The document contains responses from an engineering team to comments from Paques regarding a bleed water system at a facility. Key points addressed in the responses include: connecting return and caustic lines, locating valves and pipes for access and spacing, adding isolation valves, relocating reducers and drains, and revising pipe spools and isolations based on Paques' comments. The engineering team made revisions to the piping model based on the feedback.
The document contains responses from an engineering team to comments from Paques regarding a bleed water system at a facility. Key points addressed in the responses include: connecting return and caustic lines, locating valves and pipes for access and spacing, adding isolation valves, relocating reducers and drains, and revising pipe spools and isolations based on Paques' comments. The engineering team made revisions to the piping model based on the feedback.
The document contains responses from an engineering team to comments from Paques regarding a bleed water system at a facility. Key points addressed in the responses include: connecting return and caustic lines, locating valves and pipes for access and spacing, adding isolation valves, relocating reducers and drains, and revising pipe spools and isolations based on Paques' comments. The engineering team made revisions to the piping model based on the feedback.
Drain on nutrient and caustic is connect on the same pipe since our header is only one (chemical drain header). We already confirm to our process team about this issue.
2.
- Our concern to locate the pipe as shown on snapshot is for
No -
Comment from PAQUES
No low piping pockets.
Respond Comment from Engineering
access operator to operate this valve, since this pipe routes is locate on our pipe rack with el. +3.1 m.
3.
2x reducer (see P&ID sheet 5)
- This is typical cases if we located reducer on 6 inch line
before tee, since spacing between 2 nozzle inlet & 2 nozzle outlet on compressor cooler is to short when we attach reducer.
4.
- The pipe routes is already follow as per P&ID.
No 5.
Comment from PAQUES
Respond Comment from Engineering
- Drain is already revised on our model.
6.
- Drain piping for CIP Tank A/B is already located as shown on
our model. - Additional for vent point & drain point on line no : 1. 340-CL-1504-3-01L0
No
Comment from PAQUES
Respond Comment from Engineering
2. 340-CL-1505-3-01L0 3. 340-CL-1506-2-01L0 4. 340-CL-1507-2-01L0 V.P : 4 ea (Gate valve SS 316L inch) for line class 01L0 D.P : 4 ea (Gate valve SS 316L inch) for line class 01L0
7.
- Our mechanical team is already conduct the study for
handling tubular modules. We attached monorail on
No
Comment from PAQUES
Respond Comment from Engineering
structure to lifting this modules to laydown area.
8.
- Reducer 3x2 is already moved backward before
flowmeter. - Additional drain point on line no. 340-WB-1500-01L0 : D.P : 1 ea (Gate valve SS 316L inch) for line class 01L0 9.
- Isolation valve located near membrane unit to make it
easier for operated/ maintenance. - Isolation valve can be move on tank, but it can be effect on pipe spool. On membrane unit is also needed isolation valve.
No 10.
Comment from PAQUES
Respond Comment from Engineering
- Butterfly valve are located below nozzle tank to make it
easier for operate/ maintenance, since nozzle elevation is on +2.3 m (from GL.0.00). - D.P is already rotated as per comment on our model.
No 11.
Comment from PAQUES
Respond Comment from Engineering
- Additional vent point valve on line no. 340-PW-1503-201L0. V.P : 1 ea (Gate valve SS 316L inch) for line class 01L0
12.
- Drain point is already rotated on our model.
- Tapping position is changing as per Paques comment.
No 13.
Comment from PAQUES
Respond Comment from Engineering
- Temporary cone strainer is not shown on our model. - This item is already take-off for line no. 340-PW-1506-1001L0 & 340-PW-1507-10-01L0.
14.
- No item FICA 1501 on latest P&ID, since clarification from
GEA is not used.
No 15.
Comment from PAQUES
Respond Comment from Engineering
- Pipe is connected from 340-P-1035A/B (back flush) to back
flush header (N3) on membran unit (see yellow marking on pipe). - Additional vent point valve on line no. 340-PW-1518-301L0. V.P : 1 ea (Gate valve SS 316L inch) for line class 01L0
No 16.
Comment from PAQUES
Respond Comment from Engineering
- Drain point is already revised as per comment on our
model. Pipe spool is changing based on Paques comment. - Additional drain point on line no. 340-PW-1519-2-01L0 : D.P : 1 ea (Gate valve SS 316L inch) for line class 01L0