4842 Federal Register / Vol. 70, No.

19 / Monday, January 31, 2005 / Notices

CFR 385.2001(a)(1)(iii) and the filing; and (4) otherwise comply with Salas, Secretary, Federal Energy
instructions on the Commission’s Web the requirements of 18 CFR 385.2001 Regulatory Commission, 888 First
site (http://www.ferc.gov) under the ‘‘e- through 385.2005. All comments, Street, NE., Washington, DC 20426.
filing’’ link. k. This application has been recommendations, terms and conditions The Commission’s Rules of Practice
accepted for filing and is now ready for or prescriptions must set forth their require all intervenors filing documents
environmental analysis. evidentiary basis and otherwise comply with the Commission to serve a copy of
l. The existing Nantahala Project with the requirements of 18 CFR 4.34(b). that document on each person on the
operates in a peaking mode and consists Agencies may obtain copies of the official service list for the project.
of the following features: (1) A 1,042- application directly from the applicant. Further, if an intervenor files comments
foot-long, 250-foot-high earth and Each filing must be accompanied by or documents with the Commission
rockfill dam; (2) a spillway for the dam proof of service on all persons listed on relating to the merits of an issue that
located at the east abutment; (3) a 1,605- the service list prepared by the may affect the responsibilities of a
acre reservoir, with a normal reservoir Commission in this proceeding, in particular resource agency, they must
elevation of 3,012.2 feet National accordance with 18 CFR 4.34(b), and also serve a copy of the document on
Geodetic Vertical Datum and a storage 385.2010. that resource agency.
capacity of 38,336 acre-feet; (4) a Comments, recommendations, terms
reinforced concrete powerhouse Magalie R. Salas, and conditions, and prescriptions may
containing one generating unit having Secretary. be filed electronically via the Internet in
an installed capacity of 42 megawatts [FR Doc. E5–335 Filed 1–28–05; 8:45 am] lieu of paper. The Commission strongly
(MW); (5) two stream diversions (Dicks BILLING CODE 6717–01–P encourages electronic filings. See 18
Creek and Whiteoak Creek) that provide CFR 385.2001(a)(1)(iii) and the
additional flow into the project; and (6) instructions on the Commission’s Web
appurtenant facilities. m. A copy of the DEPARTMENT OF ENERGY site (http://www.ferc.gov) under the ‘‘e-
application is available for review at the filing’’ link.
Commission in the Public Reference Federal Energy Regulatory k. This application has been accepted
Room or may be viewed on the Commission for filing and is now ready for
Commission’s Web site at http:// [P–2698–033] environmental analysis.
www.ferc.gov using the ‘‘eLibrary’’ link. l. The existing East Fork Project
Enter the docket number excluding the Duke Power; Notice of Application operates in a peaking mode and is
last three digits in the docket number Ready for Environmental Analysis and comprised of three developments: Cedar
field to access the document. For Soliciting Comments, Cliff, Bear Creek and Tennessee Creek.
assistance, contact FERC Online Recommendations, Terms and The Cedar Cliff development consists of
Support at Conditions, and Prescriptions the following features: (1) A 590-foot-
FERCOnlineSupport@ferc.gov or toll- long, 173-foot-tall earth core and rockfill
January 21, 2005. dam (Cedar Cliff Dam); (2) a service
free at 1–866–208–3676, or for TTY,
Take notice that the following spillway excavated in rock at the right
(202) 502–8659. A copy is also available
hydroelectric application has been filed abutment; (3) a 221-foot-long emergency
for inspection and reproduction at the
with the Commission and is available spillway located at the left abutment; (4)
address in item (h) above.
You may also register online at for public inspection. a 121-acre reservoir, with a normal
a. Type of Application: New Major reservoir elevation of 2,330 feet National
http://www.ferc.gov/docs-filing/
License. Geodetic Vertical Datum and a storage
esubscription.asp to be notified via e-
b. Project No.: 2698–033. capacity of 6,200-acre-feet; (5) a
mail of new filings and issuances c. Date filed: February 20, 2004.
related to this or other pending projects. d. Applicant: Duke Power. concrete powerhouse containing one
For assistance, contact FERC Online e. Name of Project: East Fork generating unit having an installed
Support. Hydroelectric Project. capacity of 6.1 megawatts (MW); and (6)
n. Public notice of the filing of the f. Location: On the East Fork of the appurtenant facilities.
initial development application, which Tuckasegee River, in Jackson County, The Bear Creek development consists
has already been given, established the North Carolina. There are 23.15 acres of of the following features: (1) A 760-foot-
due date for filing competing United States Forest Service land long, 215-foot-tall earth core and rockfill
applications or notices of intent. Under (Nantahala National Forest) within the dam (Bear Creek Dam); (2) a spillway on
the Commission’s regulations, any boundary of the project. the right abutment; (3) a 473-acre
competing development application g. Filed Pursuant to: Federal Power reservoir, with a normal reservoir
must be filed in response to and in Act, 16 U.S.C. 791(a)–825(r). elevation of 2,560 feet National Geodetic
compliance with public notice of the h. Applicant Contact: John C. Wishon, Vertical Datum and a storage capacity of
initial development application. No Nantahala Area Relicensing Project 34,650-acre-feet; (4) a concrete
competing applications or notices of Manager, Duke Power, 301 NP&L Loop, powerhouse containing one generating
intent may be filed in response to this Franklin, NC 28734, (828) 369–4604, unit having an installed capacity of 8.2
notice. jcwishon@duke-energy.com. MW; and (5) appurtenant facilities.
All filings must (1) Bear in all capital i. FERC Contact: Carolyn Holsopple at The Tennessee development consists
letters the title ‘‘COMMENTS’’, ‘‘REPLY (202) 502–6407 or of the following features: (1) A 385-foot-
COMMENTS’’, carolyn.holsopple@ferc.gov. long, 140-foot-tall earth core and rockfill
‘‘RECOMMENDATIONS,’’ ‘‘TERMS j. Deadline for filing comments, dam (Tanasee Creek Dam) with a 225-
AND CONDITIONS,’’ or recommendations, terms and foot-long, 15-foot-tall earth and rockfill
‘‘PRESCRIPTIONS;’’ (2) set forth in the conditions, and prescriptions is 60 days saddle dam located 600 feet south of the
heading the name of the applicant and from the issuance of this notice; reply Tanasee Creek Dam left abutment; (2) a
the project number of the application to comments are due 105 days from the spillway located in a channel excavated
which the filing responds; (3) furnish issuance date of this notice. in the right abutment; (3) a 810-foot-
the name, address, and telephone All documents (original and eight long, 175-foot-tall earth core and rockfill
number of the person submitting the copies) should be filed with: Magalie R. dam (Wolf Creek Dam); (4) a spillway

VerDate jul<14>2003 16:59 Jan 28, 2005 Jkt 205001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\31JAN1.SGM 31JAN1
Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices 4843

located in a channel excavated in the proof of service on all persons listed on to serve a copy of that document on
right abutment; (5) a 40-acre reservoir the service list prepared by the each person in the official service list
(Tanasee Creek Lake), with a normal Commission in this proceeding, in for the project. Further, if an intervenor
reservoir elevation of 3,080 feet National accordance with 18 CFR 4.34(b), and files comments or documents with the
Geodetic Vertical Datum and a storage 385.2010. Commission relating to the merits of an
capacity of 1,340-acre-feet; (6) a 176- issue that may affect the responsibilities
Magalie R. Salas,
acre reservoir (Wolf Creek Lake), with a of a particular resource agency, the
normal reservoir elevation of 3,080 feet Secretary. intervenor must also serve a copy of the
National Geodetic Vertical Datum and a [FR Doc. E5–336 Filed 1–28–05; 8:45 am] document on that resource agency.
storage capacity of 10,040-acre-feet; (7) BILLING CODE 6717–01–P l. Description of Proposed Action: The
a concrete powerhouse containing one licensee seeks to surrender the license
generating unit having an installed because its lease of the project lands and
capacity of 8.75 MW. DEPARTMENT OF ENERGY facilities has been cancelled and it does
m. A copy of the application is not have the means or the intent to
available for review at the Commission Federal Energy Regulatory reacquire the project lands and to
in the Public Reference Room or may be Commission operate the project. The 500 kilowatt
viewed on the Commission’s Web site at project is currently not operating.
Notice of Application for Surrender of
http://www.ferc.gov using the m. Locations of Application: A copy
License andSoliciting Comments, of the application is available for
‘‘eLibrary’’ link. Enter the docket
Motions To Intervene, and Protests inspection and reproduction at the
number excluding the last three digits in
the docket number field to access the January 19, 2005. Commission in the Public Reference
document. For assistance, contact FERC Take notice that the following Room, located at 888 First Street NE,
Online Support at hydroelectric application has been filed Room 2A, Washington, DC 20426, or by
FERCOnlineSupport@ferc.gov or toll- with the Commission and is available calling (202) 502–8371. This filing may
free at 1–866–208–3676, or for TTY, for public inspection: also be viewed on the Commission’s
(202) 502–8659. A copy is also available a. Application Type: Surrender of Web site at http://www.ferc.gov using
for inspection and reproduction at the License. the ‘‘eLibrary’’ link. Enter the docket
address in item (h) above. b. Project No.: 8535–039. number, here P–8535, in the docket
You may also register online at c. Date filed: December 20, 2004. number field to access the document.
http://www.ferc.gov/docs-filing/ d. Licensee: Virginia Hydrogeneration For assistance, call toll-free 1–866–208–
esubscription.asp to be notified via e- and Historical Society, LC. 3676 or e-mail
mail of new filings and issuances e. Name of Project: Battersea Dam. FERCOnlineSupport@ferc.gov. For TTY,
related to this or other pending projects. f. Location: Located on the call (202) 502–8659. A copy is also
For assistance, contact FERC Online Appomattox River, in Chesterfield and available for inspection and
Support. Dinwiddie Counties, Virginia. reproduction at the address in item h.
n. Public notice of the filing of the g. Filed Pursuant to: Federal Power above.
initial development application, which Act, 16 U.S.C. 791(a)–825(r). n. Individuals desiring to be included
has already been given, established the h. Licensee Contact: Paul V. Nolan, on the Commission’s mailing list should
due date for filing competing Esq., 5515 North 17th Street, Arlington, so indicate by writing to the Secretary
applications or notices of intent. Under Virginia 22205, (703) 534–5509. of the Commission.
the Commission’s regulations, any i. FERC Contact: Regina Saizan, (202) o. Comments, Protests, or Motions to
competing development application 502–8765. Intervene: Anyone may submit
must be filed in response to and in j. Status of Environmental Analysis: comments, a protest, or a motion to
compliance with public notice of the This application is ready for intervene in accordance with the
initial development application. No environmental analysis at this time, and requirements of Rules of Practice and
competing applications or notices of the Commission is requesting Procedure, 18 CFR 385.210, 385.211,
intent may be filed in response to this comments, reply comments, and 385.214. In determining the appropriate
notice. recommendations for terms and action to take, the Commission will
All filings must (1) bear in all capital conditions. consider all protests or other comments
letters the title ‘‘COMMENTS’’, ‘‘REPLY k. Deadline for filing responsive filed, but only those who file a motion
COMMENTS’’, documents: comments, motions to to intervene in accordance with the
‘‘RECOMMENDATIONS,’’ ‘‘TERMS intervene, protests, and Commission’s Rules may become a
AND CONDITIONS,’’ or recommendations for terms and party to the proceeding. Any comments,
‘‘PRESCRIPTIONS;’’ (2) set forth in the conditions concerning the application protests, or motions to intervene must
heading the name of the applicant and shall be filed with the Commission by be received on or before the specified
the project number of the application to February 22, 2005. All reply comments comment date for the particular
which the filing responds; (3) furnish must be filed with the Commission by application.
the name, address, and telephone March 7, 2005. p. Filing and Service of Responsive
number of the person submitting the Comments, protests, and Documents—Any filings must bear in
filing; and (4) otherwise comply with interventions may be filed electronically all capital letters the title
the requirements of 18 CFR 385.2001 via the Internet in lieu of paper; see 18 ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’,
through 385.2005. All comments, CFR 385.2001(a)(1)(iii) and the ‘‘RECOMMENDATIONS FOR TERMS
recommendations, terms and conditions instructions on the Commission’s Web AND CONDITIONS’’, ‘‘PROTEST’’, OR
or prescriptions must set forth their site under the ‘‘e-Filing’’ link. The ‘‘MOTION TO INTERVENE’’, as
evidentiary basis and otherwise comply Commission strongly encourages applicable, and the Project Number of
with the requirements of 18 CFR 4.34(b). electronic filings. the particular application to which the
Agencies may obtain copies of the The Commission’s Rules of Practice filing refers. Any of the above-named
application directly from the applicant. and Procedure require all intervenors documents must be filed by providing
Each filing must be accompanied by filing documents with the Commission the original and eight copies to: Magalie

VerDate jul<14>2003 16:59 Jan 28, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\31JAN1.SGM 31JAN1

Vous aimerez peut-être aussi