1226 Federal Register / Vol. 70, No.

4 / Thursday, January 6, 2005 / Notices

comments within the time specified for h. Description of Projects: The project application no later than 30 days after
filing comments, it will be presumed to proposed by Birch Power Company the specified comment date for the
have no comments. One copy of an would use the irrigation Canal system particular application. A competing
agency’s comments must also be sent to owned by the Greenfield Irrigation preliminary permit application must
the Applicant’s representatives. District and operate in a run-of-river conform with 18 CFR 4.30(b) and 4.36.
mode and would consist of: (1) A l. Competing Development
Magalie R. Salas, Application: Any qualified development
Diversion structure, crest elevation of
Secretary. 3,893 feet, on the Mill Coulee Canal, (2) applicant desiring to file a competing
[FR Doc. E5–2 Filed 1–5–05; 8:45 am] a proposed 480-foot-long, 54-inch- development application must submit to
BILLING CODE 6717–01–P diameter penstock, (3) a proposed the Commission, on or before a
powerhouse containing one generating specified comment date for the
unit with a total installed capacity of particular application, either a
DEPARTMENT OF ENERGY 370 kilowatts, (4) a proposed 1⁄4-mile- competing development application or a
long, 69-KV transmission line; and (5) notice of intent to file such an
Federal Energy Regulatory appurtenant facilities. The Birch Power application. Submission of a timely
Commission Company project would have an average notice of intent to file a development
annual generation of 1.6 gigawatt-hours. application allows an interested person
Notice of Applications Accepted for
The project proposed by to file the competing application no
Filing and Soliciting Comments,
Hydrodynamics, LLC would use the later than 120 days after the specified
Motions To Intervene, and Protests
irrigation Canal system owned by the comment date for the particular
December 30, 2004. Greenfield Irrigation District and application. A competing license
Take notice that the following operate in a run-of-river mode and application must conform with 18 CFR
hydroelectric applications have been would consist of (1) a Diversion 4.30(b) and 4.36.
filed with the Commission and are structure, crest elevation of 3,893 feet, m. Notice of Intent: A notice of intent
available for public inspection: on the Mill Coulee Canal, (2) a proposed must specify the exact name, business
a. Type of Applications: Preliminary 480-foot-long, 54-inch-diameter address, and telephone number of the
permit (competing). penstock, (3) a proposed powerhouse prospective applicant, and must include
b. Applicants, Project Numbers, and containing one generating unit with a an unequivocal statement of intent to
Dates Filed: Birch Power Company filed total installed capacity of 370 kilowatts, submit, if such an application may be
the application for Project No. 12536– (4) a proposed 1⁄4-mile-long, 69-KV filed, either a preliminary permit
000 on September 9, 2004. transmission line; and (5) appurtenant application or a development
Hydrodynamics, LLC filed the facilities. The Hydrodynamics, LLC application (specify which type of
application for Project No. 12547–000 project would have an average annual application). A notice of intent must be
on September 22, 2004. generation of 1.6 gigawatt-hours. served on the applicant(s) named in this
c. Name of the project is Mill Coulee i. Locations of Applications: A copy of public notice.
Lower Project. The project would be the application is available for n. Proposed Scope of Studies Under
located on the Mill Coulee Canal in inspection and reproduction at the Permit: A preliminary permit, if issued,
Cascade County, Montana. It would use Commission in the Public Reference does not authorize construction. The
the U.S. Bureau of Reclamation’s Room, located at 888 First Street NE., term of the proposed preliminary permit
existing Greenfield Irrigation District Room 2A, Washington DC 20426, or by would be 36 months. The work
canal system. calling (202) 502–8371. This filing may proposed under the preliminary permit
d. Filed Pursuant to: Federal Power also be viewed on the Commission’s would include economic analysis,
Act, 16 U.S.C. 791a–825r. Web site at http://www.ferc.gov using preparation of preliminary engineering
e. Applicants Contacts: For Birch the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
Power Company: Mr. Ted Sorenson, number excluding the last three digits in impacts. Based on the results of these
Birch Power Company, 5203 South 11th the docket number field to access the studies, the Applicant would decide
Avenue E, Idaho Falls, ID 83404, (208) document. For assistance, please contact whether to proceed with the preparation
522–8069. For Hydrodynamics, LLC: FERC Online Support at of a development application to
Mr. Roger Kirk, Hydrodynamics, LLC, FERCOnlineSupport@ferc.gov or toll construct and operate the project.
P.O. Box 1136, Bozeman, MT 59771– free at 1–866–208–3676, or TTY, contact o. Comments, Protests, or Motions to
1136, (406) 587–5086. (202) 502–8659. A copy is also available Intervene: Anyone may submit
f. FERC Contact: Robert Bell, (202) for inspection and reproduction at the comments, a protest, or a motion to
502–6062. address in item h. above. intervene in accordance with the
g. Deadline for Filing Comments, j. Individuals desiring to be included requirements of Rules of Practice and
Protests, and Motions to Intervene: 60 on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
days from the issuance date of this so indicate by writing to the Secretary In determining the appropriate action to
notice. of the Commission. take, the Commission will consider all
The Commission’s Rules of Practice k. Competing Preliminary Permit: protests or other comments filed, but
and Procedure require all intervenors Anyone desiring to file a competing only those who file a motion to
filing documents with the Commission application for preliminary permit for a intervene in accordance with the
to serve a copy of that document on proposed project must submit the Commission’s Rules may become a
each person in the official service list competing application itself, or a notice party to the proceeding. Any comments,
for the project. Further, if an intervenor of intent to file such an application, to protests, or motions to intervene must
files comments or documents with the the Commission on or before the be received on or before the specified
Commission relating to the merits of an specified comment date for the comment date for the particular
issue that may affect the responsibilities particular application (see 18 CFR 4.36). application.
of a particular resource agency, they Submission of a timely notice of intent Comments, protests and interventions
must also serve a copy of the document allows an interested person to file the may be filed electronically via the
on that resource agency. competing preliminary permit Internet in lieu of paper; See 18 CFR

VerDate jul<14>2003 15:45 Jan 05, 2005 Jkt 205001 PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
Federal Register / Vol. 70, No. 4 / Thursday, January 6, 2005 / Notices 1227

385.2001 (a)(1)(iii) and the instructions existing Greenfield Irrigation District Room 2A, Washington DC 20426, or by
on the Commission’s Web site under ‘‘e- canal system. calling (202) 502–8371. This filing may
filing’’ link. The Commission strongly d. Filed Pursuant to: Federal Power also be viewed on the Commission’s
encourages electronic filing. Act, 16 U.S.C. 791a–825r. Web site at http://www.ferc.gov using
p. Filing and Service of Responsive e. Applicants Contacts: For Birch the ‘‘eLibrary’’ link. Enter the docket
Documents: Any filings must bear in all Power Company: Mr. Ted Sorenson, number excluding the last three digits in
capital letters the title ‘‘COMMENTS’’, Birch Power Company, 5203 South 11th the docket number field to access the
‘‘RECOMMENDATIONS FOR TERMS Avenue E, Idaho Falls, ID 83404, (208) document. For assistance, please contact
AND CONDITIONS’’, ‘‘PROTEST’’, OR 522–8069. For Hydrodynamics, LLC: FERC Online Support at
‘‘MOTION TO INTERVENE’’, as Mr. Roger Kirk, Hydrodynamics, LLC, FERCOnlineSupport@ferc.gov or toll
applicable, and the Project Number of P.O. Box 1136, Bozeman, MT 59771– free at 1–866–208–3676, or TTY, contact
the particular application to which the 1136, (406) 587–5086. (202) 502–8659. A copy is also available
filing refers. Any of the above-named f. FERC Contact: Robert Bell, (202) for inspection and reproduction at the
documents must be filed by providing 502–6062. address in item h. above.
g. Deadline for Filing Comments, j. Individuals desiring to be included
the original and the number of copies
Protests, and Motions to Intervene: 60 on the Commission’s mailing list should
provided by the Commission’s
days from the issuance date of this so indicate by writing to the Secretary
regulations to: The Secretary, Federal
notice. of the Commission.
Energy Regulatory Commission, 888 The Commission’s Rules of Practice
First Street, NE., Washington, DC 20426. k. Competing Preliminary Permit:
and Procedure require all intervenors Anyone desiring to file a competing
A copy of any motion to intervene must filing documents with the Commission
also be served upon each representative application for preliminary permit for a
to serve a copy of that document on proposed project must submit the
of the Applicant specified in the each person in the official service list
particular application. competing application itself, or a notice
for the project. Further, if an intervenor of intent to file such an application, to
q. Agency Comments: Federal, state, files comments or documents with the the Commission on or before the
and local agencies are invited to file Commission relating to the merits of an specified comment date for the
comments on the described application. issue that may affect the responsibilities particular application (see 18 CFR 4.36).
A copy of the application may be of a particular resource agency, they Submission of a timely notice of intent
obtained by agencies directly from the must also serve a copy of the document allows an interested person to file the
Applicant. If an agency does not file on that resource agency. competing preliminary permit
comments within the time specified for h. Description of Projects: The project application no later than 30 days after
filing comments, it will be presumed to proposed by Birch Power Company the specified comment date for the
have no comments. One copy of an would use the irrigation Canal system particular application. A competing
agency’s comments must also be sent to owned by the Greenfield Irrigation preliminary permit application must
the Applicant’s representatives. District and operate in a run-of-river conform with 18 CFR 4.30(b) and 4.36.
Magalie R. Salas, mode and would consist of: (1) A l. Competing Development
Secretary. Diversion structure, crest elevation of Application: Any qualified development
[FR Doc. E5–3 Filed 1–5–05; 8:45 am]
4,010 feet, on the Mill Coulee Canal, (2) applicant desiring to file a competing
a proposed 800-foot-long, 54-inch- development application must submit to
BILLING CODE 6717–01–P
diameter penstock, (3) a proposed the Commission, on or before a
powerhouse containing one generating specified comment date for the
DEPARTMENT OF ENERGY unit with a total installed capacity of 1 particular application, either a
megawatts, (4) a proposed 3⁄4-mile-long, competing development application or a
Federal Energy Regulatory 69-KV transmission line, and (5) notice of intent to file such an
Commission appurtenant facilities. The Birch Power application. Submission of a timely
Company project would have an average notice of intent to file a development
Notice of Applications Accepted for annual generation of 4.4 gigawatt-hours. application allows an interested person
Filing and Soliciting Comments, The project proposed by to file the competing application no
Motions To Intervene, and Protests Hydrodynamics, LLC would use the later than 120 days after the specified
irrigation Canal system owned by the comment date for the particular
December 30, 2004. Greenfield Irrigation District and application. A competing license
Take notice that the following operate in a run-of-river mode and application must conform with 18 CFR
hydroelectric applications have been would consist of: (1) A Diversion 4.30(b) and 4.36.
filed with the Commission and are structure, crest elevation of 4,010 feet, m. Notice of Intent: A notice of intent
available for public inspection: on the Mill Coulee Canal, (2) a proposed must specify the exact name, business
a. Type of Applications: Preliminary 800-foot-long, 54-inch-diameter address, and telephone number of the
permit (competing). penstock, (3) a proposed powerhouse prospective applicant, and must include
b. Applicants, Project Numbers, and containing one generating unit with a an unequivocal statement of intent to
Dates Filed: Birch Power Company filed total installed capacity of 1 megawatts, submit, if such an application may be
the application for Project No. 12537– (4) a proposed 3⁄4-mile-long, 69-KV filed, either a preliminary permit
000 on September 9, 2004. transmission line, and (5) appurtenant application or a development
Hydrodynamics, LLC filed the facilities. The Hydrodynamics, LLC application (specify which type of
application for Project No. 12546–000 project would have an average annual application). A notice of intent must be
on September 22, 2004. generation of 4.4 gigawatt-hours. served on the applicant(s) named in this
c. Name of the project is Mill Coulee i. Locations of Applications: A copy of public notice.
Upper Project. The project would be the application is available for n. Proposed Scope of Studies Under
located on the Mill Coulee Canal in inspection and reproduction at the Permit: A preliminary permit, if issued,
Cascade County, Montana. It would use Commission in the Public Reference does not authorize construction. The
the U.S. Bureau of Reclamation’s Room, located at 888 First Street NE., term of the proposed preliminary permit