Vous êtes sur la page 1sur 2

Federal Register / Vol. 70, No.

35 / Wednesday, February 23, 2005 / Notices 8801

already licensed Project No. 77 owned competing application itself, or a notice party to the proceeding. Any comments,
by Pacific Gas and Electric Company. of intent to file such an application, to protests, or motions to intervene must
g. Filed Pursuant to: Federal Power the Commission on or before the be received on or before the specified
Act, 16 U.S.C. 791(a)–825(r). specified comment date for the comment date for the particular
h. Applicant Contact: Mr. Edward T. particular application (see 18 CFR 4.36). application.
Navickis, P. O. Box 910, Penn Valley, Submission of a timely notice of intent Comments, protests and interventions
CA 95946, (530) 432–9226. allows an interested person to file the may be filed electronically via the
i. FERC Contact: Robert Bell, (202) competing preliminary permit Internet in lieu of paper; see 18 CFR
502–6062. application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions
j. Deadline for filing comments, the specified comment date for the on the Commission’s Web site under ‘‘e-
protests, and motions to intervene: 60 particular application. A competing filing’’ link. The Commission strongly
days from the issuance date of this preliminary permit application must encourages electronic filing.
notice. conform with 18 CFR 4.30(b) and 4.36.
The Commission’s Rules of Practice s. Filing and Service of Responsive
o. Competing Development Documents: Any filings must bear in all
and Procedure require all intervenors Application: Any qualified development
filing documents with the Commission capital letters the title ‘‘COMMENTS’’,
applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS
to serve a copy of that document on development application must submit to
each person in the official service list AND CONDITIONS’’, ‘‘PROTEST’’, or
the Commission, on or before a ‘‘MOTION TO INTERVENE’’, as
for the project. Further, if an intervenor specified comment date for the
files comments or documents with the applicable, and the Project Number of
particular application, either a the particular application to which the
Commission relating to the merits of an competing development application or a
issue that may affect the responsibilities filing refers. Any of the above-named
notice of intent to file such an documents must be filed by providing
of a particular resource agency, they application. Submission of a timely
must also serve a copy of the document the original and the number of copies
notice of intent to file a development provided by the Commission’s
on that resource agency. application allows an interested person
k. Description of Project: The regulations to: The Secretary, Federal
to file the competing application no Energy Regulatory Commission, 888
proposed would consist of: (1) An later than 120 days after the specified
existing 805-foot-long, 138-foot-high, First Street, NE., Washington, DC 20426.
comment date for the particular A copy of any motion to intervene must
Concrete Gravity Scott Dam, (2) an application. A competing license
existing reservoir having a surface area also be served upon each representative
application must conform with 18 CFR of the Applicant specified in the
of 2,000 acres and storage capacity of 4.30(b) and 4.36.
80,556 acre-feet with a normal water particular application.
p. Notice of Intent: A notice of intent
surface elevation of 1910 feet mean sea must specify the exact name, business t. Agency Comments: Federal, State,
level, (3) reconfigured outlet works, (4) address, and telephone number of the and local agencies are invited to file
a proposed powerhouse containing a prospective applicant, and must include comments on the described application.
generating unit having an installed an unequivocal statement of intent to A copy of the application may be
capacity of 2.5 megawatts, (5) a submit, if such an application may be obtained by agencies directly from the
proposed 9-mile-long transmission line, filed, either a preliminary permit Applicant. If an agency does not file
and (6) appurtenant facilities. The application or a development comments within the time specified for
project would have an annual application (specify which type of filing comments, it will be presumed to
generation of 15 GWh, which would be application). A notice of intent must be have no comments. One copy of an
sold to a local utility. served on the applicant(s) named in this agency’s comments must also be sent to
l. Locations of Applications: A copy of public notice. the Applicant’s representatives.
the application is available for q. Proposed Scope of Studies under Magalie R. Salas,
inspection and reproduction at the Permit: A preliminary permit, if issued, Secretary.
Commission in the Public Reference does not authorize construction. The
[FR Doc. E5–717 Filed 2–22–05; 8:45 am]
Room, located at 888 First Street, NE., term of the proposed preliminary permit
BILLING CODE 6717–01–P
Room 2A, Washington DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
DEPARTMENT OF ENERGY
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental Federal Energy Regulatory
number excluding the last three digits in impacts. Based on the results of these Commission
the docket number field to access the studies, the Applicant would decide
document. For assistance, call toll-free whether to proceed with the preparation Notice of Application for Transfer of
1–866–208–3676 or e-mail of a development application to License and Approval of Financing
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Arrangement and Soliciting
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Comments, Motions To Intervene, and
available for inspection and Intervene: Anyone may submit Protests
reproduction at the address in item h. comments, a protest, or a motion to
intervene in accordance with the February 15, 2005.
above.
m. Individuals desiring to be included requirements of Rules of Practice and Take notice that the following
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211, hydroelectric application has been filed
so indicate by writing to the Secretary 385.214. In determining the appropriate with the Commission and is available
of the Commission. action to take, the Commission will for public inspection:
n. Competing Preliminary Permit: consider all protests or other comments a. Type of Application: Partial transfer
Anyone desiring to file a competing filed, but only those who file a motion of license and transfer of license.
application for preliminary permit for a to intervene in accordance with the b. Project No.: P–2669–039.
proposed project must submit the Commission’s Rules may become a c. Date Filed: February 8, 2005.

VerDate jul<14>2003 16:28 Feb 22, 2005 Jkt 205001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\23FEN1.SGM 23FEN1
8802 Federal Register / Vol. 70, No. 35 / Wednesday, February 23, 2005 / Notices

d. Applicants: USGen New England, receive e-mail notification when a to convene this technical conference in
Inc., Bear Swamp Generating Trust No. document is added to a subscribed a December 22, 2004 order on rehearing
1 LLC, Bear Swamp Generating Trust docket(s). For assistance with any FERC and establishing technical conference.1
No. 2 LLC, Bear Swamp Power Online service, please e-mail This case began on October 1, 2003,
Company LLC. FERCOnlineSupport@ferc.gov, or call as a result of revised tariff sheets
e. Name of Project: Bear Swamp. (866) 208–3676 (toll free). For TTY, call submitted by Enbridge KPC to adjust its
f. Location: On the Deerfield River in (202) 502–8659. fuel reimbursement percentages to
Franklin and Berkshire Counties, m. Any person desiring to intervene reflect changes in its fuel usage and lost
Massachusetts. or to protest this filing must file in and unaccounted for gas (L&U). The
g. Filed Pursuant to: Federal Power accordance with Rules 211 and 214 of revised tariff sheets proposed, among
Act, 16 U.S.C. 791(a)–825(r). the Commission’s Rules of Practice and other things, a decrease in the fuel
h. Applicants’ Contact: Amy S. Koch, Procedure (18 CFR 385.211 and reimbursement percentages (FRPs) that
Patton Boggs LLP, 2550 M Street, NW., 385.214). Protests will be considered by became effective November 1, 2003.
Washington, DC 20037, (202) 457–6000. the Commission in determining the Enbridge KPC should be prepared to
i. FERC Contact: James Hunter at appropriate action to be taken, but will further explain its proposal, and address
(202) 502–6086. not serve to make protestants parties to the concerns raised in the December 1,
j. Deadline for filing comments, the proceeding. Any person wishing to 2003, request for rehearing of Kansas
protests, and motions to intervene: become a party must file a notice of Corporation Commission (KCC) and its
March 4, 2005. intervention or motion to intervene, as
All documents (original and eight October 27, 2004, response to Staff’s
appropriate. Such notices, motions, or August 27, 2004, data request. For
copies) should be filed with the
protests must be filed on or before the further information regarding this
Secretary, Federal Energy Regulatory
comment date. Anyone filing a motion conference please contact Lisa Long at
Commission, 888 First Street, NE.,
to intervene or protest must serve a copy (202) 502–8691 or lisa.long@ferc.gov.
Washington, DC 20426.
k. Description of Application: Bear of that document on the Applicant. On FERC conferences are accessible
Swamp Generating Trust No. 1 LLC, or before the comment date, it is not under section 508 of the Rehabilitation
Bear Swamp Generating Trust No. 2 necessary to serve motions to intervene Act of 1973. For accessibility
LLC, (the Trusts), USGen New England, or protests on persons other than the accommodations please send an e-mail
Inc. (USGenNE) and Bear Swamp Power Applicant. to accessibility@ferc.gov or call toll free
The Commission encourages (866) 208–3372 (voice) or (202) 502–
Company LLC (BSPC) tendered for filing
electronic submission of protests and 1659 (TTY), or send a FAX to (202) 208–
an application for a two-step transfer of
interventions in lieu of paper using the 2106 with the required
license. First, the Applicants seek the
‘‘eFiling’’ link at http://www.ferc.gov. accommodations.
partial transfer of license from
Persons unable to file electronically All interested persons are permitted
USGenNE and the Trusts, as joint
should submit an original and eight to attend.
licensees, to the Trusts and BSPC, as
copies of the protest or intervention to
joint licenses. The Trusts and BSPC Magalie R. Salas,
the Federal Energy Regulatory
then seek approval for a subsequent Secretary.
Commission, 888 First Street, NE.,
transfer of license from the Trusts and [FR Doc. E5–726 Filed 2–22–05; 8:45 am]
Washington, DC 20426.
BSPC to BSPC as sole licensee. The BILLING CODE 6717–01–P
Trusts and BSPC also request that the Magalie R. Salas,
Commission allow them to consummate Secretary.
the transaction without filing a second [FR Doc. E5–722 Filed 2–22–05; 8:45 am] DEPARTMENT OF ENERGY
application for transfer of the license. BILLING CODE 6717–01–P
BSPC and the Trusts also inform the Federal Energy Regulatory
Commission that there is a possibility Commission
that an affiliate of BSPC may operate the DEPARTMENT OF ENERGY [Docket No. AD05–3–000]
Project at the direction of BSPC for a
period of time if BSPC has not received Federal Energy Regulatory Promoting Regional Transmission
its market-based rate authorization from Commission Planning and Expansion To Facilitate
the Commission by the effective date of [Docket Nos. RP04–6–000 and –001] Fuel Diversity Including Expanded
an interim operating arrangement Uses of Coal-Fired Resources; Notice
among BSPC and the Trusts. They Enbridge Pipelines (KPC); Notice of of Technical Conference
respectfully request that the Rescheduling of Technical Conference
Commission approve such an February 16, 2005.
arrangement. February 15, 2005. Take notice that the Federal Energy
l. Location of the Application: A copy Take notice that the Commission staff Regulatory Commission will host a
of the application is available for will convene a technical conference on technical conference on Friday, May 13,
inspection and reproduction at the Thursday, March 24, 2005, from 10 a.m. 2005, to identify regional solutions to
Commission’s Public Reference Room, to 5 p.m. (e.s.t.), in a room to be promoting regional transmission
located at 888 First Street, NE., Room designated at the offices of the Federal planning, expansion and enhancement
2A, Washington, DC 20426 or by calling Energy Regulatory Commission, 888 to facilitate fuel diversity including
(202) 208–1371. First Street, NE., Washington, DC 20426. increased integration of coal-fired
This filing is accessible online at This conference was originally resources to the transmission grid. The
http://www.ferc.gov using the scheduled for January 26, 2005. technical conference will be held at the
‘‘eLibrary’’ link and is available for The purpose of the conference is to Charleston Marriott Town Center, 200
review in the Commission’s Public address the negative deferred fuel Lee Street East, Charleston, West
Reference Room in Washington, DC. account balance and surplus gas on
There is an ‘‘eSubscription’’ link on the Enbridge Pipelines (KPC) (Enbridge 1 Enbridge Pipelines (KPC), 109 FERC ¶ 61,346

Web site that enables subscribers to KPC). The Commission directed its staff (2004).

VerDate jul<14>2003 16:28 Feb 22, 2005 Jkt 205001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\23FEN1.SGM 23FEN1

Vous aimerez peut-être aussi