Académique Documents
Professionnel Documents
Culture Documents
2808
Tag No.
SCIBTM Code:
0.9
(1)
Approved
(2)
(3)
(4)
Signed by:
Date:
Revision List
Nov 17,
2012
JS
Revision
Date
Prepared by
Verified by
Approved by
Client
QA Approved
Document No.
0.9
SCI
09
Project No.
Group/System code
PO Number
Document Code
Sequence No.
Revision
Page 1 of 6
Issuing Office:
SUCOFINDO Building, Jl. Raden Patah No. 61, Baloi Batam Island 29432, Indonesia
Phone/Facs: +62 778 456575/456292
Email: rkt.btm@sucofindo.co.id
Client Requirement
Proof test load
The test load for a proof test shall be taken to:
1) 1.5 x SWL (1.5 x 9.06 ton)
DNV Lifting Appliances 2011 Lifting Beam or Spreader Bar Section 12.
12. B100 Table
B2.
B2.
Load (proof) Loading
(a) SWL < 10 ton, load test .2 x SWL
(b) 10 ton < SWL 160 ton, load test .1.04 x SWL + 9.6 ton
(c) > 160 ton, load test.1.1 x SWL
2. Scope
The Scope of work of this Procedure shall be cover the preparation for the load test,
equipments, tools and manpower required and check list records to be used.
3. References
References Document
3.1
Pad Eyes
Place of Testing equipment of the Pad Eyes. See detail drawing as per appendix -1
All paint, if any, shall be removed on welds prior to MPI after testing.
Non-Destructive Examination to Critical welds of Steel Structure and of Pad Eyes shall
be carried out after Load Testing to ensure that no Crack or Crack Line Indication.
Check and make sure that all testing equipments in valid certificate calibration.
6.
Procedure
6.1.
Stay clear all testing area, unauthorized personnel and equipments from testing area.
This area shall be barricade or rope off and or otherwise to prevent entry of any
unauthorized personnel and equipments.
6.1.1
Ensure that lifting Equipments tools for testing are in proper position and
suitable.
6.1.2
6.2.
Pull (hoisting), until the reading on Load Cell is equal or slightly greater than the
required load test value. After reach load test value, pull stopped, and the test held to
1 minutes.
6.3.
6.4.
Carried out visual inspection 100% of Spreader Bar and Pad Eyes Post Steel
Structure of any deformation or deflection occur.
6.5
6.6
Carried out re-NDE after load test to pad eye welds as identified on Spreader Bar Pad
Eyes.
After all testing completed, Statement of Fact shall provided and signed by PT. AT
Oceanic Offshore and PT Sucofindo representatives.
6.7
If Test result is Acceptable, Certificate shall be Issuing and signed by PT. Sucofindo
representatives. And the following documents shall be reviewed and signed off as
well:
6.7.1
6.7.2
Page 3 of 6
Issuing Office:
SUCOFINDO Building, Jl. Raden Patah No. 61, Baloi Batam Island 29432, Indonesia
Phone/Facs: +62 778 456575/456292
Email: rkt.btm@sucofindo.co.id
7. Load Test
Refer to Client Requirement or DNV Lifting Appliances 2011.
2011
unit to as below:
7.1 Spreader Bar shall be Load Tested minimum to 1.5 X SWL refer to Drawing No.: I-DE3010.82-5115-140-GBM-010. Rev.B Date 28/01/12 and General Notes: no. 8.
7.2 DNV Lifting Appliances 2011 Lifting Beam or Spreader Bar Section 12. B100 Table
B2.
Load (proof) Loading
(d) SWL < 10 ton, load test .2 x SWL
(e) 10 ton < SWL 160 ton, load test .1.04 x SWL + 9.6 ton
(f)
8. Acceptance Criteria
Testing is acceptable if results as below:
8.1
8.2
No Crack or Crack Line indication was found on welds after load test, which re-check
by NDE.
9. Appendix
1. Sketch of Load Test methods for Spreader Bar.
2. Load Test Report / Certificate
Page 4 of 6
Issuing Office:
SUCOFINDO Building, Jl. Raden Patah No. 61, Baloi Batam Island 29432, Indonesia
Phone/Facs: +62 778 456575/456292
Email: rkt.btm@sucofindo.co.id
APPENDIX - 1
Page 5 of 6
Issuing Office:
SUCOFINDO Building, Jl. Raden Patah No. 61, Baloi Batam Island 29432, Indonesia
Phone/Facs: +62 778 456575/456292
Email: rkt.btm@sucofindo.co.id
CERTIFICATE OF INSPECTION
PRINCIPAL
OWNER
SUBJECT
OBJECT
PLACE OF INSPECTION
:
:
DATE OF INSPECTION
REFERENCES
Client Requirement.
DNV Standard for Certification Lifting Appliances 2011
PO / RKT OPS / 38
RFI ENQ 1089, Date: May 23, 2012
No.
ID No.
Description
6.3
Test Load
Required (Ton)
12.6
..
Result
Conclusion:
Based on the above Inspection finding and testing result, we certify that the item(s) in Attachment-1 was fit for
further operation.
Expire Certificate: November , 2013
This result reflects our finding at the time and place of inspection only and is issued without prejudice.
APPENDIX-2
Page 6 of 6
Issuing Office:
SUCOFINDO Building, Jl. Raden Patah No. 61, Baloi Batam Island 29432, Indonesia
Phone/Facs: +62 778 456575/456292
Email: rkt.btm@sucofindo.co.id