COMPLEX GAS TREATMENT UNIT

The GTU-3 will be a raw gas handling, treating, and LPG recovery unit for
Processing stream production from the Chinarevskoye gas-condensate field. The
Primary purpose of GTU-3 will be to separate hydrocarbon liquids from the gas into
Three liquid products: propane, butane and stabilized condensate and produce a
Residue gas suitable for delivery to a sales gas pipeline. GTU-3 consists of six
Primary hydrocarbon processing steps which include:
inlet handling and separation of the gas from the condensate and water;
Condensate stabilization;
gas sweetening and mercaptans removal
mole sieve dehydration;
Deethanizer;
Depropanizer;
Debutanizer

Area-17 (Produced water & hydrocarbon system closed drain Unit)


Detail Engineering (Piping, Equipment Design & Civil)
V-3800(Underground Vessel)
V-3801(Underground Vessel)
Process: Vessel V-3800 & V-3801 are underground vessel used to collect Produced water and
fuel gases which are coming from (V-3000, V-3203 & V-3806) and inside the vessel separate
this mixture into two fluid fuel gas and water. Rejected Fuel gas will go to Wet Flare and water
will transfer to Condensate (V-3001A/B) through Pump (P-3801A/B).

Area-15 (Fuel Gas Receiver Unit)


Detail Engineering (Piping, Equipment Design & Civil)
V-3806(Vessel)
E-3806(Exchanger)
Process: In fuel gas receiver (V-3806) Fuel gas will come from Equipment No TE-3300 to
maintain the fuel gas temperature we used Heat exchanger (E-3806) after that process will be
done inside the receiver and fuel gas will transfer to user. And condensate will go to V-3801.

Area-25 (Buffer Vessels Unit)


Detail Engineering (Piping, Equipment Design & Civil)
V-3910A/B (Vessel)
Process: Vessel V-3910A/B are used to collect Hydrocarbon Condensate and fuel gases which
are coming from Stabilizer Units and inside the vessel separate this mixture into two fluid fuel
gas and Hydrocarbon Condensate. Rejected Fuel gas will go to Wet Flare and Hydrocarbon
Condensate will transfer to Condensate (V-3001A/B) through Pump (P-3905A/B/C).
Area-59 (Glycol Drain Tank Unit)
Detail Engineering (Piping, Equipment Design & Civil)
V-3812 (Underground Vessel)
Process: Vessel V-3812 is used to collect Glycol Drain which are coming from Area-25 and
transfer it to user by truck.

Area-13(Methanol Chemical Injection Unit)


Skid1: M-3901
Skid2: M-3902
Skid3: M-3903
Process: Methanol Chemical Injection Unit is design into a container. In this system Methanol
will come from chemical drum and transfer methanol to wet flare, amine flare, Unit-4 & Propane
drum (V-3302).

VACCUME EJECTER SYSTEM ( IOCL HALDIA )

Detail Engineering (Piping, Equipment Design & Support Modeling)


Equipment List

105-V-02 (Vessel)
105-J1A/B/C (Ejector)
105-J2A/B/C (Ejector)
105-J3A/B/C (Ejector)
105-E-08/09/10 (Condenser Vessel)

Process
Ejectors are used in upstream applications for flare gas recovery. In this system steam is used
as motive fluid. The motive steam actually expands to a pressure below the suction-fluid
pressure. This expansion creates a low-pressure region, which draws suction fluid into an
ejector. This process boosts the production and condensate is collect into condensate vessel.