7 MT EXPANSION OF BHILAI STEEL PLANT

DETAILS OF 7 MT EXPN PACKAGES UNDER MECONS SCOPE


SN

Pkg.

Name of Scheme

001 -SE01

7 m Tall Coke Oven Battery


No. 11 with 67 ovens
Oven Machine & Land based
Pushing emission control for
Battery-11
Coke Dry Quench. facilities
with coke sorting plant
BPP for COB-11 with H2S
recovery unit - Re-tendering
Renovation,
Augmentation
and modification of existing
PETP
4060 m3 BF-Main Techno.
Pkg.
Instn. of Boiler along with
Steam Turbo-Blower Building
(Pkg.-011-1A) Instn. of Boiler
along with Steam TurboBlower Building

001 SE02
002
003A

BOD

PBOD

Stage-II

LOI

Contract
Signed

Completion
duration

BEC-GPK-CUI

15.11.0
7

17.01.08

20.03.08

13.08.08

03.09.08

16.09.0
8

28 Months
(15.01.11)

15.11.0
7

17.01.08

20.03.08

13.08.08

03.09.08

19.09.0
8

24 Months
(18.09.10)

17.01.08

23.02.08

13.08.08

03.09.08

27.01.10

19.08.10

29.03.11

15.04.11

18.09.0
8
20.04.1
1

25 Months
(17.10.10)
24 Months
(19.04.13)

BEC-KBK
BEC-CUI-GPK
Mcnally Bharat Engg.,
Kolkata

15.11.0
7
25.12.0
9
24.09.0
9

04.01.10

16.04.10

21.05.10

26.05.10

25.06.1
0

12 Months
(24.06.11)

Paul Wurth, Italy / L&T,


Kolkata

06.07.0
9

04.08.09

04.12.09

29.07.10

04.08.10

30.08.1
0

28 Months
(29.12.12)

Fujian Longking Co.


China /Allied Energy Sys.,
New Delhi

10.03.1
1

06.05.11

19.12.11

03.03.12

06.03.12

24.03.1
2

20 Months
(23.11.13)

011-01
B

Instn.
Of
Steam
turbine
generator, back pressure turbine
generator,
Cooling
water
systems,
Power
Evacuation
System
(excluding enabling
works)

Triveni Engineering

02.04.1
1

21.05.11

24.09.11

16.12.11

19.12.11

19.01.1
2

18 Months
(18.07.13)

011-01
C

Installation of 3x225 m3/h


DM Plant for PBS

Technofab Engg Ltd New


Delhi/ ARTES INGEGNERIA
SPA, Italy

26.05.1
1

09.07.11

07.01.12

31.01.12

01.02.12

25.02.1
2

12 Months
(24.02.13)

HSCL

21.05.1
0

02.07.10

23.07.10

14.08.10

18.09.1
0

WICC, Bhilai

04.04.1
1

02.05.11

06.07.11

30.08.11

23.09.1
1

9 Months
(22.06.12)

15.11.07

01.08.08

30.09.10

12.10.10

20.09.08

17.12.08

19.07.10

04.08.10

11.11.1
0
28.08.1
0

27 Months
(10.02.13)
28 Months
(27.12.12)

010
011-01
A

NIT

UEM India Ltd.

003C
4

Party

011-02

011-03
6

012

020

Enabling works for Boiler,


Turbine & balance of Plant
for existing as well as new
power & blowing Station
Dismantling & Relocation of
Mech. Repair Shop, Mech.
Spare Store & Ingot Storage
Yard
Installation of Turbo Blower8
2nd Sinter M/c (360 m2) in
SP-3(Re-Tendered)

BHEL
L&T-Outotech, Germany

15.09.0
7
19.08.0
8

6 Months
(13.02.11)

SN

Pkg.

021-A
021-B
8
021-C
021-D
9

025

10

025-A

11

026

12

027

13

028
029-A

14
029 A- 2
029-B-1

15

Name of Scheme

Party

NIT

BOD

PBOD

Stage-II

LOI

Contract
Signed

Completion
duration

Cold Sinter Screening system


(Re-Tendered)
Lime
dosing
along
with
tankers, compressor & sinter
cooler. (Re-Tendered)
Electrics
&
Automation
System
(Re-Tendered)

Petro General Engg.


Works, Bhilai

02.10.0
8

09.02.09

01.08.09

06.05.10

08.05.10

05.06.1
0

18 Months
(04.12.11)

Petro General Engg.


Works, Bhilai

12.12.0
9

12.01.10

17.02.10

06.05.10

08.05.10

05.06.1
0

9 Months
(04.03.11)

Siemens. Kolkata

13.01.0
9

09.03.09

30.10.09

06.05.10

08.05.10

19.06.1
0

18 Months
(18.12.11)

27.10.0
8

08.01.09

05.05.09

06.05.10

08.05.10

18 Months
(18.12.11)

15.11.07

09.04.08

10.09.08

15.09.08

19.06.1
0
24.10.0
8

10.12.07

05.11.08

08.01.10

16.01.10

11.12.07

29.07.08

25.02.09

31.03.09

15.11.07

29.02.08

13.08.08

03.09.08

15.04.09

19.06.09

30.10.09

13.11.09

27.12.07

06.03.09

28.05.09

03.06.09

29.06.09

13.10.10

17.01.11

17.01.11

12.02.1
1

Dedusting Plant
(Re-Tendered)
BOF shop Tech. package
Installation of secondary
Refining Unit for SMS-III
Continuous casting shop
Technological Pkg
Hot metal Desulphurization
unit in SMS-3
Lime calcinations plant
RMP-III (Re-tendered)
7 Nos
EOT Crane -300T
Cap. for BOF & CCP
Installation of
10 Cranes
above 100 T Cap ( 8 for BOF
& CCP & 2 FOR SRU)
Installation of Cranes for
BOF
&
CCP
(Cranes:
Rotating Trolley 18 Nos.,
Non-rotating Trolley 3 Nos.)
(Re-tendered)

Scintillant Projects Kolkata


Siemens VAI
WISDRI Engg. & Research
China
Siemens VAI
ESM USA-Beekay Engg.
Shapoorji Polanji
HEC

30.06.0
7
14.08.0
7
04.07.0
7
14.08.0
7
28.02.0
9
07.11.0
7 MOU

HEC - MOU

07.06.1
0

14.09.10

1. Taiyuan Heavy Industry Co. Ltd.,China


/ Vazant Enterprises Pvt. Ltd Mumbai
2. Henan Weihua Heavy Machinery Co.
Ltd., Henan, China
3. AMT International,
4. Danieli & C SpA,Italy/M/s Danieli India
Limited,Kolkata / Beekay Engg. Bhilai
5. Anupam Industries Ltd.,Anand, Gujrat
/ JCB SIBCRANEX, Russia
6. Mukand Ltd., Mumbai
7. Dalian Huarai Heavy Industry
International Ltd. (DHI) /
Walchandnagar Industries Ltd. (WIL),
Pune
8. Unique Industrial Handlers Ltd.,
Mumbai
9. Impression Systems & Engineers Pvt.
Ltd., Pune / KG Cranes, Korea
10.
Jindal Steel & Power Limited
(Machinery Division) , Raipur /
Tehnoros, Russia

12.04.1
3

01.06.13

08.03.10
18.04.0
9
06.10.0
8
09.12.0
9

33.5 Months
(08.08.11)
30.5 Months
(22.09.12)
32 Months
(17.12.11)
24 Months
(05.03.11)
27 Months
(08.03.12)
24 Months
(28.06.11)
24 Months
(11.02.13)

18 Months

SN

Pkg.

029-B-2

16

030

17

031

18

032

19

033-A-1
033-A

20

033 A-2
033-B

21

034

22

037
038
038-01
038-03

23

038-05

038-06

Name of Scheme

Installation of Cranes for


BOF & CCP (Cranes: Nonrotating trolley 9 Nos.,
Under slung/ repair trolley
41 Nos.)
Hoisting
&
Handling
Facilities in Bar & Rod Mill
and Universal Rail Mill
Hot metal handling system
(Torpedo system)
(Re-tendered)
Propane storage & handling
system
Cast in situ bored piling
work in SMS-III complex
Civil and Strl works for BOF,
CCP shop (Re-tendered)
Balance civil works for BOF
& CCP at BSP Bhilai
Strl works for BOF & CCP
(Re-tendered)
Miscellaneous civil works
Interplant Telecomn. system
(Server
based)
through
optical network
(Re-tendered)

LOI

Contract
Signed

Completion
duration

16.07.12

08.08.1
2

18 Months
(07.02.14)

21.12.11

31.12.11

21.01.1
2

18 Months
(20.07.13)

23.06.10

09.08.10

10.08.10

10.09.1
0

04.05.10

18.01.11

12.03.11

16.03.11

19.04.1
1

03.09.09

12.1109

08.01.10

16.01.10

23.01.10

24.11.10

16.12.10

09.02.11

10.02.11

12.11.12

23.11.12

02.02.13

11.02.13

21.04.09

26.05.09

27.08.09

27.08.09

24.06.1
1

26.07.11

19.03.12

23.04.1
0

23.06.10

12.01.11

Party

NIT

BOD

PBOD

Mukand Limited, Thane

05.08.1
1

16.09.11

03.05.12

HEC Ltd., Ranchi

10.03.1
1

08.04.11

13.10.11

Qinhuangdao Qinye Heavy Ind.


China Associated Industrial
Furnace, Kolkata

25.07.0
9

22.09.09

Oil & Gas Plant Engineers.,


Delhi.

03.04.1
0
06.08.0
9
09.11.1
0
20.10.1
2
12.03.0
9

Era Infrastructure, New Delhi


HSCL
Simplex Infrastructures
Era Infrastructure, New Delhi

Stage-II

21.02.1
1
28.02.1
3
30.09.0
9

As per site requirement


Equant Technology Services,
Kolkata

20 Months
(09.05.12)
12 Months
(15.03.12)
9 Months
(22.10.10)
20 Months
(20.10.12)
14 Months
(10.04.14)
24 Months
(29.09.11)
12 Months

17.05.12

12.07.1
2

18 Months
(11.01.14)

16.02.11

15.03.1
1

9 Months
(14.12.11)

Augmentation of facilities in SMS-2

Augmentation
of facilities
for
Material handling
in
SMS-II
(Re-tendered)
GCP Modification
(Re-tendered)
Combined
blowing
of
Argon/Nitrogen in Converter

Modern. of BOF Automation


(Re-tendered)

Anupam Industries, Gujarat

Revised TS issued.

12 Months

To be dropped.
1. SMS India Ltd., Gurgaon / SMS
Siemage, Germany
2. ABB Limited, Bangalore /
Danieli Corus, Netherlands

3.

Essar Projects (India) Ltd,


Mumbai / Tata Steel Ltd.,
Jamshedpur
/
Honeywell
Automation India, Pune

12.02.11

19 Months

04.08.1
2

03.10.12

18 Months

SN

2
4
2
5
2
6
2
7

Pkg.

Name of Scheme

Party

NIT

BOD

PBOD

Stage-II

LOI

Contract
Signed

Completion
duration

038-12

Revamping of De-dusting
system at +47M level of BOF
Converter (Retendered

Scintillant Projects India,


Kolkatta

05.10.0
9

23.12.09

05.03.10

19.05.10

25.05.10

19.06.1
0

9 Months
(18.03.11)

Danieli & C SpA, Italy

14.11.0
9
19.03.0
9

15.12.09

20.02.10

19.07.10

27.07.10

11.05.09

21.09.08

19.07.10

27.07.10

25.08.1
0
23.08.1
0

24 Months
(24.08.12)
32 Months
(22.06.13)

046
047
049-1
049-3
050
051A-01

2
8

2
9
3
0
3
1
3
2
3
3

051B-01
051B1A
052-A
052-B

Bar & Rod Mill (B&RM)


Universal Rail Mill (URM)
( Re-Tendered)
Reheating
furnaces
for
B&RM
( Re-Tendered)
Reheating furnaces for URM
(Re-Tendered)
2nd Normalizing Furnace in
Plate Mill
Civil work for Bar & Rod Mill
( Re-tendered)
Strl works for Bar & Rod Mill
(Re-tendered)
Additional Structural Works
of Bar & Rod Mill
Civil works for Universal Rail
Mill (Re-tendered)
Strl works for URM
(Re-tendered)

SMS Meer, Germany


Fives Stein, Spain / Fives Stein,
India / Beekay, Bhilai

04.06.1
0

21.07.10

23.12.10

06.01.11

07.01.11

09.02.1
1

20 Months
(08.11.12)

Micco, Kolkata / BricMont, USA/


BricMont India, Kolkata

06.12.1
0

07.01.11

09.04.11

20.06.11

21.06.11

13.07.1

21 Months
(12.04.13)

02.09.10

27.10.10

27.11.10

01.12.10

15.07.09

08.09.09

07.08.10

09.08.10

06.09.12

09.10.12

27.04.09

17.06.09

06.08.10

09.08.10

19.07.10

13.09.10

09.11.10

11.11.10

14.11.07

31.01.08

14.03.08

25.03.08

23.01.09

27.06.09

17.03.10

03.04.10

30.11.07

28.02.08

13.08.08

03.09.08

30.12.1
0
16.09.1
0
24.11.1
2
15.09.1
0
10.12.1
0
09.04.0
8
30.04.1
0
20.09.0
8

6 Months
(29.08.12)
20 Months
(06.05.12)
6 Months
(06.05.12)
20 Months
(06.03.12)
20 Months
(09.08.12)
24 Months
(08.04.10)
24 Months
(29.04.12)
30 Months
(19.03.11)

Work Completed on
29.03.10
HSCL, Bhilai
HSCL, Bhilai
HSCL, Bhilai
HSCL, Bhilai
HSCL, Bhilai

060

Augmentation of OHP Part-A

HEC, Ranchi

061

Augmentation of OHP Part-B


(Re-tendered)

EPI, New Delhi

062

New Coal Handling Plant

064
070

3
4

070 A

35

071-A

36

071-B

Augm. Of
fuel and flux
crushing & screening facility
(Re-Tendered)
Augmn.
of
MSDS
&
Installation of MSDS-VII
Capacity Enhancement at
MSDS- 4 & 5
Installation of HT distributed
Sub station
Power Sector Compensating
Equipment

HEC, Ranchi

04.08.1
0
12.06.0
9
16.08.1
2
21.03.0
9
08.05.1
0
07.09.0
7
08.11.0
8
18.09.0
7

24.11.12

EPI, New Delhi

28.03.0
9

30.05.09

03.09.09

17.01.11

17.01.11

15.02.1
1

22 Months
(14.12.12)

AREVA

29.09.0
7

11.12.07

08.04.08

13.08.08

03.09.08

25.09.0
8

24 Month
(24.09.10)

17.10.1
0

09.11.10

23.02.11

29.07.11

05.08.11

02.09.1
1

20 Months
(01.05.13)

Final TS awaited
ABB Ltd.,Raipur
Revised TS issued.

SN

37

Pkg.

Name of Scheme

Party

NIT

BOD

PBOD

Stage-II

LOI

Contract
Signed

Completion
duration

075

Interplant
fuel
gas
&
industrial gases piping for all
units

Tata Projects, Kolkata

13.03.1
0

27.04.10

21.09.10

22.12.10

29.12.10

22.01.1
1

15 Months
(21.04.12)

Masibus Automation

04.05.1
1

25.06.11

17.03.12

30.04.12

30.05.1
2

24 Months
(29.05.14)

Blue Star Ltd, Kolkata & BPHV,


Vishkapatnam

07.07.1
1

23.08.11

10.02.12

07.06.12

07.07.1
2

12 Months
(05.07.13)

Nicco Corporation

04.04.1
1

26.04.11

01.10.11

25.11.11

06.01.1
2

21 Months
(05.01.13)

Aireff Detox Ltd., Thane,

14.06.1
1

25.07.11

19.03.12

18.05.12

29.06.1
2

15 Months
(28.09.13)

McNally Bharat Engg., Kolkata


& Southern Cooling Tower,
Kolkata

04.07.1
1

27.08.11

16.06.12

27.08.12

22.09.1
2

15 Months
(21.12.13)

Vishwa Infrastructure,
Hyderabad - M/s Bogeshwara
Rao, Gunter

18.12.1
0

02.02.11

14.07.11

08.09.11

01.10.1
1

15 Months
(31.12.12)

075 A
075 B

38

076
077-01

39
077-02

40

078

41

090

Energy monitoring system


Installation of Buffer Vessels
and Pressure Reducing &
Metering Station for Oxygen,
Nitrogen & Argon
Gas mixing and boosting
stations (Re-tendered)
Water Supply System for
BOF & CCP (Beyond battery
limit)
Water Supply System Far Bar
& Rod Mill, URM including
Re-heating
Furnaces
(Beyond Battery Limit)
Augmentation of Make up
water & Drinking water
system
Imported Lab. eqpt. for CO,
existing SP,BF8,SMS3 Cplx,
R.Mill, RMP

22.11.11

05.09.11

090-01

Laboratory Eqpt. (Imp.) for


BF-8, SMS-3, Rolling mills

1. Spectris Technologis, Ltd.,


Nagpur.
2. IR Technology, Kolkata
3. Insmart systems, Hyderabad

19.10.1
2

07.12.12

6 Months

090-02

Laboratory
Eqpt.(Imp) for
SMS-3 & Rolling mills

1. Thermofisher Scientific (I) P Ltd,


Kolkata
2. Spectro Analytical Instruments, GMBH,
Germany
3. NB Instruments (P) Ltd , New Delhi

04.09.1
2

28.09.12

6 Months

SN

Party

NIT

BOD

090-03

Laboratory
Equipments
(Imported) for SMS-3

1. IR Technology, Kolkata
2, Pioneer Scintific, Kolkata
3. Chromatography & Instruments,
Baroda

19.10.1
2

21.11.12

6 Months

090-04

Laboratory
Equipments
(Imported) for Rolling mills

04.09.1
2

28.09.12

6 Months

090-05

Laboratory
Equipments
(Imported) for Rolling mills

04.09.1
2

28.09.12

6 Months

19.10.1
2

07.12.12

6 Months

090-06
42

43

091

095 A

44

095 B

45

096

46

097
098-1

47
098-3

Laboratory
Equipments
(Imported) for BRM & Rolling
mills
Indgs Lab eqpt. for CO,
existing SP,BF8,SMS3 Cplx,
RMill, RMP
Construction
of
Railway
siding
and
MGR
Sys.
including
earthwork,
Construction of
bridges,
supply of ballast and P-way
linking in connection with
modernization of Peripheral
Yard (SCHEDULE-A)
Construction of under bridge
by box pushing technique
below railway track going to
slag yard in connection with
modn. of peripheral yard
(Schedule B)
Railway track works for plant
internal yard
Solid
State
Interlocking
signaling system
Overhead
Traction
on
existing as well as new
railway lines at peripheral
yard
Procurement of
13 Nos
WDS6 AD Locomotive.
Mobile
fire
fighting
equipments

Medimage Technologies (P) Ltd, Thane


Sharp Control Eqpts (P) Ltd, Nagpur
IR Technology Services (P) Ltd, Kolkata
Experts Vision Labs (P) Ltd, Mumbai
DHR Holding India Pvt., Ltd. Thane
Icon Analytical Eqpt (I) Ltd, Kolkata
Advance Scientific Eqpt P. Ltd, Mumbai.
Forevision Instruments (I) P.
Hyderabad
4. Sinsil International, Vadodara
1. Fine Spavy Associates and Engrs , Miraj
2. Instron India Pvt. ltd., Chennai.
3. Bangalore Integrated System Solutions

Stage-II

LOI

Completion
duration

Name of Scheme

1.
2.
3.
4.
5.
1.
2.
3.

PBOD

Contract
Signed

Pkg.

PR created for 08 packages &


sent to Purchase on
15.05.13.

Jhajharia-Arcon (JV)

22 Months

17.07.1
0

21.08.10

16.12.10

29.06.11

29.06.1
1

18 Months
(28.12.12)

Ghai construction Ltd.

11.03.1
1

09.04.11

14.10.11

02.12.11

07.12.1
1

12 Months
(06.12.12)

ISC projects P Ltd., Bhusawal

15.12.0
9

05.01.10

15.05.10

03.08.10

18.08.1
0

30 Months
(17.02.13)

05.08.10

TS under finalisation.

30 Months

(RITES Scope)

22 Months

PO placed on 14.06.11, DP
31.12.12.
TAR issued.

25 Months

SN

48

Pkg.

099 A

099 B

100-1
49

100-2
100-3

Name of Scheme

Party

Rail & Road Weigh Bridges


(Pkg-099 A)

1. Rice Lake Weighing Systems India


Limited, Tamilnadu.
2. Sartorius Mechatronics Pvt. Ltd.,
Kolkata
3. Schenck Process India Ltd, Ranchi
4. Essae Digitronics Private Ltd,
Bangalore
5. Endeavour Instruments Ahmedabad
6. ACME Automation . Ltd., Bhilai

01.09.1
2

10.10.12

12 Months

Hot
metal
Rail
Bridges (Pkg-099 B)

1. Sartorius Mechatronics India Pvt.


Ltd., Kolkata
2. Schenck Process India Ltd,
Ranchi
3. Essae Digitronics Private Limited,
Bangalore

24.08.1
2

09.10.12

12 Months

Construction In-plant road


network
outside
battery
limits of respective packages
Road works & road culvert
over Tandula canal
Storm
Water
Drainage
System

HSCL

TS will be issued 6 months


before commission of the
projects.
SP Singla Punchkula,
Chandigarh

50

111- 1

Construction of Flyovers

51

114

52

121

53

122

54

123

Ferro Alloy Storage Yard

55

124

Refractory for BOF & CCP

TS Under finalization.

ACVS for BOF & CCS

Voltas, Jamshedpur

56
125-02
126-01
57
126-02

ACVS for Bar & Rod Mill,


URM & Rail Welding
Fire Fighting system for BOF
& CCS,
Fire Fighting system BRM &
URM

24.10.0
9

16.11.09

19.01.10

24.02.10

25.02.10

21.09.09

04.01.10

15.06.10

18.06.10

31.10.07

02.02.08

14.03.08

25.03.08

27.10.09

18.08.10

08.01.11

17.01.11

25.02.1
0

12 Months
(24.02.11)

14.07.1
0
21.04.0
8
18.02.1
1

24 Months
(13.07.12)
24 Months
(20.04.10)
20 Months
(17.10.12)

Final TS issued

Road Toping (common)

125-01

LOI

23 Months

100-4

Installation of Compressed
Air Station No. 4
Rail Welding line for Long
Rail
Lab Building for Imported &
Indigenous equipment

Stage-II

Completion
duration

BOD

Weigh

PBOD

Contract
Signed

NIT

BOC
Railtech International, France/
Maco Corp., Kolkata

31.07.0
9
27.08.0
7
10.09.0
9

Final TS awaited
1. Geetanjali Enterprises, Bokaro
Steel City/ Trans Tech Turn Key
Pvt. Ltd., Pune
2. Petro General Engg. Works, Bhilai

Sterling & Wilson Ltd.,


Kolkata
Unitech Machines ltd.
Gurgaon
Agnice Fire Protection Ltd.,
Kolkata

23.01.1
3
09.08.1
1
24.09.1
2
07.01.1
2
10.05.1
2

20.04.13

9 Months

28.09.11

03.08.12

23.10.12

20.03.13

19.03.12

16.01.13

14.07.12

25.02.13

31.08.1
2

06.06.13
10.04.13

18 Months
(28.02.14)
18 Months

02.04.1
3
15.05.1
3

12 Months
(01.04.14)
12 Months
(14.05.14)

SN

Pkg.

58

127

59

128

60

129

Name of Scheme

Illumination,
Earthing
&
Lightning protection system
for SMS-3 (BOF, CCP, HMDS
&SRU)(Inside Shops)
(Retendered)
Illumination,
Earthing
&
Lightning protection system
for Bar & Rod Mill , URM &
Rail Welding (Inside Shops)
BOF & CCP Area Repair Shop
Erection
testing
&
commissioning of Plant &
equipment of BOF & CCS
NTK
Pneumatic Sample Transport
System for BOF, CCP & SRU
in SMS-III
HVWS, MVWS ( Common)
Area
Lighting
of
Plant
Premises
Design, Engg, Manufacture
& Supply of wagons of 24
nos. NPC Wagons

61

131

62

134

63

135

64

136

65

137

66

138

Fire station Building

67

140

Pipe Conveyor from RMP-III


to RMP II & RMP-III to Sinter
Plant for Lime

142-01

CNC Roll Turning for URM

69

144

70

145

Roll
&
Repair
Equipment for URM
Rerouting of Ash
pipelines
PWN connectivity

NIT

BOD

1. C & S Electric ltd, New Delhi


2. Sterling & Wilson, Kolkatta
3. HSCL, Bhilai

18.02.1
3

18.03.13

Traansrect Industries, Raipur

21.07.1
2

31.08.12

14.02.13

Shop
slurry

PBOD

Stage-II

LOI

Bridge & Roof, Kolkata

23.11.1
0

18.01.11

18.07.11

22.09.11

20.09.11

Kerry Engg, Visakhapatnam

12.10.11

30.11.11

25.01.13

25.05.13

28.05.13

Contract
Signed

Completion
duration

15 Months

21.05.1
3

9 Months
(20.02.14)

03.11.1
1

16 months
(28.02.13)

Draft TS will be prepared after


completion of engineering as
required.

9 months

Draft TS awaited
TS under preparation.

GAME, Bhilai
1. GAME, Bhilai
2. Geetanjali Enterprises, Jharkhand
3. HSCL, Bhilai

68
142-02

Party

FL Smidth Pvt. Ltd., Chennai.

Hankook Machine Tools Co.


Ltd., Korea / Sanmathi
Enterprises, Bhilai
Maco Corporation (I)
Kolkata
Manish Pipes, Raipur
TS under finalisation.

12 Months
22.11.1
1

11.01.12

04.09.1
2

06.11.12

15.01.1
0

13.02.10

12.07.10

11.07.1
2

10.08.12

05.02.13

06.11.12

25.04.13

02.07.11

13.09.11

24.09.1
2
09.06.1
1

11.08.1
2

10.07.12

PO created.
DP 31.08.13
12 Months

12.01.11

12.01.11

04.02.1
1

22.05.13

17.11.11

15 months
(03.05.12)
12 Months

17.11.1
1

6 Months
(16.05.12)

DETAILS OF 7 MT EXPANSION : ENABLING PACKAGES UNDER MECONS SCOPE


S
N

Pkg.

095

2
3

4
5

Name of Scheme

Party

NIT

BOD

Contrac
t signed

Cost (Crs)

Status

14.11.0
7

07.12.07

0.033

Completed on 07.07.08

25.02.10

12.50

12 Months
(24.02.11)

03.01.08

0.397

Completed on 16.10.08

Topographical cum alignment Survey of


Peripheral yard & works Station

MR Techint,
Mumbai

100-2

Road works & Road Culvert over Tandula


Canal

HSCL

110 -A

Geo technical investigation part A

S K Mitra

110-B

Geo technical investigation part B

Indian geo
technical service

28.07.0
7

22.08.0
7

03.01.08

0.348

Completed on 28.08.08

Fugro Geotech,
Mumbai

25.07.0
9

04.08.0
9

17.08.09

0.011

Completed on 17.02.10

110 A-01 Soil Investigation for SMS III area

24.10.0
9

16.11.0
9

113

Electrical Enabling Works TDS-1 & New LT


S/S near Boria

ABB

21.09.0
7

15.11.0
7

01.05.08

26.18

11 Months
(31.03.09)

116-A

Civil, strl., Mech., Elect.& water supply


work for Relocation of Plant Spare Stores

HSCL

11.09.0
7

17.10.0
7

08.01.08

21.02

Completed on 31.08.11

116B-1

Relocation of Tap Hole Mass Shop

GAME Bhilai

29.01.0
8

22.11.08

11.26

Completed on 16.08.12

116 B 2

LT Substation for Tap Hole Mass Shop

Servomax
Hyderabad

25.04.0
8

22.04.0
8
30.06.08
PB15.01.09

02.05.09

2.99

9 Months
(01.02.10)

HSCL

27.03.0
8

08.05.0
8

18.10.08

20.83

Completed on 03.01.11

30.04.1
0
07.05.0
7
24.07.0
7

10.07.1
0

117
7
117-A

Construction of Project Office Building &


Welfare Building inside the Plant
( 4 Bldgs, Traffic Bhavan, DNW, RMP, PP)
Data Network & Intranet services for
Units of 7 MT ( Project Office Bldgs)

HCL Infosystems,
Raipur

118-A

Dismantling work part A

HSCL

118-B

Dismantling & relocation work part B

HSCL

118-B1

Dismantling & relocation of Elect. fittings


of shipping yard of Merchant Mill & Billet
yard of Merchant Mill

Shree Enterprises

118-B2

Enabling works (Telecom) at Merchant


Mill area (Re-tendered)

Shukla
Construction

118-B3

Dismantling of existing overhead 11 KV


construction power supply lines in SMS-III
Area

DK Saha

118-B4

Electrical Power enabling for Disposal of


Sinter Plant-1

DK Saha

30.04.11

0.81

20.06.07

0.43

08.09.0
7

16.01.08

5.86

10.03.0
8

15.04.0
8

19.06.08

0.773

04.05.1
2

25.05.1
2

06.08.12

0.101

21.06.10

0.03

08.12.11

0.48

04.05.1
1

13.06.1
1

4 Months
(29.08.11)
Completed on
26.08.08
Completed on 25.06.12
Completed on
23.03.11
6 Months
(05.02.13)
Completed on
20.10.10
6 Months
(07.06.12)

S
N

Pkg.

Name of Scheme

Party

NIT

BOD

Contrac
t signed

Cost (Crs)

Status

118-B5

Dismantling of existing overhead HT/LT


lines in URM area

Jai Enterprises

12.11.1
1

03.12.1
1

18.01.12

0.278

Completed on 15.10.12

118-B6

Dismantling of BF Scrap Processing shop

Reliable Hi-Tech
infra Strs.

26.08.1
2

17.08.1
2

06.11.12

0.754

6 Months
(05.03.13)

118-C

Dismantling work part C

HSCL

12.06.0
7

14.06.0
7

18.07.07

0.449

Completed on
23.09.10

118-D

Excavation & transportation of heap


earth from OHP area & dump slag dump
earth from peripheral yard area

HSCL

18.10.0
7

25.10.0
7

03.12.07

6.99

Completed on
20.04.08

118-E

Enabling works for dismantling of Office


building & stores at various location

HSCL

17.01.0
8

02.02.0
8

26.03.08

2.067

Completed on
28.09.10

118 -F

Excavation & Transportation of Heap


Earth from OHP area & terrace leveling
of proposed Lime & Dolomite Plant in
RMP-III area

HSCL

26.03.0
8

29.03.0
8

08.04.08

7.36

Completed on
31.07.10

RE-routing of 6.6 KV over head lines


from SS 42 to SS- 9D

DK Saha,

PB16.02.09

08.12.09

0.11

Completed on 24.04.10

15.07.1
0

03.11.10

9.39

12 Months
(02.11.11)

118 F 1
118-G

Diversion piping out let No-7,14,15,16 &


17
(Re-Tendered)
Dismantling of Compressed Air Station -2
& DNW office building for enabling work
for BF-8
Terrace leveling for proposed Lime &
Dolomite Plant in RMP-3 area for Enabling
works
Dismantling and construction of storage
shed workshop in MSDS - I & II

Kulkarni & Sahu


Associates

23.06.10

HSCL

19.08.10

24.09.1
0

05.01.11

0.55

Completed on 27.05.11

Kulkarni & Sahu


Associates

29.10.10

26.11.1
0

03.01.11

0.638

Completed on 15.02.11

HSCL

21.04.11

21.05.11

16.09.11

0.503

Completed on 28.02.13

118-L

Excavation & transportation of SMS muck from


stock yard area for aug. of raw material receipt
& handling facility of new OHP Part-B

HSCL

02.11.10

03.11.1
0

15.11.10

5.96

Completed on 03.02.11

118-M2

Diversion of existing underground cables


for BF-8, BRM, etc.

Under TS
finalization.

118-H
118-J
118-K

S
N

Pkg.
118-P
118-S
118-T
119-1

119-2
119-3
120A1
120-A-2
120 B
120 C

10

120 D
120 E
120 F
120 G
120 H

Relocation of refractory storage shed


from near SP#3 to Boria Storage
Complex
Diversion of Nallah passing through
Universal Rail Mill layout
Enabling work of dismantling of CHP
Dispatcher Building
Relocation of Mech. Repair Shop &
Quenching Car Repair Station at COB-11
Electrical Power & Ventilation Fac for
Mech Repair Shop & Quenching Car Stn
COB-11
Technological & services for relocation of
Mech. Repair Shop & Quenching Car
Repair Station at COB-11
Electrification works for relocated bulk &
disposal stores
Installation of Road Weigh Bridge &
disposal store
Constn work for re-location of CR &
Reception of PRD
Constn & Renovation of CE Office & office cum
work shop at CEZ are for shifting of Pers, Fin
office from Old Admn building
Constn & Renovation existing Blacksmith shop
at CEZ are for shifting suggestion Cell, Enq. Cell,
FSS, Rec Cell, IR-CLC from Old Admn building

Construction of Toilet Blocks in in Timber


work shop & CEZ
Construction of Road for facilitating Relocation of Old Admn offices
Dismantling of existing Bldg/ Shed in
Old admn office complex, stock yard &
CMO for constn of URM(Re-tendered)
Construction of false ceiling in Existing
Black smith Shop in CEZ

120- J

Electrification of offices building in CEZ


building

120- J-1

Electrification works for related offices in


CEZ building

10

NIT

BOD

Contrac
t signed

Cost (Crs)

Status

Hitesh Bhai Patel

08.09.11

07.10.1
1

07.01.12

1.45

6 Months
(06.07.12)

Kulkarni & Sahu

17.06.11

09.02.12

9.68

6 Months
(02.06.12)

27.08.12

0.174

Completed on 14.01.13

Name of Scheme

Party

HSCL

02.11.1
1
28.06.1
10.04.12
2

07.04.0
9

30.05.09

19.08.0
9

3.797

29.06.0
9

30.07.09

09.01.1
0

2.519

9 Months
(08.10.10)

12.05.0
9

02.06.09

24.09.09
LOI
13.10.09

1.75

12 Months
(12.04.10)

12.01.11

22.02.1
1

09.12.11

0.588

Completed on 13.04.13

Basant Brothers

20.10.08

0.074

Completed on
11.05.09

SM Enterprises

22.11.08

0.204

Completed on
11.05.09

22.11.08

0.211

Completed on
11.05.09

Gayatri
Enterprises

06.03.09

0.0852

Motilal Brothers

06.03.09

0.0390

08.03.1
0

16.08.1
0

1.71 (Amount to
be paid to BSP)

HSCL
Hindustan Control
& equp Kolkata
GAME

ACME, Bhilai

JK Construction

Radha Constn
Agra,
Welcome Marketing
Assistance

Hemant & Co.


DK Saha Bhilai

08.02.1
0

6 Months
(12.04.10)

Completed on
05.10.09
Completed on
05.10.09
3 Months
(15.11.10)

24.02.0
9
13.05.0
9

18.03.0
9

04.06.0
9

0.0634

Completed on
31.07.09

30.05.0
9

08.08.09

0.075

Completed on
03.12.09

24.11.0
9

18.12.0
9

05.04.10

0.1999

Completed on 31.08.11

S
N

Pkg.
120-J-2
120-K

120-L

120-M

120-N
120-U
120-V

120-Y

120-Z

Name of Scheme
Electrification works for Existing timber
w/s, canteenetc
Construction & renovation of existing
Battery Room & store at CEZ are
Construction & renovation of existing
timber workshop , attached stores,
existing storages shed , toilet blocks at
CEZ area for shifting of printing press,
IR, CLC & CS, Inspection office, RG &
Mines, safety & Toilets
Relocation of Data & Voice Network from
Old admn office complex to CEZ
Relocation of Printing Press from old
Admn build to Timber Workshop area in
CEZ )
Construction of False Ceiling for newely
Constructed & renovated office in CEZ
Removal of unwanted vegetation bushes,
weeds & shrubs etc and leveling the
uneven area in CEZ for shifting the
offices from old Admn Bldg
Construction & Renovation of existing
Timber Workshop (Canteen, Seasoning
shop, Nishan huts, Saw Mills,Existing
store at CEZ area for shifting of stores &
offices from disposal area)
Water supply facilities at CEZ area
Construction of Relocated of Field
Maintenance Group

11

----

12

143

Enabling Works (General)

13

145

Plant wide Network connectivity

Party
DK Saha Bhilai

NIT

BOD

Contrac
t signed

Cost (Crs)

22.06.1
1

22.07.1
1

30.12.11

0.33

14.08.09

0.219

Vijay Furniture
Mart
Welcome
Marketing

Status
4 Months
(29.04.12)
Completed on
02.01.10

16.11.0
9

08.12.0
9

25.02.10

1.62

Completed on 30.06.11

HSCL Raipur

18.09.0
9

20.11.0
9
PBD
24.04.1
0

25.06.10

0.6572

Completed on 31.12.11

Sadani
Enterprises

17.05.1
0

30.06.1
0

11.04.11

0.34

6 Months
(10.10.11)

Welcome
Marketing

30.11.0
9

14.12.0
9

31.03.10

0.1562

Completed on
17.02.11

Chhbinath Singh

20.11.09

0.056

Completed on
28.01.10

Welcome
marketing

04.08.11
2.56

6 Months
(03.02.12)

0.235

5 Months
(19.05.12)

0.5147

Completed on
31.01.11

26.03.1
1

26.04.1
1

T D Shibu

12.10.1
1

02.11.1
1

HSCL

27.08.0
9

As per site
requirement
Final TS awaited.

30.09.0
9

07.01.12
02.02.10