except in confined spaces.

Opening live electrical junction boxes in non-hazardous areas to carry out switching,
testing to prove dead.

Opening, but not working on live electrical junction boxes in hazardous areas which
contain only IS circuits.

Hand painting except where the paint or the area to be painted requires the use of an
air fed mask.

Routine maintenance work, not requiring a Work Permit and covered by a written
procedure.

Work on communication systems within telecommunications safe areas.

Work on computer controlled systems.

Re-lamping in non-hazardous areas.

Maintenance work on office equipment.

Use of non-certified portable electrical equipment, cameras etc and non-IS test
equipment in hazardous areas (constant gas monitoring is mandatory).

If in any doubt, conduct a level 2 Risk Assessment.


9.2.2

Level 2 (L2RA)

This is a team based risk assessment with a minimum of three members.


There are some WCC types and categories where a L2RA is mandatory.

All Hot Work Naked Flame - Permits.


Confined Space Entry WCCs.

These are described within bpTT Policy and Guidance on Management of Risk STP-IM-009.
It should also be noted that for some tasks a risk assessment may require to be conducted
offsite as well as at the installation / site itself.

9.3

Other Types of Risk Assessment Conducted in ISSoW

In addition there is the facility to conduct Stand Alone Risk Assessments (SARA), Operational
Risk Assessments (ORA).
Title of Document: bpTT CoW / ISSoW Handbook
Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 24 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


9.3.1

Standalone Risk Assessment (SARA) - WCC

A Standalone Risk Assessment is slightly different from the other WCC types as it involves
carrying out a risk assessment, which may not be associated with either a task or specific
piece of equipment. It could for example involve performing a risk assessment associated
with a change in organisation or responsibilities. It allows direct use of the standard Level 2
Risk Assessment process.
The system has the ability to highlight controls required as being prerequisite. This function
will not allow the WCC or SCC to proceed to the next level until the controls have been
confirmed to be in place.
9.3.2

Operational Risk Assessment (ORA) - WCC

Many of the current Operational Instructions are associated with operating plant or equipment
as opposed to work on that plant or equipment, and a WCC - Operational Risk Assessment
(ORA) is designed to meet this need by utilising the L2RA process to:

Identify the risk associated with continued operation given that < 100% system
protection is available.
Identify controls needed to permit continued safe operation. It also provides a visible
and auditable approval process.

9.4

Planning

9.4.1

Collating Information

The Permit Requestor must check ISSoW to determine if a WCC and its assessment for the
activity already exists. If an assessment has been carried out previously, this must be
reviewed by the Permit Requestor and other relevant personnel to establish if it is still valid. If
so, the WCC (with its assessment) can be copied, and submitted for Verification. If it is not, a
new assessment will be required.
If a new Task Risk Assessment is required, the Requestor must collate all relevant
information including work packs, drawings and other documentation for the activity being
assessed.
9.4.2

The Risk Assessment Team (Level 2 RA)

A team composed of competent persons who have knowledge and experience relevant to the
activity must carry out the Level 2 Risk Assessment.
The team will typically include the following:
Requestor
Area Authority
Performing Authority
Isolating Authority
Other appropriate personnel who have specialist knowledge of the activity
9.4.3

Level 2 Risk Assessment

The team will carry out the Level 2 Risk Assessment using the CoW/ISSoW programme.
Having identified the hazards associated with the activity, the Team must establish effective
controls to ensure that the Residual Risk is as low as reasonably practicable using the list
associated with each group of Hazards.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 25 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Should the listings not capture all controls required then there is a facility to input additional
controls should the need arise.
9.4.4

Work Co-ordination

All proposed work activities must be discussed at daily planning meetings to ensure that all
relevant personnel are aware of the nature and extent of the work. The Permit Requestor
must ensure that sufficient resources are available to undertake the work safely. The
interactions with other operations must be addressed at this stage.

9.5

Risk Assessment Matrix

ISSoW features one Risk Matrix that combines Safety, Environment and Business
consequence as factors to consider when evaluating hazards and risk. This can be accessed
via the Level 2 Risk Assessment section within ISSoW, and is shown at Figure 3.
The three categories contained within the matrix are defined as follows:
Low (3 or less) The risk is acceptable if it is managed
Medium (4 and 5) The risk is tolerable if it has been reduced to ALARP
High (6 and above) The risk is not acceptable under any circumstance
The Initial Risk before controls are put in place will be categorised according to the matrix
levels Low, Medium and High
The Residual Risk will also be categorised after controls have been identified. These can be
used for comparison to evaluate the reduction in risk due to the control measures being
implemented.
Once all of the control measures have been identified, the following factors should be
considered when assessing the Residual Risk:

Have all the necessary controls been identified?


Are they appropriate for the hazards involved with the task?
Are any additional competencies required to complete the task?
Is the residual risk effectively controlled?

Where the Residual Risk is judged to be acceptable and as low as reasonably practicable
(ALARP), the team will recommend that the work should go ahead with the identified control
measures in place. This must be a unanimous decision of the whole team and is reflected in
the tick box stating ALARP.
If this is not the case, the work content must be re-considered before re-assessment takes
place.
The AA and SC when they respectively Verify and Authorise a WCC must ensure that a
suitable and sufficient risk assessment has been performed and that adequate controls have
been identified to reduce the risks, and their electronic signatures are captured within the
ISSoW system.

Changes that may affect Risk Assessment


If during the course of work being performed any conditions change that may affect the
suitability of the control measures in place to reduce the risk then the work will be stopped. A
Competent Person will make an assessment as to whether the Risk Assessment should be
Title of Document: bpTT CoW / ISSoW Handbook
Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 26 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


revisited or the work held until conditions return to those under which the Risk Assessment
and any Permit to Work were issued.

Training in Task Risk Assessment is provided as follows:

Training for bpTT Staff may be arranged through training administration.

The Contract Sponsor must agree contractor Contractors Training requests and,
thereafter, the Focal Point will make the arrangements.

Additional training may be provided as and when required.


The flowchart in Figure 2 illustrates the process flow through the various options and stages
of the Task Risk Assessment Process.
The purpose of this process is to provide a structured approach to task risk assessment and
to meet the regulatory and bpTT Policy and Guidance on Management of Risk STP-IM-009.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 27 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Figure 1 CoW/ISSoW Icon Shapes and Colours
Icons

Definition
Requested Incomplete
Requested
Pending
Authorised
Suspended
Suspended STT
Issued
Pre-issue & Pre-live
Issued STT
Live (the icon will flash if Overdue)
Live STT (the icon will flash if Overdue)
Continuation Pre-issue & Continuation Pre-live
Job Complete
Job Incomplete
Exceeded Validity
WCC Complete
Archive
Retained Archive
Approved Routine Template

All the above icons will be shown with a flashing border if they cover multiple areas. The
category of a WCC is shown by the Colour of the fill in the icon. In the examples above they
are all Hot Work (Naked Flame) Permits (i.e. positive source of ignition) The other
categories are:
Hot Work (Spark Potential) Permits (i.e. potential source of ignition).
Cold Work.
Cold Work - Breaking Containment.
Routines are shown as split icons where the colour in the left of the split denotes
the category.
Confined Space Entry Certificate

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 28 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Figure 2 - Risk Assessment Flow Chart

WORK REQUEST

6.1
LEVEL-2 (MANDATORY)
6.2

NO

CHECK TASK
CATEGORY

MANDATORY?

YES
PERFORM LEVEL-1
TRA

6.3

LEVEL-2 TRA

6.5

HIGH OR
MEDIUM RISK
FORM TRA TEAM

6.4

6.6

DEFINE TASK
PARAMETER

LOW RISK

BREAK DOWN
ACTIVITIES

IDENTIFY HAZARDS
For each activity

LEVEL-1
a) All new activities
b) All jobs at planning and design stage
c) Repeated activities, if condition is changed
d) Annual review for repeated activities

a) Confined Space Entry (including vessel


cleaning)
b) Excavations greater than 4 feet deep
c) Working at heights > 6 feet (including
erection of structures for this work)
d) Hot Work in Hazardous Areas
e) Failure to meet minimum isolation
requirements
f) Complex lifting operations involving multiple
suspensions or lifting near live plant
g) Any activity with potential H2S exposure
h) Where multiple protective devices are
removed or inhibited from a system
i) Simultaneous operations
j) Mud plugging and Hot tapping
k) Deviation from an existing policy, procedure,
or practice
l) Mandatory for activities where risk
assessment is medium or high

6.7

6.8

FIND ASSOCIATED
HAZARDS
For each activity

6.8

IDENTIFY
CONSEQUENCES
For each hazard

6.9

DEFINE RISK RATINGS

6.10

IDENTIFY CONTROLS

6.11

CONTROLS
ADEQUATE?

6.12

NO

YES
RESIDUAL RISK
ACCEPTABLE

NO
6.13

APPROVAL TO PROCEED

6.16

6.17

YES
AGREEMENT ON RISKS &
CONTROLS

TRA COPIES TO ALL


INVOLVED

6.14

DOCUMENT & RECORD

6.18

6.19

6.15

IMPLEMENT
CONTROLS

MONITOR FOR
CONDITION CHANGE

CARRY
OUT TASK

STOP

RE-ASSESS IF
REQUIRED

6.20

RECORD LESSONS
LEARNED

6.21

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

IF CONDITIONS
CHANGE

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 29 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Figure 3 - bpTT Risk Assessment Matrix.

Consequences

1
A

2
B

3
C
Likelihood

4
D

5
E

Likelihood Category

Cat

Level

Continuous

Very High

High

Medium

Low

Frequency of Occurrence F
(continuous Operation) per
year of facility operations
Once or more per
quarter
Once per year
Less than once per
year
Less than once in 10
years
Less than once in 1000
years

Probability of Occurrence P (single


operation) during the operation
Very likely to occur more than
once
Certain to occur at least once

F > 1/yr
F ~ 1/yr
F < 0.1/yr
F < 0.01/yr
F < 0.001/yr

Less than 1 in 10 chance of


occurring
Less than 1 in 100 chance of
occurring
Less than 1 in 1000 chance of
occurring

P > 1.0
P ~ 1.0
P < 0.1
P < 0.01
P < 0.001

Consequence Category
Cat

Level

Catastrophic

Very High

2-10 fatalities

High

Single fatality

Medium

Low

safety
>10 fatalities

Permanent Disability
DAFWC / Hospital stay
First aid case

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Environment
Oil or chemical spill
> 5000 Barrels (US
Oil or chemical spill
1000 -5000 Barrels (US)
Oil or chemical spill
100 -1000 Barrels (US)
Oil or chemical spill
10 -100 Barrels (US)
Oil or chemical spill
1 -10 Barrels (US)

Business
> $100M (US)
$10M - $100M (US)
$1M - $10M (US)
$0.1M - $1M (US)
$10,000 S 0.1M (US)

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 30 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Addendum A - Permit & CSE Lifecycle

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 31 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Addendum B - Routine Lifecycle

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 32 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Addendum C - ICC Lifecycle

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 33 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


10.0

Control of Work Standard

Intent
The intent of this Standard is to ensure there is a formal approach to managing work risk for
bp employees and bp Companies and their contractors. The further intent is to promote
adoption of the Standard by companies working on behalf of bp on non bp Premises. bp
should endeavour to hire contractors with CoW programs that are as protective, or more
protective, than this Standard and encourage those who do not have such a program to adopt
one.
Purpose
The purpose of this Control of Work (CoW) Standard is to reduce the risk to which our
workforce is exposed and the potential for harm to others. The Standard will strengthen the
Groups ability to deliver HSSE Performance by defining the Mandatory Requirements
required of any CoW process.
The Group Standard Personal Safety - Control of Work (CoW) requires compliance
with the following 12 Elements:
1. A written policy shall exist describing the CoW process.
2. All identified roles within the CoW policy and associated procedures shall have defined
accountabilities.
3. All persons involved in the CoW process shall be appropriately trained and competent to
carry out their roles.
4. Planning and scheduling of work shall identify individual tasks and their interaction.
5. Tasks shall not be conducted without being risk assessed.
6. Before conducting work that involves confined space entry, work on energy systems,
ground disturbance, hot work or other hazardous activities, a permit shall be obtained.
7. The scope, hazards, controls and mitigations shall be communicated in writing and signed
off by all involved in the task.
8. All ongoing work requiring a permit shall be regularly monitored and managed by a
responsible person.
9. The work site shall be left in a safe condition on completion or interruption of the work.
10. The CoW process shall be subject to a program of regular auditing.
11. Internal and External lessons learned that impact the CoW process shall be captured,
incorporated, and shared.
12. The CoW policy and associated procedures shall make it clear to everyone that they have
the obligation and authority to stop unsafe work.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 34 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

11.0

Golden Rules of Safety

The purpose
The Golden Rules of Safety cover the following activities:

Permit to work
Energy isolation
Ground disturbance
Confined space entry
Working at heights
Lifting operations
Driving safety
Management of change

They are the minimum standards for safeguarding personal safety and the key controls and
procedures that must be followed in all places of work. These rules have been prepared to
allow the learning from past safety incidents to be shared widely across bp and emphasize
the basic rules that should be in place in all locations for managing safety during typical risk
activities.
The Golden Rules of Safety must be strictly enforced to ensure the safety of our people and
the communities in which we live. They also provide a basis of safe practice for managing
risks outside of work activities.
Everyone should be aware of these rules and follow them. Management are accountable for
communicating, training, implementing and auditing them to assure compliance.
Permit to work
Before conducting work that involves confined space entry, work on energy systems, ground
disturbance in locations where buried hazards may exist, or hot work in potentially explosive
environments, a permit must be obtained that:

defines scope of work


identifies hazards and assesses risk
establishes control measures to eliminate or mitigate hazards
links the work to other associated work permits or simultaneous operations
is authorised by the responsible person(s)
communicates above information to all involved in the work
ensures adequate control over the return to normal operations.

A permit to work must be used whenever abnormal or high-risk work is to be carried out, or
where specific circumstances require protection above that which normal working conditions
provide. The permit provides written confirmation that a risk assessment of the specific
conditions affecting the work has been carried out and that appropriate control measures to
protect personnel and equipment from each of the hazards have been provided. It is a formal
agreement between the permit authority (responsible person) and those who will carry out the
work that both the risks and the controls that will mitigate them are understood and that the
controls will be fully implemented.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 35 of 50

Formatted: Bullets and Numbering

bp Trinidad & Tobago CoW/ISSoW Handbook


Sign it only when you are happy that you understand all the requirements.
Energy isolation
Any isolation of energy systems; mechanical, electrical, process, hydraulic and others, cannot
proceed unless:

the method of isolation and discharge of stored energy are agreed and executed by a
competent person(s)
any stored energy is discharged
a system of locks and tags is utilized at isolation points
a test is conducted to ensure the isolation is effective
isolation effectiveness is periodically monitored.

Formatted: Bullets and Numbering

An energy source in this context includes any electrical, mechanical, hydraulic, pneumatic,
gravitational, chemical, nuclear, thermal or other energy source that could cause injury.
Energy sources must be isolated whenever servicing or performing maintenance on machines
and equipment in which the unexpected energisation or start up, or the release of stored
energy could cause injury.
Note that this Golden Rule will be applied in conjunction with local rules and procedures,
which may in turn be influenced by specific regulations in the country of operation, or codes of
practice that apply to a particular industry sector.
Ground disturbance
Work that involves a man-made cut, cavity, trench or depression in the earths surface formed
by earth removal cannot proceed unless:

a hazard assessment of the work site is completed by the competent person(s)


all underground hazards, i.e. pipelines, electric cables, etc., have been identified, located
and, if necessary, isolated.

Formatted: Bullets and Numbering

Where persons are to enter an excavation:

a confined space entry permit must be issued if the entry meets the confined space
definition
ground movement must be controlled and collapse prevented by systematically shoring,
sloping, benching, etc., as appropriate
ground and environmental conditions must be continuously monitored for change.

Formatted: Bullets and Numbering

Ground excavation must not commence until it has been authorized by a competent person,
i.e. one who can identify the hazards and put in place the right measures to control them.
Particular care is required if members of the workforce are required to enter the excavation,
and conditions must be monitored during their entry to make sure that they are not
endangered by changes in soil stability as a result of the weather or other work that is going
on.
Confined space entry
Entry into any confined space cannot proceed unless:

Formatted: Bullets and Numbering

all other options have been ruled out

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 36 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

permit is issued with authorization by a responsible person(s)


permit is communicated to all affected personnel and posted, as required
all persons involved are competent to do the work
all sources of energy affecting the space have been isolated
testing of atmospheres is conducted, verified and repeated as often as defined by the risk
assessment
stand-by person is stationed
unauthorized entry is prevented

A confined space is one that is large enough for personnel to enter, has limited or restricted
means of entry, and is not designed for normal or continuous occupancy. It can be any space
of an enclosed nature where there is a risk of death or serious injury from hazardous
substances or dangerous conditions (e.g. lack of oxygen).
Entry to such spaces must be controlled, and only authorized following a risk assessment and
the establishment of controls over the hazards. In particular, the quality of the atmosphere
inside the space must be subject the stringent monitoring. On some occasions when it
becomes necessary to work in an inert atmosphere, specialist teams and very rigid
procedures are required for personnel both in the vessel and in the vicinity of it where the
atmosphere may still be unsafe.

Deleted: , very rare

Working at heights
Working at heights of 2 metres (6 feet) or higher above the ground cannot proceed unless:

a fixed platform is used with guard or hand rails, verified by a competent person, or
fall arrest equipment is used that is capable of supporting at least a 2275 kg (5000 lbs)
static load per person and has:
a proper anchor, mounted preferably overhead
full body harness using double latch self locking snap hooks at each connection
synthetic fibre lanyards
shock absorber
fall arrest equipment will limit free fall to 2 metres (6 feet) or less
a visual inspection of the fall arrest equipment and system is completed and any
equipment that is damaged or has been activated is taken out of service.
person(s) are competent to perform the work

Formatted: Bullets and Numbering

Formatted: Bullets and Numbering

The precautions required for working safely at height are very straightforward so it is
disappointing that accidents during such operations are rather common. Each business unit
must have a Fall Protection Policy based on the above rule, taking into account the specific
risks that are involved, and also the national, regional and industry sector regulations that
may apply. Remember that every office has windows to clean and a roof to maintain, so the
potential is there in just about every location.
Lifting operations
Lifts utilizing cranes, hoists, or other mechanical lifting devices will not commence unless:

an assessment of the lift has been completed and the lift method and equipment has
been determined by a competent person(s)
operators of powered lifting devices are trained and certified for that equipment
rigging of the load is carried out by a competent person(s)
lifting devices and equipment have been certified for use within the last 12 months (at a
minimum)
load does not exceed dynamic and/or static capacities of the lifting equipment

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 37 of 50

Formatted: Bullets and Numbering

bp Trinidad & Tobago CoW/ISSoW Handbook

any safety devices installed on lifting equipment are operational


all lifting devices and equipment have been visually examined before each lift by a
competent person(s).

Lifting, whether using simple hand operated mechanical devices or more complex ones, must
only be carried out by trained and competent persons using approved and recently inspected
equipment. The area underneath the lift is under control and clear of unnecessary persons or
equipment.
Each business unit must specify its own clear rules for lifting; dependant on the type and
frequency of lifting operations that are involved, and taking into account both regulatory
requirements and industry good practice.
Driving Safety
All categories of vehicle, including self-propelled mobile plant, must not be operated unless:

vehicle is fit for purpose, inspected and confirmed to be in safe working order
number of passengers does not exceed manufacturers design specification for the
vehicle
loads are secure and do not exceed manufacturers design specifications or legal limits
for the vehicle
seat belts are installed and worn by all occupants
safety helmets are worn by riders and passengers of motorcycles, bicycles, quads, snowmobiles and similar types of vehicle.

Formatted: Bullets and Numbering

Formatted: Bullets and Numbering

Drivers must not be authorized to operate the vehicle unless:

they are trained, certified and medically fit to operate the class of vehicle
they are not under the influence of alcohol or drugs, and are not suffering from fatigue
they do not use hand-held cell phones and radios while driving (best practice is to switch
off all phones and two-way radios when driving).

Operation of road transport, of all kinds, light vehicles, heavy vehicles, or self-propelled mobile plant
on or off-road, is the source of the greatest number of serious accidents and fatalities, both for BP and
for the world in general The two key components of getting road safety right are: access to the right
vehicles with appropriate equipment, standards, procedures; and the quality of the training and
competencies of drivers together with their behaviours and attitudes.
Management of change
Work arising from temporary and permanent changes to organization, personnel, systems,
process, procedures, equipment, products, materials or substances, and laws and regulations
cannot proceed unless a Management of Change process is completed, where applicable, to
include:

a risk assessment conducted by all impacted by the change


development of a work plan that clearly specifies the timescale for the change and any
control measures to be implemented regarding:
equipment, facilities and process
operations, maintenance, inspection procedures
training, personnel and communication
documentation
authorisation of the work plan by the responsible person(s) through completion.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 38 of 50

Formatted: Bullets and Numbering


Formatted: Bullets and Numbering

Deleted: A crucial third element is


the support and leadership shown by
management in creating the right
environment for safe driving.

Alternative last sentence:

The leadership will come from


management, who must support the
road safety effort by creating the right
environment for safe driving.
Formatted: Bullets and Numbering

Formatted: Bullets and Numbering

bp Trinidad & Tobago CoW/ISSoW Handbook


Ensuring systematic Management of Change (MOC) is a key part of Process Safety
Management (PSM) and the detailed processes that are necessary will be covered in site and
business documentation elsewhere. Failure to identify and control the potential hazards that
are associated with changes has led to a number of catastrophic incidents, and many others
that have caused great harm to people and facilities. As a result, it is vital that everyone
understands what is meant by a change and is aware of the MOC process. Every affected
person must be briefed on the control measures that are to be put in place to manage any
proposed change.

12.0

Site Standards
These Site Standards are mandatory in bpTT

Failure to comply with these standards will result in disciplinary action


NO ACCIDENTS
NO HARM TO PEOPLE
NO DAMAGE TO THE ENVIRONMENT
12.1

Beachfield Site Standards

Rules for Personnel & Vehicle Operators


These Site Standards are mandatory and apply to all persons entering the Beachfield site.
Failure to comply with these standards may result in disciplinary action and/or removal from
the site.
Fairplay
All the requirements stated within this booklet shall be followed. The rules of Fair-play will
determine the appropriate action for non-conformers.
We will adhere to

Getting HSSE right


BP Golden Safety Rules
Control of Work plan
bpTTs 6+ prominent Risks Standards

The following items are prohibited


Matches, cigarettes, lighters, drugs, alcohol, pagers, cell phones, cameras, jewellery,
firearms, non-intrinsically safe radios or electronic equipment, combustible materials,
poisonous chemicals and all items deemed unsafe for use on the plant by operations.
Plant Security

Entry to the plant will require registration at the Security Booth and all prohibited
materials surrendered.
Vehicles will only be allowed onto plant after being screened by Security.
All small deliveries will be made at the Security Booth.
Theft will not be tolerated.
Instructions from security guard must be followed.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 39 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

Vehicles and people are subject to be searched.

Work Site

Before starting work, the site must be visited the Area Authority and Performing
Authority, to understand the exposure to risks.
Escape routes and safety equipment must never be obstructed.
Sites will be kept clean and tidy at all times. Waste will be disposed in the correct bins
or designated areas.
Personnel will not cross CAUTION barriers unless accompanied by the associated
Performing Authority or designate.

PPE

Safety footwear consistent with bpTTs boot policy must be worn.


Fire Resistant Clothing, hard hats and safety glasses are mandatory. Hearing
protection must be worn where required, dependent upon location and job being
performed.
Finger rings, ear rings, necklaces, chains and bracelets are not allowed on the
worksite. Watches will be allowed except those with metal bands.

Equipment / Tools

Equipment / Tools shall be intrinsically safe


Striking end tools to be non sparking
All electrical outlets and extension cords to be GFCI protected and explosion proof
as per Area classification
Assured equipment grounding shall be done where required
NO refuelling of equipment on site

Incident and Injury

Any unsafe act, or condition witnessed, MUST be stopped and reported to your
supervisor or to Ext 2420. All persons are advised to report all near miss,
incidents / accidents.
Incorrect reporting or falsifying data will not be tolerated.
Injuries (however minor) must be reported immediately.

Auditing

Personnel are expected to STOP WORK and participate in the safety conversations/
auditing process.

Smoking

Only permitted in designated area Smoke shed


No Matches, lighters, or other sources of ignition allowed ON THE PLANT.

Lifting

All equipment / tools to used for lifting must be certified by a bpTT recognised
authority
All personnel must be qualified and competent.
All lifts must be risk assessed.
All lifts must comply with bpTTs safe lifting policy / procedure.

Energy Isolation

All energy isolations must comply with bpTTs policy / procedure.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 40 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

Isolation Confirmations must be agreed to by a competent Authority before work can


begin
Isolation must be re-tested daily and at the end of shifts.
Locks and Tags must be accounted for and Isolations must be registered.

Working at Height

Use only certified scaffolding.


Scaffold must be erected as per bpTT standard and certified by a registered
competent person (advanced scaffolder) before use.
Three points of contact will be made when ascending or descending a ladder.
Tools and materials must be secured when working aloft.
Any area with risks of dropped objects must be securely cordoned off (at ground
level) for the duration of the task.
All scaffold material must be fit for use
All fall protection / prevention devices to be fit for purpose

Computer Use Protocol

Accessing or forwarding material that includes: Pornography, sexually explicit


material, illegal activity and intolerance for others are prohibited.

Drug And Alcohol Testing

Random drug and alcohol testing can be done at anytime in accordance with BpTTs
drug and alcohol policy.

Visitors

ALL VISITORS (i.e. persons who do not regularly enter the plant) MUST BE MET AT
THE GATE BY THEIR HOST OR DELEGATE.
Visitors must sign the security register before entering
Visitors must have induction and demonstrate understanding. Site inductions will
occur in the security building.
Re-induction will be done every time an employee or visitor is away from the site for
more than three months.

Vehicles

Only vehicles with equipment identified on the daily work plan will be allowed entry
into the plant
Only diesel vehicles with spark arrestors will be allowed entry
All individuals in vehicles must wear seat belts
Speed limit must be adhered to at all times.
Vehicle Operators must inform the site 24hrs before arrival so that safety
preparations can be made.
All vehicles will be inspected. Vehicles failing inspection will not gain entry, same
documented and forwarded to HSSE dept.
Drivers must leave all prohibited materials at the security booth.

Work Controls

No work will occur unless:


o it is approved by the area authority or his/her designate
o it is risk assessed
o it is adequately supervised
o a work permit and/or a procedure with JSA is in place

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 41 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


any deviation from planned activities have been approved by the appropriate
area authority and relevant risk assessment done.
A Control of Work Plan is available from the Performing Authority. The work must be
on the Daily Work Plan
New employees/trainees must be supervised for a period of two weeks by supervisor.
o

If you have questions with respect to any of these expectations, you are expected to
ask now and gain clarity from the induction facilitator.
Failure to comply with these rules will result in disciplinary action and/or removal from
the site.

12.2

Galeota Terminal Site Standards

Visitors

All persons not on the daily work plan or the approved list of the site workers are
considered visitors.
All visitors must be met at the gate by their host or delegate.
Visitors must sign the register before entering the site.
Visitors must have an induction and confirm understanding.
Everyone must be re-inducted every three months.
The BP Video and ASCO Video must be shown at these inductions.

Site Rules for Personnel & Vehicle Operators

These Site Standards are mandatory.


Failure to comply with these rules will result in disciplinary actions and/or removal
from the site.
These standards apply to all employees, contractors and visitors.
These Site Standards begin at the Main Gate.

Work Controls

No work or activity will occur unless:


It is approved by the area authority or his/her delegate.
It is PROPERLY risk assessed (TBRA/JSA)
It HAS COMPETENT Supervision.
A work permit and/or procedure is in place.
Any deviations from planned activities have been approved by the appropriate
area authority.
Pre job Tool Box Talks must be heldALL PERSONNEL PRESENT.

A Control of Work Plan is available from the Performing Authority.


New employees/trainees must be supervised for a period of two weeks by the supervisor.
Vehicles

MUST HAVE SPARK SUPPRESSION DEVICES.


All individuals in vehicles must wear a seat belt.
Speed limit must be adhered to at all times.
Vehicle operators involved in works must inform the site 24hrs before arrival so
that safety preparations can be made. Vehicles that are not on the Daily Work
Plan cannot enter the site.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 42 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

All vehicles are subject to an inspection. Vehicles that do not pass inspection
cannot enter the site.
All vehicles engaged in work processes will be provided with a colour coded pass
to identify the location/destination/purpose or worksite.
Drivers should confirm that their cell phones and pagers are turned off while the
vehicle engine is running,
No gas driven vehicles are allowed on the plant.

Fairplay

The rules of Fairplay will be used to determine the appropriate action for nonconformers.

At all times we adhere to

Getting HSSE right.


BP Golden Safety Rules.
Galeota Control of work plan.
BPTT 6+ prominent Risks Standards.

Security

Unethical, illegal & violent behaviour will not be tolerated.


Instructions from security guards must be followed at all times.
Vehicles, people and their belongings are subject to be searched.
Accessing or forwarding material that includes: pornography, sexually explicit
material, illegal activity and intolerance for others are prohibited.
Spot Checks can be done by Security even when you are on site. Failure to
have all the entry documents on your person will result in expulsion.

Auditing

Personnel are expected to STOP WORK and participate in the safety


conversations/auditing process.
Auditors are to be properly attired .as per PPE Expectations.

Smoking

Only permitted in designated areas. Non-flame lighters are installed at the


Smoking Kiosks.
Persons found smoking outside the designated smoking areas will be
permanently removed from the site.

Lifting

All equipment to be used must be certified and their lifting capacity must be
greater than the item to be lifted.
All personnel engaged in lifting must be qualified, competent and approved.
All lifting operations will adhere to the Bp/ASCO lifting rules.

Energy Isolation

All personnel engaged in energy isolation must be qualified, competent and


approved.COMPETENT AUTHORITIES.
All energy isolation operations will adhere to the BP/ASCO energy isolation rules.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 43 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Working at Heights

ONLY APPROVED SCAFFOLDING WILL BE USED.


All personnel working at heights must be qualified, competent and approved.
All working at heights operations will adhere to the BP/ASCO working at heights
rules.

Tools & Equipment

MUST BE INSPECTED/CERTIFIED/FIT FOR PURPOSE.


Will be fit for purpose and not modified in anyway.
Tools and equipment will not be used unless the user is competent in their use.
All electrical equipment must be approved by the authorized electric person. (
COMPETENT AUTHORITY)

Drugs & Alcohol

Random drug and alcohol testing can be done at anytime in accordance with
bpTTs drug and alcohol policy.
Illegal drugs and alcohol are not allowed on the site.
It would be advisable to inform emergency dispatch or Plant Nurse of any
medications that you are taking.

Work Site

Before starting work, know the location and use of the safety equipment, escape
routed and the site must be visited by AA and PA to understand exposure to risks
Escape routes and safety equipment must never be obstructed.
Sites will be kept clean and tidy at all times. Waste will be disposed of in the
correct bins or designated areas.
Personnel will not cross CAUTION barriers unless accompanied by an
associated performing authority or designate.
Barriers will display ownership details.
There must be appropriate signage to identify the project being undertaken,
and to alert third party personnel.

PPE

Except when in vehicles or office building, the following minimum PPE rules
apply:
Hard hats, safety glasses and safety boots
Additional PPE must be worn appropriate for the site and job being performed
(e.g. FRCs and Hi-Vis).
Jewellery is not allowed on personnel who operate vehicles, rotating machinery,
handle tools or are involved in maintenance, operations and warehousing type
work.
Watches with non-metallic bands are allowed.

Incident & Injury

Any unsafe act or condition witnessed MUST be stopped and reported to your
supervisor or to EXT. 4099 or ASCO 4496. All persons are encouraged to report
incidents.
Intentional false reporting or falsifying data will not be tolerated.
Injuries (however minor) must be reported immediately.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 44 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


12.3

Offshore Site Standards

Smoking

Only permitted in designated areas


No Matches, lighters, or other sources of ignition allowed outside the
accommodation.

New Personnel

Will adhere to the Green hat policy for a minimum of 2 trips or until they have
satisfied the site supervision that they are competent to work solo.
Will meet with OIM/OPS for debrief after induction.

Accommodation

No dirty clothing in the Galley or Recreation room


Use only assigned bunks

Occupational Health

Safe and correct posture will be adopted on office furniture


If you are on medication, on arrival you must register with the Medic, giving
details of any medication being taken.
If you have plans to use the gym during your stay onboard, on arrival on location
register with the Medic
No running anywhere on the Installation except when using gym.

Management of Change

No modification will be carried out without following the correct change control
process.

At all times we will adhere to

Getting HSSE right


BP Golden Safety Rules
Control of Work Standards
bp Code of Ethics
Environmental Management System

Travel to and from Offshore Locations

FRC and safety footwear consistent with bp TT boot policy.

Work Controls

Work will be carried out under a Work Control Certificate (PTW) appropriate to
the risk and task.
If you do not understand the task, you will not start work.
All documented procedures will be complied with.
Work will be stopped if the scope is not as expected or has changed from the
agreed.
All Plant overrides will be registered when inhibited and reinstated.
No cell phone or pager usage onboard the installation. Lodge cell phones or
pagers to the HLO office until your departure.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 45 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Work Site

Before starting work, know the location and use of safety equipment.
Escape routes and safety equipment will not be obstructed.
Sites will be kept clean and tidy at all times.
Personnel will not cross barriers unless authorised by an associated performing
authority or designate.
Hard barriers with adequate signage to be installed around open areas.
Barriers will display ownership details.

PPE

Safety footwear consistent with bp TT boot policy, coveralls, hard hat (with chin
strap if available), safety glasses and hearing protection will be worn outside the
accommodation module at all times. Specific gloves to be worn for appropriate
tasks.
Finger rings, ear rings and necklaces, chains bracelets are not allowed.
Watches with metallic bands will not be allowed
Must be specific to task
Incident and Injury
Any unsafe act, or condition witnessed will be stopped and reported.
All Incidents and Injuries (however minor) must be reported immediately to
supervisor.

Auditing

Personnel are expected to participate in our auditing process.

Will be fit for purpose


All electrical equipment must be approved by the Authorised Electrical Person.
All tools must be inspected prior to use.
Tools and equipment will not be used unless you are competent in their use.

Tools

Working at Height

Use only certified scaffolding.


Scaffold must be erected and secured by a registered competent person before
use.
Three points of contact will be made when ascending or descending a ladder.
Step ladders will be inspected by Area Authority and Performing Authority before
use
Tools and materials must be secured when working at height
Any area at risk of dropped objects must be securely cordoned off for the
duration of the task.

Stairway Safety

Use handrails when traversing stairways


One step at a time.
Do not carry loads that compromise your safety.
Keep stairways and landings clear.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 46 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


Computer Use Protocol

Accessing or forwarding material that includes: Pornography, sexually explicit


material, illegal activity and intolerance for others is prohibited

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 47 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


13.0

HSSE Policy Statement

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 48 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook


14.0

Supplementary Certificates

Supplementary certificates are typically used where key precautions or controls have to be in
place before a WCC can be issued. Supplementary certificates should be cross referenced if
appropriate to a WCC.
Plant Contamination Certificate
A Plant Contamination Certificate (PCC) should be used to cover the handling or transport of
equipment, which is, or has been, contaminated. It should be used in every case when an
item of equipment which might be contaminated by significant amounts of flammable, toxic or
pressurised material is moved from an operational to a non-operational area, whether onsite
or offsite, including for disposal.
The only exception is if all persons handling the item(s) are the same as those who
dismantled them in the operational area, and no one else will be exposed to any residual
contamination or hazard, e.g. where small items are removed to a local workshop and
returned to site within a single shift.
The certificate provides a means to:

declare that a contaminated piece of equipment has been cleaned, specifying the
method(s) used

define the substance(s) with which a piece of equipment is contaminated, if it has not
been cleaned

specify the precautions to be taken when handling a piece of contaminated equipment.

The certificate shall be securely attached to the equipment and a copy included with the
manifest if the equipment is to be transported from the premises.
Clearance for Excavation Certificate
A Clearance for Excavation Certificate should be used where any excavation or ground
penetration is planned, on any site except greenfield locations, i.e. where there are known to
be no underground services.
The certificate provides the means to:

request permission to excavate as specified

record the consent of the person(s) responsible for the technical integrity of any
underground equipment or services, together with any required precautions

record the consent of the AA, subject to the issue of a WCC

confirm agreement by the PA to observe the specified precautions and to obtain the
necessary Permit before starting work.

Clearance to Move Heavy Equipment


A Clearance to Move Heavy Equipment Certificate should be used when it is planned to move
heavy equipment off-road in operational premises, or to lay it down on a floor or structure not
designed for the resulting point loading. The site risk assessment should define heavy in the
context of the specific premises, including relevant limitations of floor or structural loadings.
The certificate provides the means to:

apply for permission to move the heavy equipment as specified

specify the precautions to be taken to avoid damage to underground, surface and aboveground services, structures and facilities

record the consent of the AA subject to the issue of a WCC

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 49 of 50

bp Trinidad & Tobago CoW/ISSoW Handbook

confirm agreement by the PA to observe the specified precautions and to obtain the
necessary Permit before starting the move.

Title of Document: bpTT CoW / ISSoW Handbook


Status: Managed
CD#: CoW 4109

Custodian: Operations Technical Authority


Last Rev.Date: 03/10/2006
Page 50 of 50