Id-A
Name
Description
Notes
Availability of utilities in
TUCO
SIMOPs risk
Supervision of activities
Procurement delay with
LLI's
A-1783
Contracting strategy
A-1905
T-2511
A-1780
T-2514
A-1084
T-2515
A-1792
T-2519
Status
Closed
Khan Kashif
Franz Bauer
Closed
Low
Dejan
Ivanovic
Repetitive EPCC.
2015-02- Hig
06
Low
2015-02- Hig
06
Low
2014-0930
2015-0227
A-1087
T-2532
Abandonment
A-1784
T-2535
A-1098
T-2536
T-2538
Carmen
Dumitrana
2014-09- Hig
02
Bejan
2014-03Anca-Mirela 06
Franz Bauer 2014-09- 2015-0602
01
Franz Bauer
2015-02- Low
06
Active
Carmen
Dumitrana
2014-0306
Active
Active
Carmen
Dumitrana
Active
Carmen
Dumitrana
Active
Franz Bauer
Permits / authorization not Licenses are not ready in time to start with
ready on time
construction / operation.
Non-compliance with authority requirements and
regulations may delay authorizations issuance,
resulting in delay in construction
LPG market affected
Impact for LPG market by new plant, potential loss of
LPG production; current LPG receivers putting
pressure onto Petrom
LPG supplying contracts
Check duration of LPG supplying contracts and
involve commercial dept. into this issue.
Claims of community
A-1102
Active
Use Socu wells after closing After closing Turburea, a possible solution may be to The action owners are Daniel Lungu and Apostoiu Ion. In
Laurentiu
2014-03- 2016-09Turburea
use Socu wells. Asses this solution.
progress Constantines 06
01
cu
Turburea shut down:
Negative impact for the Turburea area due to shutting Close Alignment with Asset. Personnel restructuring to Active Carmen
2014-09- Mid
Impact on workforce
down the existing plant
be covered by companys budget.
Dumitrana
02
A-1097
T-2534
Land owners
2014-09- Low
02
Low
Low
V-L
V-L
2014-03- 2015-0406
01
2015-02- V-L
06
V-L
T-2539
Land owners
Active
Anca Bejan
Active
Tiberiu
Amzar
Tiberiu Amzar2014-0306
In
Carmen
progress Dumitrana
Active Tiberiu
Amzar
A-1103
Problems arising due to shifting / restructuring people Support from Head Office and Project Management.
from Turburea to Hurezani area
Use Petrom CSR & training program to provide new
job opportunities for shifted people
A-1822
Fluctuating personnel
T-2540
A-1109
T-2543
Active
2014-03- 2015-0606
01
2014-09- Hig
02
2015-1231
2014-11- 2015-0403
01
2014-09- Low
02
Carmen
Dumitrana
2014-09- Mid
02
A-1783
Contracting strategy
A-1785
2014-0930
2015-0331
2015-0801
2015-02- V-L
06
A-1794
T-2544
Commissioning Plan
A-1786
Commissioning engineer
A-1821
Closed
Active
Active
Active
T-2545
Gate Rejected/Re-work
T-2546
T-2547
Stealing by Locals
V-L
Reworks During
Construction
Repetitive EPCC.
Mid
Low
V-L
Carmen
2014-09- 2015-03Dumitrana
02
02
Franz Bauer 2014-11- 2016-1203
01
Franz Zisser
2014-09- Low
02
Low
Carmen
Dumitrana
2014-03- Mid
06
Mid
Cirjan
2015-02- Mid
Low
A-1104
T-2944
George-Jean
Active
T-2946
T-2947
A-1783
T-2948
A-1787
T-2949
A-1788
T-2950
06
Cirjan
2014-09George-Jean 02
Carmen
Dumitrana
Chiper Gicu 2014-0902
2015-02- Hig
06
2015-1130
Low
Franz Bauer
2015-02- Low
06
V-L
Franz Bauer
2015-02- Hig
06
Hig
Low
Low
Low
A-1789
T-2951
T-2952
T-2954
A-1904
T-2955
T-2957
T-2962
T-2964
T-2965
T-2966
T-3037
T-3106
submit a bid price within 110% of this estimate. If the Include also penalties in the contract.
bid is above 110% of the budget either MS has to be
negotiated down below 110%, or the procedure has to
be cancelled.
Get quote for cost estimate OMVP to provide an MTO to MS for quoting prices
Prepare accordingly for contract negotiations with MS,
(FEED) by MS
during FEED already, so they will have provided
and switch to the standard PP procedure if necessary
prices to us already before going into repetitive
contract discussions later on
MS Performance on EPC
Max Streicher/Bilfinger (MS) not experienced enough Experience: MS worked with Bilfinger for constructing
contracts
with EPC type of work, little proven experience
the TUCO station
MS deterred from bidding Under the repetitive process OMVP is permitted to
Possible way(s) forward to be suggested by Contract
for repetitive contract
negotiate everything, including price, time, contract Management / Procurement yet
conditions, technical etc. If intermediate milestones
with penalties are included in the CHDH contract, plus
an onerous payment schedule and tough clauses on
responsibility for the FEED then Max
Streicher/Bilfinger (MS) may be deterred from bidding
Late finalization of TEG
CHD Hurezani project will be constructed on the
project
actual place of Mole Sieve. TEG will replace Mole
Sieve. If TEG does not start in time , Mole Sieve will
have to be maintained in function.
Management of TEG project TEG project is managed by the same project team as After TEG installation the Mole Sieve dehydration will
CHD Hurezani and any possible delays can be
be decommissioned. The decommissioning time
anticipated accordingly managed.
schedule is flexible enough to mitigate TEG delays.
Rework in Engineering
Documents received from engineering contractor may This is covered by Corporate project processes and
contain errors or may not respect OMVP
guidelines (eg. DQAR, IPA, IGR reviews..)
specifications.
Tie-in
Contractor may claim about handover of equipments
for tie-in.
Pollution during
During construction, tie-ins: waste spills affecting
Assign to Steve Drever
construction
ground water in the area.
OPEX estimations
OPEX estimate for new facilities during FEED are
OPEX assessment during EPCC selection process to
higher than foreseen.
be established.
TG3 schedule cannot be
TG3 schedule is very tight.
met.
Turnover of key personnel Turnover of key personnel may affect quality and
schedule.
Crossing Amaradia river
Over cross the Amaradia river with both pipelines will Prepare detailed studies in advance and consult
with gas and condensate impact the project in terms of time and cost.
authorities to ensure permissions.
pipelines
Integrity of CONPET
For being able to use the existing condensate pipelineThe Contract between Conpet and Petrom will be the
pipeline cannot be
(CONPET) by CHD Hurezani the functionality/integritystarting point of an integrity report provided by Conpet.
confirmed
thereof has to be proven - this cannot be done by
Still the contract shall come into effect only after a
OMVP but by CONPET only once a contract has
positive integrity check.
been established.
Active
Active
Franz Bauer
Active
Franz Bauer
Active
Franz Bauer
2015-02- Low
06
2015-02- Low
06
Low
2015-02- Mid
06
Mid
Low
In
Franz Bauer 2014-11- 2015-04progress
24
30
Active
Franz Bauer
2015-02- Low
06
Active
Franz Bauer
Active
Steve Drever
Active
Active
Elena Gina
Nicolae
Franz Bauer
Active
Franz Bauer
Active
Franz Bauer
2015-0206
2015-0206
2015-0206
2015-0206
2015-0206
2015-0206
Active
Carmen
Dumitrana
Low
Low
Low
Low
Low
Hig
Mid
2014-11- V-L
24
V-L