Summary
Over 14 years of experience in the area of General Construction and Quality Control
of Petrochemical Plant, Power Plant ,Water supply and Multistoried Building
Excellent communication and interpersonal skills with strong analytical, team building,
problem solving and organizational abilities.
Execution and Inspection of various civil works and activities such as, earthworks,
concreting, pre padding, post-padding ,construction of buildings, roads and ensure that
related activities are properly implemented in accordance with project specification,
applicable International Codes and Standards
Submit quality control reports and all kind of civil test report as well as records for
corrective action taken.
Interface with the Contractors Quality Personnel and Subcontractors and follow up the
updates of work progress
Witnessing of inspection & testing and interpretation of results
Initiate action to prevent the occurrence of any Non Conformance relating to Quality
Experience
Civil Engineer
Mott MacDonald India
May 2011 July 2012 (1 year 3 months)
Working on behalf of BHARATPETROLEUM CORPORATION LIMITED-KOCHI REFINERY for
Automated Marine Loading Arm, Electrostatic Precipitator & R-LNG projects
Working on behalf of GUJARAT FLURO CHEMICAL LIMITED at Dehej for A & H and S & A
PFE projects
Civil Inspector
Vincotte,Oman
Civil Engineer
Gulf petrochemical Services & Trading LLC ,Oman
January 2006 November 2010 (4 years 11 months)Sultanate of Oman
Civil work for 24 buried line 500m and 10flow lines from 24 header to
MM275,MM277&MM302 and 10flow lines from16 header to MM359&MM361(3.5km) and
support foundation
Civil Construction works for Concentric Wash Tank, Free Water Knockout Tank(2nos),Gas
Flotation Tank, Booster Pump( 3nos),Production Separator(2nos),Indirect Fire
Heater(2nos),Foam skid, Chemical Injection Skid, Instrument Air Compressor, Water
Injection Pump (2nos),Water Circulation Pump(2nos),Water Transfer Pump(3nos),Launcher
and Receiver Foundations,33KV Substation(2nos),Control Room Extension and Pipe
Support Foundations & Sunshade foundations, Culvert(3nos),Bund Wall, Buried 36 CS
Pipeline 4km & 24 CS Pipeline 1.5km
Civil Engineer